IR 05000528/2018001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(13 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18127A004
| number = ML18127A004
| issue date = 05/07/2018
| issue date = 05/07/2018
| title = Palo Verde Nuclear Generating Station - NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001
| title = NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Bement R
| addressee name = Bement R
Line 9: Line 9:
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
| license number = NPF-041, NPF-051, NPF-074
| license number = NPF-041, NPF-051, NPF-074
| contact person = Miller G B
| contact person = Miller G
| document report number = IR 2018001
| document report number = IR 2018001
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:==SUBJECT:==
[[Issue date::May 7, 2018]]
PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001
 
Mr. Robert Bement Executive Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072
-2034
 
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION  
- NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001


==Dear Mr. Bement:==
==Dear Mr. Bement:==
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.


NRC inspectors documented one finding of very low safety significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.
NRC inspectors documented one finding of very low safety significance (Green) in this report.


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.


If you disagree with a cross
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S.


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.ht ml and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Sincerely,/RA/ Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects Docket Nos. 50
Sincerely,
-528, 50-529, 50-530 License Nos. NPF
/RA/
-41, NPF-51, NPF-74  
Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74


===Enclosure:===
===Enclosure:===
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/  
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/ Attachment:
1. Supplemental Information 2. O


===Attachment:===
==Inspection Report==
1. Supplemental Information 2. Occupational Radiation Safety Inspection Item Request
Docket Numbers: 05000528, 05000529, 05000530 License Numbers: NPF-41, NPF-51, NPF-74 Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 Enterprise Identifier: I-2018-001-0013 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: C. Peabody, Senior Resident Inspector D. Reinert, PhD, Resident Inspector D. You, Resident Inspector L. Carson, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector Approved By: Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects Enclosure


Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers: 05000528, 05000529, 05000530 License Numbers: NPF-41, NPF-51, NPF-74 Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 Enterprise Identifier:
=SUMMARY=
I-2018-001-0013 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: 5801 South Wintersburg Road
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,
, Tonopah, AZ 85354 Inspection Dates:
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
January 1, 2018 to March 31, 2018 Inspectors:
C. Peabody, Senior Resident Inspector D. Reinert, PhD, Resident Inspector D. You, Resident Inspector L. Carson, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector Approved By:
Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects


2
NRC and self-revealed findings, violations, and additional items are summarized in the table below.


=SUMMARY=
List of Findings and Violations Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone          Significance                          Cross-cutting Aspect Report Section Mitigating            Green                                [H.12] - Human          71111.12 -
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process.
Systems              NCV 05000528/2018001-01              Performance, Avoid Maintenance Closed                                Complacency            Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.


The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below. List of Findings and Violations Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
-01  Closed [H.12] - Human Performance, Avoid Complacency 71111.12 - Maintenance Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
 
3


=PLANT STATUS=
=PLANT STATUS=


Unit 1 began the inspection period at rated thermal power. On February 15, 20 18, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018, and remained at or near rated thermal power for the remainder of the inspection period.
, and remained at or near rated thermal power for the remainder of the inspection period.


Unit s 2 and 3 operated at or near rated thermal power for the entire inspection period.
Units 2 and 3 operated at or near rated thermal power for the entire inspection period.


INSPECTION SCOPE S  Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
==INSPECTION SCOPES==
-rm/doc-collections/insp
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
-manual/inspection
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
-Water Reactor Inspection Program - Operations Phase.The inspectors performed plant status activities described in IMC 2515 Appendix D, "Plant Status" and conducted routine reviews using IP 71152, "Problem Identification and Resolution.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==
71111.04 - Equipment Alignment Partial Walkdown (3 Samples)  The inspectors evaluated system configuration s during partial walkdowns of the following systems/trains
:  (1) Unit 1 containment spray system B on January 4, 2018 (2) Unit 2 auxiliary feedwater system A on January 30, 2018 (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018 Complete Walkdown (1 Sample)  The inspectors evaluated system configuration s during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.


71111.05AQ  
==71111.04 - Equipment Alignment      Partial Walkdown==
- Fire Protection Annual/Quarterly Quarterly Inspection (5 Samples)  The inspectors evaluated fire protection program implementation in the following selected areas: (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018 (2) Unit 2 control room, Fire Zone 17
{{IP sample|IP=IP 71111.04|count=3}}
, on January 19, 2018 (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A
 
, on January 23, 2018 (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018 (5) Unit 3 vital switchgear room A, Fire Zone 5A
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
, on February 8, 2018 71111.07 - Heat Sink Performance Heat Sink (1 Sample)  The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.
: (1) Unit 1 containment spray system B on January 4, 2018
: (2) Unit 2 auxiliary feedwater system A on January 30, 2018
: (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018
 
===Complete Walkdown (1 Sample)===
The inspectors evaluated system configurations during a complete walkdown of the Unit 3      containment spray system on January 18, 2018.
 
==71111.05AQ - Fire Protection Annual/Quarterly Quarterly Inspection==
{{IP sample|IP=IP 71111.05AQ|count=5}}
 
The inspectors evaluated fire protection program implementation in the following selected areas:
: (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018
: (2) Unit 2 control room, Fire Zone 17, on January 19, 2018
: (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A, on January 23, 2018
: (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
: (5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018
 
==71111.07 - Heat Sink Performance   Heat Sink==
{{IP sample|IP=IP 71111.07|count=1}}
 
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.
 
==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance    Operator Requalification==
{{IP sample|IP=IP 71111.11|count=1}}
 
The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018.
 
===Operator Performance (1 Sample)===
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.
 
The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and FWIV-174, 177, on February 27, 2018.
 
==71111.12 - Maintenance Effectiveness    Routine Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12|count=2}}
 
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
: (1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185 in Units 2 and 3
: (2) Diesel fuel oil transfer pump predictive engineering cable testing
 
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13|count=5}}
 
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
: (1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 2018
: (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018
: (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018
: (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
: (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018
 
==71111.15 - Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15|count=9}}
 
The inspectors evaluated the following operability determinations and functionality assessments:
: (1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on January 3, 2018
: (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018
: (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, failed to re-open during breaker maintenance on January 31, 2018
: (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018
: (5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI-659, on February 23, 2018
: (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
: (7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A T-drains on March 6, 2018
: (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018
: (9) Unit 2 steam generator sodium concentration increase on March 12, 2018
 
==71111.18 - Plant Modifications==
{{IP sample|IP=IP 71111.18|count=1}}
 
The inspectors evaluated the following temporary or permanent modifications:
: (1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-connect valve, SI-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018
 
==71111.19 - Post Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=6}}


71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification (1 Sample) The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018
The inspectors evaluated the following post maintenance tests:
. Operator Performance (1 Sample) The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.
: (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018
: (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018
: (3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018
: (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018
: (5) Unit 2 essential cooling water pump A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018
: (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018


The inspectors observe d and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181
==71111.20 - Refueling and Other Outage Activities==
, and FW IV-174, 177 , on February 27, 2018
{{IP sample|IP=IP 71111.20|count=1}}
. 71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness (2 Sample s)  The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
  (1) Reach rod operator gear box maintenance on safety injection valves SI
-184 and SI
-185 in Units 2 and 3 (2) Diesel fuel oil transfer pump predictive engineering cable testing 71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)  The inspectors evaluated the risk assessments for the following planned and emergent work activities:
  (1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 201 5  (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018 (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG
-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018 (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018 (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018 71111.15 - Operability Determinations and Functionality Assessments (9 Samples)  The inspectors evaluated the following operability determinations and functionality assessments:
  (1) Unit 2 abnormal trend for containment sump level transmitter, RDL
-411, on January 3, 2018 (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018 (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, failed to re
-open during breaker maintenance on January 31, 2018 (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018 (5) Unit 1 calculated qualified life of safety injection combined header isolation valves , SI-660 and SI
-659 , on February 23, 2018 (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV
-174, 177) on February 27, 2018 (7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG
-139A T-drains on March 6, 2018 (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018 (9) Unit 2 steam generator sodium concentration increase on March 12, 2018 71111.18 - Plant Modifications (1 Sample)  The inspectors evaluated the following temporary or permanent modifications:
  (1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross
-connect valve, SI
-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018 71111.19 - Post Maintenance Testing (6 Samples)  The inspectors evaluated the following post maintenance tests:  (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018 (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018 (3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018 (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018 (5) Unit 2 essential cooling water pum p A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018 (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018 71111.20 - Refueling and Other Outage Activities (1 Sample)  The inspectors evaluated activities from February 15
- 19, 2018 , for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.


71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.
Routine (6 Samples)  (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018 (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018 (3) Unit 2 containment leakage type "B and C" testing, SR 3.0.3 entry for missed surveillance on February 28, 2018 (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018 (5) Unit 3, essential chiller A vibration analysis on March 8, 2018 (6) Unit 1 containment spray pump B inservice test on March 22, 2018 I n-service (1 Sample)  (1) Unit 2 containment spray pump A inservice test on March 1, 2018 71114.02 - Alert and Notification System Testing (1 Sample)
The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016
- February 20, 2018
. 71114.03 - Emergency Response Organization Staffing and Augmentation System (1 Sample)
The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016
- February 20, 2018. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.


71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests:    Routine==
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016
{{IP sample|IP=IP 71111.22|count=6}}
- February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.
: (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
: (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
: (3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed surveillance on February 28, 2018
: (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
: (5) Unit 3, essential chiller A vibration analysis on March 8, 2018
: (6) Unit 1 containment spray pump B inservice test on March 22, 2018
 
===In-service (1 Sample)===
: (1) Unit 2 containment spray pump A inservice test on March 1, 2018
 
==71114.02 - Alert and Notification System Testing==
{{IP sample|IP=IP 71114.02|count=1}}
 
The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016 - February 20, 2018.
 
==71114.03 - Emergency Response Organization Staffing and Augmentation System==
{{IP sample|IP=IP 71114.03|count=1}}
 
The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff their emergency response facilities in accordance with emergency plan commitments.
 
==71114.04 - Emergency Action Level and Emergency Plan Changes==
{{IP sample|IP=IP 71114.04|count=1}}
 
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016 - February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.
 
==71114.05 - Maintenance of Emergency Preparedness==
{{IP sample|IP=IP 71114.05|count=1}}
 
The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
 
==71114.06 - Drill Evaluation    Emergency Planning Drill==
{{IP sample|IP=IP 71114.06|count=1}}
 
The inspectors evaluated a full-scale emergency preparedness drill on February 13,
 
==RADIATION SAFETY==
 
==71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls    Radiological Work Planning==
{{IP sample|IP=IP 71124.02|count=1}}
 
The inspectors evaluated the licensees radiological work planning by reviewing the following activities:
: (1) RWP 2017-9-1016, RMC Operations and Routine Tasks
: (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
: (3) RWP 2017-3002, Reactor Destack/Restack
: (4) RWP 2017-3015, Cavity Decontamination
: (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
The inspectors evaluated dose estimates and exposure tracking.
==71124.04 - Occupational Dose Assessment    Source Term Characterization==
{{IP sample|IP=IP 71124.04|count=1}}
 
===The inspectors evaluated the licensees source term characterization.
External Dosimetry===
{{IP sample|IP=IP 71124.04|count=1}}
 
The inspectors evaluated the licensees external dosimetry program.
 
===Internal Dosimetry (1 Sample)===
The inspectors evaluated the licensees internal dosimetry program.
 
===Special Dosimetric Situations (1 Sample)===
The inspectors evaluated the licensees performance for special dosimetric situations.
 
==OTHER ACTIVITIES - BASELINE==
 
===71151 - Performance Indicator Verification ===
{{IP sample|IP=IP 71151|count=15}}
The inspectors verified licensee performance indicators submittals listed below:
: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
: (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
: (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -
December 31, 2017)
: (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -
December 31, 2017)
: (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31, 2017)
: (6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017)
: (7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -
December 31, 2017)
 
==71152 - Problem Identification and Resolution    Annual Follow-up of Selected Issues==
{{IP sample|IP=IP 71152|count=1}}
 
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
: (1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018


71114.05 - Maintenance of Emergency Preparedness (1 Sample)
===71153 - Follow-up of Events and Notices of Enforcement Discretion    Events ===
The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016
{{IP sample|IP=IP 71153|count=1}}
- February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensees response on February 15 - 16,


71114.06 - Drill Evaluation Emergency Planning Drill (1 Sample)  The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.
==INSPECTION RESULTS==
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone        Significance                                  Cross-cutting Report Aspect            Section Mitigating          Green                                        [H.12] -


RADIATION SAFET Y  71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning (1 Sample)
==71111.12 - Systems            NCV 05000528/2018001-01                      Human              Maintenance
The inspectors evaluated the licensee's radiological work planning by reviewing the following activities:
    ==
  (1) RWP 2017-9-1016, RMC Operations and Routine Tasks (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection (3) RWP 2017-3002, Reactor Destack/Restack (4) RWP 2017-3015, Cavity Decontamination (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
Closed                                        Performance, Effectiveness Avoid Complacency The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.
The inspectors evaluated dose estimates and exposure tracking
. 71124.04 - Occupational Dose Assessment Source Term Characterization (1 Sample)  The inspectors evaluated the licensee's source term characterization
. External Dosimetry (1 Sample)  The inspectors evaluated the licensee's external dosimetry program. Internal Dosimetry (1 Sample)  The inspectors evaluated the licensee's internal dosimetry program
. Special Dosimetric Situations (1 Sample)  The inspectors evaluated the licensee's performance for special dosimetric situations


==OTHER ACTIVITIES==
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
- BASELINE  71151 - Performance Indicator Verification (15 Samples)  The inspectors verified licensee performance indicators submittals listed below:  (1) IE01:  Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017
- December 31, 2017) (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017
- December 31, 2017
) (3) IE04:  Unplanned Scrams with Complications (USwC) Sample (January 1, 2017
- December 31, 2017
) (4) MS05:  Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - December 31, 2017) (5) EP01:  Drill/Exercise Performance (DEP) Sample (January 1, 2017
- December 31, 2017)  (6) EP02:  Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017
)  (7) EP03:  Alert and Notification System (ANS) Reliability Sample (January 1, 2017
- December 31, 2017
)
71152 - Problem Identification and Resolution Annual Follow
-up of Selected Issue s (1 Sample)  The inspectors reviewed the licensee's implementation of its corrective action program related to the following issues:
  (1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018 71153 - Follow-up of Events and Notices of Enforcement Discretion Events (1 Sample)    The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensee's response on February 15
- 16, 2018. INSPECTION RESULTS Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001
-01  Closed  [H.12] - Human Performance, Avoid Complacency 71111.12 - Maintenance Effectiveness The inspectors reviewed a self
-revealed, Green, non
-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post
-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.


=====Description:=====
=====Description:=====
On November 12, 2017, the licensee was conducting a 24
On November 12, 2017, the licensee was conducting a 24-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m.


, control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24-hour surveillance run on November 14, 2017.


Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis.
-hour surveillance run on November 14, 2017.


The licensee's apparent cause investigation determine d that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017 , under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis. Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re
Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re-landed onto the secondary stabs of the breaker and motor control center chassis. The licensees work planners had not recognized the possibility that removing and re-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.
-landed onto the secondary stabs of the breaker and motor control center chassis. The licensee's work planners had not recognized the possibility that removing and re
-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.


The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pump's control switch was held in the start position for only a few seconds.
The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position for only a few seconds. The licensees apparent cause investigation identified that nonintrusive as-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.


The licensee's apparent cause investigation identified that nonintrusive as
The post-maintenance test was not written in accordance with station procedure 30DP-9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in part, that the post-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation.
-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.


The post-maintenance test was not written in accordance with station procedure 30DP
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.
-9WP04, "Post
-Maintenance Testing Development," Revision 19, Step 4.1.1
, which states, in part, that the post
-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation. The act of de
-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post
-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.


Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re
Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re-terminating motor control center secondary stab connections. As an interim measure, the inspectors confirmed that all safety-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.
-terminating motor control center secondary stab connections. As an interim measure
, the inspectors confirmed that all safety
-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.


Corrective Action Reference
Corrective Action Reference: Condition Report 17-16497
: Condition Report 17
-16497 Performance Assessment
:  Performance Deficiency:  The licensee's failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.


Screening: The performance deficiency is more
=====Performance Assessment:=====
-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel oil transfer pump A. Without an appropriate post
Performance Deficiency: The licensees failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.
-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.


Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, "Significance Determination Process for Findings at Power," Exhibit 2, "Mitigating Systems Screening Questions
Screening: The performance deficiency is more-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel oil transfer pump A. Without an appropriate post-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.
" and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.


Cross-cutting Aspect: The finding has a cross
Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.
-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].
Enforcement
:  Violation:  Title 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.


Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].
, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017.


Disposition:
=====Enforcement:=====
This violation is being treated as a non
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.
-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.


EXIT MEETING S AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017.
 
Disposition: This violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.


On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.
On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.
Line 221: Line 298:
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.


On April 11, 2018, the inspector presented the quarterly resident's inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.
On April 11, 2018, the inspector presented the quarterly residents inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


DOCUMENTS REVIEWED
DOCUMENTS REVIEWED
Section 1R04: Equipment Alignment
Section 1R04: Equipment Alignment
Procedures
Procedures
Number Title Revision 40ST-9AF07 Auxiliary Feedwater Pump AFA
Number           Title                                                       Revision
-P01 Monthly Valve Alignment 6 40ST-9SI13 LPSI and CS System Alignment Verification
40ST-9AF07       Auxiliary Feedwater Pump AFA-P01 Monthly Valve             6
Alignment
40ST-9SI13       LPSI and CS System Alignment Verification                   33
Condition Reports (CRs)
Condition Reports (CRs)
16-17321 17-03027     Drawing s Number Title Revision 03-M-HJP-001 P&I Diagram Control Building HVAC
16-17321           17-03027
03-M-HJP-002 P&I Diagram Control Building HVAC
Drawings
03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System
Number           Title                                                       Revision
03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & Cont. Spray Discharge
03-M-HJP-001     P&I Diagram Control Building HVAC                           14
03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF Pump Suction Lines
03-M-HJP-002     P&I Diagram Control Building HVAC                           14
03-M-SIP-001     P&I Diagram Safety Injection & Shutdown Cooling System     49
03-P-SIF-0207     Auxiliary Building Isometric Safety Injection System LPSI & 6
Cont. Spray Discharge
03-P-SIF-0201     Auxiliary Building Isometric Safety Injection System ESF   7
Pump Suction Lines
Miscellaneous
Miscellaneous
Number Title Revision STM-30D System Training Manual Volume 30D: Control Building HVAC System (HJ)
Number           Title                                                       Revision
Section 1R05: Fire Protection
STM-30D           System Training Manual Volume 30D: Control Building         6
HVAC System (HJ)
Section 1R05: Fire Protection
Procedures
Procedures
Number Title Revision 14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance
Number         Title                                                             Revision
14FT-9FP70     Appendix R & Former Tech Spec Penetration Seal Surveillance       13
Condition Reports (CRs)
Condition Reports (CRs)
17-03870 18-00999     Miscellaneous
17-03870           18-00999
Number Title Revision/Date
Miscellaneous
PVNGS Pre-Fire Strategies Manual
Number           Title                                           Revision/Date
13-MM-0650 Fire Protection & Spray System Sub
PVNGS Pre-Fire Strategies Manual               26
007 13-MS-A083 NFPA Code Applicability and Conformance Review
13-MM-0650       Fire Protection & Spray System Sub             007
007 4834415 Fire Safety Component Condition Record
13-MS-A083       NFPA Code Applicability and Conformance Review 007
November 3, 2016 4834430 Fire Safety Component Condition Record
4834415           Fire Safety Component Condition Record         November 3, 2016
November 3, 2016 4843902 Fire Safety Component Condition Record
4834430           Fire Safety Component Condition Record         November 3, 2016
December 6, 2016 Unit 3 Tamper/Vital/Security Tour  
4843902           Fire Safety Component Condition Record         December 6, 2016
- Post 31 February 7, 2018 4971714 Open Door/Hatch/Floor Plug Permit
Unit 3 Tamper/Vital/Security Tour - Post 31     February 7, 2018
January 29, 20
4971714           Open Door/Hatch/Floor Plug Permit               January 29, 2018
4971687 Open Door/Hatch/Floor Plug Permit
4971687           Open Door/Hatch/Floor Plug Permit               January 29, 2018
January 29, 2018
Section 1R07: Heat Sink Performance
Section 1R07: Heat Sink Performance
Procedures
Procedures
Number Title Revision 73DP-9ZZ21 Heat Exchanger Visual Inspection
Number           Title                                               Revision
73DP-9ZZ11 Heat Exchanger Program
73DP-9ZZ21       Heat Exchanger Visual Inspection                     6
73DP-9ZZ11       Heat Exchanger Program                               15
Condition Reports (CRs)
Condition Reports (CRs)
18-03133 18-03138 18-03139   Work Orders
18-03133           18-03138           18-03139
(WOs) 4591574 4591575 4667054 4667055 4667098 Section 1R11: Licensed Operator Requalification Program and Licensed Operator Performance
Work Orders (WOs)
4591574           4591575           4667054           4667055   4667098
Section 1R11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Procedures
Number Title Revision 40OP-9MB01 Main Generation and Excitation
Number           Title                                               Revision
40DP-9OP02 Conduct of Operations
40OP-9MB01       Main Generation and Excitation                       63
40DP-9OP02       Conduct of Operations                               72
Procedures
Procedures
Number Title Revision 40AL-9RK6A Panel B06A Alarm Responses
Number           Title                                                   Revision
40AL-9RK6A       Panel B06A Alarm Responses                             18
Condition Reports (CRs)
Condition Reports (CRs)
18-02797 18-02593 18-03215   Miscellaneous
18-02797           18-02593         18-03215
Number Title Date Current Alarm Status Report
Miscellaneous
February 16, 20
Number           Title                                             Date
Section 1R12: Maintenance Effectiveness
Current Alarm Status Report                       February 16, 2018
Section 1R12: Maintenance Effectiveness
Procedures
Procedures
Number Title Revision 32MT-9ZZ74 Molded Case Circuit Breaker Test
Number           Title                                                   Revision
30DP-9WP04 Post-Maintenance Testing Development
2MT-9ZZ74       Molded Case Circuit Breaker Test                       48
30DP-9WP04       Post-Maintenance Testing Development                   19
Condition Reports (CRs)
Condition Reports (CRs)
17-08025-005 17-08025 17-16497   Work Orders
17-08025-005       17-08025         17-16497
(WOs) 4925959 4925966 4925967 4925969 4685719 4788985     Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Work Orders (WOs)
25959            4925966           4925967         4925969         4685719
4788985
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Procedures
Procedures
Number Title Revision 40DP-9AP21 Protected Equipment
Number           Title                                                   Revision
70DP-0RA05 Assessment and Management of Risk when Performing Maintenance in Modes 1 and 2
40DP-9AP21       Protected Equipment                                     7
40MT-9ZZ01 Operations Maintenance Activities
70DP-0RA05       Assessment and Management of Risk when Performing       23
40DP-9RS01 Operations Department Online Nuclear Risk Management Mode 1 and 2
Maintenance in Modes 1 and 2
40MT-9ZZ01       Operations Maintenance Activities                       5
40DP-9RS01       Operations Department Online Nuclear Risk Management   4
Mode 1 and 2
Condition Reports (CRs)
Condition Reports (CRs)
18-00249 185-00136 18-00336 18-02544   Miscellaneous
18-00249           185-00136         18-00336         18-02544
Number Title Date Scheduler's Evaluation for PV Unit 1
Miscellaneous
January 4, 2018 Scheduler's Evaluation for PV Unit 1
Number           Title                                             Date
February 23, 2018 Scheduler's Evaluation for PV Unit 3
Schedulers Evaluation for PV Unit 1               January 4, 2018
February 1, 2018
Schedulers Evaluation for PV Unit 1               February 23, 2018
Scheduler's Evaluation for PV Unit 2
Schedulers Evaluation for PV Unit 3               February 1, 2018
March 19, 2018
Schedulers Evaluation for PV Unit 2               March 19, 2018
Unit 3 Archived Operator Logs
Unit 3           Archived Operator Logs                             January 29, 2018 -
January 29, 2018  
February 4, 2018
- February 4, 2018
Section 1R15: Operability Determinations and Functionality Assessments
Section 1R15: Operability Determinations and Functionality Assessments
Procedures
Procedures
Number Title Revision 40ST-9ZZm1 Operations Mode 1 Surveillance Logs
Number           Title                                                     Revision
40AL-9RK6A Panel B06A Alarm Responses
40ST-9ZZm1       Operations Mode 1 Surveillance Logs                       71
74DP-9CY04 Systems Chemistry Specifications
40AL-9RK6A       Panel B06A Alarm Responses                               18
74DP-9CY04       Systems Chemistry Specifications                         94
Condition Reports (CRs)
Condition Reports (CRs)
17-18475 12-01397 17-17856 13-01198 18-03127 17-16393 18-03215 18-03291 18-02839 18-01610 18-02334 3127427 18-02468 18-03980   Miscellaneous
17-18475           12-01397         17-17856         13-01198         18-03127
Number Title Revision/Date
17-16393           18-03215         18-03291         18-02839         18-01610
03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves
18-02334           3127427           18-02468         18-03980
18-02334-003 Engineering Evaluation
Miscellaneous
February 15, 20
Number           Title                                               Revision/Date
4428056 Adverse CRDR
03-E-SGF-023     Control Wiring Diagram Main Steam Isolation Valves 11
July 19, 2013
18-02334-003     Engineering Evaluation                             February 15, 2018
EQ Program Manual
28056          Adverse CRDR                                       July 19, 2013
Section 1R18: Plant Modifications
EQ Program Manual                                   26
Section 1R18: Plant Modifications
Condition Reports (CRs)
Condition Reports (CRs)
18-04116     Work Orders
18-04116
(WOs) 4989102     Miscellaneous
Work Orders (WOs)
Number Title Date DEC-01035 Design Equivalent Change
4989102
April 12 , 2017 Section 1R19: Post
Miscellaneous
-Maintenance Testing
Number           Title                                                   Date
DEC-01035         Design Equivalent Change                               April 12, 2017
Section 1R19: Post-Maintenance Testing
Procedures
Procedures
Number Title Revision 40OP-9CH12 Refueling Water Tank (RWT) Operations
Number           Title                                                         Revision
32MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent Relays 4 32MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous Overcurrent Relays
40OP-9CH12       Refueling Water Tank (RWT) Operations                         41
40OP-9EW02 Essential Cooling Water System (EW) Train B
2MT-9ZZ13       Testing and Calibration of 121FC66K01A Time Overcurrent       4
40ST-9DG01 Diesel Generator A Test
Relays
73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load
2MT-9ZZ17       Testing and Calibration of 12PJC11AV1A Instantaneous         4
Overcurrent Relays
40OP-9EW02       Essential Cooling Water System (EW) Train B                   26
40ST-9DG01       Diesel Generator A Test                                       49
73ST-9DG08       Class 1E Diesel Generator Load Reject 24 Hour Rated Load     13
and Hot Start Test Train B
and Hot Start Test Train B
40ST-9DG02 Diesel Generator B Test
40ST-9DG02       Diesel Generator B Test                                       54
Condition Reports (CRs)
Condition Reports (CRs)
18-00136 18-00197 18-01931 18-00210 18-00290 18-00336 18-00377 18-00346 18-04731 18-04732 Work Orders
18-00136           18-00197           18-01931       18-00210         18-00290
(WOs) 4964492 4822983 4981967 4726747 4821113 4847651 4965079 4972486 4847637
18-00336           18-00377           18-00346       18-04731         18-04732
Drawings Number Title Revision 01-E-DGB-007 Elementary Diagram: Diesel Engine Control
Work Orders (WOs)
01-E-DGF-007 Control Wiring Diagram: Diesel Engine
4964492           4822983           4981967         4726747           4821113
13-M018-00141 Control Schematic (Starting Sequence Control)
4847651           4965079           4972486         4847637
Drawings
Number           Title                                               Revision
01-E-DGB-007     Elementary Diagram: Diesel Engine Control           15
01-E-DGF-007     Control Wiring Diagram: Diesel Engine               13
13-M018-00141     Control Schematic (Starting Sequence Control)       25
Miscellaneous
Miscellaneous
Number Title Revision/Date
Number           Title                                               Revision/Date
18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown during Surveillance Run 1/5/2018
18-00210-004     Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018
January 8, 2018
during Surveillance Run 1/5/2018
Section 1R20: Refueling and Other Outage Activities
Section 1R20: Refueling and Other Outage Activities
Procedures
Procedures
Number Title Revision 40OP-9MB01 Main Generation and Excitation
Number           Title                                                   Revision
Section 1R22: Surveillance Testing
40OP-9MB01       Main Generation and Excitation                         63
Section 1R22: Surveillance Testing
Procedures
Procedures
Number Title Revision 73DP-9CL02 Containment Leakage Rate Testing Program
Number           Title                                                   Revision
73ST-9XI20 Atmospheric Dump Valves  
73DP-9CL02       Containment Leakage Rate Testing Program               33
- Inservice Test
73ST-9XI20       Atmospheric Dump Valves - Inservice Test               47
73ST-9SI06 Containment Spray Pumps and Check valves  
73ST-9SI06       Containment Spray Pumps and Check valves - Inservice   42
- Inservice Test 42 73ST-9DF01 Diesel Fuel Oil Transfer Pumps  
Test
- Inservice Test
73ST-9DF01       Diesel Fuel Oil Transfer Pumps - Inservice Test         34
40DP-9OP06 Operations Department Repetitive Task Program
40DP-9OP06       Operations Department Repetitive Task Program           130
130 73ST-9SI06 Containment Spray Pumps and Check Valves
73ST-9SI06       Containment Spray Pumps and Check Valves- Inservice     42
- Inservice Test 42  Condition Reports (CRs)
Test
16-15793 18-03304 18-01314 18-03825   Work Orders
Condition Reports (CRs)
(WOs) 4822921 4840032 4843076 4843390
16-15793           18-03304           18-01314         18-03825
Work Orders (WOs)
22921            4840032           4843076           4843390
Miscellaneous
Miscellaneous
Number Title Revision/Date
Number           Title                                                 Revision/Date
13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication Loops Uncertainty Calculation
13-JC-SI-0215     Containment Spray Pump Discharge Flow Indication     18
18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time
Loops Uncertainty Calculation
January 26, 2018
18-01314-002     Engineering Evaluation: ADV 178 Fast Stroke Time     January 26, 2018
18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for
18-03304-002     Engineering Evaluation: SR 3.0.3 Evaluation for       March 2, 2018
SB-200, 202, and 205
SB-200, 202, and 205
March 2, 2018  Section 1EP2: Alert and Notification System Testing
Section 1EP2: Alert and Notification System Testing
Miscellaneous Documents
Miscellaneous Documents
Number Title Date ID/Letter Number:  240-02802 Palo Verde Nuclear Generating Station Alert and Notification System (ANS) FEMA 350 Report  
Number           Title                                                 Date
- May 2017 May 26, 2017
ID/Letter       Palo Verde Nuclear Generating Station Alert and       May 26, 2017
Palo Verde Nuclear Generating Station, Alert and Notification System (ANS), FEMA 350 Report
Number:          Notification System (ANS) FEMA 350 Report -
May 2017  Palo Verde Nuclear Generating Station Siren Operating Manual November 2015
240-02802        May 2017
January 4, 2018
Palo Verde Nuclear Generating Station, Alert and     May 2017
Letter from FEMA Region IX to Director, Division of Emergency Management, State of Arizona
Notification System (ANS), FEMA 350 Report
September 19, 2017  State of Arizona/Maricopa County Offsite Emergency Response Plan, Palo Verde Nuclear Generating Station
Palo Verde Nuclear Generating Station Siren Operating November 2015
November 2017
Manual                                                January 4, 2018
The Maricopa County Sheriff's Office Emergency Response to Palo Verde Nuclear Generating Station
Letter from FEMA Region IX to Director, Division of   September 19,
August 2016
Emergency Management, State of Arizona               2017
Work Orders
State of Arizona/Maricopa County Offsite Emergency   November 2017
(WOs) 474965/0     Section 1EP3: Emergency Response Organization Staffing and Augmentation
Response Plan, Palo Verde Nuclear Generating Station
The Maricopa County Sheriffs Office Emergency       August 2016
Response to Palo Verde Nuclear Generating Station
Work Orders (WOs)
474965/0
Section 1EP3: Emergency Response Organization Staffing and Augmentation
Procedures
Procedures
Number Title Revision EP-0902 Notifications
Number           Title                                                 Revision
EP-0901 Classifications
EP-0902           Notifications                                         10
40AL-9RK7C Panel B07C Alarm Responses 15 40AO-9ZZ21 Acts of Nature
EP-0901           Classifications                                       10
79IS-9SM01 Analysis of Seismic Event
40AL-9RK7C       Panel B07C Alarm Responses                             15
40AO-9ZZ21       Acts of Nature                                         37
79IS-9SM01       Analysis of Seismic Event                             27
Miscellaneous Documents
Miscellaneous Documents
Number Title Date 240-02799 JF/MA 2017 1 st Quarter - Emergency Preparedness Augmentation Drill Report
Number           Title                                               Date
240-02799         2017 1 Quarter - Emergency Preparedness
st
March 21, 2017
March 21, 2017
240-02803 CS/MA 2017 2 nd Quarter - Emergency Preparedness Augmentation Drill Report
JF/MA            Augmentation Drill Report
June 6, 2017
240-02803         2017 2nd Quarter - Emergency Preparedness           June 6, 2017
240-02797 2017 3rd Quarter  
CS/MA            Augmentation Drill Report
- Emergency Preparedness Augmentation Drill Report (After Hours)
240-02797         2017 3rd Quarter - Emergency Preparedness           July 25, 2017
July 25, 2017
Augmentation Drill Report (After Hours)
240-02808 2017 3rd Quarter  
240-02808         2017 3rd Quarter - Emergency Preparedness           September 6, 2017
- Emergency Preparedness Augmentation Drill Repo
Augmentation Drill Report
rt September 6, 2017
240-02817         2017 4th Quarter - Emergency Preparedness           December 13,
240-02817 CS/ma 2017 4 th Quarter - Emergency Preparedness Augmentation Drill Report
CS/ma            Augmentation Drill Report                           2017
December 13, 2017 240-02790 JF/MA 2016 2 nd Quarter - Emergency Preparedness Augmentation Drill Report
240-02790         2016 2nd Quarter - Emergency Preparedness           June 23, 2016
June 23, 2016
JF/MA            Augmentation Drill Report
240-02791 JF/MA 2016 3 rd Quarter - Emergency Preparedness Augmentation Drill Report
240-02791         2016 3rd Quarter - Emergency Preparedness           August 3, 2016
August 3, 2016
JF/MA            Augmentation Drill Report
240-02798 December 5, 2016, Alert Event Report
240-02798         December 5, 2016, Alert Event Report               January 17, 2017
January 17, 2017
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Procedure
Procedure   Number Title Revision 16DP-0EP22 Emergency Plan Maintenance
Number           Title                                                   Revision
11, 12 Miscellaneous Documents
16DP-0EP22       Emergency Plan Maintenance                               11, 12
Number Title Date Evaluation Tracking Number
Miscellaneous Documents
2017-001E Replace the Meteorological Instrumentation and Data Transmission System (MDTS)
Number           Title                                                 Date
August 8, 2017
Evaluation       Replace the Meteorological Instrumentation and Data   August 8, 2017
Evaluation Tracking Number
Tracking Number   Transmission System (MDTS)
2017-003E EP-0900, Rev. 16
2017-001E
August 17, 2017
Evaluation        EP-0900, Rev. 16                                       August 17, 2017
Evaluation Tracking Number
Tracking Number
2017-004E EP-0901, Rev. 10
2017-003E
August 21, 2017
Evaluation        EP-0901, Rev. 10                                       August 21, 2017
Screening Tracking Number
Tracking Number
2017-002S 74RM-9EF42, Radiation Monitor Alarm Setpoint Determination, Rev. 30
2017-004E
April 16, 2017
Screening        74RM-9EF42, Radiation Monitor Alarm Setpoint           April 16, 2017
Screening Tracking Number
Tracking Number   Determination, Rev. 30
2017-022S Procedure EP
2017-002S
-0901, Classifications, Added New EALs form EPLAN R60, Revise PV Proc Format
Screening        Procedure EP-0901, Classifications, Added New EALs     August 20, 2017
August 20, 2017
Tracking Number  form EPLAN R60, Revise PV Proc Format
 
2017-022S
Miscellaneous Documents
Miscellaneous Documents
Number Title Date Screening Tracking Number
Number             Title                                               Date
2017-014S EP-905, Revision 9, Protective Actions
Screening         EP-905, Revision 9, Protective Actions               June 7, 2017
June 7, 2017
Tracking Number
Screening Tracking Number
2017-014S
2017-023S DMWO 3452940 Palo Verde Nuclear Generating Station Radio Replacement Project
Screening          DMWO 3452940 Palo Verde Nuclear Generating           September 8,
September 8, 2017 Screening Tracking Number
Tracking Number    Station Radio Replacement Project                   2017
2017-029S 40AO-9ZZ18 R018 Fire Outside Control Room
2017-023S
September 26, 2017 EPM Tracking Number  2015-006S DEC-00720 Allow Solar
Screening          40AO-9ZZ18 R018 Fire Outside Control Room           September 26,
-Charged Offsite Sirens to Replace AC
Tracking Number                                                        2017
-Charged Offsite Sirens
2017-029S
February 18, 2015 Section 1EP5: Maintenance of Emergency Preparedness
EPM Tracking       DEC-00720 Allow Solar-Charged Offsite Sirens to     February 18,
Number            Replace AC-Charged Offsite Sirens                   2015
2015-006S
Section 1EP5: Maintenance of Emergency Preparedness
Procedures
Procedures
Number Title Revision 01DP-0AP12 Condition Reporting Process
Number             Title                                                 Revision
01DP-0AP12-01 Condition Reporting Process Administrative Guide
01DP-0AP12         Condition Reporting Process                           28
EP-0905 Protective Actions
01DP-0AP12-01     Condition Reporting Process Administrative Guide     4
EP-0902 Notifications
EP-0905           Protective Actions                                   9
8, 9, 10 16DP-0EP31 Emergency Preparedness Equipment Out
EP-0902           Notifications                                         8, 9, 10
-of-Service 9 16DP-0EP27 Emergency Preparedness Equipment Testing
16DP-0EP31         Emergency Preparedness Equipment Out-of-Service       9
16DP-0EP28 Emergency Facility/Kit Inventories and Inspections
16DP-0EP27         Emergency Preparedness Equipment Testing             10
16DP-0EP28         Emergency Facility/Kit Inventories and Inspections   5
Condition Reports (CRs)
Condition Reports (CRs)
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501 16-14593 16-14934 16-16710 17-02188 17-03147 17-03149 17-03202 17-03605 17-03721 17-03736 17-03826 17-03828 17-03829 17-03884 17-04633 17-06893 17-08328 17-10906 17-10949 17-11437 17-13663 17-14927 17-15449 17-15797 17-15884 17-16771 17-17091 17-17218 17-17739 17-18443 18-03244
16-08461       16-09213         16-11134     16-11930       16-12640   16-13501
16-14593       16-14934         16-16710     17-02188       17-03147   17-03149
17-03202       17-03605         17-03721     17-03736       17-03826   17-03828
17-03829       17-03884         17-04633     17-06893       17-08328   17-10906
17-10949       17-11437         17-13663     17-14927       17-15449   17-15797
17-15884       17-16771         17-17091     17-17218       17-17739   17-18443
18-03244
Miscellaneous Documents
Miscellaneous Documents
Number Title Revision/Date
Number           Title                                               Revision/Date
KLD TR-983 Palo Verde Nuclear Generating Station, 2017 Population Update Analysis
KLD TR-983       Palo Verde Nuclear Generating Station,               December 7,
December 7, 2017 KLD TR-895 Palo Verde Nuclear Generating Station, 2016 Population Update Analysis
2017 Population Update Analysis                     2017
December 8, 2016  Updated Review of Palo Verde Nuclear Generating Station Emergency Plan 2016 Letters of Agreement
KLD TR-895       Palo Verde Nuclear Generating Station,               December 8,
September 29, 2016 Letter # 240
2016 Population Update Analysis                     2016
-02819 2017 Review of Palo Verde Nuclear Generating Station Emergency Plan Letters of Agreement
Updated Review of Palo Verde Nuclear Generating     September 29,
December 26, 2017 NAD Audit 2016
Station Emergency Plan 2016 Letters of Agreement     2016
-010 Nuclear Assurance Department (NAD) Audit Plan and Report, 2016
Letter # 240-     2017 Review of Palo Verde Nuclear Generating Station December 26,
-010, Emergency Preparedness
2819            Emergency Plan Letters of Agreement                 2017
December 14, 2016  Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date  
NAD Audit 2016-   Nuclear Assurance Department (NAD) Audit Plan and   December 14,
- June 1, 2017, Radiological Emergency Preparedness Program
010              Report, 2016-010, Emergency Preparedness             2016
August 18 , 2017 ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill Report (Revised)
Palo Verde Nuclear Generating Station After Action   August 18,
June 23, 2017
Report/Improvement Plan, Exercise Date - June 1,     2017
ID: 240-02816 2017 Health Physics Drill Report (November 2017)
2017, Radiological Emergency Preparedness Program
December 12, 2017 ID: 240-02818 1709 ERO Mini Drill  
ID: 240-02806     2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017
- ERO Blue Team  
Report (Revised)
(December 2017)
ID: 240-02816     2017 Health Physics Drill Report (November 2017)     December 12,
December 21, 2017 NAD Audit 2017
2017
-008 Nuclear Assurance Department (NAD) Audit Plan and Report, 2017
ID: 240-02818     1709 ERO Mini Drill - ERO Blue Team                 December 21,
-008, Emergency Preparedness
                  (December 2017)                                     2017
January 25, 2018 240-02812 CS/MA 1704 and 1705 ERO Mini Drills  
NAD Audit 2017-   Nuclear Assurance Department (NAD) Audit Plan and   January 25,
- ERO White Team and Green Team (June and July 2017)
008              Report, 2017-008, Emergency Preparedness             2018
October 18, 2017 240-02813 CS/MA 1706 ERO Mini Drill  
240-02812         1704 and 1705 ERO Mini Drills - ERO White Team and   October 18,
- ERO Gold Team (July 2017)
CS/MA            Green Team (June and July 2017)                     2017
October 18, 2017 240-02814 TW/MA 1707 ERO Mini Drill  
240-02813         1706 ERO Mini Drill - ERO Gold Team (July 2017)     October 18,
- ERO Red Team (August 2017) Revision 1
CS/MA                                                                  2017
October 18, 2017 Emergency Response Facility Telephone Book, 1 st Quarter Edition 2018
240-02814         1707 ERO Mini Drill - ERO Red Team (August 2017)     October 18,
January 1, 2018 240-02801 JF/MA 1702 IPZ Evaluated Exercise  
TW/MA            Revision 1                                          2017
- ERO White Team (March 2017)
Emergency Response Facility Telephone Book,         January 1,
April 6, 2017
1st Quarter Edition 2018                            2018
240-02797 JF/MA 1608 ERO Mini Drill  
240-02801         1702 IPZ Evaluated Exercise - ERO White Team         April 6, 2017
- ERO Red Team  
JF/MA            (March 2017)
(December 2016)
240-02797         1608 ERO Mini Drill - ERO Red Team                   January 4,
January 4, 2017 240-02792 JF/MA 1604 and 1605 ERO Drills
JF/MA            (December 2016)                                     2017
September 14, 2016 240-02793 JF/MA 1606 ERO Mini Drill  
240-02792         1604 and 1605 ERO Drills                             September 14,
- ERO Green Team  
JF/MA                                                                  2016
(September 2016)
240-02793         1606 ERO Mini Drill - ERO Green Team                 October 4,
October 4, 2016
JF/MA            (September 2016)                                     2016
Miscellaneous Documents
Miscellaneous Documents
Number Title Revision/Date
Number           Title                                                   Revision/Date
240-02795 JF/MA 1609 Off-Hours Drive-in Augmentation Drill  
240-02795         1609 Off-Hours Drive-in Augmentation Drill -            December 2,
- (November 2016)
JF/MA            (November 2016)                                         2016
December 2, 2016 240-02796 2016 Health Physics Drill Report (November 2016)
240-02796         2016 Health Physics Drill Report (November 2016)       December 7,
December 7, 2016 Evaluation Report 16-11134 Evaluate Adding STSC ENS Communicator Duties to STSC Communicator
2016
September 7, 2016 17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass Break September 28, 2017 17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators
Evaluation       Evaluate Adding STSC ENS Communicator Duties to         September 7,
October 11, 2017 Level 4 Evaluation Report 17-15797-001 Default Values Used in Dose Assessment
Report 16-11134  STSC Communicator                                      2016
November 30, 2017 Document No.
17-11437-002     Actual Event Investigation, Unit 3 Ammonia Sight glass September 28,
500599510 Master Agreement Between Arizona Public Service Company and Westinghouse Electric Company LLC for Goods and Services (Effective January 29, 2016 to December 31, 2018)
Break                                                  2017
Palo Verde Nuclear Generating Station After
17-13663-001     Actual Event Investigation, Unit 2 Loss of Annunciators October 11,
Action Report/Improvement Plan, Exercise Dates  
2017
- March 7-8, 2017, Radiological Emergency Preparedness Program (REPP) May 26, 2017
Level 4           Default Values Used in Dose Assessment                 November 30,
240-02789 JF/TW 2016 Health Physics Drill Report (Re
Evaluation                                                                2017
-Demonstration)
Report 17-
June 9, 2016
15797-001
240-02788 JF/MA 2016 Contaminated Injury/Health Physics Drill Report
Document No.     Master Agreement Between Arizona Public Service         0
April 22, 2016
500599510        Company and Westinghouse Electric Company LLC for
Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date  
Goods and Services (Effective January 29, 2016 to
November 16, 2016, Radiological Emergency Preparedness Program (REPP)
December 31, 2018)
February 9, 2017 240-02787 JF/MA 1602 IPZ Exercise  
Palo Verde Nuclear Generating Station After Action      May 26, 2017
- ERO Green Team (March 2016)
Report/Improvement Plan, Exercise Dates - March 7-8,
March 25, 2016
2017, Radiological Emergency Preparedness Program
Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date  
                  (REPP)
November 16, 2016, Radiological Emergency Preparedness Program (REPP)
240-02789         2016 Health Physics Drill Report (Re-Demonstration)     June 9, 2016
February 9, 2017  Level 3 Evaluation Report 18
JF/TW
-02668-002 March 22, 2018
240-02788         2016 Contaminated Injury/Health Physics Drill Report   April 22, 2016
 
JF/MA
Palo Verde Nuclear Generating Station After Action     February 9,
Report/Improvement Plan, Exercise Date -                2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
240-02787         1602 IPZ Exercise - ERO Green Team (March 2016)         March 25, 2016
JF/MA
Palo Verde Nuclear Generating Station After Action     February 9,
Report/Improvement Plan, Exercise Date -                2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
Level 3 Evaluation Report 18-02668-002                 March 22, 2018
Work Orders (WOs)
Work Orders (WOs)
4782667 4783959/0 4787729/0 4787847/0 4836236 4836263/0 4860832/0 4862234/0 4862502/0 4885361/0 4889725/0 4896971/0 4901070 4916668/0 4918303/0 4918455/0 4937577/0 4947802/0   Section 1EP6: Drill Evaluation
4782667           4783959/0         4787729/0     4787847/0         4836236
4836263/0         4860832/0         4862234/0     4862502/0         4885361/0
4889725/0         4896971/0         4901070       4916668/0         4918303/0
4918455/0         4937577/0         4947802/0
Section 1EP6: Drill Evaluation
Procedures
Procedures
Number Title Revision EP-0900 Emergency Response Organization (ERO) Position Checklists
Number           Title                                                   Revision
EP-0901 Classifications
EP-0900           Emergency Response Organization (ERO) Position         16
Checklists
EP-0901           Classifications                                         10
Condition Reports (CRs)
Condition Reports (CRs)
18-02352 18-02503 18-02655   Section 2RS2: Occupational ALARA Planning and Controls
18-02352           18-02503         18-02655
Section 2RS2: Occupational ALARA Planning and Controls
Procedures
Procedures
Number Title Revision 75DP-0RP03 ALARA Program Overview
Number           Title                                                   Revision
75DP-0RP06 ALARA Committee
75DP-0RP03       ALARA Program Overview                                 06
75DP-0RP08 Managing Radiological Risk
75DP-0RP06       ALARA Committee                                         07
75RP-9RP02 Radiation Work Permits
75DP-0RP08       Managing Radiological Risk                             02
75RP-9RP25 Temporary Shielding
75RP-9RP02       Radiation Work Permits                                 31
75TD-9RP02 ALARA Work Planning
75RP-9RP25       Temporary Shielding                                     14
Audits and Self
75TD-9RP02       ALARA Work Planning                                     11
-Assessments
Audits and Self-Assessments
Title Date PVGS Integrated Performance Assessment Report Radiation Protection 2nd Quarter 2017
Title                                                           Date
September 14, 2017
PVGS Integrated Performance Assessment Report Radiation         September 14, 2017
2016 Annual ALARA/Management Evaluation Report
Protection 2nd Quarter 2017
June 23, 2017
2016 Annual ALARA/Management Evaluation Report                   June 23, 2017
2016 Annual Radiation Protection Program Summary Report
2016 Annual Radiation Protection Program Summary Report         July 27, 2017
July 27, 2017
 
Condition Reports (CRs)
Condition Reports (CRs)
17-15502   17-15529 17-15802 17-16741 17-17944 17-18180 18-01890     Radiation Work Permits/ALARA Reviews
17-15502           17-15529           17-15802         17-16741       17-17944
Number Title RWP 2017-9-1016 RMC Operations and Routine Tasks
17-18180           18-01890
RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection
Radiation Work Permits/ALARA Reviews
RWP 2017-3002 Reactor Destack/Restack
Number               Title
RWP 2017-3015 Cavity Decontamination
RWP 2017-9-1016     RMC Operations and Routine Tasks
RWP 2017-3039 10-Year In-Service Inspection Vessel
RWP 2018-1-1523     Temporary Mat Insulation Fiber Inspection
RWP 2017-3002       Reactor Destack/Restack
RWP 2017-3015       Cavity Decontamination
RWP 2017-3039       10-Year In-Service Inspection Vessel
Miscellaneous
Miscellaneous
Title Date ALARA 5-Year Plan 2015  
Title                                                                 Date
- 2019 November 2015 1R20 Radiological Safety Summary In Perspective
ALARA 5-Year Plan 2015 - 2019                                         November 2015
November 7, 2017
1R20 Radiological Safety Summary In Perspective                       November 7, 2017
2R20 Radiological Safety Summary In Perspective
2R20 Radiological Safety Summary In Perspective                       May 9, 2017
May 9, 2017
3R19 Radiological Safety Summary In Perspective                       November 10, 2016
3R19 Radiological Safety Summary In Perspective
Section 2RS4 : Occupational Dose Assessment
November 10, 2016
Section 2 RS 4 : Occupational Dose Assessment
Procedures
Procedures
Number Title Revision 75DP-0RP01 RP Program Overview
Number           Title                                                     Revision
75DP-0RP06 Managing Radiological Risk
75DP-0RP01       RP Program Overview                                       11
75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect Dosimetry, and Anticipated EPD Dose Rate Alarm
75DP-0RP06       Managing Radiological Risk                               2
75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation
75RP-9ME23       Exposure Evaluation for Lost, Damaged, or Suspect         12
75RP-9ME25 TLD Reader Calibration and Response Check
Dosimetry, and Anticipated EPD Dose Rate Alarm
75RP-9RP03 Bioassay Analysis
75RP-9ME24       Dosimetry Processing, Evaluation, and Documentation       5
75RP-9RP05 Contamination Dose Evaluation
75RP-9ME25       TLD Reader Calibration and Response Check                 6
75RP-9RP16 Special Dosimetry
75RP-9RP03       Bioassay Analysis                                         10
75RP-9QE21 Calibration of Self
75RP-9RP05       Contamination Dose Evaluation                             7
-Indicating Dosimeters
75RP-9RP16       Special Dosimetry                                         24
75RP-9QE21       Calibration of Self-Indicating Dosimeters                 13
Procedures
Procedures
Number Title Revision 75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM
Number           Title                                                         Revision
-21 Calibrator
75RP-9QE26       Operation and Verification of the Merlin Gerin Model CDM-      10
Audits and Self
Calibrator
-Assessments
Audits and Self-Assessments
Title Date 2016 Annual ALARA/Management Evaluation Report
Title                                                                         Date
June 23, 2017
2016 Annual ALARA/Management Evaluation Report                               June 23, 2017
2016 Annual Radiation Protection Program Summary Report
2016 Annual Radiation Protection Program Summary Report                       July 27, 2017
July 27, 2017 Condition Reports (CRs)
Condition Reports (CRs)
17-14033 17-14127 17-14527 17-15700 18-01423 Self-Reading Dosimeter Calibration Records
17-14033           17-14127         17-14527             17-15700         18-01423
Number Title Date 837097 Self-Reading Dosimeter
Self-Reading Dosimeter Calibration Records
September 8, 2017
Number           Title                                                 Date
836204 Self-Reading Dosimeter
837097           Self-Reading Dosimeter                               September 8, 2017
September 9, 2017
836204           Self-Reading Dosimeter                               September 9, 2017
833059 Self-Reading Dosimeter
833059           Self-Reading Dosimeter                               September 30, 2017
September 30, 2017
810641           Self-Reading Dosimeter gamma/neutron                 December 12, 2017
810641 Self-Reading Dosimeter gamma/neutron
810633           Self-Reading Dosimeter gamma/neutron                 December 12, 2017
December 12, 2017
810552           Self-Reading Dosimeter gamma/neutron                 December 13, 2017
810633 Self-Reading Dosimeter gamma/neutron
December 12, 2017
810552 Self-Reading Dosimeter gamma/neutron
December 13, 2017
Miscellaneous
Miscellaneous
Number Title Date 2017 Multi-Pack TLD Results
Number           Title                                                 Date
2017 100536 NVLAP Accreditation Report
2017             Multi-Pack TLD Results                                 2017
April 8, 2016
100536           NVLAP Accreditation Report                             April 8, 2016
100536 NVLAP Proficiency Testing Results  
100536           NVLAP Proficiency Testing Results - TLD               May 2, 2016
- TLD May 2, 2016
100536           NVLAP Proficiency Testing Results-EPD                 August 5, 2016
100536 NVLAP Proficiency Testing Results
100536           NVLAP Accreditation Report                             February 15, 2018
-EPD August 5, 2016
2017             Unit 1 Dry Active Waste                               December 1, 2017
100536 NVLAP Accreditation Report
2017             Unit 2 Dry Active Waste                               May 18, 2017
February 15, 2018
2016             Unit 3 Dry Active Waste                               December 22, 2016
2017 Unit 1 Dry Active Waste
25116             Intake Dose Assessment                                 April 21, 2016
December 1, 2017
2017 Unit 2 Dry Active Waste
May 18, 2017
2016 Unit 3 Dry Active Waste
December 22, 2016
25116 Intake Dose Assessment
April 21, 2016
 
Miscellaneous
Miscellaneous
Number Title Date 47194 Personnel Dosimetry Processing Report
Number           Title                                           Date
November 15, 2017 Section 4OA1: Performance Indicator Verification
47194             Personnel Dosimetry Processing Report           November 15, 2017
Section 4OA1: Performance Indicator Verification
Miscellaneous
Miscellaneous
Number Title Date 2016-002-01 Licensee Event Report
Number           Title                                                 Date
June 27, 20 17 2017-001-00 June 27, 2017
2016-002-01       Licensee Event Report                                 June 27, 2017
June 14, 2017 Palo Verde Plant Computer PI ProcessBook
2017-001-00       June 27, 2017                                         June 14, 2017
Palo Verde Control Room Logs (1/1/17  
Palo Verde Plant Computer PI ProcessBook
- 12/31/17)   Section 4OA2: Problem Identification and Resolution
Palo Verde Control Room Logs (1/1/17 - 12/31/17)
Section 4OA2: Problem Identification and Resolution
Procedures
Procedures
Number Title Revision 40ST-9DG01 Diesel Generator A Test
Number           Title                                                 Revision
40ST-9DG01       Diesel Generator A Test                               49
Condition Reports (CRs)
Condition Reports (CRs)
17-15901 18-03517 17-15838 17-11155 17-09750 16-03783     Section 4OA3:
17-15901           18-03517         17-15838         17-11155       17-09750
Follow-up of Events and Notices of Enforcement Discretion
16-03783
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion
Condition Reports (CRs)
Condition Reports (CRs)
18-02544 18-02688 18-02664 18-02605 18-02716
18-02544           18-02688         18-02664         18-02605       18-02716
The following items are requested for the
The following items are requested for the
Occupational Radiation Safety Inspection
Occupational Radiation Safety Inspection
Line 616: Line 760:
Inspection areas are listed in the attachments below.
Inspection areas are listed in the attachments below.
Please provide the requested information on or before January 26, 2018.
Please provide the requested information on or before January 26, 2018.
Please submit this information using the same lettering system as below. For example, all contacts and phone numbers for Inspection Procedure 71124.0
Please submit this information using the same lettering system as below. For example, all
should be in a file/folder titled  
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
"1- A," applicable organization charts in file/folder "
1- A, applicable organization charts in file/folder 1- B, etc.
1- B," etc. If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the report.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting. The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
information while writing the report.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or louis.carson@nrc.gov. PAPERWORK REDUCTION ACT STATEMENT
In addition to the corrective action document lists provided for each inspection procedure listed
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.
below, please provide updated lists of corrective action documents at the entrance meeting.
: [[contact::S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget]], control number 3150
The dates for these lists should range from the end dates of the original lists to the day of the
-0011.
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or
louis.carson@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
2. Occupational ALARA Planning and Controls (71124.02)
2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection:
Date of Last Inspection:         October 20, 2017
October 20, 2017
A. List of contacts and telephone numbers for ALARA program personnel
A. List of contacts and telephone numbers for ALARA program personnel
B. Applicable organization charts
B. Applicable organization charts
: [[contact::C. Copies of audits]], self
: [[contact::C. Copies of audits]], self-assessments, and LERs, written since date of last inspection,
-assessments, and LERs, written since date of last inspection
focusing on ALARA
, focusing on ALARA
D. Procedure index for ALARA Program
D. Procedure index for ALARA Program
E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures may be requested by number
E. Please provide specific procedures related to the following areas noted below.
after the inspector reviews the procedure indexes.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
1. ALARA Program
2. ALARA Committee
2. ALARA Committee
3. Radiation Work Permit Preparation
3. Radiation Work Permit Preparation
F. A summary list of corrective action documents (including corporate and sub
F. A summary list of corrective action documents (including corporate and sub-tiered
-tiered systems) written since date of last inspection, related to the ALARA program. In addition to ALARA, the summary should also address Radiation Work Permit violations, Electronic Dosimeter Alarms, and RWP Dose Estimates
systems) written since date of last inspection, related to the ALARA program. In addition
NOTE: The lists should indicate the significance level
to ALARA, the summary should also address Radiation Work Permit violations,
of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
Electronic Dosimeter Alarms, and RWP Dose Estimates
: [[contact::G. List of work activities greater than 1 rem]], since date of last inspection, Include original dose estimate and actual dose.
NOTE: The lists should indicate the significance level of each issue and the search
H. Site dose totals and 3
criteria used. Please provide in document formats which are searchable so that
-year rolling averages for the past 3 years (based on dose of record) I. Outline of source term reduction strategy
the inspector can perform word searches.
: [[contact::J. If available]], provide a copy of the ALARA outage report for the most recently completed outages for each unit
: [[contact::G. List of work activities greater than 1 rem]], since date of last inspection,
Include original dose estimate and actual dose.
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
record)
I. Outline of source term reduction strategy
: [[contact::J. If available]], provide a copy of the ALARA outage report for the most recently completed
outages for each unit
K. Please provide your most recent Annual ALARA Report.
K. Please provide your most recent Annual ALARA Report.
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
Date of Last Inspection:
Date of Last Inspection:       January 22, 2016
January 22, 2016
A. List of contacts and telephone numbers for the following areas:
A. List of contacts and telephone numbers for the following areas:
1. Dose Assessment personnel
1. Dose Assessment personnel
B. Applicable organization charts
B. Applicable organization charts
: [[contact::C. Audits]], self
: [[contact::C. Audits]], self-assessments, vendor or NUPIC audits of contractor support, and LERs
-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to:
written since date of last inspection, related to:
1. Occupational
1. Occupational Dose Assessment
Dose Assessment
D. Procedure indexes for the following areas:
D. Procedure indexes for the following areas:
1. Occupational Dose Assessment
1. Occupational Dose Assessment
E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Radiation Protection Program
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations
2. Radiation Protection Conduct of Operations
Line 671: Line 829:
7. Declared Pregnant Worker
7. Declared Pregnant Worker
8. Bioassay Program
8. Bioassay Program
F. List of corrective action documents (including corporate and sub
F. List of corrective action documents (including corporate and sub-tiered systems) written
-tiered systems) written since date of last inspection, associated with:
since date of last inspection, associated with:
1. National Voluntary Laboratory Accreditation Program (NVLAP)
1. National Voluntary Laboratory Accreditation Program (NVLAP)
2. Dosimetry (TLD/OSL, etc.) problems
2. Dosimetry (TLD/OSL, etc.) problems
Line 678: Line 836:
4. Bioassays or internally deposited radionuclides or internal dose
4. Bioassays or internally deposited radionuclides or internal dose
5. Neutron dose
5. Neutron dose
NOTE: The lists should indicate the significance level
NOTE: The lists should indicate the significance level of each issue and the search
of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
criteria used. Please provide in document formats which are searchable so that
: [[contact::G. List of positive whole body counts since date of last inspection]], names redacted if desired H. Part 61 analyses/scaling factors
the inspector can perform word searches.
: [[contact::I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP) accreditation report or]], if dosimetry is provided by a vendor, the vendor's most recent results
: [[contact::G. List of positive whole body counts since date of last inspection]], names redacted if
desired
H. Part 61 analyses/scaling factors
I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent
results
 
ML18127A004
ML18127A004
SUNSI Review:
SUNSI Review:         ADAMS:             Non-Publicly Available     Non-Sensitive   Keyword:
ADAMS:   Non-Publicly Available
By: JDixon             Yes No       Publicly Available           Sensitive     NRC-002
Non-Sensitive Keyword: By: JDixon
OFFICE           DRP/SRI       DRP/RI         DRP/RI         C:DRS/EB1     C:DRS/EB2     C:DRS/OB
Yes     No Publicly Available
NAME             CPeabody       DReinert       DYou         TFarnholtz       JDrake     VGaddy
Sensitive
SIGNATURE           /RA/           /RA/           /RA/             /RA/           /RA/       /RA/
NRC-002 OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB NAME CPeabody DReinert DYou TFarnholtz
DATE               4/30/18       5/1/2018       5/1/18       04/30/2018       4/30/18     4/30/18
JDrake VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 4/30/18 5/1/2018 5/1/18 04/30/2018
OFFICE           C:DRS/PS2       TL:IPAT       C:DRP/D
4/30/18 4/30/18 OFFICE C:DRS/PS2 TL:IPAT C:DRP/D   NAME HGepford GGeorge GMiller   SIGNATURE /RA/ /RA/ /RA/   DATE 4/30/18 4/30/2018 5/7/18
NAME             HGepford       GGeorge         GMiller
May 7, 2018   Mr. Robert Bement
SIGNATURE           /RA/           /RA/           /RA/
DATE               4/30/18     4/30/2018       5/7/18
 
May 7, 2018
Mr. Robert Bement
Executive Vice President, Nuclear/CNO
Executive Vice President, Nuclear/CNO
Mail Station 7602
Mail Station 7602
Arizona Public Service Company
Arizona Public Service Company
P.O. Box 52034
P.O. Box 52034
Phoenix, AZ 85072
Phoenix, AZ 85072-2034
-2034 SUBJECT: PALO VERDE NUCLEAR GENERATING STATION  
SUBJECT:       PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED
- NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001
INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND
05000530/2018001
Dear Mr. Bement:
Dear Mr. Bement:
On March 31, 2018, the  
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
: [[contact::U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1]], 2, and 3. On April 11, 2018, the
at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC
NRC inspectors discussed the results of this inspection with
inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of
Mr. Jack Cadogan
your staff. The results of this inspection are documented in the enclosed report.
and other members of your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
NRC inspectors
This finding involved a violation of NRC requirements. The NRC is treating this violation as a
documented
non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
one finding of very low safety significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as
If you contest the violation or significance of the NCV, you should provide a response within
a non-cited violation (NCV) consistent
days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
with Section
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
2.3.2.a of the Enforcement Policy. If you contest the violation or significance of the NCV, you should
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the
provide a response within
NRC resident inspector at the Palo Verde Nuclear Generating Station.
days of the date of this inspection report, with the basis for your denial, to the  
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
: [[contact::U.S.
response within 30 days of the date of this inspection report, with the basis for your
Nuclear Regulatory Commission]], ATTN: Document Control Desk, Washington, DC 20555
disagreement, to the  
-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.
: [[contact::U.S. Nuclear Regulatory Commission]], ATTN: Document Control Desk,
If you disagree with a cross
Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the
-cutting aspect assignment in this report, you should provide a response within 30
NRC resident inspector at the Palo Verde Nuclear Generating Station.
days of the date of this inspection report, with the basis for your disagreement, to the  
R. Bement                                         2
: [[contact::U.S.
This letter, its enclosure, and your response (if any) will be made available for public inspection
Nuclear Regulatory Commission]], ATTN: Document Control Desk, Washington, DC 20555
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
-0001; with copies to the
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Regional Administrator, Region
Withholding.
IV; and the NRC resident inspector at the
Sincerely,
Palo Verde Nuclear Generating Station.
                                                /RA/
: [[contact::R. Bement 2   This letter]], its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
Geoffrey  
-rm/adams.ht
ml and at the NRC Public Document Room in accordance with 10
CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely, /RA/   Geoffrey  
: [[contact::B. Miller]], Chief
: [[contact::B. Miller]], Chief
Project Branch D
Project Branch D
Division of Reactor Projects
Division of Reactor Projects
Docket Nos. 50
Docket Nos. 50-528, 50-529, 50-530
-528, 50-529, 50-530 License Nos. NPF
License Nos. NPF-41, NPF-51, NPF-74
-41, NPF-51, NPF-74 Enclosure:
Enclosure:
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001
Inspection Report 05000528/2018001,
05000529/2018001, 05000530/2018001
w/ Attachment:
w/ Attachment:
1. Supplemental Information
1. Supplemental Information
2. Occupational Radiation Safety
2. Occupational Radiation Safety
Inspection Item Request
Inspection Item Request
U.S. NUCLEAR REGULATORY COMMISSION
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Inspection Report
Docket Numbers: 05000528, 05000529, 05000530
Docket Numbers:       05000528, 05000529, 05000530
License Numbers: NPF-41, NPF-51, NPF-74   Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001
License Numbers:       NPF-41, NPF-51, NPF-74
Enterprise Identifier:
Report Numbers:       05000528/2018001, 05000529/2018001, and 05000530/2018001
I-2018-001-0013   Licensee: Arizona Public Service Company
Enterprise Identifier: I-2018-001-0013
Facility: Palo Verde Nuclear Generating Station
Licensee:             Arizona Public Service Company
Location: 5801 South Wintersburg Road
Facility:             Palo Verde Nuclear Generating Station
, Tonopah, AZ 85354
Location:               5801 South Wintersburg Road, Tonopah, AZ 85354
Inspection Dates:
Inspection Dates:       January 1, 2018 to March 31, 2018
January 1, 2018 to
Inspectors:            
March 31, 2018
Inspectors:
: [[contact::C. Peabody]], Senior Resident Inspector
: [[contact::C. Peabody]], Senior Resident Inspector
: [[contact::D. Reinert]], PhD, Resident Inspector
: [[contact::D. Reinert]], PhD, Resident Inspector
: [[contact::D. You]], Resident Inspector
: [[contact::D. You]], Resident Inspector
: [[contact::L. Carson]], Senior Health Physicist
: [[contact::L. Carson]], Senior Health Physicist
: [[contact::S. Hedger]], Emergency Preparedness Inspector
: [[contact::S. Hedger]], Emergency Preparedness Inspector
Approved By:
Approved By:           Geoffrey  
Geoffrey  
: [[contact::B. Miller]], Chief, Project Branch D, Division of Reactor Projects
: [[contact::B. Miller]], Chief, Project Branch D, Division of Reactor Projects
 
SUMMARY
SUMMARY  The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
an integrated inspection at Palo Verde Nuclear Generating Station, Units 1, 2, and 3, in accordance with the Reactor Oversight Process.
performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,
The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight
for more information. NRC and self
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
-revealed findings, violations, and additional items are summarized in the table below. List of Findings and Violations
reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC and self-revealed findings, violations, and additional items are summarized in the table
below.
List of Findings and Violations
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
Cornerstone
Cornerstone           Significance                         Cross-cutting Aspect Report
Significance
Section
Cross-cutting Aspect
Mitigating           Green                                 [H.12] - Human         71111.12 -
Report Section Mitigating Systems Green NCV 05000528/2018001
Systems              NCV 05000528/2018001-01              Performance, Avoid Maintenance
-01  Closed [H.12] - Human Performance, Avoid Complacency
Closed                                Complacency            Effectiveness
71111.12 - Maintenance Effectiveness
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
The inspectors reviewed a self
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe
-revealed, Green, non
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump  
-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump
: [[contact::A.
: [[contact::A. Specifically]], following power cable maintenance on November 9, 2017, the instructions for conducting a post
Specifically]], following power cable maintenance on November 9, 2017, the instructions for
-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
conducting a post-maintenance test for the transfer pump were inadequate to detect a high
 
resistance connection in the associated motor control center.
PLANT STATUS
PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On February 15, 20 18, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit
, and remained at or near rated thermal power for the remainder of the inspection period.
automatically tripped from full power when a control system failure caused a loss of generator
Unit s 2 and 3 operated at or near rated thermal power for the entire inspection period.
field excitation. The unit was restarted on February 19, 2018, and remained at or near rated
INSPECTION SCOPE
thermal power for the remainder of the inspection period.
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading
Units 2 and 3 operated at or near rated thermal power for the entire inspection period.
-rm/doc-collections/insp
INSPECTION SCOPES
-manual/inspection
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, "Light
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
-Water Reactor Inspection Program - Operations Phase.The inspectors performed plant status activities described in IMC 2515 Appendix
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
D, "Plant Status" and conducted routine reviews using IP
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
71152, "Problem Identification and Resolution.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and
complete when the IP requirements most appropriate to the inspection activity were met
compliance with Commission rules and regulations, license conditions, site procedures, and standards.
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed plant status activities described in
IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem
Identification and Resolution. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess licensee performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
REACTOR SAFETY
71111.04 - Equipment Alignment
71111.04 - Equipment Alignment
Partial Walkdown
Partial Walkdown (3 Samples)
(3 Samples) The inspectors evaluated system configuration
The inspectors evaluated system configurations during partial walkdowns of the following
s during partial walkdowns
systems/trains:
of the following systems/trains
    (1) Unit 1 containment spray system B on January 4, 2018
(1) Unit 1 containment spray system
    (2) Unit 2 auxiliary feedwater system A on January 30, 2018
B on January 4, 2018
    (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018
(2) Unit 2 auxiliary feedwater system A on January 30, 2018
Complete Walkdown (1 Sample)
(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018
The inspectors evaluated system configurations during a complete walkdown of the Unit 3
Complete Walkdown
containment spray system on January 18, 2018.
(1 Sample) The inspectors
71111.05AQ - Fire Protection Annual/Quarterly
evaluated system configuration
Quarterly Inspection (5 Samples)
s during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.
The inspectors evaluated fire protection program implementation in the following selected
71111.05AQ  
areas:
- Fire Protection Annual/Quarterly
    (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on
Quarterly Inspection
January 4, 2018
(5 Samples) The inspectors evaluated fire protection program implementation in the following selected areas: (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018
  (2) Unit 2 control room, Fire Zone 17, on January 19, 2018
(2) Unit 2 control room, Fire Zone 17
  (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A,
, on January 19, 2018
on January 23, 2018
(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A
  (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
, on January 23, 2018
  (5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018
(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B
on February 2, 2018
(5) Unit 3 vital switchgear room
A, Fire Zone 5A
, on February 8, 2018
71111.07 - Heat Sink Performance
71111.07 - Heat Sink Performance
Heat Sink (1 Sample) The inspectors
Heat Sink (1 Sample)
evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger
performance on February 21, 2018.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Operator Requalification
Operator Requalification (1 Sample)
(1 Sample) The inspectors
The inspectors observed and evaluated risk informed completion time program and
observed and evaluated risk informed completion time program and
CFR 50.69 program classroom training on January 31, 2018.
CFR 50.69 program classroom training
Operator Performance (1 Sample)
on January 31, 2018
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main
. Operator Performance
generator to the grid following a reactor trip caused by a fault in the main generator
(1 Sample) The inspectors
excitation system on February 19, 2018.
observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system
The inspectors observed and evaluated operator response to Unit 3 loss of A channel
on February 19, 2018.
indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and
The inspectors
FWIV-174, 177, on February 27, 2018.
observe d and evaluated
71111.12 - Maintenance Effectiveness
operator response to Unit 3 loss of A channel indication for
Routine Maintenance Effectiveness (2 Samples)
main steam and feedwater isolation valves, MSIV-170, 171, 180, 181
The inspectors evaluated the effectiveness of routine maintenance activities associated
, and FW IV-174, 177 , on February 27, 2018
with the following equipment and/or safety significant functions:
. 71111.12 - Maintenance Effectiveness
  (1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185
Routine Maintenance Effectiveness
in Units 2 and 3
(2 Sample s) The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
  (2) Diesel fuel oil transfer pump predictive engineering cable testing
  (1) Reach rod operator gear box maintenance on safety injection valves SI
71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)
-184 and SI
The inspectors evaluated the risk assessments for the following planned and emergent
-185 in Units 2 and 3
work activities:
(2) Diesel fuel oil transfer pump predictive engineering cable testing
  (1) Unit 1 elevated risk due to failure of emergency core cooling system A combined
71111.13 - Maintenance Risk Assessments and Emergent Work Control
minimum flow recirculation valve SIA-UV660 on January 4, 2018
(5 Samples) The inspectors evaluated the risk assessments for the following planned and emergent work activities:
  (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a
  (1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 201
surveillance run on January 5, 2018
(2) Unit 1 emergent risk due to diesel generator
  (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A
A unexpectedly shutdown during a surveillance run on January 5, 2018
atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection
(3) Unit 3 elevated risk due to planned maintenance on containment spray pump
valve SI-687 January 29, 2018 through February 4, 2018
A atmospheric dump valves
  (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
SG-179A and SG
  (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018
-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018
71111.15 - Operability Determinations and Functionality Assessments (9 Samples)
(4) Unit 1 elevated risk due to
The inspectors evaluated the following operability determinations and functionality
diesel generator
assessments:
A super outage on February 26, 2018
  (1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on
(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018
January 3, 2018
71111.15 - Operability Determinations and Functionality Assessments
  (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on
(9 Samples) The inspectors evaluated the following operability determinations and functionality assessments:
January 25, 2018
  (1) Unit 2 abnormal trend for containment sump level transmitter, RDL
  (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685,
-411, on January 3, 2018 (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts
failed to re-open during breaker maintenance on January 31, 2018
on January 25, 2018 (3) Unit 3 containment spray discharge
  (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on
to shutdown cooling heat exchanger
February 13, 2018
valve, SI-685, failed to re
  (5) Unit 1 calculated qualified life of safety injection combined header isolation valves,
-open during breaker maintenance on January 31, 2018
SI-660 and SI-659, on February 23, 2018
(4) Unit 1 diesel generator
  (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater
B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018 (5) Unit 1 calculated qualified life of safety injection combined header isolation
isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
valves , SI-660 and SI
  (7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A
-659 , on February 23, 2018
T-drains on March 6, 2018
(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves
  (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on
(MSIV-170, 171, 180, 181 and FWIV
March 7, 2018
-174, 177) on February 27, 2018
  (9) Unit 2 steam generator sodium concentration increase on March 12, 2018
(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG
71111.18 - Plant Modifications (1 Sample)
-139A T-drains on March 6, 2018
The inspectors evaluated the following temporary or permanent modifications:
(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018
  (1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-
(9) Unit 2 steam generator sodium concentration increase on March 12, 2018
connect valve, SI-696, replacement with General Electrical model Spectra breaker per
71111.18 - Plant Modifications
Design Equivalent Change 01035 on March 15, 2018
(1 Sample) The inspectors evaluated the following temporary or permanent modifications:
71111.19 - Post Maintenance Testing (6 Samples)
  (1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross
The inspectors evaluated the following post maintenance tests:
-connect valve, SI
  (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve
-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018
SIA-UV660 following limit switch adjustment on January 4, 2018
 
  (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch
71111.19 - Post Maintenance Testing
replacement following an unplanned cooldown during a monthly surveillance run on
(6 Samples) The inspectors evaluated the following post maintenance
January 9, 2018
tests: (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018
  (3) Unit 3 containment spray pump A test following breaker maintenance on
(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018
February 6, 2018
(3) Unit 3 containment spray pump
  (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves
A test following breaker maintenance on February 6, 2018 (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018
on February 28, 2018
(5) Unit 2 essential cooling water pum
  (5) Unit 2 essential cooling water pump A test and flow balance following planned
p A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018
maintenance to calibrate motor overcurrent relays and replace a high discharge
(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test
pressure switch on March 20, 2018
following online maintenance outage
  (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features
on March 23, 2018
fast start test following online maintenance outage on March 23, 2018
71111.20 - Refueling and Other Outage Activities
71111.20 - Refueling and Other Outage Activities (1 Sample)
(1 Sample) The inspectors evaluated activities
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced
from February 15
outage due to an unplanned reactor trip caused by a fault in the main generator excitation
- 19, 2018 , for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.
circuitry.
71111.22 - Surveillance Testing
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
The inspectors evaluated the following surveillance tests:
Routine (6 Samples) (1) Unit 1 diesel fuel oil
Routine (6 Samples)
transfer pump A inservice test
  (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
on January 24, 2018
  (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
  (3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed
(3) Unit 2 containment leakage type "B and C" testing, SR 3.0.3 entry for missed surveillance on February 28, 2018
surveillance on February 28, 2018
(4) Unit 3 diesel fuel oil transfer pump A inservice test
  (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
on March 7, 2018
  (5) Unit 3, essential chiller A vibration analysis on March 8, 2018
(5) Unit 3, essential chiller A vibration analysis
  (6) Unit 1 containment spray pump B inservice test on March 22, 2018
on March 8, 2018
In-service (1 Sample)
(6) Unit 1 containment spray pump B inservice test on March 22, 2018
  (1) Unit 2 containment spray pump A inservice test on March 1, 2018
I n-service (1 Sample) (1) Unit 2 containment spray pump A inservice
71114.02 - Alert and Notification System Testing (1 Sample)
test on March 1, 2018
 
71114.02 - Alert and Notification System Testing
(1 Sample)
The inspectors evaluated the maintenance and testing of the alert and notification system
The inspectors evaluated the maintenance and testing of the alert and notification system
between May 1, 2016
between May 1, 2016 - February 20, 2018.
- February 20, 2018
71114.03 - Emergency Response Organization Staffing and Augmentation System (1 Sample)
. 71114.03 - Emergency Response Organization Staffing and Augmentation System
The inspectors evaluated the readiness of the Emergency Response Organization between
(1 Sample)
May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff
The inspectors evaluated the readiness of the Emergency Response Organization
their emergency response facilities in accordance with emergency plan commitments.
between May 1, 2016
- February 20, 2018. Inspectors also evaluated the licensee's ability to staff their emergency response facilities in accordance with emergency plan commitments.
71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)
71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and
- February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.
practices between May 1, 2016 - February 20, 2018. The evaluation reviewed
71114.05 - Maintenance of Emergency Preparedness
screenings and evaluations documenting the implementation of this process. The review
(1 Sample)
of the change process documentation does not constitute NRC approval.
The inspectors
71114.05 - Maintenance of Emergency Preparedness (1 Sample)
evaluated the maintenance of the emergency preparedness program between May 1, 2016
The inspectors evaluated the maintenance of the emergency preparedness program
- February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the
emergency plan, the conduct of drills and exercises, licensee audits and assessments,
and the maintenance of equipment important to emergency preparedness.
71114.06 - Drill Evaluation
71114.06 - Drill Evaluation
Emergency Planning Drill
Emergency Planning Drill (1 Sample)
(1 Sample) The inspectors evaluated
The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.
a full-scale emergency preparedness drill on February 13, 2018.
RADIATION SAFETY
RADIATION SAFET
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
Radiological Work Planning (1 Sample)
Radiological Work Planning
The inspectors evaluated the licensees radiological work planning by reviewing the
(1 Sample)
following activities:
The inspectors evaluated the licensee's radiological work planning by reviewing the following activities:
  (1) RWP 2017-9-1016, RMC Operations and Routine Tasks
  (1) RWP 2017-9-1016, RMC Operations and Routine Tasks
  (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
  (3) RWP 2017-3002, Reactor Destack/Restack
(3) RWP 2017-3002, Reactor Destack/Restack
  (4) RWP 2017-3015, Cavity Decontamination
(4) RWP 2017-3015, Cavity Decontamination
  (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel
(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel
Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
 
The inspectors evaluated dose estimates and exposure tracking.
Verification of Dose Estimates and Exposure Tracking Systems
71124.04 - Occupational Dose Assessment
(1 Sample)
Source Term Characterization (1 Sample)
The inspectors
The inspectors evaluated the licensees source term characterization.
evaluated dose estimates and exposure tracking
External Dosimetry (1 Sample)
. 71124.04 - Occupational Dose Assessment
The inspectors evaluated the licensees external dosimetry program.
Source Term Characterization
Internal Dosimetry (1 Sample)
(1 Sample) The inspectors evaluated the licensee's source term characterization
The inspectors evaluated the licensees internal dosimetry program.
. External Dosimetry (1 Sample) The inspectors
Special Dosimetric Situations (1 Sample)
evaluated the licensee's external dosimetry program. Internal Dosimetry
The inspectors evaluated the licensees performance for special dosimetric situations.
(1 Sample) The inspectors
OTHER ACTIVITIES - BASELINE
evaluated the licensee's internal dosimetry program
71151 - Performance Indicator Verification (15 Samples)
. Special Dosimetric Situations
The inspectors verified licensee performance indicators submittals listed below:
(1 Sample) The inspectors
  (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -
evaluated the licensee's performance for special dosimetric situations
December 31, 2017)
. OTHER ACTIVITIES
  (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -
- BASELINE 71151 - Performance Indicator Verification
December 31, 2017)
(15 Samples) The inspectors
  (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -
verified licensee performance
December 31, 2017)
indicators
  (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -
submittals
December 31, 2017)
listed below:   (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017
  (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31,
- December 31, 2017) (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017
2017)
- December 31, 2017
  (6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1,
) (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017
2017 - December 31, 2017)
- December 31, 2017
  (7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -
) (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - December 31, 2017) (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017
December 31, 2017)
- December 31, 2017) (6) EP02: Emergency Response Organization (ERO) Drill Participation
Sample (January 1, 2017 - December 31, 2017
(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017
- December 31, 2017
)
71152 - Problem Identification and Resolution
71152 - Problem Identification and Resolution
Annual Follow
Annual Follow-up of Selected Issues (1 Sample)
-up of Selected Issue s (1 Sample) The inspectors reviewed the licensee's implementation of its corrective action program related to the following issues:
The inspectors reviewed the licensees implementation of its corrective action program
  (1) Multiple failures of diesel generator underfrequency protective relay
related to the following issues:
on March 26, 2018
    (1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018
71153 - Follow-up of Events
71153 - Follow-up of Events and Notices of Enforcement Discretion
and Notices of Enforcement Discretion
Events (1 Sample)
Events (1 Sample)   The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation
and licensee's response
and licensees response on February 15 - 16, 2018.
on February 15
INSPECTION RESULTS
- 16, 2018. INSPECTION RESULTS
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
Cornerstone
Cornerstone         Significance                                 Cross-cutting Report
Significance
Aspect             Section
Cross-cutting Aspect Report Section Mitigating Systems Green NCV 05000528/2018001
Mitigating         Green                                         [H.12] -           71111.12 -
-01  Closed  [H.12] - Human Performance, Avoid Complacency
Systems            NCV 05000528/2018001-01                      Human              Maintenance
71111.12 - Maintenance Effectiveness
Closed                                        Performance, Effectiveness
The inspectors reviewed a self
Avoid
-revealed, Green, non
Complacency
-cited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
: [[contact::A. Specifically]], following power cable maintenance on November 9, 2017, the instructions for conducting a post
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe
-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump  
Description: On November 12, 2017, the licensee was conducting a 24
: [[contact::A.
-hour surveillance test run of Unit 1 diesel generator
Specifically]], following power cable maintenance on November 9, 2017, the instructions for
(EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m.
conducting a post-maintenance test for the transfer pump were inadequate to detect a high
, control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump
resistance connection in the associated motor control center.
A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
Description: On November 12, 2017, the licensee was conducting a 24-hour surveillance test
Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24
run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began
-hour surveillance run on November 14, 2017.
the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer
 
pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start
The licensee's apparent cause investigation determine
on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the
d that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017 , under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis. Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re
EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run
-landed onto the secondary stabs of the breaker and motor control center chassis. The licensee's work planners had not recognized the possibility that removing and re
for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.
Licensee electricians took electrical resistance readings across the connections in the motor
The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pump's control switch was held in the start position for only a few seconds.
control center for the fuel oil transfer pump breaker. The electricians identified that the direct
The licensee's apparent cause
cause of the transfer pump failure was a high variable resistance secondary stab connection
investigation identified that nonintrusive as
in the motor control center cubicle. The electricians removed the breaker and cleaned and
-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative
adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as
maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.
left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was
The post-maintenance test was not written in accordance with station procedure 30DP
successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared
-9WP04, "Post
operable following the successful completion of the 24-hour surveillance run on November
-Maintenance Testing Development," Revision 19, Step 4.1.1
14, 2017.
, which states, in part, that the post
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump
-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation. The act of de
breaker had been removed from service for periodic predictive maintenance on November 9,
-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post
2017, under work order 4685719. During this maintenance activity licensee engineers
-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.
disconnected the diesel fuel oil transfer pump motor power and control cables for megger
Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re
testing. Cable lug screw connections attach each of these cables to the secondary stab
-terminating motor control center secondary stab connections. As an interim measure
connections on the movable motor breaker and the stationary motor control center chassis.
, the inspectors confirmed that all safety
Cable connections on the secondary stab connections are removed for testing, and then
-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.
following testing, the cables are re-landed onto the secondary stabs of the breaker and motor
Corrective Action Reference
control center chassis. The licensees work planners had not recognized the possibility that
: Condition Report 17
removing and re-landing the cables on the lug screw connections had the potential to disturb
-16497 Performance Assessment
the motor control center secondary stab connections.
Performance Deficiency: The licensee's failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance
The post-maintenance test associated with the cable testing was a momentary start of the
diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position
for only a few seconds. The licensees apparent cause investigation identified that
nonintrusive as-left quantitative resistance checks could have been used to assess the
integrity of the secondary stab connections. The licensee performs similar checks when
performing individual breaker cubicle preventative maintenance tasks that actively remove
and re-test the individual motor control center bucket. Such a check was the method used by
the electricians to initially diagnose the breaker failure. However, no such quantitative
resistance check was specified in the cable testing work order.
The post-maintenance test was not written in accordance with station procedure 30DP-
9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in
part, that the post-maintenance test shall ensure that equipment performs its intended
function when returned to service following maintenance, that a new deficiency has not been
created, and that the equipment will function as designed for safe and reliable plant operation.
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing
created new failure deficiency by disturbing electrical continuity and creating a high resistance
condition at the secondary stab connection that impacted EDG operability. The post-
maintenance test following the cable testing maintenance was not adequate to ensure that a
new deficiency had not been created.
Corrective Action: The licensee has taken corrective action to revise the work instructions for
performing future cable testing to include quantitative resistance retests when re-terminating
motor control center secondary stab connections. As an interim measure, the inspectors
confirmed that all safety-related 480V electrical breakers that have been subject to this cable
testing have performed satisfactorily during subsequent diesel generator surveillance testing.
Corrective Action Reference: Condition Report 17-16497
Performance Assessment:
Performance Deficiency: The licensees failure to prescribe appropriate retest activities
following predictive maintenance on diesel fuel oil transfer pump cables is a performance
deficiency.
deficiency.
Screening: The performance deficiency is more
Screening: The performance deficiency is more-than-minor and a finding because it is
-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that
associated with the equipment performance attribute of the mitigating systems cornerstone
disturbed the power cables for the Unit 1 diesel fuel
objective to ensure the availability, reliability, and capability of systems that respond to
oil transfer pump
initiating events to prevent undesirable consequences. Specifically, on November 9, 2017,
A. Without an appropriate post
the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel
-maintenance test, this activity rendered the Unit 1 diesel generator
oil transfer pump  
A inoperable.
: [[contact::A. Without an appropriate post-maintenance test]], this activity rendered the
Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, "Significance Determination Process for Findings at Power," Exhibit 2, "Mitigating Systems Screening Questions
Unit 1 diesel generator A inoperable.
" and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.
Significance: The inspectors performed the initial significance determination using NRC
Cross-cutting Aspect: The finding has a cross
Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for
-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing
Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that
the power cables leads, instead relying on past successful tests [H.12].
the finding was of very low safety significance (Green) because the finding did not represent
Enforcement
an actual loss of safety function of a single train for greater that its technical specification
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.
allowed outage time.
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human
A, an activity affecting quality to which Appendix B
performance associated with the avoid complacency aspect. Specifically, licensee work
applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result
planners did not consider potential undesired consequences associated with disturbing the
, the Unit 1 diesel generator
power cables leads, instead relying on past successful tests [H.12].
A was rendered inoperable from November 9, 2017 to November 14, 2017. Disposition:
Enforcement:
This violation is being treated as a non
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and
-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
Drawings, requires, in part, that activities affecting quality be prescribed by documented
EXIT MEETING S AND DEBRIEFS
instructions, procedures, or drawings, of a type appropriate to the circumstances and be
accomplished in accordance with these instructions, procedures, or drawings.
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the
Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies,
without documented instructions, procedures, or drawings of a type appropriate to the
circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure
the maintenance was successful and the pump was returned to service, and as a result, the
Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14,
2017.
Disposition: This violation is being treated as a non-cited violation consistent with Section
2.3.2.a of the Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
On February 16, 2018, the inspector presented the radiation safety inspection results to Ms.  
On February 16, 2018, the inspector presented the radiation safety inspection results to
: [[contact::M. Lacal]], Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.
Ms.  
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr.  
: [[contact::M. Lacal]], Senior Vice President, Regulatory and Oversight, and other members of the
: [[contact::M. McLaughlin]], Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr.  
licensee staff.
: [[contact::T. Weber]], Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program
On April 11, 2018, the inspector presented the quarterly resident's inspection results to Mr.  
inspection to Mr.  
: [[contact::J. Cadogan]], Senior Vice President, Site Operations, and other members of the licensee staff.
: [[contact::M. McLaughlin]], Vice President, Operations Support, and other members of the
licensee staff. On March 29, 2018, the inspector communicated the inspection results
telephonically to Mr.  
: [[contact::T. Weber]], Acting Director, Nuclear Regulatory Affairs, and other members
of the licensee staff.
On April 11, 2018, the inspector presented the quarterly residents inspection results to
Mr.  
: [[contact::J. Cadogan]], Senior Vice President, Site Operations, and other members of the licensee
staff.
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
DOCUMENTS REVIEWED
DOCUMENTS REVIEWED
Section 1R04: Equipment Alignment
Section 1R04: Equipment Alignment
Procedures
Procedures
Number Title Revision 40ST-9AF07 Auxiliary Feedwater Pump AFA
Number           Title                                                       Revision
-P01 Monthly Valve Alignment 6 40ST-9SI13 LPSI and CS System Alignment Verification
40ST-9AF07       Auxiliary Feedwater Pump AFA-P01 Monthly Valve             6
Alignment
40ST-9SI13       LPSI and CS System Alignment Verification                   33
Condition Reports (CRs)
Condition Reports (CRs)
16-17321 17-03027     Drawing s Number Title Revision 03-M-HJP-001 P&I Diagram Control Building HVAC
16-17321           17-03027
03-M-HJP-002 P&I Diagram Control Building HVAC
Drawings
03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System
Number           Title                                                       Revision
03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & Cont. Spray Discharge
03-M-HJP-001     P&I Diagram Control Building HVAC                           14
03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF Pump Suction Lines
03-M-HJP-002     P&I Diagram Control Building HVAC                           14
03-M-SIP-001     P&I Diagram Safety Injection & Shutdown Cooling System     49
03-P-SIF-0207     Auxiliary Building Isometric Safety Injection System LPSI & 6
Cont. Spray Discharge
03-P-SIF-0201     Auxiliary Building Isometric Safety Injection System ESF   7
Pump Suction Lines
Miscellaneous
Miscellaneous
Number Title Revision STM-30D System Training Manual Volume 30D: Control Building HVAC System (HJ)
Number           Title                                                       Revision
Section 1R05: Fire Protection
STM-30D           System Training Manual Volume 30D: Control Building         6
HVAC System (HJ)
Section 1R05: Fire Protection
Procedures
Procedures
Number Title Revision 14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance
Number         Title                                                             Revision
14FT-9FP70     Appendix R & Former Tech Spec Penetration Seal Surveillance       13
Condition Reports (CRs)
Condition Reports (CRs)
17-03870 18-00999     Miscellaneous
17-03870           18-00999
Number Title Revision/Date
Miscellaneous
PVNGS Pre-Fire Strategies Manual
Number           Title                                           Revision/Date
13-MM-0650 Fire Protection & Spray System Sub
PVNGS Pre-Fire Strategies Manual               26
007 13-MS-A083 NFPA Code Applicability and Conformance Review
13-MM-0650       Fire Protection & Spray System Sub             007
007 4834415 Fire Safety Component Condition Record
13-MS-A083       NFPA Code Applicability and Conformance Review 007
November 3, 2016 4834430 Fire Safety Component Condition Record
4834415           Fire Safety Component Condition Record         November 3, 2016
November 3, 2016 4843902 Fire Safety Component Condition Record
4834430           Fire Safety Component Condition Record         November 3, 2016
December 6, 2016 Unit 3 Tamper/Vital/Security Tour  
4843902           Fire Safety Component Condition Record         December 6, 2016
- Post 31 February 7, 2018 4971714 Open Door/Hatch/Floor Plug Permit
Unit 3 Tamper/Vital/Security Tour - Post 31     February 7, 2018
January 29, 20
4971714           Open Door/Hatch/Floor Plug Permit               January 29, 2018
4971687 Open Door/Hatch/Floor Plug Permit
4971687           Open Door/Hatch/Floor Plug Permit               January 29, 2018
January 29, 2018
Section 1R07: Heat Sink Performance
Section 1R07: Heat Sink Performance
Procedures
Procedures
Number Title Revision 73DP-9ZZ21 Heat Exchanger Visual Inspection
Number           Title                                               Revision
73DP-9ZZ11 Heat Exchanger Program
73DP-9ZZ21       Heat Exchanger Visual Inspection                     6
73DP-9ZZ11       Heat Exchanger Program                               15
Condition Reports (CRs)
Condition Reports (CRs)
18-03133 18-03138 18-03139   Work Orders
18-03133           18-03138           18-03139
(WOs) 4591574 4591575 4667054 4667055 4667098 Section 1R11: Licensed Operator Requalification Program and Licensed Operator Performance
Work Orders (WOs)
4591574           4591575           4667054           4667055   4667098
Section 1R11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Procedures
Number Title Revision 40OP-9MB01 Main Generation and Excitation
Number           Title                                               Revision
40DP-9OP02 Conduct of Operations
40OP-9MB01       Main Generation and Excitation                       63
40DP-9OP02       Conduct of Operations                               72
Procedures
Procedures
Number Title Revision 40AL-9RK6A Panel B06A Alarm Responses
Number           Title                                                   Revision
40AL-9RK6A       Panel B06A Alarm Responses                             18
Condition Reports (CRs)
Condition Reports (CRs)
18-02797 18-02593 18-03215   Miscellaneous
18-02797           18-02593         18-03215
Number Title Date Current Alarm Status Report
Miscellaneous
February 16, 20
Number           Title                                             Date
Section 1R12: Maintenance Effectiveness
Current Alarm Status Report                       February 16, 2018
Section 1R12: Maintenance Effectiveness
Procedures
Procedures
Number Title Revision 32MT-9ZZ74 Molded Case Circuit Breaker Test
Number           Title                                                   Revision
30DP-9WP04 Post-Maintenance Testing Development
2MT-9ZZ74       Molded Case Circuit Breaker Test                       48
30DP-9WP04       Post-Maintenance Testing Development                   19
Condition Reports (CRs)
Condition Reports (CRs)
17-08025-005 17-08025 17-16497   Work Orders
17-08025-005       17-08025         17-16497
(WOs) 4925959 4925966 4925967 4925969 4685719 4788985     Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Work Orders (WOs)
25959            4925966           4925967         4925969         4685719
4788985
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Procedures
Procedures
Number Title Revision 40DP-9AP21 Protected Equipment
Number           Title                                                   Revision
70DP-0RA05 Assessment and Management of Risk when Performing Maintenance in Modes 1 and 2
40DP-9AP21       Protected Equipment                                     7
40MT-9ZZ01 Operations Maintenance Activities
70DP-0RA05       Assessment and Management of Risk when Performing       23
40DP-9RS01 Operations Department Online Nuclear Risk Management Mode 1 and 2
Maintenance in Modes 1 and 2
40MT-9ZZ01       Operations Maintenance Activities                       5
40DP-9RS01       Operations Department Online Nuclear Risk Management   4
Mode 1 and 2
Condition Reports (CRs)
Condition Reports (CRs)
18-00249 185-00136 18-00336 18-02544   Miscellaneous
18-00249           185-00136         18-00336         18-02544
Number Title Date Scheduler's Evaluation for PV Unit 1
Miscellaneous
January 4, 2018 Scheduler's Evaluation for PV Unit 1
Number           Title                                             Date
February 23, 2018 Scheduler's Evaluation for PV Unit 3
Schedulers Evaluation for PV Unit 1               January 4, 2018
February 1, 2018
Schedulers Evaluation for PV Unit 1               February 23, 2018
Scheduler's Evaluation for PV Unit 2
Schedulers Evaluation for PV Unit 3               February 1, 2018
March 19, 2018
Schedulers Evaluation for PV Unit 2               March 19, 2018
Unit 3 Archived Operator Logs
Unit 3           Archived Operator Logs                             January 29, 2018 -
January 29, 2018  
February 4, 2018
- February 4, 2018
Section 1R15: Operability Determinations and Functionality Assessments
Section 1R15: Operability Determinations and Functionality Assessments
Procedures
Procedures
Number Title Revision 40ST-9ZZm1 Operations Mode 1 Surveillance Logs
Number           Title                                                     Revision
40AL-9RK6A Panel B06A Alarm Responses
40ST-9ZZm1       Operations Mode 1 Surveillance Logs                       71
74DP-9CY04 Systems Chemistry Specifications
40AL-9RK6A       Panel B06A Alarm Responses                               18
74DP-9CY04       Systems Chemistry Specifications                         94
Condition Reports (CRs)
Condition Reports (CRs)
17-18475 12-01397 17-17856 13-01198 18-03127 17-16393 18-03215 18-03291 18-02839 18-01610 18-02334 3127427 18-02468 18-03980   Miscellaneous
17-18475           12-01397         17-17856         13-01198         18-03127
Number Title Revision/Date
17-16393           18-03215         18-03291         18-02839         18-01610
03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves
18-02334           3127427           18-02468         18-03980
18-02334-003 Engineering Evaluation
Miscellaneous
February 15, 20
Number           Title                                               Revision/Date
4428056 Adverse CRDR
03-E-SGF-023     Control Wiring Diagram Main Steam Isolation Valves 11
July 19, 2013
18-02334-003     Engineering Evaluation                             February 15, 2018
EQ Program Manual
28056          Adverse CRDR                                       July 19, 2013
Section 1R18: Plant Modifications
EQ Program Manual                                   26
Section 1R18: Plant Modifications
Condition Reports (CRs)
Condition Reports (CRs)
18-04116     Work Orders
18-04116
(WOs) 4989102     Miscellaneous
Work Orders (WOs)
Number Title Date DEC-01035 Design Equivalent Change
4989102
April 12 , 2017 Section 1R19: Post
Miscellaneous
-Maintenance Testing
Number           Title                                                   Date
DEC-01035         Design Equivalent Change                               April 12, 2017
Section 1R19: Post-Maintenance Testing
Procedures
Procedures
Number Title Revision 40OP-9CH12 Refueling Water Tank (RWT) Operations
Number           Title                                                         Revision
32MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent Relays 4 32MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous Overcurrent Relays
40OP-9CH12       Refueling Water Tank (RWT) Operations                         41
40OP-9EW02 Essential Cooling Water System (EW) Train B
2MT-9ZZ13       Testing and Calibration of 121FC66K01A Time Overcurrent       4
40ST-9DG01 Diesel Generator A Test
Relays
73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load
2MT-9ZZ17       Testing and Calibration of 12PJC11AV1A Instantaneous         4
Overcurrent Relays
40OP-9EW02       Essential Cooling Water System (EW) Train B                   26
40ST-9DG01       Diesel Generator A Test                                       49
73ST-9DG08       Class 1E Diesel Generator Load Reject 24 Hour Rated Load     13
and Hot Start Test Train B
and Hot Start Test Train B
40ST-9DG02 Diesel Generator B Test
40ST-9DG02       Diesel Generator B Test                                       54
Condition Reports (CRs)
Condition Reports (CRs)
18-00136 18-00197 18-01931 18-00210 18-00290 18-00336 18-00377 18-00346 18-04731 18-04732 Work Orders
18-00136           18-00197           18-01931       18-00210         18-00290
(WOs) 4964492 4822983 4981967 4726747 4821113 4847651 4965079 4972486 4847637
18-00336           18-00377           18-00346       18-04731         18-04732
Drawings Number Title Revision 01-E-DGB-007 Elementary Diagram: Diesel Engine Control
Work Orders (WOs)
01-E-DGF-007 Control Wiring Diagram: Diesel Engine
4964492           4822983           4981967         4726747           4821113
13-M018-00141 Control Schematic (Starting Sequence Control)
4847651           4965079           4972486         4847637
Drawings
Number           Title                                               Revision
01-E-DGB-007     Elementary Diagram: Diesel Engine Control           15
01-E-DGF-007     Control Wiring Diagram: Diesel Engine               13
13-M018-00141     Control Schematic (Starting Sequence Control)       25
Miscellaneous
Miscellaneous
Number Title Revision/Date
Number           Title                                               Revision/Date
18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown during Surveillance Run 1/5/2018
18-00210-004     Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018
January 8, 2018
during Surveillance Run 1/5/2018
Section 1R20: Refueling and Other Outage Activities
Section 1R20: Refueling and Other Outage Activities
Procedures
Procedures
Number Title Revision 40OP-9MB01 Main Generation and Excitation
Number           Title                                                   Revision
Section 1R22: Surveillance Testing
40OP-9MB01       Main Generation and Excitation                         63
Section 1R22: Surveillance Testing
Procedures
Procedures
Number Title Revision 73DP-9CL02 Containment Leakage Rate Testing Program
Number           Title                                                   Revision
73ST-9XI20 Atmospheric Dump Valves  
73DP-9CL02       Containment Leakage Rate Testing Program               33
- Inservice Test
73ST-9XI20       Atmospheric Dump Valves - Inservice Test               47
73ST-9SI06 Containment Spray Pumps and Check valves  
73ST-9SI06       Containment Spray Pumps and Check valves - Inservice   42
- Inservice Test 42 73ST-9DF01 Diesel Fuel Oil Transfer Pumps  
Test
- Inservice Test
73ST-9DF01       Diesel Fuel Oil Transfer Pumps - Inservice Test         34
40DP-9OP06 Operations Department Repetitive Task Program
40DP-9OP06       Operations Department Repetitive Task Program           130
130 73ST-9SI06 Containment Spray Pumps and Check Valves
73ST-9SI06       Containment Spray Pumps and Check Valves- Inservice     42
- Inservice Test 42  Condition Reports (CRs)
Test
16-15793 18-03304 18-01314 18-03825   Work Orders
Condition Reports (CRs)
(WOs) 4822921 4840032 4843076 4843390
16-15793           18-03304           18-01314         18-03825
Work Orders (WOs)
22921            4840032           4843076           4843390
Miscellaneous
Miscellaneous
Number Title Revision/Date
Number           Title                                                 Revision/Date
13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication Loops Uncertainty Calculation
13-JC-SI-0215     Containment Spray Pump Discharge Flow Indication     18
18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time
Loops Uncertainty Calculation
January 26, 2018
18-01314-002     Engineering Evaluation: ADV 178 Fast Stroke Time     January 26, 2018
18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for
18-03304-002     Engineering Evaluation: SR 3.0.3 Evaluation for       March 2, 2018
SB-200, 202, and 205
SB-200, 202, and 205
March 2, 2018  Section 1EP2: Alert and Notification System Testing
Section 1EP2: Alert and Notification System Testing
Miscellaneous Documents
Miscellaneous Documents
Number Title Date ID/Letter Number:  240-02802 Palo Verde Nuclear Generating Station Alert and Notification System (ANS) FEMA 350 Report  
Number           Title                                                 Date
- May 2017 May 26, 2017
ID/Letter       Palo Verde Nuclear Generating Station Alert and       May 26, 2017
Palo Verde Nuclear Generating Station, Alert and Notification System (ANS), FEMA 350 Report
Number:          Notification System (ANS) FEMA 350 Report -
May 2017  Palo Verde Nuclear Generating Station Siren Operating Manual November 2015
240-02802        May 2017
January 4, 2018
Palo Verde Nuclear Generating Station, Alert and     May 2017
Letter from FEMA Region IX to Director, Division of Emergency Management, State of Arizona
Notification System (ANS), FEMA 350 Report
September 19, 2017  State of Arizona/Maricopa County Offsite Emergency Response Plan, Palo Verde Nuclear Generating Station
Palo Verde Nuclear Generating Station Siren Operating November 2015
November 2017
Manual                                                January 4, 2018
The Maricopa County Sheriff's Office Emergency Response to Palo Verde Nuclear Generating Station
Letter from FEMA Region IX to Director, Division of   September 19,
August 2016
Emergency Management, State of Arizona               2017
Work Orders
State of Arizona/Maricopa County Offsite Emergency   November 2017
(WOs) 474965/0     Section 1EP3: Emergency Response Organization Staffing and Augmentation
Response Plan, Palo Verde Nuclear Generating Station
The Maricopa County Sheriffs Office Emergency       August 2016
Response to Palo Verde Nuclear Generating Station
Work Orders (WOs)
474965/0
Section 1EP3: Emergency Response Organization Staffing and Augmentation
Procedures
Procedures
Number Title Revision EP-0902 Notifications
Number           Title                                                 Revision
EP-0901 Classifications
EP-0902           Notifications                                         10
40AL-9RK7C Panel B07C Alarm Responses 15 40AO-9ZZ21 Acts of Nature
EP-0901           Classifications                                       10
79IS-9SM01 Analysis of Seismic Event
40AL-9RK7C       Panel B07C Alarm Responses                             15
40AO-9ZZ21       Acts of Nature                                         37
79IS-9SM01       Analysis of Seismic Event                             27
Miscellaneous Documents
Miscellaneous Documents
Number Title Date 240-02799 JF/MA 2017 1 st Quarter - Emergency Preparedness Augmentation Drill Report
Number           Title                                               Date
240-02799         2017 1 Quarter - Emergency Preparedness
st
March 21, 2017
March 21, 2017
240-02803 CS/MA 2017 2 nd Quarter - Emergency Preparedness Augmentation Drill Report
JF/MA            Augmentation Drill Report
June 6, 2017
240-02803         2017 2nd Quarter - Emergency Preparedness           June 6, 2017
240-02797 2017 3rd Quarter  
CS/MA            Augmentation Drill Report
- Emergency Preparedness Augmentation Drill Report (After Hours)
240-02797         2017 3rd Quarter - Emergency Preparedness           July 25, 2017
July 25, 2017
Augmentation Drill Report (After Hours)
240-02808 2017 3rd Quarter  
240-02808         2017 3rd Quarter - Emergency Preparedness           September 6, 2017
- Emergency Preparedness Augmentation Drill Repo
Augmentation Drill Report
rt September 6, 2017
240-02817         2017 4th Quarter - Emergency Preparedness           December 13,
240-02817 CS/ma 2017 4 th Quarter - Emergency Preparedness Augmentation Drill Report
CS/ma            Augmentation Drill Report                           2017
December 13, 2017 240-02790 JF/MA 2016 2 nd Quarter - Emergency Preparedness Augmentation Drill Report
240-02790         2016 2nd Quarter - Emergency Preparedness           June 23, 2016
June 23, 2016
JF/MA            Augmentation Drill Report
240-02791 JF/MA 2016 3 rd Quarter - Emergency Preparedness Augmentation Drill Report
240-02791         2016 3rd Quarter - Emergency Preparedness           August 3, 2016
August 3, 2016
JF/MA            Augmentation Drill Report
240-02798 December 5, 2016, Alert Event Report
240-02798         December 5, 2016, Alert Event Report               January 17, 2017
January 17, 2017
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Procedure
Procedure   Number Title Revision 16DP-0EP22 Emergency Plan Maintenance
Number           Title                                                   Revision
11, 12 Miscellaneous Documents
16DP-0EP22       Emergency Plan Maintenance                               11, 12
Number Title Date Evaluation Tracking Number
Miscellaneous Documents
2017-001E Replace the Meteorological Instrumentation and Data Transmission System (MDTS)
Number           Title                                                 Date
August 8, 2017
Evaluation       Replace the Meteorological Instrumentation and Data   August 8, 2017
Evaluation Tracking Number
Tracking Number   Transmission System (MDTS)
2017-003E EP-0900, Rev. 16
2017-001E
August 17, 2017
Evaluation        EP-0900, Rev. 16                                       August 17, 2017
Evaluation Tracking Number
Tracking Number
2017-004E EP-0901, Rev. 10
2017-003E
August 21, 2017
Evaluation        EP-0901, Rev. 10                                       August 21, 2017
Screening Tracking Number
Tracking Number
2017-002S 74RM-9EF42, Radiation Monitor Alarm Setpoint Determination, Rev. 30
2017-004E
April 16, 2017
Screening        74RM-9EF42, Radiation Monitor Alarm Setpoint           April 16, 2017
Screening Tracking Number
Tracking Number   Determination, Rev. 30
2017-022S Procedure EP
2017-002S
-0901, Classifications, Added New EALs form EPLAN R60, Revise PV Proc Format
Screening        Procedure EP-0901, Classifications, Added New EALs     August 20, 2017
August 20, 2017
Tracking Number  form EPLAN R60, Revise PV Proc Format
 
2017-022S
Miscellaneous Documents
Miscellaneous Documents
Number Title Date Screening Tracking Number
Number             Title                                               Date
2017-014S EP-905, Revision 9, Protective Actions
Screening         EP-905, Revision 9, Protective Actions               June 7, 2017
June 7, 2017
Tracking Number
Screening Tracking Number
2017-014S
2017-023S DMWO 3452940 Palo Verde Nuclear Generating Station Radio Replacement Project
Screening          DMWO 3452940 Palo Verde Nuclear Generating           September 8,
September 8, 2017 Screening Tracking Number
Tracking Number    Station Radio Replacement Project                   2017
2017-029S 40AO-9ZZ18 R018 Fire Outside Control Room
2017-023S
September 26, 2017 EPM Tracking Number  2015-006S DEC-00720 Allow Solar
Screening          40AO-9ZZ18 R018 Fire Outside Control Room           September 26,
-Charged Offsite Sirens to Replace AC
Tracking Number                                                        2017
-Charged Offsite Sirens
2017-029S
February 18, 2015 Section 1EP5: Maintenance of Emergency Preparedness
EPM Tracking       DEC-00720 Allow Solar-Charged Offsite Sirens to     February 18,
Number            Replace AC-Charged Offsite Sirens                   2015
2015-006S
Section 1EP5: Maintenance of Emergency Preparedness
Procedures
Procedures
Number Title Revision 01DP-0AP12 Condition Reporting Process
Number             Title                                                 Revision
01DP-0AP12-01 Condition Reporting Process Administrative Guide
01DP-0AP12         Condition Reporting Process                           28
EP-0905 Protective Actions
01DP-0AP12-01     Condition Reporting Process Administrative Guide     4
EP-0902 Notifications
EP-0905           Protective Actions                                   9
8, 9, 10 16DP-0EP31 Emergency Preparedness Equipment Out
EP-0902           Notifications                                         8, 9, 10
-of-Service 9 16DP-0EP27 Emergency Preparedness Equipment Testing
16DP-0EP31         Emergency Preparedness Equipment Out-of-Service       9
16DP-0EP28 Emergency Facility/Kit Inventories and Inspections
16DP-0EP27         Emergency Preparedness Equipment Testing             10
16DP-0EP28         Emergency Facility/Kit Inventories and Inspections   5
Condition Reports (CRs)
Condition Reports (CRs)
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501 16-14593 16-14934 16-16710 17-02188 17-03147 17-03149 17-03202 17-03605 17-03721 17-03736 17-03826 17-03828 17-03829 17-03884 17-04633 17-06893 17-08328 17-10906 17-10949 17-11437 17-13663 17-14927 17-15449 17-15797 17-15884 17-16771 17-17091 17-17218 17-17739 17-18443 18-03244
16-08461       16-09213         16-11134     16-11930       16-12640   16-13501
16-14593       16-14934         16-16710     17-02188       17-03147   17-03149
17-03202       17-03605         17-03721     17-03736       17-03826   17-03828
17-03829       17-03884         17-04633     17-06893       17-08328   17-10906
17-10949       17-11437         17-13663     17-14927       17-15449   17-15797
17-15884       17-16771         17-17091     17-17218       17-17739   17-18443
18-03244
Miscellaneous Documents
Miscellaneous Documents
Number Title Revision/Date
Number           Title                                               Revision/Date
KLD TR-983 Palo Verde Nuclear Generating Station, 2017 Population Update Analysis
KLD TR-983       Palo Verde Nuclear Generating Station,               December 7,
December 7, 2017 KLD TR-895 Palo Verde Nuclear Generating Station, 2016 Population Update Analysis
2017 Population Update Analysis                     2017
December 8, 2016  Updated Review of Palo Verde Nuclear Generating Station Emergency Plan 2016 Letters of Agreement
KLD TR-895       Palo Verde Nuclear Generating Station,               December 8,
September 29, 2016 Letter # 240
2016 Population Update Analysis                     2016
-02819 2017 Review of Palo Verde Nuclear Generating Station Emergency Plan Letters of Agreement
Updated Review of Palo Verde Nuclear Generating     September 29,
December 26, 2017 NAD Audit 2016
Station Emergency Plan 2016 Letters of Agreement     2016
-010 Nuclear Assurance Department (NAD) Audit Plan and Report, 2016
Letter # 240-     2017 Review of Palo Verde Nuclear Generating Station December 26,
-010, Emergency Preparedness
2819            Emergency Plan Letters of Agreement                 2017
December 14, 2016  Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date  
NAD Audit 2016-   Nuclear Assurance Department (NAD) Audit Plan and   December 14,
- June 1, 2017, Radiological Emergency Preparedness Program
010              Report, 2016-010, Emergency Preparedness             2016
August 18 , 2017 ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill Report (Revised)
Palo Verde Nuclear Generating Station After Action   August 18,
June 23, 2017
Report/Improvement Plan, Exercise Date - June 1,     2017
ID: 240-02816 2017 Health Physics Drill Report (November 2017)
2017, Radiological Emergency Preparedness Program
December 12, 2017 ID: 240-02818 1709 ERO Mini Drill  
ID: 240-02806     2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017
- ERO Blue Team  
Report (Revised)
(December 2017)
ID: 240-02816     2017 Health Physics Drill Report (November 2017)     December 12,
December 21, 2017 NAD Audit 2017
2017
-008 Nuclear Assurance Department (NAD) Audit Plan and Report, 2017
ID: 240-02818     1709 ERO Mini Drill - ERO Blue Team                 December 21,
-008, Emergency Preparedness
                  (December 2017)                                     2017
January 25, 2018 240-02812 CS/MA 1704 and 1705 ERO Mini Drills  
NAD Audit 2017-   Nuclear Assurance Department (NAD) Audit Plan and   January 25,
- ERO White Team and Green Team (June and July 2017)
008              Report, 2017-008, Emergency Preparedness             2018
October 18, 2017 240-02813 CS/MA 1706 ERO Mini Drill  
240-02812         1704 and 1705 ERO Mini Drills - ERO White Team and   October 18,
- ERO Gold Team (July 2017)
CS/MA            Green Team (June and July 2017)                     2017
October 18, 2017 240-02814 TW/MA 1707 ERO Mini Drill  
240-02813         1706 ERO Mini Drill - ERO Gold Team (July 2017)     October 18,
- ERO Red Team (August 2017) Revision 1
CS/MA                                                                  2017
October 18, 2017 Emergency Response Facility Telephone Book, 1 st Quarter Edition 2018
240-02814         1707 ERO Mini Drill - ERO Red Team (August 2017)     October 18,
January 1, 2018 240-02801 JF/MA 1702 IPZ Evaluated Exercise  
TW/MA            Revision 1                                          2017
- ERO White Team (March 2017)
Emergency Response Facility Telephone Book,         January 1,
April 6, 2017
1st Quarter Edition 2018                            2018
240-02797 JF/MA 1608 ERO Mini Drill  
240-02801         1702 IPZ Evaluated Exercise - ERO White Team         April 6, 2017
- ERO Red Team  
JF/MA            (March 2017)
(December 2016)
240-02797         1608 ERO Mini Drill - ERO Red Team                   January 4,
January 4, 2017 240-02792 JF/MA 1604 and 1605 ERO Drills
JF/MA            (December 2016)                                     2017
September 14, 2016 240-02793 JF/MA 1606 ERO Mini Drill  
240-02792         1604 and 1605 ERO Drills                             September 14,
- ERO Green Team  
JF/MA                                                                  2016
(September 2016)
240-02793         1606 ERO Mini Drill - ERO Green Team                 October 4,
October 4, 2016
JF/MA            (September 2016)                                     2016
Miscellaneous Documents
Miscellaneous Documents
Number Title Revision/Date
Number           Title                                                   Revision/Date
240-02795 JF/MA 1609 Off-Hours Drive-in Augmentation Drill  
240-02795         1609 Off-Hours Drive-in Augmentation Drill -            December 2,
- (November 2016)
JF/MA            (November 2016)                                         2016
December 2, 2016 240-02796 2016 Health Physics Drill Report (November 2016)
240-02796         2016 Health Physics Drill Report (November 2016)       December 7,
December 7, 2016 Evaluation Report 16-11134 Evaluate Adding STSC ENS Communicator Duties to STSC Communicator
2016
September 7, 2016 17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass Break September 28, 2017 17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators
Evaluation       Evaluate Adding STSC ENS Communicator Duties to         September 7,
October 11, 2017 Level 4 Evaluation Report 17-15797-001 Default Values Used in Dose Assessment
Report 16-11134  STSC Communicator                                      2016
November 30, 2017 Document No.
17-11437-002     Actual Event Investigation, Unit 3 Ammonia Sight glass September 28,
500599510 Master Agreement Between Arizona Public Service Company and Westinghouse Electric Company LLC for Goods and Services (Effective January 29, 2016 to December 31, 2018)
Break                                                  2017
Palo Verde Nuclear Generating Station After
17-13663-001     Actual Event Investigation, Unit 2 Loss of Annunciators October 11,
Action Report/Improvement Plan, Exercise Dates  
2017
- March 7-8, 2017, Radiological Emergency Preparedness Program (REPP) May 26, 2017
Level 4           Default Values Used in Dose Assessment                 November 30,
240-02789 JF/TW 2016 Health Physics Drill Report (Re
Evaluation                                                                2017
-Demonstration)
Report 17-
June 9, 2016
15797-001
240-02788 JF/MA 2016 Contaminated Injury/Health Physics Drill Report
Document No.     Master Agreement Between Arizona Public Service         0
April 22, 2016
500599510        Company and Westinghouse Electric Company LLC for
Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date  
Goods and Services (Effective January 29, 2016 to
November 16, 2016, Radiological Emergency Preparedness Program (REPP)
December 31, 2018)
February 9, 2017 240-02787 JF/MA 1602 IPZ Exercise  
Palo Verde Nuclear Generating Station After Action      May 26, 2017
- ERO Green Team (March 2016)
Report/Improvement Plan, Exercise Dates - March 7-8,
March 25, 2016
2017, Radiological Emergency Preparedness Program
Palo Verde Nuclear Generating Station After Action Report/Improvement Plan, Exercise Date  
                  (REPP)
November 16, 2016, Radiological Emergency Preparedness Program (REPP)
240-02789         2016 Health Physics Drill Report (Re-Demonstration)     June 9, 2016
February 9, 2017  Level 3 Evaluation Report 18
JF/TW
-02668-002 March 22, 2018
240-02788         2016 Contaminated Injury/Health Physics Drill Report   April 22, 2016
 
JF/MA
Palo Verde Nuclear Generating Station After Action     February 9,
Report/Improvement Plan, Exercise Date -                2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
240-02787         1602 IPZ Exercise - ERO Green Team (March 2016)         March 25, 2016
JF/MA
Palo Verde Nuclear Generating Station After Action     February 9,
Report/Improvement Plan, Exercise Date -                2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
Level 3 Evaluation Report 18-02668-002                 March 22, 2018
Work Orders (WOs)
Work Orders (WOs)
4782667 4783959/0 4787729/0 4787847/0 4836236 4836263/0 4860832/0 4862234/0 4862502/0 4885361/0 4889725/0 4896971/0 4901070 4916668/0 4918303/0 4918455/0 4937577/0 4947802/0   Section 1EP6: Drill Evaluation
4782667           4783959/0         4787729/0     4787847/0         4836236
4836263/0         4860832/0         4862234/0     4862502/0         4885361/0
4889725/0         4896971/0         4901070       4916668/0         4918303/0
4918455/0         4937577/0         4947802/0
Section 1EP6: Drill Evaluation
Procedures
Procedures
Number Title Revision EP-0900 Emergency Response Organization (ERO) Position Checklists
Number           Title                                                   Revision
EP-0901 Classifications
EP-0900           Emergency Response Organization (ERO) Position         16
Checklists
EP-0901           Classifications                                         10
Condition Reports (CRs)
Condition Reports (CRs)
18-02352 18-02503 18-02655   Section 2RS2: Occupational ALARA Planning and Controls
18-02352           18-02503         18-02655
Section 2RS2: Occupational ALARA Planning and Controls
Procedures
Procedures
Number Title Revision 75DP-0RP03 ALARA Program Overview
Number           Title                                                   Revision
75DP-0RP06 ALARA Committee
75DP-0RP03       ALARA Program Overview                                 06
75DP-0RP08 Managing Radiological Risk
75DP-0RP06       ALARA Committee                                         07
75RP-9RP02 Radiation Work Permits
75DP-0RP08       Managing Radiological Risk                             02
75RP-9RP25 Temporary Shielding
75RP-9RP02       Radiation Work Permits                                 31
75TD-9RP02 ALARA Work Planning
75RP-9RP25       Temporary Shielding                                     14
Audits and Self
75TD-9RP02       ALARA Work Planning                                     11
-Assessments
Audits and Self-Assessments
Title Date PVGS Integrated Performance Assessment Report Radiation Protection 2nd Quarter 2017
Title                                                           Date
September 14, 2017
PVGS Integrated Performance Assessment Report Radiation         September 14, 2017
2016 Annual ALARA/Management Evaluation Report
Protection 2nd Quarter 2017
June 23, 2017
2016 Annual ALARA/Management Evaluation Report                   June 23, 2017
2016 Annual Radiation Protection Program Summary Report
2016 Annual Radiation Protection Program Summary Report         July 27, 2017
July 27, 2017
 
Condition Reports (CRs)
Condition Reports (CRs)
17-15502   17-15529 17-15802 17-16741 17-17944 17-18180 18-01890     Radiation Work Permits/ALARA Reviews
17-15502           17-15529           17-15802         17-16741       17-17944
Number Title RWP 2017-9-1016 RMC Operations and Routine Tasks
17-18180           18-01890
RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection
Radiation Work Permits/ALARA Reviews
RWP 2017-3002 Reactor Destack/Restack
Number               Title
RWP 2017-3015 Cavity Decontamination
RWP 2017-9-1016     RMC Operations and Routine Tasks
RWP 2017-3039 10-Year In-Service Inspection Vessel
RWP 2018-1-1523     Temporary Mat Insulation Fiber Inspection
RWP 2017-3002       Reactor Destack/Restack
RWP 2017-3015       Cavity Decontamination
RWP 2017-3039       10-Year In-Service Inspection Vessel
Miscellaneous
Miscellaneous
Title Date ALARA 5-Year Plan 2015  
Title                                                                 Date
- 2019 November 2015 1R20 Radiological Safety Summary In Perspective
ALARA 5-Year Plan 2015 - 2019                                         November 2015
November 7, 2017
1R20 Radiological Safety Summary In Perspective                       November 7, 2017
2R20 Radiological Safety Summary In Perspective
2R20 Radiological Safety Summary In Perspective                       May 9, 2017
May 9, 2017
3R19 Radiological Safety Summary In Perspective                       November 10, 2016
3R19 Radiological Safety Summary In Perspective
Section 2RS4 : Occupational Dose Assessment
November 10, 2016
Section 2 RS 4 : Occupational Dose Assessment
Procedures
Procedures
Number Title Revision 75DP-0RP01 RP Program Overview
Number           Title                                                     Revision
75DP-0RP06 Managing Radiological Risk
75DP-0RP01       RP Program Overview                                       11
75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect Dosimetry, and Anticipated EPD Dose Rate Alarm
75DP-0RP06       Managing Radiological Risk                               2
75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation
75RP-9ME23       Exposure Evaluation for Lost, Damaged, or Suspect         12
75RP-9ME25 TLD Reader Calibration and Response Check
Dosimetry, and Anticipated EPD Dose Rate Alarm
75RP-9RP03 Bioassay Analysis
75RP-9ME24       Dosimetry Processing, Evaluation, and Documentation       5
75RP-9RP05 Contamination Dose Evaluation
75RP-9ME25       TLD Reader Calibration and Response Check                 6
75RP-9RP16 Special Dosimetry
75RP-9RP03       Bioassay Analysis                                         10
75RP-9QE21 Calibration of Self
75RP-9RP05       Contamination Dose Evaluation                             7
-Indicating Dosimeters
75RP-9RP16       Special Dosimetry                                         24
75RP-9QE21       Calibration of Self-Indicating Dosimeters                 13
Procedures
Procedures
Number Title Revision 75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM
Number           Title                                                         Revision
-21 Calibrator
75RP-9QE26       Operation and Verification of the Merlin Gerin Model CDM-      10
Audits and Self
Calibrator
-Assessments
Audits and Self-Assessments
Title Date 2016 Annual ALARA/Management Evaluation Report
Title                                                                         Date
June 23, 2017
2016 Annual ALARA/Management Evaluation Report                               June 23, 2017
2016 Annual Radiation Protection Program Summary Report
2016 Annual Radiation Protection Program Summary Report                       July 27, 2017
July 27, 2017 Condition Reports (CRs)
Condition Reports (CRs)
17-14033 17-14127 17-14527 17-15700 18-01423 Self-Reading Dosimeter Calibration Records
17-14033           17-14127         17-14527             17-15700         18-01423
Number Title Date 837097 Self-Reading Dosimeter
Self-Reading Dosimeter Calibration Records
September 8, 2017
Number           Title                                                 Date
836204 Self-Reading Dosimeter
837097           Self-Reading Dosimeter                               September 8, 2017
September 9, 2017
836204           Self-Reading Dosimeter                               September 9, 2017
833059 Self-Reading Dosimeter
833059           Self-Reading Dosimeter                               September 30, 2017
September 30, 2017
810641           Self-Reading Dosimeter gamma/neutron                 December 12, 2017
810641 Self-Reading Dosimeter gamma/neutron
810633           Self-Reading Dosimeter gamma/neutron                 December 12, 2017
December 12, 2017
810552           Self-Reading Dosimeter gamma/neutron                 December 13, 2017
810633 Self-Reading Dosimeter gamma/neutron
December 12, 2017
810552 Self-Reading Dosimeter gamma/neutron
December 13, 2017
Miscellaneous
Miscellaneous
Number Title Date 2017 Multi-Pack TLD Results
Number           Title                                                 Date
2017 100536 NVLAP Accreditation Report
2017             Multi-Pack TLD Results                                 2017
April 8, 2016
100536           NVLAP Accreditation Report                             April 8, 2016
100536 NVLAP Proficiency Testing Results  
100536           NVLAP Proficiency Testing Results - TLD               May 2, 2016
- TLD May 2, 2016
100536           NVLAP Proficiency Testing Results-EPD                 August 5, 2016
100536 NVLAP Proficiency Testing Results
100536           NVLAP Accreditation Report                             February 15, 2018
-EPD August 5, 2016
2017             Unit 1 Dry Active Waste                               December 1, 2017
100536 NVLAP Accreditation Report
2017             Unit 2 Dry Active Waste                               May 18, 2017
February 15, 2018
2016             Unit 3 Dry Active Waste                               December 22, 2016
2017 Unit 1 Dry Active Waste
25116             Intake Dose Assessment                                 April 21, 2016
December 1, 2017
2017 Unit 2 Dry Active Waste
May 18, 2017
2016 Unit 3 Dry Active Waste
December 22, 2016
25116 Intake Dose Assessment
April 21, 2016
 
Miscellaneous
Miscellaneous
Number Title Date 47194 Personnel Dosimetry Processing Report
Number           Title                                           Date
November 15, 2017 Section 4OA1: Performance Indicator Verification
47194             Personnel Dosimetry Processing Report           November 15, 2017
Section 4OA1: Performance Indicator Verification
Miscellaneous
Miscellaneous
Number Title Date 2016-002-01 Licensee Event Report
Number           Title                                                 Date
June 27, 20 17 2017-001-00 June 27, 2017
2016-002-01       Licensee Event Report                                 June 27, 2017
June 14, 2017 Palo Verde Plant Computer PI ProcessBook
2017-001-00       June 27, 2017                                         June 14, 2017
Palo Verde Control Room Logs (1/1/17  
Palo Verde Plant Computer PI ProcessBook
- 12/31/17)   Section 4OA2: Problem Identification and Resolution
Palo Verde Control Room Logs (1/1/17 - 12/31/17)
Section 4OA2: Problem Identification and Resolution
Procedures
Procedures
Number Title Revision 40ST-9DG01 Diesel Generator A Test
Number           Title                                                 Revision
40ST-9DG01       Diesel Generator A Test                               49
Condition Reports (CRs)
Condition Reports (CRs)
17-15901 18-03517 17-15838 17-11155 17-09750 16-03783     Section 4OA3:
17-15901           18-03517         17-15838         17-11155       17-09750
Follow-up of Events and Notices of Enforcement Discretion
16-03783
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion
Condition Reports (CRs)
Condition Reports (CRs)
18-02544 18-02688 18-02664 18-02605 18-02716
18-02544           18-02688         18-02664         18-02605       18-02716
The following items are requested for the
The following items are requested for the
Occupational Radiation Safety Inspection
Occupational Radiation Safety Inspection
Line 1,456: Line 1,725:
Inspection areas are listed in the attachments below.
Inspection areas are listed in the attachments below.
Please provide the requested information on or before January 26, 2018.
Please provide the requested information on or before January 26, 2018.
Please submit this information using the same lettering system as below. For example, all contacts and phone numbers for Inspection Procedure 71124.0
Please submit this information using the same lettering system as below. For example, all
should be in a file/folder titled  
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
"1- A," applicable organization charts in file/folder "
1- A, applicable organization charts in file/folder 1- B, etc.
1- B," etc. If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the report.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting. The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
information while writing the report.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or louis.carson@nrc.gov. PAPERWORK REDUCTION ACT STATEMENT
In addition to the corrective action document lists provided for each inspection procedure listed
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.
below, please provide updated lists of corrective action documents at the entrance meeting.
: [[contact::S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget]], control number 3150
The dates for these lists should range from the end dates of the original lists to the day of the
-0011.
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or
louis.carson@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
2. Occupational ALARA Planning and Controls (71124.02)
2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection:
Date of Last Inspection:         October 20, 2017
October 20, 2017
A. List of contacts and telephone numbers for ALARA program personnel
A. List of contacts and telephone numbers for ALARA program personnel
B. Applicable organization charts
B. Applicable organization charts
: [[contact::C. Copies of audits]], self
: [[contact::C. Copies of audits]], self-assessments, and LERs, written since date of last inspection,
-assessments, and LERs, written since date of last inspection
focusing on ALARA
, focusing on ALARA
D. Procedure index for ALARA Program
D. Procedure index for ALARA Program
E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures may be requested by number
E. Please provide specific procedures related to the following areas noted below.
after the inspector reviews the procedure indexes.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
1. ALARA Program
2. ALARA Committee
2. ALARA Committee
3. Radiation Work Permit Preparation
3. Radiation Work Permit Preparation
F. A summary list of corrective action documents (including corporate and sub
F. A summary list of corrective action documents (including corporate and sub-tiered
-tiered systems) written since date of last inspection, related to the ALARA program. In addition to ALARA, the summary should also address Radiation Work Permit violations, Electronic Dosimeter Alarms, and RWP Dose Estimates
systems) written since date of last inspection, related to the ALARA program. In addition
NOTE: The lists should indicate the significance level
to ALARA, the summary should also address Radiation Work Permit violations,
of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
Electronic Dosimeter Alarms, and RWP Dose Estimates
: [[contact::G. List of work activities greater than 1 rem]], since date of last inspection, Include original dose estimate and actual dose.
NOTE: The lists should indicate the significance level of each issue and the search
H. Site dose totals and 3
criteria used. Please provide in document formats which are searchable so that
-year rolling averages for the past 3 years (based on dose of record) I. Outline of source term reduction strategy
the inspector can perform word searches.
: [[contact::J. If available]], provide a copy of the ALARA outage report for the most recently completed outages for each unit
: [[contact::G. List of work activities greater than 1 rem]], since date of last inspection,
Include original dose estimate and actual dose.
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
record)
I. Outline of source term reduction strategy
: [[contact::J. If available]], provide a copy of the ALARA outage report for the most recently completed
outages for each unit
K. Please provide your most recent Annual ALARA Report.
K. Please provide your most recent Annual ALARA Report.
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
Date of Last Inspection:
Date of Last Inspection:       January 22, 2016
January 22, 2016
A. List of contacts and telephone numbers for the following areas:
A. List of contacts and telephone numbers for the following areas:
1. Dose Assessment personnel
1. Dose Assessment personnel
B. Applicable organization charts
B. Applicable organization charts
: [[contact::C. Audits]], self
: [[contact::C. Audits]], self-assessments, vendor or NUPIC audits of contractor support, and LERs
-assessments, vendor or NUPIC audits of contractor support, and LERs written since date of last inspection, related to:
written since date of last inspection, related to:
1. Occupational
1. Occupational Dose Assessment
Dose Assessment
D. Procedure indexes for the following areas:
D. Procedure indexes for the following areas:
1. Occupational Dose Assessment
1. Occupational Dose Assessment
E. Please provide specific procedures related to the following areas noted below. Additional Specific Procedures will be requested by number after the inspector reviews the procedure indexes.
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Radiation Protection Program
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations
2. Radiation Protection Conduct of Operations
Line 1,511: Line 1,794:
7. Declared Pregnant Worker
7. Declared Pregnant Worker
8. Bioassay Program
8. Bioassay Program
F. List of corrective action documents (including corporate and sub
F. List of corrective action documents (including corporate and sub-tiered systems) written
-tiered systems) written since date of last inspection, associated with:
since date of last inspection, associated with:
1. National Voluntary Laboratory Accreditation Program (NVLAP)
1. National Voluntary Laboratory Accreditation Program (NVLAP)
2. Dosimetry (TLD/OSL, etc.) problems
2. Dosimetry (TLD/OSL, etc.) problems
Line 1,518: Line 1,801:
4. Bioassays or internally deposited radionuclides or internal dose
4. Bioassays or internally deposited radionuclides or internal dose
5. Neutron dose
5. Neutron dose
NOTE: The lists should indicate the significance level
NOTE: The lists should indicate the significance level of each issue and the search
of each issue and the search criteria used. Please provide in document formats which are "searchable" so that the inspector can perform word searches.
criteria used. Please provide in document formats which are searchable so that
: [[contact::G. List of positive whole body counts since date of last inspection]], names redacted if desired H. Part 61 analyses/scaling factors
the inspector can perform word searches.
: [[contact::I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP) accreditation report or]], if dosimetry is provided by a vendor, the vendor's most recent results
: [[contact::G. List of positive whole body counts since date of last inspection]], names redacted if
desired
H. Part 61 analyses/scaling factors
I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent
results
 
ML18127A004
ML18127A004
SUNSI Review:
SUNSI Review:         ADAMS:             Non-Publicly Available     Non-Sensitive   Keyword:
ADAMS:   Non-Publicly Available
By: JDixon             Yes No       Publicly Available           Sensitive     NRC-002
Non-Sensitive Keyword: By: JDixon
OFFICE           DRP/SRI       DRP/RI         DRP/RI         C:DRS/EB1     C:DRS/EB2     C:DRS/OB
Yes     No Publicly Available
NAME             CPeabody       DReinert       DYou         TFarnholtz       JDrake     VGaddy
Sensitive
SIGNATURE           /RA/           /RA/           /RA/             /RA/           /RA/       /RA/
NRC-002 OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB NAME CPeabody DReinert DYou TFarnholtz
DATE               4/30/18       5/1/2018       5/1/18       04/30/2018       4/30/18     4/30/18
JDrake VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 4/30/18 5/1/2018 5/1/18 04/30/2018
OFFICE           C:DRS/PS2       TL:IPAT       C:DRP/D
4/30/18 4/30/18 OFFICE C:DRS/PS2 TL:IPAT C:DRP/D   NAME HGepford GGeorge GMiller   SIGNATURE /RA/ /RA/ /RA/   DATE 4/30/18 4/30/2018 5/7/18
NAME             HGepford       GGeorge         GMiller
SIGNATURE           /RA/           /RA/           /RA/
DATE               4/30/18     4/30/2018       5/7/18
}}
}}

Latest revision as of 21:57, 18 December 2019

NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001
ML18127A004
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/07/2018
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-D
To: Bement R
Arizona Public Service Co
Miller G
References
IR 2018001
Download: ML18127A004 (32)


Text

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001

Dear Mr. Bement:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/ Attachment:

1. Supplemental Information 2. O

Inspection Report

Docket Numbers: 05000528, 05000529, 05000530 License Numbers: NPF-41, NPF-51, NPF-74 Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 Enterprise Identifier: I-2018-001-0013 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: C. Peabody, Senior Resident Inspector D. Reinert, PhD, Resident Inspector D. You, Resident Inspector L. Carson, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector Approved By: Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,

Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Green [H.12] - Human 71111.12 -

Systems NCV 05000528/2018001-01 Performance, Avoid Maintenance Closed Complacency Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,

Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018, and remained at or near rated thermal power for the remainder of the inspection period.

Units 2 and 3 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 containment spray system B on January 4, 2018
(2) Unit 2 auxiliary feedwater system A on January 30, 2018
(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.

71111.05AQ - Fire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018
(2) Unit 2 control room, Fire Zone 17, on January 19, 2018
(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A, on January 23, 2018
(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
(5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018

71111.07 - Heat Sink Performance Heat Sink

The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.

The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and FWIV-174, 177, on February 27, 2018.

71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185 in Units 2 and 3
(2) Diesel fuel oil transfer pump predictive engineering cable testing

71111.13 - Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 2018
(2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018
(3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018
(4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018

71111.15 - Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on January 3, 2018
(2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018
(3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, failed to re-open during breaker maintenance on January 31, 2018
(4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018
(5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI-659, on February 23, 2018
(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A T-drains on March 6, 2018
(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018
(9) Unit 2 steam generator sodium concentration increase on March 12, 2018

71111.18 - Plant Modifications

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-connect valve, SI-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018

71111.19 - Post Maintenance Testing

The inspectors evaluated the following post maintenance tests:

(1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018
(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018
(3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018
(4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018
(5) Unit 2 essential cooling water pump A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018
(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018

71111.20 - Refueling and Other Outage Activities

The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.

71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Routine

(1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
(3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed surveillance on February 28, 2018
(4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
(5) Unit 3, essential chiller A vibration analysis on March 8, 2018
(6) Unit 1 containment spray pump B inservice test on March 22, 2018

In-service (1 Sample)

(1) Unit 2 containment spray pump A inservice test on March 1, 2018

71114.02 - Alert and Notification System Testing

The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016 - February 20, 2018.

71114.03 - Emergency Response Organization Staffing and Augmentation System

The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff their emergency response facilities in accordance with emergency plan commitments.

71114.04 - Emergency Action Level and Emergency Plan Changes

The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016 - February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness

The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.

71114.06 - Drill Evaluation Emergency Planning Drill

The inspectors evaluated a full-scale emergency preparedness drill on February 13,

RADIATION SAFETY

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning

The inspectors evaluated the licensees radiological work planning by reviewing the following activities:

(1) RWP 2017-9-1016, RMC Operations and Routine Tasks
(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
(3) RWP 2017-3002, Reactor Destack/Restack
(4) RWP 2017-3015, Cavity Decontamination
(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

71124.04 - Occupational Dose Assessment Source Term Characterization

===The inspectors evaluated the licensees source term characterization.

External Dosimetry===

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -

December 31, 2017)

(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -

December 31, 2017)

(3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -

December 31, 2017)

(4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -

December 31, 2017)

(5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31, 2017)
(6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017)
(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -

December 31, 2017)

71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018

71153 - Follow-up of Events and Notices of Enforcement Discretion Events

The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensees response on February 15 - 16,

INSPECTION RESULTS

Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Report Aspect Section Mitigating Green [H.12] -

==71111.12 - Systems NCV 05000528/2018001-01 Human Maintenance

==

Closed Performance, Effectiveness Avoid Complacency The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.

Description:

On November 12, 2017, the licensee was conducting a 24-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.

Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24-hour surveillance run on November 14, 2017.

The licensees apparent cause investigation determined that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis.

Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re-landed onto the secondary stabs of the breaker and motor control center chassis. The licensees work planners had not recognized the possibility that removing and re-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.

The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position for only a few seconds. The licensees apparent cause investigation identified that nonintrusive as-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.

The post-maintenance test was not written in accordance with station procedure 30DP-9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in part, that the post-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation.

The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.

Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re-terminating motor control center secondary stab connections. As an interim measure, the inspectors confirmed that all safety-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.

Corrective Action Reference: Condition Report 17-16497

Performance Assessment:

Performance Deficiency: The licensees failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.

Screening: The performance deficiency is more-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel oil transfer pump A. Without an appropriate post-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.

Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.

Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017.

Disposition: This violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.

On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.

On April 11, 2018, the inspector presented the quarterly residents inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.

SUPPLEMENTAL INFORMATION

DOCUMENTS REVIEWED

Section 1R04: Equipment Alignment

Procedures

Number Title Revision

40ST-9AF07 Auxiliary Feedwater Pump AFA-P01 Monthly Valve 6

Alignment

40ST-9SI13 LPSI and CS System Alignment Verification 33

Condition Reports (CRs)

16-17321 17-03027

Drawings

Number Title Revision

03-M-HJP-001 P&I Diagram Control Building HVAC 14

03-M-HJP-002 P&I Diagram Control Building HVAC 14

03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49

03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & 6

Cont. Spray Discharge

03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF 7

Pump Suction Lines

Miscellaneous

Number Title Revision

STM-30D System Training Manual Volume 30D: Control Building 6

HVAC System (HJ)

Section 1R05: Fire Protection

Procedures

Number Title Revision

14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13

Condition Reports (CRs)

17-03870 18-00999

Miscellaneous

Number Title Revision/Date

PVNGS Pre-Fire Strategies Manual 26

13-MM-0650 Fire Protection & Spray System Sub 007

13-MS-A083 NFPA Code Applicability and Conformance Review 007

4834415 Fire Safety Component Condition Record November 3, 2016

4834430 Fire Safety Component Condition Record November 3, 2016

4843902 Fire Safety Component Condition Record December 6, 2016

Unit 3 Tamper/Vital/Security Tour - Post 31 February 7, 2018

4971714 Open Door/Hatch/Floor Plug Permit January 29, 2018

4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018

Section 1R07: Heat Sink Performance

Procedures

Number Title Revision

73DP-9ZZ21 Heat Exchanger Visual Inspection 6

73DP-9ZZ11 Heat Exchanger Program 15

Condition Reports (CRs)

18-03133 18-03138 18-03139

Work Orders (WOs)

4591574 4591575 4667054 4667055 4667098

Section 1R11: Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number Title Revision

40OP-9MB01 Main Generation and Excitation 63

40DP-9OP02 Conduct of Operations 72

Procedures

Number Title Revision

40AL-9RK6A Panel B06A Alarm Responses 18

Condition Reports (CRs)

18-02797 18-02593 18-03215

Miscellaneous

Number Title Date

Current Alarm Status Report February 16, 2018

Section 1R12: Maintenance Effectiveness

Procedures

Number Title Revision

2MT-9ZZ74 Molded Case Circuit Breaker Test 48

30DP-9WP04 Post-Maintenance Testing Development 19

Condition Reports (CRs)

17-08025-005 17-08025 17-16497

Work Orders (WOs)

25959 4925966 4925967 4925969 4685719

4788985

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Procedures

Number Title Revision

40DP-9AP21 Protected Equipment 7

70DP-0RA05 Assessment and Management of Risk when Performing 23

Maintenance in Modes 1 and 2

40MT-9ZZ01 Operations Maintenance Activities 5

40DP-9RS01 Operations Department Online Nuclear Risk Management 4

Mode 1 and 2

Condition Reports (CRs)

18-00249 185-00136 18-00336 18-02544

Miscellaneous

Number Title Date

Schedulers Evaluation for PV Unit 1 January 4, 2018

Schedulers Evaluation for PV Unit 1 February 23, 2018

Schedulers Evaluation for PV Unit 3 February 1, 2018

Schedulers Evaluation for PV Unit 2 March 19, 2018

Unit 3 Archived Operator Logs January 29, 2018 -

February 4, 2018

Section 1R15: Operability Determinations and Functionality Assessments

Procedures

Number Title Revision

40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71

40AL-9RK6A Panel B06A Alarm Responses 18

74DP-9CY04 Systems Chemistry Specifications 94

Condition Reports (CRs)

17-18475 12-01397 17-17856 13-01198 18-03127

17-16393 18-03215 18-03291 18-02839 18-01610

18-02334 3127427 18-02468 18-03980

Miscellaneous

Number Title Revision/Date

03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11

18-02334-003 Engineering Evaluation February 15, 2018

28056 Adverse CRDR July 19, 2013

EQ Program Manual 26

Section 1R18: Plant Modifications

Condition Reports (CRs)

18-04116

Work Orders (WOs)

4989102

Miscellaneous

Number Title Date

DEC-01035 Design Equivalent Change April 12, 2017

Section 1R19: Post-Maintenance Testing

Procedures

Number Title Revision

40OP-9CH12 Refueling Water Tank (RWT) Operations 41

2MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent 4

Relays

2MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous 4

Overcurrent Relays

40OP-9EW02 Essential Cooling Water System (EW) Train B 26

40ST-9DG01 Diesel Generator A Test 49

73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load 13

and Hot Start Test Train B

40ST-9DG02 Diesel Generator B Test 54

Condition Reports (CRs)

18-00136 18-00197 18-01931 18-00210 18-00290

18-00336 18-00377 18-00346 18-04731 18-04732

Work Orders (WOs)

4964492 4822983 4981967 4726747 4821113

4847651 4965079 4972486 4847637

Drawings

Number Title Revision

01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15

01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13

13-M018-00141 Control Schematic (Starting Sequence Control) 25

Miscellaneous

Number Title Revision/Date

18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018

during Surveillance Run 1/5/2018

Section 1R20: Refueling and Other Outage Activities

Procedures

Number Title Revision

40OP-9MB01 Main Generation and Excitation 63

Section 1R22: Surveillance Testing

Procedures

Number Title Revision

73DP-9CL02 Containment Leakage Rate Testing Program 33

73ST-9XI20 Atmospheric Dump Valves - Inservice Test 47

73ST-9SI06 Containment Spray Pumps and Check valves - Inservice 42

Test

73ST-9DF01 Diesel Fuel Oil Transfer Pumps - Inservice Test 34

40DP-9OP06 Operations Department Repetitive Task Program 130

73ST-9SI06 Containment Spray Pumps and Check Valves- Inservice 42

Test

Condition Reports (CRs)

16-15793 18-03304 18-01314 18-03825

Work Orders (WOs)

22921 4840032 4843076 4843390

Miscellaneous

Number Title Revision/Date

13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication 18

Loops Uncertainty Calculation

18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018

18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for March 2, 2018

SB-200, 202, and 205

Section 1EP2: Alert and Notification System Testing

Miscellaneous Documents

Number Title Date

ID/Letter Palo Verde Nuclear Generating Station Alert and May 26, 2017

Number: Notification System (ANS) FEMA 350 Report -

240-02802 May 2017

Palo Verde Nuclear Generating Station, Alert and May 2017

Notification System (ANS), FEMA 350 Report

Palo Verde Nuclear Generating Station Siren Operating November 2015

Manual January 4, 2018

Letter from FEMA Region IX to Director, Division of September 19,

Emergency Management, State of Arizona 2017

State of Arizona/Maricopa County Offsite Emergency November 2017

Response Plan, Palo Verde Nuclear Generating Station

The Maricopa County Sheriffs Office Emergency August 2016

Response to Palo Verde Nuclear Generating Station

Work Orders (WOs)

474965/0

Section 1EP3: Emergency Response Organization Staffing and Augmentation

Procedures

Number Title Revision

EP-0902 Notifications 10

EP-0901 Classifications 10

40AL-9RK7C Panel B07C Alarm Responses 15

40AO-9ZZ21 Acts of Nature 37

79IS-9SM01 Analysis of Seismic Event 27

Miscellaneous Documents

Number Title Date

240-02799 2017 1 Quarter - Emergency Preparedness

st

March 21, 2017

JF/MA Augmentation Drill Report

240-02803 2017 2nd Quarter - Emergency Preparedness June 6, 2017

CS/MA Augmentation Drill Report

240-02797 2017 3rd Quarter - Emergency Preparedness July 25, 2017

Augmentation Drill Report (After Hours)

240-02808 2017 3rd Quarter - Emergency Preparedness September 6, 2017

Augmentation Drill Report

240-02817 2017 4th Quarter - Emergency Preparedness December 13,

CS/ma Augmentation Drill Report 2017

240-02790 2016 2nd Quarter - Emergency Preparedness June 23, 2016

JF/MA Augmentation Drill Report

240-02791 2016 3rd Quarter - Emergency Preparedness August 3, 2016

JF/MA Augmentation Drill Report

240-02798 December 5, 2016, Alert Event Report January 17, 2017

Section 1EP4: Emergency Action Level and Emergency Plan Changes

Procedure

Number Title Revision

16DP-0EP22 Emergency Plan Maintenance 11, 12

Miscellaneous Documents

Number Title Date

Evaluation Replace the Meteorological Instrumentation and Data August 8, 2017

Tracking Number Transmission System (MDTS)

2017-001E

Evaluation EP-0900, Rev. 16 August 17, 2017

Tracking Number

2017-003E

Evaluation EP-0901, Rev. 10 August 21, 2017

Tracking Number

2017-004E

Screening 74RM-9EF42, Radiation Monitor Alarm Setpoint April 16, 2017

Tracking Number Determination, Rev. 30

2017-002S

Screening Procedure EP-0901, Classifications, Added New EALs August 20, 2017

Tracking Number form EPLAN R60, Revise PV Proc Format

2017-022S

Miscellaneous Documents

Number Title Date

Screening EP-905, Revision 9, Protective Actions June 7, 2017

Tracking Number

2017-014S

Screening DMWO 3452940 Palo Verde Nuclear Generating September 8,

Tracking Number Station Radio Replacement Project 2017

2017-023S

Screening 40AO-9ZZ18 R018 Fire Outside Control Room September 26,

Tracking Number 2017

2017-029S

EPM Tracking DEC-00720 Allow Solar-Charged Offsite Sirens to February 18,

Number Replace AC-Charged Offsite Sirens 2015

2015-006S

Section 1EP5: Maintenance of Emergency Preparedness

Procedures

Number Title Revision

01DP-0AP12 Condition Reporting Process 28

01DP-0AP12-01 Condition Reporting Process Administrative Guide 4

EP-0905 Protective Actions 9

EP-0902 Notifications 8, 9, 10

16DP-0EP31 Emergency Preparedness Equipment Out-of-Service 9

16DP-0EP27 Emergency Preparedness Equipment Testing 10

16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5

Condition Reports (CRs)

16-08461 16-09213 16-11134 16-11930 16-12640 16-13501

16-14593 16-14934 16-16710 17-02188 17-03147 17-03149

17-03202 17-03605 17-03721 17-03736 17-03826 17-03828

17-03829 17-03884 17-04633 17-06893 17-08328 17-10906

17-10949 17-11437 17-13663 17-14927 17-15449 17-15797

17-15884 17-16771 17-17091 17-17218 17-17739 17-18443

18-03244

Miscellaneous Documents

Number Title Revision/Date

KLD TR-983 Palo Verde Nuclear Generating Station, December 7,

2017 Population Update Analysis 2017

KLD TR-895 Palo Verde Nuclear Generating Station, December 8,

2016 Population Update Analysis 2016

Updated Review of Palo Verde Nuclear Generating September 29,

Station Emergency Plan 2016 Letters of Agreement 2016

Letter # 240- 2017 Review of Palo Verde Nuclear Generating Station December 26,

2819 Emergency Plan Letters of Agreement 2017

NAD Audit 2016- Nuclear Assurance Department (NAD) Audit Plan and December 14,

010 Report, 2016-010, Emergency Preparedness 2016

Palo Verde Nuclear Generating Station After Action August 18,

Report/Improvement Plan, Exercise Date - June 1, 2017

2017, Radiological Emergency Preparedness Program

ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017

Report (Revised)

ID: 240-02816 2017 Health Physics Drill Report (November 2017) December 12,

2017

ID: 240-02818 1709 ERO Mini Drill - ERO Blue Team December 21,

(December 2017) 2017

NAD Audit 2017- Nuclear Assurance Department (NAD) Audit Plan and January 25,

008 Report, 2017-008, Emergency Preparedness 2018

240-02812 1704 and 1705 ERO Mini Drills - ERO White Team and October 18,

CS/MA Green Team (June and July 2017) 2017

240-02813 1706 ERO Mini Drill - ERO Gold Team (July 2017) October 18,

CS/MA 2017

240-02814 1707 ERO Mini Drill - ERO Red Team (August 2017) October 18,

TW/MA Revision 1 2017

Emergency Response Facility Telephone Book, January 1,

1st Quarter Edition 2018 2018

240-02801 1702 IPZ Evaluated Exercise - ERO White Team April 6, 2017

JF/MA (March 2017)

240-02797 1608 ERO Mini Drill - ERO Red Team January 4,

JF/MA (December 2016) 2017

240-02792 1604 and 1605 ERO Drills September 14,

JF/MA 2016

240-02793 1606 ERO Mini Drill - ERO Green Team October 4,

JF/MA (September 2016) 2016

Miscellaneous Documents

Number Title Revision/Date

240-02795 1609 Off-Hours Drive-in Augmentation Drill - December 2,

JF/MA (November 2016) 2016

240-02796 2016 Health Physics Drill Report (November 2016) December 7,

2016

Evaluation Evaluate Adding STSC ENS Communicator Duties to September 7,

Report 16-11134 STSC Communicator 2016

17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass September 28,

Break 2017

17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11,

2017

Level 4 Default Values Used in Dose Assessment November 30,

Evaluation 2017

Report 17-

15797-001

Document No. Master Agreement Between Arizona Public Service 0

500599510 Company and Westinghouse Electric Company LLC for

Goods and Services (Effective January 29, 2016 to

December 31, 2018)

Palo Verde Nuclear Generating Station After Action May 26, 2017

Report/Improvement Plan, Exercise Dates - March 7-8,

2017, Radiological Emergency Preparedness Program

(REPP)

240-02789 2016 Health Physics Drill Report (Re-Demonstration) June 9, 2016

JF/TW

240-02788 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016

JF/MA

Palo Verde Nuclear Generating Station After Action February 9,

Report/Improvement Plan, Exercise Date - 2017

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

240-02787 1602 IPZ Exercise - ERO Green Team (March 2016) March 25, 2016

JF/MA

Palo Verde Nuclear Generating Station After Action February 9,

Report/Improvement Plan, Exercise Date - 2017

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

Level 3 Evaluation Report 18-02668-002 March 22, 2018

Work Orders (WOs)

4782667 4783959/0 4787729/0 4787847/0 4836236

4836263/0 4860832/0 4862234/0 4862502/0 4885361/0

4889725/0 4896971/0 4901070 4916668/0 4918303/0

4918455/0 4937577/0 4947802/0

Section 1EP6: Drill Evaluation

Procedures

Number Title Revision

EP-0900 Emergency Response Organization (ERO) Position 16

Checklists

EP-0901 Classifications 10

Condition Reports (CRs)

18-02352 18-02503 18-02655

Section 2RS2: Occupational ALARA Planning and Controls

Procedures

Number Title Revision

75DP-0RP03 ALARA Program Overview 06

75DP-0RP06 ALARA Committee 07

75DP-0RP08 Managing Radiological Risk 02

75RP-9RP02 Radiation Work Permits 31

75RP-9RP25 Temporary Shielding 14

75TD-9RP02 ALARA Work Planning 11

Audits and Self-Assessments

Title Date

PVGS Integrated Performance Assessment Report Radiation September 14, 2017

Protection 2nd Quarter 2017

2016 Annual ALARA/Management Evaluation Report June 23, 2017

2016 Annual Radiation Protection Program Summary Report July 27, 2017

Condition Reports (CRs)

17-15502 17-15529 17-15802 17-16741 17-17944

17-18180 18-01890

Radiation Work Permits/ALARA Reviews

Number Title

RWP 2017-9-1016 RMC Operations and Routine Tasks

RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection

RWP 2017-3002 Reactor Destack/Restack

RWP 2017-3015 Cavity Decontamination

RWP 2017-3039 10-Year In-Service Inspection Vessel

Miscellaneous

Title Date

ALARA 5-Year Plan 2015 - 2019 November 2015

1R20 Radiological Safety Summary In Perspective November 7, 2017

2R20 Radiological Safety Summary In Perspective May 9, 2017

3R19 Radiological Safety Summary In Perspective November 10, 2016

Section 2RS4 : Occupational Dose Assessment

Procedures

Number Title Revision

75DP-0RP01 RP Program Overview 11

75DP-0RP06 Managing Radiological Risk 2

75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect 12

Dosimetry, and Anticipated EPD Dose Rate Alarm

75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5

75RP-9ME25 TLD Reader Calibration and Response Check 6

75RP-9RP03 Bioassay Analysis 10

75RP-9RP05 Contamination Dose Evaluation 7

75RP-9RP16 Special Dosimetry 24

75RP-9QE21 Calibration of Self-Indicating Dosimeters 13

Procedures

Number Title Revision

75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM- 10

Calibrator

Audits and Self-Assessments

Title Date

2016 Annual ALARA/Management Evaluation Report June 23, 2017

2016 Annual Radiation Protection Program Summary Report July 27, 2017

Condition Reports (CRs)

17-14033 17-14127 17-14527 17-15700 18-01423

Self-Reading Dosimeter Calibration Records

Number Title Date

837097 Self-Reading Dosimeter September 8, 2017

836204 Self-Reading Dosimeter September 9, 2017

833059 Self-Reading Dosimeter September 30, 2017

810641 Self-Reading Dosimeter gamma/neutron December 12, 2017

810633 Self-Reading Dosimeter gamma/neutron December 12, 2017

810552 Self-Reading Dosimeter gamma/neutron December 13, 2017

Miscellaneous

Number Title Date

2017 Multi-Pack TLD Results 2017

100536 NVLAP Accreditation Report April 8, 2016

100536 NVLAP Proficiency Testing Results - TLD May 2, 2016

100536 NVLAP Proficiency Testing Results-EPD August 5, 2016

100536 NVLAP Accreditation Report February 15, 2018

2017 Unit 1 Dry Active Waste December 1, 2017

2017 Unit 2 Dry Active Waste May 18, 2017

2016 Unit 3 Dry Active Waste December 22, 2016

25116 Intake Dose Assessment April 21, 2016

Miscellaneous

Number Title Date

47194 Personnel Dosimetry Processing Report November 15, 2017

Section 4OA1: Performance Indicator Verification

Miscellaneous

Number Title Date

2016-002-01 Licensee Event Report June 27, 2017

2017-001-00 June 27, 2017 June 14, 2017

Palo Verde Plant Computer PI ProcessBook

Palo Verde Control Room Logs (1/1/17 - 12/31/17)

Section 4OA2: Problem Identification and Resolution

Procedures

Number Title Revision

40ST-9DG01 Diesel Generator A Test 49

Condition Reports (CRs)

17-15901 18-03517 17-15838 17-11155 17-09750

16-03783

Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion

Condition Reports (CRs)

18-02544 18-02688 18-02664 18-02605 18-02716

The following items are requested for the

Occupational Radiation Safety Inspection

at Palo Verde Nuclear Generating Station, Units 1, 2, and 3

February 12 to 16, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before January 26, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

louis.carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2. Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: October 20, 2017

A. List of contacts and telephone numbers for ALARA program personnel

B. Applicable organization charts

C. Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D. Procedure index for ALARA Program

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I. Outline of source term reduction strategy

J. If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K. Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection: January 22, 2016

A. List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D. Procedure indexes for the following areas:

1. Occupational Dose Assessment

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F. List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. List of positive whole body counts since date of last inspection, names redacted if

desired

H. Part 61 analyses/scaling factors

I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML18127A004

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JDixon Yes No Publicly Available Sensitive NRC-002

OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB

NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18

OFFICE C:DRS/PS2 TL:IPAT C:DRP/D

NAME HGepford GGeorge GMiller

SIGNATURE /RA/ /RA/ /RA/

DATE 4/30/18 4/30/2018 5/7/18

May 7, 2018

Mr. Robert Bement

Executive Vice President, Nuclear/CNO

Mail Station 7602

Arizona Public Service Company

P.O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED

INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND

05000530/2018001

Dear Mr. Bement:

On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC

inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of

your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors documented one finding of very low safety significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a

non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within

days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the

NRC resident inspector at the Palo Verde Nuclear Generating Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the

U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the

NRC resident inspector at the Palo Verde Nuclear Generating Station.

R. Bement 2

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

/RA/

Geoffrey

B. Miller, Chief

Project Branch D

Division of Reactor Projects

Docket Nos. 50-528, 50-529, 50-530

License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

Inspection Report 05000528/2018001,

05000529/2018001, 05000530/2018001

w/ Attachment:

1. Supplemental Information

2. Occupational Radiation Safety

Inspection Item Request

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers: 05000528, 05000529, 05000530

License Numbers: NPF-41, NPF-51, NPF-74

Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001

Enterprise Identifier: I-2018-001-0013

Licensee: Arizona Public Service Company

Facility: Palo Verde Nuclear Generating Station

Location: 5801 South Wintersburg Road, Tonopah, AZ 85354

Inspection Dates: January 1, 2018 to March 31, 2018

Inspectors:

C. Peabody, Senior Resident Inspector
D. Reinert, PhD, Resident Inspector
D. You, Resident Inspector
L. Carson, Senior Health Physicist
S. Hedger, Emergency Preparedness Inspector

Approved By: Geoffrey

B. Miller, Chief, Project Branch D, Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,

Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight

Process is the NRCs program for overseeing the safe operation of commercial nuclear power

reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC and self-revealed findings, violations, and additional items are summarized in the table

below.

List of Findings and Violations

Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump

Cornerstone Significance Cross-cutting Aspect Report

Section

Mitigating Green [H.12] - Human 71111.12 -

Systems NCV 05000528/2018001-01 Performance, Avoid Maintenance

Closed Complacency Effectiveness

The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,

Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe

appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump

A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for

conducting a post-maintenance test for the transfer pump were inadequate to detect a high

resistance connection in the associated motor control center.

PLANT STATUS

Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit

automatically tripped from full power when a control system failure caused a loss of generator

field excitation. The unit was restarted on February 19, 2018, and remained at or near rated

thermal power for the remainder of the inspection period.

Units 2 and 3 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed plant status activities described in

IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem

Identification and Resolution. The inspectors reviewed selected procedures and records,

observed activities, and interviewed personnel to assess licensee performance and compliance

with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1) Unit 1 containment spray system B on January 4, 2018

(2) Unit 2 auxiliary feedwater system A on January 30, 2018

(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the Unit 3

containment spray system on January 18, 2018.

71111.05AQ - Fire Protection Annual/Quarterly

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected

areas:

(1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on

January 4, 2018

(2) Unit 2 control room, Fire Zone 17, on January 19, 2018

(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A,

on January 23, 2018

(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018

(5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018

71111.07 - Heat Sink Performance

Heat Sink (1 Sample)

The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger

performance on February 21, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated risk informed completion time program and

CFR 50.69 program classroom training on January 31, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated operator performance synchronizing the Unit 1 main

generator to the grid following a reactor trip caused by a fault in the main generator

excitation system on February 19, 2018.

The inspectors observed and evaluated operator response to Unit 3 loss of A channel

indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and

FWIV-174, 177, on February 27, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185

in Units 2 and 3

(2) Diesel fuel oil transfer pump predictive engineering cable testing

71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined

minimum flow recirculation valve SIA-UV660 on January 4, 2018

(2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a

surveillance run on January 5, 2018

(3) Unit 3 elevated risk due to planned maintenance on containment spray pump A

atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection

valve SI-687 January 29, 2018 through February 4, 2018

(4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018

(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018

71111.15 - Operability Determinations and Functionality Assessments (9 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on

January 3, 2018

(2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on

January 25, 2018

(3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685,

failed to re-open during breaker maintenance on January 31, 2018

(4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on

February 13, 2018

(5) Unit 1 calculated qualified life of safety injection combined header isolation valves,

SI-660 and SI-659, on February 23, 2018

(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater

isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018

(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A

T-drains on March 6, 2018

(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on

March 7, 2018

(9) Unit 2 steam generator sodium concentration increase on March 12, 2018

71111.18 - Plant Modifications (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-

connect valve, SI-696, replacement with General Electrical model Spectra breaker per

Design Equivalent Change 01035 on March 15, 2018

71111.19 - Post Maintenance Testing (6 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve

SIA-UV660 following limit switch adjustment on January 4, 2018

(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch

replacement following an unplanned cooldown during a monthly surveillance run on

January 9, 2018

(3) Unit 3 containment spray pump A test following breaker maintenance on

February 6, 2018

(4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves

on February 28, 2018

(5) Unit 2 essential cooling water pump A test and flow balance following planned

maintenance to calibrate motor overcurrent relays and replace a high discharge

pressure switch on March 20, 2018

(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features

fast start test following online maintenance outage on March 23, 2018

71111.20 - Refueling and Other Outage Activities (1 Sample)

The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced

outage due to an unplanned reactor trip caused by a fault in the main generator excitation

circuitry.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (6 Samples)

(1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018

(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018

(3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed

surveillance on February 28, 2018

(4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018

(5) Unit 3, essential chiller A vibration analysis on March 8, 2018

(6) Unit 1 containment spray pump B inservice test on March 22, 2018

In-service (1 Sample)

(1) Unit 2 containment spray pump A inservice test on March 1, 2018

71114.02 - Alert and Notification System Testing (1 Sample)

The inspectors evaluated the maintenance and testing of the alert and notification system

between May 1, 2016 - February 20, 2018.

71114.03 - Emergency Response Organization Staffing and Augmentation System (1 Sample)

The inspectors evaluated the readiness of the Emergency Response Organization between

May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff

their emergency response facilities in accordance with emergency plan commitments.

71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)

The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and

practices between May 1, 2016 - February 20, 2018. The evaluation reviewed

screenings and evaluations documenting the implementation of this process. The review

of the change process documentation does not constitute NRC approval.

71114.05 - Maintenance of Emergency Preparedness (1 Sample)

The inspectors evaluated the maintenance of the emergency preparedness program

between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the

emergency plan, the conduct of drills and exercises, licensee audits and assessments,

and the maintenance of equipment important to emergency preparedness.

71114.06 - Drill Evaluation

Emergency Planning Drill (1 Sample)

The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.

RADIATION SAFETY

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Radiological Work Planning (1 Sample)

The inspectors evaluated the licensees radiological work planning by reviewing the

following activities:

(1) RWP 2017-9-1016, RMC Operations and Routine Tasks

(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection

(3) RWP 2017-3002, Reactor Destack/Restack

(4) RWP 2017-3015, Cavity Decontamination

(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

71124.04 - Occupational Dose Assessment

Source Term Characterization (1 Sample)

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification (15 Samples)

The inspectors verified licensee performance indicators submittals listed below:

(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -

December 31, 2017)

(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -

December 31, 2017)

(3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -

December 31, 2017)

(4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -

December 31, 2017)

(5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31,

2017)

(6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1,

2017 - December 31, 2017)

(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -

December 31, 2017)

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018

71153 - Follow-up of Events and Notices of Enforcement Discretion

Events (1 Sample)

The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation

and licensees response on February 15 - 16, 2018.

INSPECTION RESULTS

Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump

Cornerstone Significance Cross-cutting Report

Aspect Section

Mitigating Green [H.12] - 71111.12 -

Systems NCV 05000528/2018001-01 Human Maintenance

Closed Performance, Effectiveness

Avoid

Complacency

The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,

Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe

appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump

A.

Specifically, following power cable maintenance on November 9, 2017, the instructions for

conducting a post-maintenance test for the transfer pump were inadequate to detect a high

resistance connection in the associated motor control center.

Description: On November 12, 2017, the licensee was conducting a 24-hour surveillance test

run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began

the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer

pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start

on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the

EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run

for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.

Licensee electricians took electrical resistance readings across the connections in the motor

control center for the fuel oil transfer pump breaker. The electricians identified that the direct

cause of the transfer pump failure was a high variable resistance secondary stab connection

in the motor control center cubicle. The electricians removed the breaker and cleaned and

adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as

left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was

successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared

operable following the successful completion of the 24-hour surveillance run on November

14, 2017.

The licensees apparent cause investigation determined that the diesel fuel oil transfer pump

breaker had been removed from service for periodic predictive maintenance on November 9,

2017, under work order 4685719. During this maintenance activity licensee engineers

disconnected the diesel fuel oil transfer pump motor power and control cables for megger

testing. Cable lug screw connections attach each of these cables to the secondary stab

connections on the movable motor breaker and the stationary motor control center chassis.

Cable connections on the secondary stab connections are removed for testing, and then

following testing, the cables are re-landed onto the secondary stabs of the breaker and motor

control center chassis. The licensees work planners had not recognized the possibility that

removing and re-landing the cables on the lug screw connections had the potential to disturb

the motor control center secondary stab connections.

The post-maintenance test associated with the cable testing was a momentary start of the

diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position

for only a few seconds. The licensees apparent cause investigation identified that

nonintrusive as-left quantitative resistance checks could have been used to assess the

integrity of the secondary stab connections. The licensee performs similar checks when

performing individual breaker cubicle preventative maintenance tasks that actively remove

and re-test the individual motor control center bucket. Such a check was the method used by

the electricians to initially diagnose the breaker failure. However, no such quantitative

resistance check was specified in the cable testing work order.

The post-maintenance test was not written in accordance with station procedure 30DP-

9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in

part, that the post-maintenance test shall ensure that equipment performs its intended

function when returned to service following maintenance, that a new deficiency has not been

created, and that the equipment will function as designed for safe and reliable plant operation.

The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing

created new failure deficiency by disturbing electrical continuity and creating a high resistance

condition at the secondary stab connection that impacted EDG operability. The post-

maintenance test following the cable testing maintenance was not adequate to ensure that a

new deficiency had not been created.

Corrective Action: The licensee has taken corrective action to revise the work instructions for

performing future cable testing to include quantitative resistance retests when re-terminating

motor control center secondary stab connections. As an interim measure, the inspectors

confirmed that all safety-related 480V electrical breakers that have been subject to this cable

testing have performed satisfactorily during subsequent diesel generator surveillance testing.

Corrective Action Reference: Condition Report 17-16497

Performance Assessment:

Performance Deficiency: The licensees failure to prescribe appropriate retest activities

following predictive maintenance on diesel fuel oil transfer pump cables is a performance

deficiency.

Screening: The performance deficiency is more-than-minor and a finding because it is

associated with the equipment performance attribute of the mitigating systems cornerstone

objective to ensure the availability, reliability, and capability of systems that respond to

initiating events to prevent undesirable consequences. Specifically, on November 9, 2017,

the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel

oil transfer pump

A. Without an appropriate post-maintenance test, this activity rendered the

Unit 1 diesel generator A inoperable.

Significance: The inspectors performed the initial significance determination using NRC

Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for

Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that

the finding was of very low safety significance (Green) because the finding did not represent

an actual loss of safety function of a single train for greater that its technical specification

allowed outage time.

Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human

performance associated with the avoid complacency aspect. Specifically, licensee work

planners did not consider potential undesired consequences associated with disturbing the

power cables leads, instead relying on past successful tests [H.12].

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and

Drawings, requires, in part, that activities affecting quality be prescribed by documented

instructions, procedures, or drawings, of a type appropriate to the circumstances and be

accomplished in accordance with these instructions, procedures, or drawings.

Contrary to the above, on November 9, 2017, the licensee performed maintenance on the

Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies,

without documented instructions, procedures, or drawings of a type appropriate to the

circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure

the maintenance was successful and the pump was returned to service, and as a result, the

Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14,

2017.

Disposition: This violation is being treated as a non-cited violation consistent with Section

2.3.2.a of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 16, 2018, the inspector presented the radiation safety inspection results to

Ms.

M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the

licensee staff.

On March 2, 2018, the inspector provided a debrief for the emergency preparedness program

inspection to Mr.

M. McLaughlin, Vice President, Operations Support, and other members of the

licensee staff. On March 29, 2018, the inspector communicated the inspection results

telephonically to Mr.

T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members

of the licensee staff.

On April 11, 2018, the inspector presented the quarterly residents inspection results to

Mr.

J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee

staff.

SUPPLEMENTAL INFORMATION

DOCUMENTS REVIEWED

Section 1R04: Equipment Alignment

Procedures

Number Title Revision

40ST-9AF07 Auxiliary Feedwater Pump AFA-P01 Monthly Valve 6

Alignment

40ST-9SI13 LPSI and CS System Alignment Verification 33

Condition Reports (CRs)

16-17321 17-03027

Drawings

Number Title Revision

03-M-HJP-001 P&I Diagram Control Building HVAC 14

03-M-HJP-002 P&I Diagram Control Building HVAC 14

03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49

03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & 6

Cont. Spray Discharge

03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF 7

Pump Suction Lines

Miscellaneous

Number Title Revision

STM-30D System Training Manual Volume 30D: Control Building 6

HVAC System (HJ)

Section 1R05: Fire Protection

Procedures

Number Title Revision

14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13

Condition Reports (CRs)

17-03870 18-00999

Miscellaneous

Number Title Revision/Date

PVNGS Pre-Fire Strategies Manual 26

13-MM-0650 Fire Protection & Spray System Sub 007

13-MS-A083 NFPA Code Applicability and Conformance Review 007

4834415 Fire Safety Component Condition Record November 3, 2016

4834430 Fire Safety Component Condition Record November 3, 2016

4843902 Fire Safety Component Condition Record December 6, 2016

Unit 3 Tamper/Vital/Security Tour - Post 31 February 7, 2018

4971714 Open Door/Hatch/Floor Plug Permit January 29, 2018

4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018

Section 1R07: Heat Sink Performance

Procedures

Number Title Revision

73DP-9ZZ21 Heat Exchanger Visual Inspection 6

73DP-9ZZ11 Heat Exchanger Program 15

Condition Reports (CRs)

18-03133 18-03138 18-03139

Work Orders (WOs)

4591574 4591575 4667054 4667055 4667098

Section 1R11: Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number Title Revision

40OP-9MB01 Main Generation and Excitation 63

40DP-9OP02 Conduct of Operations 72

Procedures

Number Title Revision

40AL-9RK6A Panel B06A Alarm Responses 18

Condition Reports (CRs)

18-02797 18-02593 18-03215

Miscellaneous

Number Title Date

Current Alarm Status Report February 16, 2018

Section 1R12: Maintenance Effectiveness

Procedures

Number Title Revision

2MT-9ZZ74 Molded Case Circuit Breaker Test 48

30DP-9WP04 Post-Maintenance Testing Development 19

Condition Reports (CRs)

17-08025-005 17-08025 17-16497

Work Orders (WOs)

25959 4925966 4925967 4925969 4685719

4788985

Section 1R13: Maintenance Risk Assessments and Emergent Work Control

Procedures

Number Title Revision

40DP-9AP21 Protected Equipment 7

70DP-0RA05 Assessment and Management of Risk when Performing 23

Maintenance in Modes 1 and 2

40MT-9ZZ01 Operations Maintenance Activities 5

40DP-9RS01 Operations Department Online Nuclear Risk Management 4

Mode 1 and 2

Condition Reports (CRs)

18-00249 185-00136 18-00336 18-02544

Miscellaneous

Number Title Date

Schedulers Evaluation for PV Unit 1 January 4, 2018

Schedulers Evaluation for PV Unit 1 February 23, 2018

Schedulers Evaluation for PV Unit 3 February 1, 2018

Schedulers Evaluation for PV Unit 2 March 19, 2018

Unit 3 Archived Operator Logs January 29, 2018 -

February 4, 2018

Section 1R15: Operability Determinations and Functionality Assessments

Procedures

Number Title Revision

40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71

40AL-9RK6A Panel B06A Alarm Responses 18

74DP-9CY04 Systems Chemistry Specifications 94

Condition Reports (CRs)

17-18475 12-01397 17-17856 13-01198 18-03127

17-16393 18-03215 18-03291 18-02839 18-01610

18-02334 3127427 18-02468 18-03980

Miscellaneous

Number Title Revision/Date

03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11

18-02334-003 Engineering Evaluation February 15, 2018

28056 Adverse CRDR July 19, 2013

EQ Program Manual 26

Section 1R18: Plant Modifications

Condition Reports (CRs)

18-04116

Work Orders (WOs)

4989102

Miscellaneous

Number Title Date

DEC-01035 Design Equivalent Change April 12, 2017

Section 1R19: Post-Maintenance Testing

Procedures

Number Title Revision

40OP-9CH12 Refueling Water Tank (RWT) Operations 41

2MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent 4

Relays

2MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous 4

Overcurrent Relays

40OP-9EW02 Essential Cooling Water System (EW) Train B 26

40ST-9DG01 Diesel Generator A Test 49

73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load 13

and Hot Start Test Train B

40ST-9DG02 Diesel Generator B Test 54

Condition Reports (CRs)

18-00136 18-00197 18-01931 18-00210 18-00290

18-00336 18-00377 18-00346 18-04731 18-04732

Work Orders (WOs)

4964492 4822983 4981967 4726747 4821113

4847651 4965079 4972486 4847637

Drawings

Number Title Revision

01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15

01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13

13-M018-00141 Control Schematic (Starting Sequence Control) 25

Miscellaneous

Number Title Revision/Date

18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018

during Surveillance Run 1/5/2018

Section 1R20: Refueling and Other Outage Activities

Procedures

Number Title Revision

40OP-9MB01 Main Generation and Excitation 63

Section 1R22: Surveillance Testing

Procedures

Number Title Revision

73DP-9CL02 Containment Leakage Rate Testing Program 33

73ST-9XI20 Atmospheric Dump Valves - Inservice Test 47

73ST-9SI06 Containment Spray Pumps and Check valves - Inservice 42

Test

73ST-9DF01 Diesel Fuel Oil Transfer Pumps - Inservice Test 34

40DP-9OP06 Operations Department Repetitive Task Program 130

73ST-9SI06 Containment Spray Pumps and Check Valves- Inservice 42

Test

Condition Reports (CRs)

16-15793 18-03304 18-01314 18-03825

Work Orders (WOs)

22921 4840032 4843076 4843390

Miscellaneous

Number Title Revision/Date

13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication 18

Loops Uncertainty Calculation

18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018

18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for March 2, 2018

SB-200, 202, and 205

Section 1EP2: Alert and Notification System Testing

Miscellaneous Documents

Number Title Date

ID/Letter Palo Verde Nuclear Generating Station Alert and May 26, 2017

Number: Notification System (ANS) FEMA 350 Report -

240-02802 May 2017

Palo Verde Nuclear Generating Station, Alert and May 2017

Notification System (ANS), FEMA 350 Report

Palo Verde Nuclear Generating Station Siren Operating November 2015

Manual January 4, 2018

Letter from FEMA Region IX to Director, Division of September 19,

Emergency Management, State of Arizona 2017

State of Arizona/Maricopa County Offsite Emergency November 2017

Response Plan, Palo Verde Nuclear Generating Station

The Maricopa County Sheriffs Office Emergency August 2016

Response to Palo Verde Nuclear Generating Station

Work Orders (WOs)

474965/0

Section 1EP3: Emergency Response Organization Staffing and Augmentation

Procedures

Number Title Revision

EP-0902 Notifications 10

EP-0901 Classifications 10

40AL-9RK7C Panel B07C Alarm Responses 15

40AO-9ZZ21 Acts of Nature 37

79IS-9SM01 Analysis of Seismic Event 27

Miscellaneous Documents

Number Title Date

240-02799 2017 1 Quarter - Emergency Preparedness

st

March 21, 2017

JF/MA Augmentation Drill Report

240-02803 2017 2nd Quarter - Emergency Preparedness June 6, 2017

CS/MA Augmentation Drill Report

240-02797 2017 3rd Quarter - Emergency Preparedness July 25, 2017

Augmentation Drill Report (After Hours)

240-02808 2017 3rd Quarter - Emergency Preparedness September 6, 2017

Augmentation Drill Report

240-02817 2017 4th Quarter - Emergency Preparedness December 13,

CS/ma Augmentation Drill Report 2017

240-02790 2016 2nd Quarter - Emergency Preparedness June 23, 2016

JF/MA Augmentation Drill Report

240-02791 2016 3rd Quarter - Emergency Preparedness August 3, 2016

JF/MA Augmentation Drill Report

240-02798 December 5, 2016, Alert Event Report January 17, 2017

Section 1EP4: Emergency Action Level and Emergency Plan Changes

Procedure

Number Title Revision

16DP-0EP22 Emergency Plan Maintenance 11, 12

Miscellaneous Documents

Number Title Date

Evaluation Replace the Meteorological Instrumentation and Data August 8, 2017

Tracking Number Transmission System (MDTS)

2017-001E

Evaluation EP-0900, Rev. 16 August 17, 2017

Tracking Number

2017-003E

Evaluation EP-0901, Rev. 10 August 21, 2017

Tracking Number

2017-004E

Screening 74RM-9EF42, Radiation Monitor Alarm Setpoint April 16, 2017

Tracking Number Determination, Rev. 30

2017-002S

Screening Procedure EP-0901, Classifications, Added New EALs August 20, 2017

Tracking Number form EPLAN R60, Revise PV Proc Format

2017-022S

Miscellaneous Documents

Number Title Date

Screening EP-905, Revision 9, Protective Actions June 7, 2017

Tracking Number

2017-014S

Screening DMWO 3452940 Palo Verde Nuclear Generating September 8,

Tracking Number Station Radio Replacement Project 2017

2017-023S

Screening 40AO-9ZZ18 R018 Fire Outside Control Room September 26,

Tracking Number 2017

2017-029S

EPM Tracking DEC-00720 Allow Solar-Charged Offsite Sirens to February 18,

Number Replace AC-Charged Offsite Sirens 2015

2015-006S

Section 1EP5: Maintenance of Emergency Preparedness

Procedures

Number Title Revision

01DP-0AP12 Condition Reporting Process 28

01DP-0AP12-01 Condition Reporting Process Administrative Guide 4

EP-0905 Protective Actions 9

EP-0902 Notifications 8, 9, 10

16DP-0EP31 Emergency Preparedness Equipment Out-of-Service 9

16DP-0EP27 Emergency Preparedness Equipment Testing 10

16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5

Condition Reports (CRs)

16-08461 16-09213 16-11134 16-11930 16-12640 16-13501

16-14593 16-14934 16-16710 17-02188 17-03147 17-03149

17-03202 17-03605 17-03721 17-03736 17-03826 17-03828

17-03829 17-03884 17-04633 17-06893 17-08328 17-10906

17-10949 17-11437 17-13663 17-14927 17-15449 17-15797

17-15884 17-16771 17-17091 17-17218 17-17739 17-18443

18-03244

Miscellaneous Documents

Number Title Revision/Date

KLD TR-983 Palo Verde Nuclear Generating Station, December 7,

2017 Population Update Analysis 2017

KLD TR-895 Palo Verde Nuclear Generating Station, December 8,

2016 Population Update Analysis 2016

Updated Review of Palo Verde Nuclear Generating September 29,

Station Emergency Plan 2016 Letters of Agreement 2016

Letter # 240- 2017 Review of Palo Verde Nuclear Generating Station December 26,

2819 Emergency Plan Letters of Agreement 2017

NAD Audit 2016- Nuclear Assurance Department (NAD) Audit Plan and December 14,

010 Report, 2016-010, Emergency Preparedness 2016

Palo Verde Nuclear Generating Station After Action August 18,

Report/Improvement Plan, Exercise Date - June 1, 2017

2017, Radiological Emergency Preparedness Program

ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017

Report (Revised)

ID: 240-02816 2017 Health Physics Drill Report (November 2017) December 12,

2017

ID: 240-02818 1709 ERO Mini Drill - ERO Blue Team December 21,

(December 2017) 2017

NAD Audit 2017- Nuclear Assurance Department (NAD) Audit Plan and January 25,

008 Report, 2017-008, Emergency Preparedness 2018

240-02812 1704 and 1705 ERO Mini Drills - ERO White Team and October 18,

CS/MA Green Team (June and July 2017) 2017

240-02813 1706 ERO Mini Drill - ERO Gold Team (July 2017) October 18,

CS/MA 2017

240-02814 1707 ERO Mini Drill - ERO Red Team (August 2017) October 18,

TW/MA Revision 1 2017

Emergency Response Facility Telephone Book, January 1,

1st Quarter Edition 2018 2018

240-02801 1702 IPZ Evaluated Exercise - ERO White Team April 6, 2017

JF/MA (March 2017)

240-02797 1608 ERO Mini Drill - ERO Red Team January 4,

JF/MA (December 2016) 2017

240-02792 1604 and 1605 ERO Drills September 14,

JF/MA 2016

240-02793 1606 ERO Mini Drill - ERO Green Team October 4,

JF/MA (September 2016) 2016

Miscellaneous Documents

Number Title Revision/Date

240-02795 1609 Off-Hours Drive-in Augmentation Drill - December 2,

JF/MA (November 2016) 2016

240-02796 2016 Health Physics Drill Report (November 2016) December 7,

2016

Evaluation Evaluate Adding STSC ENS Communicator Duties to September 7,

Report 16-11134 STSC Communicator 2016

17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass September 28,

Break 2017

17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11,

2017

Level 4 Default Values Used in Dose Assessment November 30,

Evaluation 2017

Report 17-

15797-001

Document No. Master Agreement Between Arizona Public Service 0

500599510 Company and Westinghouse Electric Company LLC for

Goods and Services (Effective January 29, 2016 to

December 31, 2018)

Palo Verde Nuclear Generating Station After Action May 26, 2017

Report/Improvement Plan, Exercise Dates - March 7-8,

2017, Radiological Emergency Preparedness Program

(REPP)

240-02789 2016 Health Physics Drill Report (Re-Demonstration) June 9, 2016

JF/TW

240-02788 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016

JF/MA

Palo Verde Nuclear Generating Station After Action February 9,

Report/Improvement Plan, Exercise Date - 2017

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

240-02787 1602 IPZ Exercise - ERO Green Team (March 2016) March 25, 2016

JF/MA

Palo Verde Nuclear Generating Station After Action February 9,

Report/Improvement Plan, Exercise Date - 2017

November 16, 2016, Radiological Emergency

Preparedness Program (REPP)

Level 3 Evaluation Report 18-02668-002 March 22, 2018

Work Orders (WOs)

4782667 4783959/0 4787729/0 4787847/0 4836236

4836263/0 4860832/0 4862234/0 4862502/0 4885361/0

4889725/0 4896971/0 4901070 4916668/0 4918303/0

4918455/0 4937577/0 4947802/0

Section 1EP6: Drill Evaluation

Procedures

Number Title Revision

EP-0900 Emergency Response Organization (ERO) Position 16

Checklists

EP-0901 Classifications 10

Condition Reports (CRs)

18-02352 18-02503 18-02655

Section 2RS2: Occupational ALARA Planning and Controls

Procedures

Number Title Revision

75DP-0RP03 ALARA Program Overview 06

75DP-0RP06 ALARA Committee 07

75DP-0RP08 Managing Radiological Risk 02

75RP-9RP02 Radiation Work Permits 31

75RP-9RP25 Temporary Shielding 14

75TD-9RP02 ALARA Work Planning 11

Audits and Self-Assessments

Title Date

PVGS Integrated Performance Assessment Report Radiation September 14, 2017

Protection 2nd Quarter 2017

2016 Annual ALARA/Management Evaluation Report June 23, 2017

2016 Annual Radiation Protection Program Summary Report July 27, 2017

Condition Reports (CRs)

17-15502 17-15529 17-15802 17-16741 17-17944

17-18180 18-01890

Radiation Work Permits/ALARA Reviews

Number Title

RWP 2017-9-1016 RMC Operations and Routine Tasks

RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection

RWP 2017-3002 Reactor Destack/Restack

RWP 2017-3015 Cavity Decontamination

RWP 2017-3039 10-Year In-Service Inspection Vessel

Miscellaneous

Title Date

ALARA 5-Year Plan 2015 - 2019 November 2015

1R20 Radiological Safety Summary In Perspective November 7, 2017

2R20 Radiological Safety Summary In Perspective May 9, 2017

3R19 Radiological Safety Summary In Perspective November 10, 2016

Section 2RS4 : Occupational Dose Assessment

Procedures

Number Title Revision

75DP-0RP01 RP Program Overview 11

75DP-0RP06 Managing Radiological Risk 2

75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect 12

Dosimetry, and Anticipated EPD Dose Rate Alarm

75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5

75RP-9ME25 TLD Reader Calibration and Response Check 6

75RP-9RP03 Bioassay Analysis 10

75RP-9RP05 Contamination Dose Evaluation 7

75RP-9RP16 Special Dosimetry 24

75RP-9QE21 Calibration of Self-Indicating Dosimeters 13

Procedures

Number Title Revision

75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM- 10

Calibrator

Audits and Self-Assessments

Title Date

2016 Annual ALARA/Management Evaluation Report June 23, 2017

2016 Annual Radiation Protection Program Summary Report July 27, 2017

Condition Reports (CRs)

17-14033 17-14127 17-14527 17-15700 18-01423

Self-Reading Dosimeter Calibration Records

Number Title Date

837097 Self-Reading Dosimeter September 8, 2017

836204 Self-Reading Dosimeter September 9, 2017

833059 Self-Reading Dosimeter September 30, 2017

810641 Self-Reading Dosimeter gamma/neutron December 12, 2017

810633 Self-Reading Dosimeter gamma/neutron December 12, 2017

810552 Self-Reading Dosimeter gamma/neutron December 13, 2017

Miscellaneous

Number Title Date

2017 Multi-Pack TLD Results 2017

100536 NVLAP Accreditation Report April 8, 2016

100536 NVLAP Proficiency Testing Results - TLD May 2, 2016

100536 NVLAP Proficiency Testing Results-EPD August 5, 2016

100536 NVLAP Accreditation Report February 15, 2018

2017 Unit 1 Dry Active Waste December 1, 2017

2017 Unit 2 Dry Active Waste May 18, 2017

2016 Unit 3 Dry Active Waste December 22, 2016

25116 Intake Dose Assessment April 21, 2016

Miscellaneous

Number Title Date

47194 Personnel Dosimetry Processing Report November 15, 2017

Section 4OA1: Performance Indicator Verification

Miscellaneous

Number Title Date

2016-002-01 Licensee Event Report June 27, 2017

2017-001-00 June 27, 2017 June 14, 2017

Palo Verde Plant Computer PI ProcessBook

Palo Verde Control Room Logs (1/1/17 - 12/31/17)

Section 4OA2: Problem Identification and Resolution

Procedures

Number Title Revision

40ST-9DG01 Diesel Generator A Test 49

Condition Reports (CRs)

17-15901 18-03517 17-15838 17-11155 17-09750

16-03783

Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion

Condition Reports (CRs)

18-02544 18-02688 18-02664 18-02605 18-02716

The following items are requested for the

Occupational Radiation Safety Inspection

at Palo Verde Nuclear Generating Station, Units 1, 2, and 3

February 12 to 16, 2018

Integrated Report 2018001

Inspection areas are listed in the attachments below.

Please provide the requested information on or before January 26, 2018.

Please submit this information using the same lettering system as below. For example, all

contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled

1- A, applicable organization charts in file/folder 1- B, etc.

If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at

least 30 days later than the onsite inspection dates, so the inspectors will have access to the

information while writing the report.

In addition to the corrective action document lists provided for each inspection procedure listed

below, please provide updated lists of corrective action documents at the entrance meeting.

The dates for these lists should range from the end dates of the original lists to the day of the

entrance meeting.

If more than one inspection procedure is to be conducted and the information requests appear

to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which

file the information can be found.

If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or

louis.carson@nrc.gov.

PAPERWORK REDUCTION ACT STATEMENT

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget,

control number 3150-0011.

2. Occupational ALARA Planning and Controls (71124.02)

Date of Last Inspection: October 20, 2017

A. List of contacts and telephone numbers for ALARA program personnel

B. Applicable organization charts

C. Copies of audits, self-assessments, and LERs, written since date of last inspection,

focusing on ALARA

D. Procedure index for ALARA Program

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures may be requested by number after the inspector reviews

the procedure indexes.

1. ALARA Program

2. ALARA Committee

3. Radiation Work Permit Preparation

F. A summary list of corrective action documents (including corporate and sub-tiered

systems) written since date of last inspection, related to the ALARA program. In addition

to ALARA, the summary should also address Radiation Work Permit violations,

Electronic Dosimeter Alarms, and RWP Dose Estimates

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. List of work activities greater than 1 rem, since date of last inspection,

Include original dose estimate and actual dose.

H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of

record)

I. Outline of source term reduction strategy

J. If available, provide a copy of the ALARA outage report for the most recently completed

outages for each unit

K. Please provide your most recent Annual ALARA Report.

4. Occupational Dose Assessment (Inspection Procedure 71124.04)

Date of Last Inspection: January 22, 2016

A. List of contacts and telephone numbers for the following areas:

1. Dose Assessment personnel

B. Applicable organization charts

C. Audits, self-assessments, vendor or NUPIC audits of contractor support, and LERs

written since date of last inspection, related to:

1. Occupational Dose Assessment

D. Procedure indexes for the following areas:

1. Occupational Dose Assessment

E. Please provide specific procedures related to the following areas noted below.

Additional Specific Procedures will be requested by number after the inspector reviews

the procedure indexes.

1. Radiation Protection Program

2. Radiation Protection Conduct of Operations

3. Personnel Dosimetry Program

4. Radiological Posting and Warning Devices

5. Air Sample Analysis

6. Performance of High Exposure Work

7. Declared Pregnant Worker

8. Bioassay Program

F. List of corrective action documents (including corporate and sub-tiered systems) written

since date of last inspection, associated with:

1. National Voluntary Laboratory Accreditation Program (NVLAP)

2. Dosimetry (TLD/OSL, etc.) problems

3. Electronic alarming dosimeters

4. Bioassays or internally deposited radionuclides or internal dose

5. Neutron dose

NOTE: The lists should indicate the significance level of each issue and the search

criteria used. Please provide in document formats which are searchable so that

the inspector can perform word searches.

G. List of positive whole body counts since date of last inspection, names redacted if

desired

H. Part 61 analyses/scaling factors

I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)

accreditation report or, if dosimetry is provided by a vendor, the vendors most recent

results

ML18127A004

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JDixon Yes No Publicly Available Sensitive NRC-002

OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB

NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18

OFFICE C:DRS/PS2 TL:IPAT C:DRP/D

NAME HGepford GGeorge GMiller

SIGNATURE /RA/ /RA/ /RA/

DATE 4/30/18 4/30/2018 5/7/18