IR 05000528/2024005
| ML24232A207 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/22/2024 |
| From: | John Dixon NRC/RGN-IV/DORS |
| To: | Heflin A Arizona Public Service Co |
| Shared Package | |
| ML24232A207 | List: |
| References | |
| IR 2024005 | |
| Download: ML24232A207 (1) | |
Text
August 22, 2024
SUBJECT:
UPDATED INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION - UNITS 1, 2, AND 3 (REPORT 05000528/2024005, 05000529/2024005, 05000530/2024005)
Dear Adam Heflin:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Palo Verde Nuclear Generating Station. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This plan also includes two non-routine inspections in calendar year 2024 and 2025 which are Inspection Procedures (IP) 71003, Post-Approval Site Inspection for License Renewal (Unit 2 - Phase 1) scheduled for October 14-25, 2024, and IP 71003 Post-Approval Site Inspection for License Renewal (Units 1, 2 and 3 - Phase 2) scheduled for March 3-21, 2025.
The regional administrator has approved implementation of these inspection procedures.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1574 with any questions you have regarding this letter.
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528, 05000529, and 05000530 License Nos. NPF-41, NPF-51, and NPF-74 Enclosure:
Inspection Plan cc w/encl: Distribution via LISTSERV Signed by Dixon, John on 08/22/24
ML24232A207 X SUNSI Review By: ASanchez ADAMS:
X Yes No Sensitive X Non-Sensitive Non-Publicly Available X Publicly Available Keyword NRC-002 OFFICE SPE:DORS/D BC:DORS/D NAME ASanchez JDixon SIGNATURE
/RA/
/RA/
DATE 08/22/2024 8/22/2024
Prepared on 8/15/2024 12:30:18 PM Enclosure Page 1 of 3 Site Inspection Activity Plan Palo Verde 07/01/2024 - 06/30/2026 PV 2024 BRQ
Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)
1,2,3 9/9/2024 9/13/2024 IP 71130.02 000734 Access Control 1,2,3 9/9/2024 9/13/2024 IP 71130.09 001656 Security Plan Changes 1,2,3 9/9/2024 9/13/2024 IP 71151 001338 Performance Indicator Verification Inservice Inspection - PV (Unit 2)
2 10/14/2024 10/25/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
License Renewal 71003 - PV Unit 2 (Phase 1)
2 10/21/2024 10/25/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal RP 1,3,PI
1,2,3 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2,3 10/21/2024 10/25/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2,3 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification Target Set Inspection (71130.14)
1,2,3 11/4/2024 11/5/2024 IP 71130.14 000743 Review of Power Reactor Target Sets FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - PV
1,2,3 1/6/2025 1/10/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2,3 1/27/2025 1/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Fire Protection Inspection - PV
1,2,3 1/27/2025 1/31/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2,3 2/10/2025 2/14/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
License Renewal 71003-PV (Phase 2)
1,2,3 3/3/2025 3/7/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal 1,2,3 3/17/2025 3/21/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal EP 2025 Biennial Exercise Inspection - PV
1,2,3 3/3/2025 3/7/2025 IP 71114.01 000716 Exercise Evaluation 1,2,3 3/3/2025 3/7/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2,3 3/3/2025 3/7/2025 IP 71151 001397 Performance Indicator Verification PV 2025 INITIAL EXAM
1,2,3 3/30/2025 4/5/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2,3 5/4/2025 5/10/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
1,2,3 8/25/2024 8/31/2024 IP 7111711171 111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Unit Start End Activity CAC Title Staff Count
Site Inspection Activity Plan Inservice Inspection - PV (U1)
Prepared on 8/15/2024 12:30:18 PM 2 of 3
4/7/2025 4/18/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1,2,3 4/14/2025 4/18/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2,3 4/14/2025 4/18/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2,3 4/14/2025 4/18/2025 IP 71151 000746 Performance Indicator Verification PV 2025 Biennial PI&R
1,2,3 6/9/2025 6/13/2025 IP 71152B 000747 Problem Identification and Resolution 1,2,3 6/23/2025 6/27/2025 IP 71152B 000747 Problem Identification and Resolution MC&A - PV
1,2,3 6/23/2025 6/27/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151)
1,2,3 9/8/2025 9/12/2025 IP 71130.02 000734 Access Control 1,2,3 9/8/2025 9/12/2025 IP 71130.09 001656 Security Plan Changes 1,2,3 9/8/2025 9/12/2025 IP 71151 001338 Performance Indicator Verification RP 5,6,7,8 - PV
1,2,3 9/22/2025 9/26/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2,3 9/22/2025 9/26/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2,3 9/22/2025 9/26/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2,3 9/22/2025 9/26/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation License Renewal 71003 - PV Unit 3 (Phase 1)
3 10/5/2025 10/11/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal Comprehensive Engineering Team Inspection - Palo Verde
1,2,3 1/26/2026 1/30/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2,3 2/9/2026 2/13/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection EP Program & PI Inspection (2026) - PV
1,2,3 3/16/2026 3/20/2026 IP 71114.02 000717 Alert and Notification System Testing 1,2,3 3/16/2026 3/20/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2,3 3/16/2026 3/20/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2,3 3/16/2026 3/20/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2,3 3/16/2026 3/20/2026 IP 71151 001397 Performance Indicator Verification PV 2026 INITIAL EXAM
1,2,3 4/12/2026 4/18/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2,3 5/10/2026 5/16/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection-PV (U3)
3 10/13/2025 10/24/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Site Inspection Activity Plan Inservice Inspection - PV (U2)
Prepared on 8/15/2024 12:30:18 PM 3 of 3
4/13/2026 4/24/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
1,2,3 4/13/2026 4/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2,3 4/13/2026 4/17/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2,3 4/13/2026 4/17/2026 IP 71151 000746 Performance Indicator Verification Cyber Security - PV
1,2,3 5/18/2026 5/22/2026 IP 71130.10 000741 Cybersecurity