IR 05000520/2022002

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000528/2022002 and 05000529/2022002 and 05000520/2022002
ML22207B789
Person / Time
Site: Palo Verde, Hartsville  Arizona Public Service icon.png
Issue date: 08/05/2022
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Heflin A
Arizona Public Service Co
Sanchez A
References
IR 2022002
Download: ML22207B789 (31)


Text

August 5, 2022

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2022002 AND 05000529/2022002 AND 05000530/2022002

Dear Mr. Heflin:

On June 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On July 8, 2022, the NRC inspectors discussed the results of this inspection with Mr. T. Horton, Senior Vice President, Site Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528, 05000529,05000530 License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51 and NPF-74

Report Numbers:

05000528/2022002, 05000529/2022002 and 05000530/2022002

Enterprise Identifier:

I-2022-002-0006

Licensee:

Arizona Public Service

Facility:

Palo Verde Nuclear Generating Station

Location:

Tonopah, AZ

Inspection Dates:

April 1 to June 30, 2022

Inspectors:

L. Merker, Senior Resident Inspector

E. Lantz, Resident Inspector

N. Cuevas, Resident Inspector

J. O'Donnell, Senior Health Physicist

J. Drake, Senior Reactor Inspector

E. Fernandez, Reactor Inspector

D. Antonangeli, Health Physicist

B. Baca, Health Physicist

E. Simpson, Health Physicist

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 entered the inspection period at approximately 95 percent power during a coastdown for refueling outage 1R23. On April 8, 2022, the unit was shut down for the refueling outage. On May 12, 2022, the unit reached criticality and returned to full power on May 18, 2022. The unit remained at full power for the remainder of the inspection period.

Units 2 and 3 operated at or near full power for the duration of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk-significant activities and completed onsite portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the site's readiness for seasonal extreme weather conditions prior to the onset of seasonal high temperatures for Units 1, 2, and 3, class 1E 4.16 kV train B and essential spray pond train A, on May 25, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2, containment spray train A during containment spray train B maintenance, on May 27, 2022
(2) Unit 1, essential spray pond train B during summer reliability window, on June 28, 2022
(3) Unit 3, essential chilled water train B during summer reliability window, on June 29, 2022

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) Unit 1, low-pressure safety injection train B due to being placed in service during refueling outage 1R23, on May 25, 2022.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1, containment building 80-foot elevation, fire zones 66A, 66B, 67A, and 67B, on May 4, 2022
(2) Unit 1, emergency core cooling system train B piping penetration room, fire zone 37D, on June 22, 2022
(3) Unit 2, high-pressure safety injection pump B room, fire zone 31B, on June 23, 2022
(4) Unit 3, emergency diesel generator B room, fire zone 21B, on June 29, 2022

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the Unit 2 auxiliary building 40-foot level due to water intrusion from a backed-up floor drain, on April 12, 2022.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the readiness and performance of the Unit 1 emergency diesel generator train A, air intercoolers A and B, on April 15, 2022.

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

(1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities in Unit 1 from April 11-22, 2022:

03.01.a - Nondestructive Examination and Welding Activities.

Phase array ultrasonic examination (PAUT) of auxiliary feedwater welds 58-40

& 58-1

Liquid Penetrant (PT) examination of high-pressure safety injection long-term recirculation welds 39-26 & 39-27

Welding for vent valve for pipe component ID 1PEWBL057

Welding for vent valve for pipe component ID 1PEWBL112 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities.

Evaluation 20-12302-003 SIC-UV-653, shutdown cooling from loop 1 suction valve

Evaluation 20-12315-003 SIB-V-057, refueling water level indication system isolation/drain valve

Condition Report 20-11584-002 packing leak of valve CHE-LV-110Q 03.01.d - Pressurized-Water Reactor Steam Generator Tube Examination Activities.

eddy current (ET) testing of 12427 steam generator tubes in steam generator 11

eddy current (ET) testing of 11184 steam generator tubes in steam generator 12 Problem Identification and Resolution:

The inspectors reviewed condition reports associated with inservice inspection activities and concluded that NDE/ISI related issues and operating experience are put into the corrective action program system at low levels to ensure conditions and problems are identified. No findings or violations of more than minor significance were identified.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the main control room during the following activities:

Units 2 and 3, alignment of electrical buses to the alternate offsite power sources following the loss of startup transformer NAN-X01, on May 5, 2022

Unit 1, dilution to estimated critical boron concentration and reactor startup, on May 12, 2022

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed licensed operator continuing training simulator evaluation activities, on May 17, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2, emergency diesel generator train B, on May 16, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 3, high risk for planned 18-month reactor trip switchgear breaker C testing, on April 11, 2022
(2) Units 2 and 3, emergent work on startup transformer NAN-X01 after the loss of NAN-X01 that resulted in a partial loss of offsite power, on May 13, 2022
(3) Unit 2, high risk for transferring control element assembly subgroup 19 from hold bus after emergent work on control element drive mechanism control system cabinet, on May 24, 2022
(4) Unit 1, high risk for emergent work on safety injection tank 1A nitrogen vent valve SIB-HV-633A, on May 26, 2022
(5) Unit 3, high risk for emergent work on main turbine control oil pump B, on June 15, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1, essential cooling water pump A operability determination due to oil leakage, on May 18, 2022
(2) Unit 1, emergency diesel generator train A fuel oil storage tank operability determination due to cracked internal support ribs, on June 3, 2022
(3) Unit 1, condensate transfer pump B functionality assessment due to pump data outside acceptance criteria, on June 17, 2022
(4) Unit 1, main steam isolation valve SGE-UV-170 operability determination due to accumulator B pressure decreasing trend, on June 28, 2022
(5) Unit 2, balance of plant engineered safety features actuation system train A auto-sequencer operability determination due to an auto-test failure, on June 30, 2022

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2, temporary modification to swap leads in process protective cabinet D following emergent replacement of failed low steam generator 1 reactor coolant flow trip pressure transmitter D, on April 25, 2022

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) Unit 1, safety injection tank 2A vent valve SIB-HV-613 testing following failure to open, on May 26, 2022
(2) Unit 1, high-pressure safety injection pump B, long-term cooling valve SID-HV-331 testing following repair of identified valve leakage, on June 1, 2022
(3) Unit 1, low-pressure safety injection pump B suction valve SIB-HV-692 testing following repairs to correct identified valve seat leakage, on June 21, 2022
(4) Unit 1, containment spray pump B flow control valve SIB-HV-671 testing following pressure equalization line installation, on June 21, 2022
(5) Unit 1, startup transformer NAN-X01 phase differential relays testing following a partial loss of offsite power, shield wire removal, and protective relay calibrations, on June 22, 2022
(6) Unit 2, atmospheric dump valve SGB-HV-185 testing following valve positioner replacement, on June 22, 2022

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the Unit 1 refueling outage 1R23 activities utilizing guidance from Operating Experience Smart Sample (OpESS) 2007/03, Crane and Heavy Lift Inspection, Supplemental Guidance to [Inspection Procedure] 71111.20 and

[Inspection Procedure] 71111.13, revision 3, from April 8 through May 18, 2022.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (3 Samples)

(1) Unit 1, emergency diesel generator and integrated safeguards train B testing, on April 19, 2022
(2) Unit 1, auxiliary feedwater train A surveillance testing, on May 19, 2022
(3) Unit 3, low-pressure safety injection train B in-service testing, on June 3, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 3, containment spray pump B inservice testing, on May 16, 2022

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Unit 1, containment spray train A containment isolation valve SIA-V-164 testing, on May 9,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee instructs workers on plant-related radiological hazards and the radiation protection requirements intended to protect workers from those hazards.

Contamination and Radioactive Material Control (IP Section 03.03) (3 Samples)

The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:

(1)surveys of potentially contaminated packages/equipment from the radiologically controlled area and workers exiting potentially contaminated areas (2)labeling for several nonexempt radioactive sources listed in the licensee's source inventory, including the following sources: RP407, RP036, RP696, and RP191 (3)physical and programmatic controls for highly activated and contaminated non-fuel materials stored within the spent fuel pool

Radiological Hazards Control and Work Coverage (IP Section 03.04) (3 Samples)

The inspectors evaluated the licensee's control of radiological hazards for the following radiological work:

(1)high risk radiological work and job coverage for reactor inboard loop discharge check valve disassembly, inspection, and repair of safety injection train B valve SIE-V-237 (RWP 1-3521-R232022-1508, tasks 30 and 50)

(2)medium and high-risk radiological work and job coverage for primary side steam generator maintenance activities for the Unit 1, reactor (RWP 1-3306-R23, all tasks)

(3)medium risk radiological work and job coverage for low-pressure safety injection valve work, lapping in-body seats for low-pressure safety injection train B valve SIB-HV-692 (RWP 1-3502-R23)

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (4 Samples)

The inspectors evaluated licensee controls of the following high radiation areas and very high radiation areas (VHRA):

(1) Unit 1, VHRA tunnel and incore instrumentation chase, 100-foot elevation, room C-B05, door C-107
(2) Unit 1, regenerative heat exchanger access, 120- and 126-foot elevations, door C-203
(3) Unit 1, reactor head laydown structure access, 140-foot elevation, doors C-306, C-307, and C-308
(4) Unit 1, reactor drain tank access, 80-foot elevation, room C-A02, door C-A07 Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (2 Samples)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1)emergency ventilation systems for the main control rooms in Units 1, 2, and 3 (2)emergency ventilation system for the technical support center, which is independent of the three units

Temporary Ventilation Systems (IP Section 03.02) (2 Samples)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) steam generator ventilation system in Unit 1 (2)reactor vessel head ventilation system in Unit 1

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees use of respiratory protection devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (5 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Unit 2, containment building and containment purge ventilation exhaust
(2) Unit 2, plant stack exhaust
(3) Unit 2, radwaste ventilation exhaust
(4) Unit 3, fuel building exhaust sampling
(5) Unit 3, retention tanks 1 and 2

Sampling and Analysis (IP Section 03.02) (5 Samples)

Inspectors evaluated the following effluent samples, sampling processes and compensatory samples:

(1) Unit 1, iron skid liquid grab sample number 1-19-0771
(2) Unit 1, seismic gap water tritium sample dated October 15, 2020
(3) Unit 3, chemical waste neutralizing tank B sample number 3-22-0118
(4) Unit 3, fuel building exhaust RU-145 particulate, iodine, gaseous, and tritium sampling for permit number 2022-3-061
(5) Unit 3, retention tank 2 sample number 3-22-0435

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1) Unit 1, fuel building ventilation exhaust effluent release permit number 2022-1-070, revision 1
(2) Unit 1, fuel building ventilation exhaust effluent release permit number 2022-1-075, revision 1

Abnormal Discharges (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensee performance for abnormal releases. There were no abnormal discharges identified during the inspection period.

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative program to identify incomplete or discontinued program elements.

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Shipment Preparation (IP Section 03.04)

(1) The inspectors observed the preparation of radioactive waste shipment 22-RW-023 on June 14, 2022. This shipment included two intermodal containers of low specific activity dry active waste.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (January 1, 2021, through March 31, 2022)
(2) Unit 2 (January 1, 2021, through March 31, 2022)
(3) Unit 3 (January 1, 2021, through March 31, 2022)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) Units 1, 2, and 3 (October 1, 2021, through March 31, 2022)

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) Units 1, 2, and 3 (October 1, 2021, through March 31, 2022)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 1, effectiveness of corrective actions following discovery of a broken wire from the rotor slip ring to one of the field pole windings on emergency diesel generator train A, on June 29, 2022

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees system health reports and program health reports for potential adverse trends that might be indicative of a more significant safety issue. For system health, the inspectors noted the control element drive mechanism control system (CEDMCS) was moved from green (excellent) to yellow (marginal) health status over a six-month period during 2021 for Unit 3. For systems in yellow status, action plans are developed and implemented by the licensees strategic engineering personnel to address declining system and equipment performance per procedure. Prior to the CEDMCS system moving to yellow health status, the licensee was already aware of the declining performance and had ranked the CEDMCS system number one in the site top ten technical issues for pathway to excellence in plant reliability. The inspectors recognize that action plans have been developed and will be implemented in the next outages to improve CEDMCS performance. Overall, the inspectors determined that the licensee has adequately followed site procedures to monitor system and equipment performance over time.

71153 - Follow Up of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)

(1) The inspectors evaluated the Unit 2 and Unit 3 partial loss of offsite power due to a loss of the startup transformer NAN-X01 and the licensees response, on May 5, 2022.

Reporting (IP Section 03.05) (1 Sample)

(1) The inspectors evaluated event notification 55926 for the Unit 1 invalid actuations of auxiliary feedwater train B and essential spray pond train B, on June 27,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On April 22, 2022, the inspectors presented the Palo Verde Unit 1 refueling outage 1R23 inservice inspection results to Mr. A. Meeden, Vice President, Nuclear Engineering, and other members of the licensee staff.

On April 22, 2022, the inspectors presented the occupational radiation safety inspection results to Mr. T. Horton, Senior Vice President, Site Operations, and other members of the licensee staff.

On May 20, 2022, the inspectors presented the public radiation safety inspection results to Mr. B. Cable, General Plant Manager, and other members of the licensee staff.

On June 29, 2022, the inspectors presented the public radiation safety inspection results to Mr. A. Meeden, Vice President, Nuclear Engineering, and other members of the licensee staff.

On July 8, 2022, the inspectors presented the integrated inspection results to Mr. T. Horton, Senior Vice President, Site Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

20-03234, 22-05663, 22-05649, 22-04795, 22-05815

40OP-9PB01

4.16 kV Class 1E Power (PB)

40OP-9SP01

Essential Spray Pond (SP) Train A

40OP-9ZZ19

Hot Weather Protection

71111.01

Procedures

40ST-9ZZM1

Operations Mode 1 Surveillance Logs

Corrective Action

Documents

15-12565, 18-01355, 20-09071, 22-04502, 20-07811, 21-

04745, 22-05258

01-M-ECP-001

P&I Diagram Essential Chilled System

01-M-RCP-001

P & I Diagram Reactor Coolant System

01-M-RCP-002

P & I Diagram Reactor Coolant System

01-M-SIP-001

P & I Diagram Safety Injection and Shutdown Cooling

System

01-M-SIP-001

P & I Diagram Safety Injection and Shutdown Cooling

System

01-M-SIP-002

P & I Diagram Safety Injection and Shutdown Cooling

System

01-M-SPP-001

P & I Diagram Essential Spray Pond System

01-M-SPP-002

P & I Diagram Essential Spray Pond System

Drawings

2-M-SIP-001

P & I Diagram Safety Injection & Shutdown Cooling System

System Training Manual volume 40 Safety Injection System

(SI

Safety Injection System Design Basis Manual

PVNGS DBM

Essential Spray Pond System

Miscellaneous

PVNGS DBM

Essential Chilled Water System

40OP-9EC02

Essential Chilled Water Train B

40OP-9SI02

Recovery from Shutdown Cooling to Normal Operating

Lineup

21

40OP-9SP02

Essential Spray Pond (SP) B

40ST-9SI13

Train A LPSI and CS System Alignment Verification

71111.04

Procedures

40ST-9SI14

Train B LPSI and CS System Alignment Verification

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

13-MC-FP-0805

Combustible Loads-Containment Building

13-MC-FP-0809

Combustible Loads - Auxiliary Building

Calculations

13-MC-FP-808

Combustible Loads - Diesel Generator Building

Corrective Action

Documents

2-04422, 22-04934, 22-04303, 22-04156, FSCCR 5436858,

2-06824, FSCCR 5454046

Pre-fire Strategies Manual

Pre-fire Strategies Manual

Unit 2 Tamper/Vital/Security Tour Post 20 dates 6/1-

6/15/2022

06/23/2022

Pre-fire Strategies Manual

01-M-FPP-006

P&I Diagram Fire Protection System

N-04-29-004

Security Incident Form

04/27/2022

Miscellaneous

VTD-H260-0018

Honeywell Model W940A/C Multizone fire and security

systems installation Instructions

14DP-0FP01

Firewatch Requirements

14DP-0FP02

Fire System Impairments and Notifications

14DP-0FP32

Emergency Notification and Response

14DP-0FP35

Pre-Fire Strategies Manual Control

14DP-0FP43

Fire Protection Program Responsibilities, Authorities, and

Management Expectation

14DP-9FP06

B.5B Containment Flooding

38FT-9QK05

Fire Detection/Protection System Supervised Circuits and

Functional Test - Diesel Generator Building

Procedures

38FT-9QK27

Fire Detection/Protection System Functional Test -

Honeywell One Detector Type Panels

71111.05

Work Orders

289424, 5336398

Corrective Action

Documents

2-01002, 22-00999, PVAR 4011751, PVAR 4021314

Updated Final Safety Analysis Report

71111.06

Miscellaneous

13-MC-ZA-0809

As Built Auxiliary Building Flooding Calculation

Calculations

13-MC-DG-0411

DG Heat Exchanger Minimum Flow Rate vs. Inlet SP Water

Temperature

71111.07A

Corrective Action

2-02133, 22-02153, 22-02257

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

73DP-9ZZ11

Heat Exchanger Program

73DP-9ZZ21

Heat Exchanger Visual Inspection

Procedures

73TI-9ZZ28

Eddy Current Examination of Tubing

Work Orders

297615, 5297616

CR 1 22-03786

White Residue Found on SG 1 Pressure Nozzle After

Insulation Removed

04/12/2022

Corrective Action

Documents

CR 1 22-03940

Boron Accumulation on "B" HJTC Hub and Clamp Halves

04/14/2022

73TI-9ZZ07

Liquid Penetrant Examination

73TI-RC01

Steam Generator Eddy Current Exams

36a

73WP-0ZZ05

WPS for GTAW Process Welding Groove and Fillet Welds in

P1 Materials

MN756-A00001

PDI Generic Procedure for Ultrasonic Examination of Ferritic

Pipe Welds, PDI-UT-1

Procedures

MN756-A00005

PDI Generic Procedure for Ultrasonic Examination of

Dissimilar Metal Welds, PDI-UT-10

Self-Assessments INPO Letter

Results of the 202 MRV INPO Review Visit

09/29/2020

71111.08P

Work Orders

W.O Number

5030564

Weld Data Sheet for Fillet and Socket Welds

10/06/2021

Corrective Action

Documents

2-04997, 22-05012

Startup Rod Worth Estimator-Table 2.8.1, 2.8.2, and 2.8.3,

Unit 1 Cycle 24 Core Data Book

Determination of Anticipated Condition - Anticipated Critical

Position and 1/M plot

05/12/2022

Miscellaneous

SES-0-05-K-07

Licensed Operator Continuing Training Simulator Evaluation

Scenario

05/23/2018

40DP-9OP02

Conduct of Operations

40OP-9DG01

Emergency Diesel Generator A

40OP-9NA03

13.8 kV Electrical System (NA)

40OP-9NB01

4.16 kV Non-Class 1E Power (NB)

40OP-9PB01

4.16 kV Class 1E Power (PB)

71111.11Q

Procedures

40OP-9ZZ02

Initial Reactor Startup Following Refuelings

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2OP-9RX01

Calculation of Estimated Critical Condition

Corrective Action

Documents

2-02856, 22-02912, 22-02920, 22-20921, 22-02924, 22-

2925, 22-02930, 22-03046, 22-02997, 22-03124

Performance Criteria Formulation Bases for DG System

(Emergency Diesel Generator)

Performance Criteria Formulation Bases for HD System

(Diesel Building HVAC)

Unit 2 Maintenance Rule SSC Unavailability (UA) Report

03/22/2022

Unit 2 Emergency Diesel Generator Train B Performance

Monitoring Group Report

03/29/2022

Miscellaneous

01-M-SGP-002

P&I Diagram Main Steam System

30DP-9MP03

Mechanical System Cleanliness

31MT-9DG06

Installation and Removal of DG B Temporary Piping

Supports

Procedures

70DP-0MR01

Maintenance Rule

71111.12

Work Orders

5303387, 5303436, 5303324, 5303389

Corrective Action

Documents

2-04997, 22-04999, 22-05000, 22-05012, 22-04997, 22-

05590, 22-06427

Phoenix Risk Monitor - PVGS Unit 2, Work Week 2218

Schedule Risk Evaluation 5/2/2022-5/8/2022

05/04/2022

Phoenix Risk Monitor - PVGS Unit 2, Work Week 2218

Schedule Risk Evaluation 5/2/2022-5/8/2022

05/05/2022

Phoenix Risk Monitor - PVGS Unit 2, Work Week 2218

Schedule Risk Evaluation 5/2/2022-5/8/2022

05/06/2022

Phoenix Risk Monitor - PVGS Unit 3, Work Week 2218

Schedule Risk Evaluation 5/2/2022-5/8/2022

05/04/2022

Phoenix Risk Monitor - PVGS Unit 3, Work Week 2218

Schedule Risk Evaluation 5/2/2022-5/8/2022

05/05/2022

Phoenix Risk Monitor - PVGS Unit 3, Work Week 2218

Schedule Risk Evaluation 5/2/2022-5/8/2022

05/06/2022

Phoenix Risk Monitor - PVGS Unit 2, Current Risk Summary

Report as of 5/4/2022 21:40

05/04/2022

71111.13

Miscellaneous

Phoenix Risk Monitor - PVGS Unit 3, Current Risk Summary

Report as of 5/4/2022 21:40

05/04/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Unit 2 Protected Equipment Scheme for Offsite Power

Source INOP

05/05/2022

Unit 3 Protected Equipment Scheme for Offsite Power

Source INOP

05/05/2022

Work Week 2214 Schedule Risk Evaluation

04/06/2022

Site Integrated Risk Assessment Work Task 5249300-0

07/28/2021

Phoenix Risk Monitor - PVGS Unit 2, Work Week 2221

Schedule Risk Evaluation 5/23/2022-5/29/2022, as of

05/25/2022

Site integrated risk assessment work task 5445781-1

05/22/2022

Work Week 2221 Schedule Risk Evaluation

05/25/2022

Phoenix Risk Monitor - PVGS Unit 3, Work Week 2224

Schedule Evaluation

06/15/2022

01DP-0AP57

Management of Critical Evolutions and Infrequently

Performed Tests or Evolutions

01DP-0AP57

Management of Critical Evolutions and Infrequently

Performed Tests or Evolutions

2DP-0RS01

Online Integrated Risk

2ST-9SB02

Month Surveillance Test for Westinghouse Type DS-416

Reactor Trip Breakers

36ST-9SB52

RTSG Shunt and Undervoltage Trip Functional Rest

40AO-9ZZ12

Degraded Electrical Power

40DP-9AP21

Protected Equipment

40DP-9RS01

Operations Department Online Nuclear Risk Determination

Modes 1 and 2

40DP-9ZZ01

Containment entry in mode 1 thru mode 4

40OP-9DG01

Emergency Diesel Generator A

40OP-9MT02

Main Turbine

40OP-9NA03

13.8 kV Electrical System (NA)

40OP-9PB01

4.16kV Class 1E Power (PB)

40OP-9SF01

Control Element Drive Mechanism Control System

(CEDMECS) Operation

Procedures

40ST-9ZZ37

Inoperable Power Sources Action Statement

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

70DP-0RA05

Assessment and Management of Risk When Performing

Maintenance in Modes 1 and 2

Work Orders

249300, 5270938, 5301642, 5445781, 5446205, 5448858

Calculations

13-MC-DF-0503

Seismic Evaluation of Diesel Fuel Oil Storage Tanks

Corrective Action

Documents

2-02110, 18-08590, 22-05673, 22-02173, 22-14388, 22-

209, 22-05998, 17-00288, 22-04759, 22-04840, 22-04849

J104-00025

Schematic FBEVAS, CPIAS & CREFAS Module

Drawings

J104-00026

Schematic FBEVAS, CPIAS & CREFAS Module

Design Basis Manual - Main Steam

DBM, Diesel Generator, Class 1E Standby Generation, Fuel

Oil Storage and Transfer System

UFSAR, Section 9.2.6 - Condensate Storage Facility

21A

Design Basis Manual, Essential Cooling Water System

Prompt Operability Determination, 1MEWBP01 Pump

Outboard Bearing Fitting Oil Leaks

13-NS-C088

Mission Times for the EW, SP, SI, AF, and DG Systems

22-00099

Engineering Design Change

21-14504-003

Engineering Evaluation

2-01209-002

Engineering Evaluation

2-01209-003

Immediate Operability Determination/Functional Assessment

Evaluation

4378348

Engineering Evaluation

VTD-A391-00010

Anchor/Darling Instruction Manual for Main Steam Isolation

Valves (MSIV) and Feedwater Isolation Valves (FWIV)

Miscellaneous

VTD-G063-00002

General Atomic (Sorrento Division) Instruction Manual for

Balance of Plant Engineered Safety Features Actuation

System (BOP ESFAS) [Pub. # E-115-760]

36MT-9SA01

Balance of Plant Engineered Safety Features Actuation

System Functional Test

36MT-9SA01

Balance of Plant Engineered Safety Features Actuation

System Functional Test

40DP-9OP26

Operations Condition Reporting Process and Operability

Determination/Functional Assessment

71111.15

Procedures

40OP-9SA01

BOP ESFAS Modules Operation

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40OP-9SA02

De-Energization of BOP ESFAS

40OP-9SG01

Main Steam

73ST-9CT02

Condensate Transfer System - Comprehensive Pump Test

73ST-9EW02

Essential Cooling Water Pumps - Comprehensive Pump

Test

Work Orders

22133, 5416947, 5423586, 5262223, 5074439, 5424192,

268665, 5448694, 5440240

Corrective Action

Documents

21-12743, 22-02134, 22-02526, 22-02777, 22-02778, 22-

03008, 21-10165

Drawings

2-J-RCE-0072

Instrument Loop Wiring Diagram Reactor Coolant System

Engineering

Changes

2-02134-004

Temporary Modification to Support Reverse Polarity on Unit

Pressure Transmitter 115D

Miscellaneous

VTD-I204-00025

ITT Barton Models 764 Differential Pressure Electronic

Transmitter Installation and Operational Manual

36MT-9SA01

Balance of Plant Engineered Safety Features Actuation

System Functional Test

81DP-0DC17

Temporary Configuration Changes

81DP-0EE10

Design Change Process

Procedures

IP-ENG-001

Standard Design Process (SDP)

71111.18

Work Orders

24635, 5423562, 5427875

Corrective Action

Documents

17-00732, 22-04140, 22-04143, 22-04724, 22-05698, 22-

04531, 22-04997, 22-05060, 22-06690

01-E-MAF-0026

Control Wiring Diagram Main Generation System Startup

SFMR A-E-NAN-X01 Billing & Metering

Drawings

01-E-NAB-0004

Elementary Diagram 13.8kV Non-Class 1E Power System

Intermediate Bus 1E-NAN-S06 13.8kV Stand-by Supply

Breaker

Miscellaneous

VTD-M430-00010

Model Series 74 Valve Positioner and Motion Transmitter

39MT-9SG04

Calibrate Atmospheric Dump Valve SGB-HV-0185

40OP-9SI03

Safety Injection Tank Operations

73ST-9XI04

SI Train B Valves - Inservice Test

73ST-9XI12

HPSI B Long Term Cooling Valve - Inservice Testing

71111.19

Procedures

73ST-9XI20

ADVs-Inservice Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

73ST-9XI33

HPSI pump and check valve full flow test

73ST-9XI37

Safety Injection Tank Nitrogen Vent Valves-Inservice Test

Work Orders

4856277, 5307449, 5310508, 5073803, 5311066, 5034972,

5442074, 5446387, 5453258

Corrective Action

Documents

2-03168, 22-03209, 22-03775, 22-03802, 22-03909, 22-

03958, 22-03951, 22-04260, 22-04284, 22-04342, 22-04434,

2-04690, 22-04667, 22-04712, 22-05316, 22-05348, 22-

03672

Unit ONE 23rd Refueling Outage Shutdown Risk

Assessment Final Report

Unit 1 Fuel Building Material Accountability Log (MAL),

04/29/2022

Palo Verde Nuclear Generating Station Design Basis

Manual-PC System, Table 2-1:System Specific Design

Requirements

Palo Verde Shutdown Safety Function Assessment e-form

PV-E2263, RCS At/Below RV Flange, as of 07:10AM on

04/15/2022

04/15/2022

UFSAR, Section 9.1-Fuel Storage and Handling, Table 9.1-2

Cooling System Design Parameters

21A

2-003 1R23 Refueling Outage Restart Plant Review Board

05/06/2022

TD 282072

1ENANS02**CKTBRK - 13.8KV - Non-class

1ESWITCHGEAR *CRIT* (278563)

04/19/2022

TSCCR 5443671

40ST-9ZZ09 Containment Cleanliness Inspection TSCCR for

Unit 1

05/12/2022

Miscellaneous

TSCCR 5443671

40ST-9ZZ09 Containment Cleanliness Inspection TSCCR for

Unit 1

05/10/2022

01DP-0AP17

Managing Personnel Fatigue

30DO-9MP23

Foreign Material Exclusion Controls

31MT-9RC01

Reactor Vessel Missile Shield, Cable Support Structure,

Riser Duct & RV Flange Insulation Removal and Installation

31MT-9RC30

Reactor Vessel Head Removal and Installation

60B

31MT-9ZC05

Open/Close the Containment Equipment Access Hatch and

Missile Shield Doors

71111.20

Procedures

31MT-9ZC05

Open/Close the Containment Equipment Access Hatch and

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Missile Shield Doors

21MT-9ZC07

Miscellaneous Containment Building Heavy Loads

40AO-9ZZ23

Loss of SFP Level or Cooling

40DP-9OP29

Power Block Clearance and Tagging

40EP-9EO11

Lower Mode Functional Recovery

40OP-9ZZ16

RCS Drain Operations

40OP-9ZZ23

Outage GOP

40ST-9RC01

RCS and Pressurizer Heatup and Cooldown Rates,

40ST-9ZZ09

Containment Cleanliness Inspection

70DP-0RA01

Shutdown Risk Assessments

78OP-9FX01

Refueling Machine Operations

Work Orders

5305253, 5149326, 5307104, 5307995

2-EC-MA-0221

AC Distribution, Section 3.1.7 - Load Equipment Minimum

Operating Voltage Levels

Calculations

13-NC-ZC-0232

Loss of Coolant Accident Pressure and Temperature

Containment Analysis for Limiting Case

2-03778, 22-03722, 22-04872, 22-04875, 22-05125,

3395638, 22-04994

18-11987

Corrective Action

Documents

2-05320

QSPDS Flow transmitter FT-41A and FT-40A flow data, time

14:00 to 14:10 on 05/11/2022

05/11/2022

PVNGS Design Basis Manual - Reactor Coolant System

UFSAR, section 18.II.E.3.1, Emergency Power Supply for

Pressurizer Heaters

21A

01-M-AFP-001

P&I Diagram Auxiliary-Feedwater System

73DP-9CL02

Containment Leakage Rate Testing Program Basis

Document

37A

73ST-9CL01

Containment Leakage Type B and C Testing Basis

Document

50A

Miscellaneous

S-03-0045

LDCR 03-R002 for TRM T7.0300 and LDCR 03-F005 for

UFSAR Sections 6.2.4 and 6.2.6

71111.22

Procedures

2ST-9RC01

AC Distribution, Section 3.1.7 - Load Equipment Minimum

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Operating Voltage Levels

73DP-(XI01

Pump and Valve Inservice Testing Program

73DP-9CL02

Containment Leakage Rate Testing Program

73ST-9AF04

Auxiliary Feedwater Pump A - Comprehensive Pump Test

73ST-9CL01

Containment Leakage Type B and C Testing

73ST-9DG02

Class 1E Diesel Generator and Integrated Safeguards Test

Train B

73ST-9SI06

Containment Spray Pumps and Check Valves - Inservice

Test

73ST-9SI11

Low Pressure Safety Injection Pumps Miniflow - Inservice

Test

5312257

Work Orders

5307398, 5307436, 3830281, 5310494

RWP 3306

Steam Generator Maintenance and Support

RWP 3502

Valve, Flange, and Pump Maintenance and Inspection

ALARA Plans

RWP 3521

High Risk - Inboard Loop Discharge Check Valve Work

Corrective Action

Documents

CR-

21-11774, 21-12257, 21-12591, 21-12701, 21-12977, 21-

13124, 21-14301, 21-14818, 21-14886, 21-15023, 22-00129,

2-00164, 22-00264, 22-00419, 22-00512, 22-00688, 22-

00786, 22-00796, 22-01002, 22-01376, 22-01543, 22-01562,

2-01595, 22-01681, 22-01695, 22-01759, 22-01978, 22-

01978, 22-02438, 22-02685, 22-02926, 22-03016

75DP-9RP01

Radiation Exposure and Access Control

75RP-0RP01

Radiological Posting and Labeling

75RP-9OP02

Control of High Radiation Areas, Locked High Radiation

Areas, and Very High Radiation Areas

75RP-9RP04

Personnel Contamination Monitoring

75RP-9RP05

Contamination Dose Evaluation

75RP-9RP07

Radiation and Contamination Surveys

75RP-9RP08

Radiological Air Sampling

Procedures

75RP-9RP10

Conduct of R.P. Operations

71124.01

Radiation

Surveys

2-M-20211009-11

Unit 2 Steam Generator and Regenerative Heat Exchanger

Survey

10/09/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-M-20220129-1

40-foot Auxiliary Building Follow-up Survey for Floor Drain

Backup

01/28/2022

2-M-20220216-3

New High Radiation Area Posting of the Auxiliary Building

88-foot Pipe Chase

2/16/2022

Corrective Action

Documents

CR-

21-12149, 21-13888, 22-00917, 22-01564, 22-02478, 22-

2630, 22-02926, 22-03976

February 2022 Respiratory Equipment Inventory

2/22/2022

435039-0

Laboratory Report

Compressed Air/Gas Quality Testing

Bauer K18 36012 - Grade D

11/23/2021

435039-1

Laboratory Report

Compressed Air/Gas Quality Testing

Bauer K18 36012 - Grade E

11/23/2021

Airhawk 4500

S/N: LAC-240-

26

Posi3 USB Test Results

Complete SCBA Test

11/01/2021

Airhawk 4500

S/N: LAC-240-

941

Posi3 USB Test Results

Complete SCBA Test

10/12/2021

Airhawk 4500

S/N: LAC-240-

951

Posi3 USB Test Results

Complete SCBA Test

11/15/2021

Miscellaneous

Airhawk 4500

S/N: LAC-265-

2

Posi3 USB Test Results

Complete SCBA Test

11/01/2021

01DP-0EM20

Respirator Fit Test

01DP-0EM21

Respirator Medical Evaluation

01DP-0IS10

PVGS Respiratory Protection Program

14DP-0FP42

Respiratory Equipment Inspection and Repair

Documentation

33DP-0AP03

Ventilation Filter Testing Program (VFTP)

73DP-0AP08

Control Room Envelope Habitability Program

75DP-0RP01

RP Program Overview

71124.03

Procedures

75RP-9RP08

Radiological Air Sampling

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

75RP-9RP20

Use and Control of HEPA Filtration and Vacuum Equipment

Radiological Safety Trends

2/28/2022

Organizational Health Quarterly Report for 4th Quarter -

21

2/18/2022

Self-Assessments

Integrated Performance Assessment Report

Radiation Protection

1st Half of 2021

08/03/2021

5168823

33ST9HJ031 Train B Carbon Analysis for the Unit 1 Control

Room Essential Nuclear Air Treatment Sys.

11/12/2020

218995

33ST9HJ02 - Perform Surveillance Testing of the Unit 3

Control Room Nuclear Air Treatment System. Train "A"

06/08/2021

29400

33ST9HJ033 Train A Carbon Analysis for the Unit 3 Control

Room Essential Nuclear Air Treatment Sys.

04/07/2021

238085

33ST9HJ031 Train A Carbon Analysis for the Unit 1 Control

Room Essential Nuclear Air Treatment Sys.

08/03/2021

Work Orders

254415

33ST9HJ02 - Perform Surveillance Testing of the Unit 2

Control Room Nuclear Air Treatment System. Train "A".

2/06/2021

Corrective Action

Documents

19-05660, 19-05826, 19-06030, 19-06982, 19-07312, 19-

08154, 19-08356, 19-08357, 19-08576, 19-08743, 19-09372,

19-09979, 19-10583, 19-10923, 19-13299, 19-13930, 19-

15767, 20-02366, 20-03430, 20-03432, 20-03548, 20-05385,

20-06303, 20-06322, 20-07392, 20-07664, 20-07807, 20-

07995, 20-08425, 20-09289, 20-11384, 20-11784, 20-12169,

20-14316, 20-14604, 20-14833, 20-15077, 20-16696, 20-

16869, 21-01719, 21-04180, 21-04358, 21-04426, 21-06744,

21-08122, 21-08443, 21-09419, 21-10990, 21-12026

Corrective Action

Documents

Resulting from

Inspection

2-05691

Unit 2 Ventilation Testing and Maintenance Report:

2MHANJ01A, 2MHANJ01B, 2MHRNJ01A, 2MHRNJ01B,

2MCPNJ02, 2MHCNF01A, 2MHCNF01B

05/19/2022

71124.06

Miscellaneous

Technical Specification (Engineered Safety Feature) Air

04/28/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Cleaning Ventilation Surveillance Testing Report

Offsite Dose Calculation Manual, Palo Verde Nuclear

Generating Station Units 1, 2, and 3

Palo Verde Nuclear Generating Station 2019 Annual

Radioactive Effluent Release Report

04/17/2020

Palo Verde Nuclear Generating Station 2020 Annual

Radioactive Effluent Release Report

04/21/2021

Palo Verde Nuclear Generating Station 2021 Annual

Radioactive Effluent Release Report

04/26/2022

237-03072-LMB

3rd Quarter 2020 Chemistry Hot Cross Checks

01/18/2021

237-03074-BDM

4th Quarter 2020 Chemistry Hot Cross Checks

01/21/2021

237-03082-

AJR/AJR

1st Quarter 2021 Chemistry Hot Cross Checks

04/19/2022

Special Report 1-

SR-2019-001-00

Fuel Building Ventilation System High Range Radioactive

Gaseous Effluent Monitor Nonfunctional, Docket No. STN

50-528, Unit 1

04/26/2019

74RM-9EF20

Gaseous Radioactive Release Permits and Offsite Dose

Assessment

74RM-9EF63

RU-143/RU-144 Sample Operations

74RM-9EF65

RU-145/146 Sample Operations

74ST-9SQ04

Effluent Monitoring System Monthly Source Check

Procedures

74ST-9SQ04

Effluent Monitoring System Monthly Source Check

3-22-0118

Chemical Waste Neutralizing Tank (CWNT) to Retention

Tank Sample Data Sheet and associated CWNT Effluent

Sample Data Sheet

2/07/2022

3-22-0204

Retention Tank (AMOWN11) to Evaporation Pond Data

Sheet and associated Effluent Sample Data Sheet

03/08/2022

3-22-0431

Steam Generator/Condensate Demineralizer Regeneration

Data Sheet and associated RC#6 Caustic Injection Rinse

Effluent Sample Data Sheet

05/19/2022

3-22-0435

Retention Tank (AMOWN12) to Evaporation Pond Data

Sheet and associated Retention Tank #2 Effluent Sample

Data Sheet

05/19/2022

Radiation

Surveys

G3-22-0422

Gas Grab Sample for Fuel Building Exhaust (FBE) RU-145

05/17/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

I3-22-0421

RU145 4X Monthly P&I (particulate/iodine) Changeout for

Fuel Building Exhaust Permit - Iodine

05/17/2022

P3-22-0420

RU145 4X Monthly P&I (particulate/iodine) Changeout for

Fuel Building Exhaust Permit - Particulate

05/17/2022

Permit 2022-3-

061

RU145 4X Monthly P&I (particulate/iodine) Changeout for

Fuel Building Exhaust Permit Effluent Sample Data Sheet

05/17/2022

T3-22-0423

Monthly Fuel Building Exhaust RU-145 Tritium (H3) Sample

05/17/2022

218-04731

20 Annual Radiation Protection Program Summary Report

08/25/2021

Audit 2020-004

Nuclear Assurance Department (NAD) Audit Report:

Radiation Safety

08/06/2021

Self-Assessments

TSD 22-008

Assessment of Palo Verde Radiological Monitoring System

and Radiological Effluents Programs

Work Orders

WO 5146989, 5204740

Corrective Action

Documents

19-17113, 19-17120, 21-08037, 21-08261, 21-08443, 21-

14818, 21-15209, 22-04327

Corrective Action

Documents

Resulting from

Inspection

2-05633, 22-05696, 22-05697

Palo Verde Nuclear Generating Station Annual Radiological

Environmental Operating Report 2020

04/14/2021

Palo Verde Nuclear Generating Station Annual Radiological

Environmental Operating Report 2021

04/08/2022

Palo Verde Nuclear Generating Station Units 1, 2, and 3 -

Offsite Dose Calculation Manual

Land Use Census, Appendix A

2/17/2021

Monthly Well Tritium Data for March 2022

Palo Verde Nuclear Generating Station Units 1, 2, and 3 -

Technical Requirements Manual

218-04612-MLC

Decommissioning Records Review and 10 CFR 50.75(g)(1)

Applicability Review for 2019

05/12/2020

218-04728-MLC

Decommissioning Records Review and 10 CFR 50.75(g)(1)

Applicability Review for 2020

08/15/2021

71124.07

Miscellaneous

ACT 4657834

Radiological Environmental Monitoring Program Air

11/14/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Sampling Siting Evaluation

MOD RG-1609

Engineering Disposition for ENG-DMW #4225738

2/06/2018

74RM-0EN02

Radiological Environmental Air Sampling

74RM-0EN03

Radiological Environmental Sampling

74RM-0EN07

Land Use Census

74RM-9EN01

Sentinel Well Sampling Instructions

75DP-9AP01

Groundwater Protection Program

77ST-9RG04

Meteorological System Instrumentation Replacement and

Verification (Primary Side)

77ST-9RG05

Meteorological System Instrumentation Replacement and

Verification (Redundant System)

Procedures

91DP-0EN30-01

Environmental Sampling Administrative Guideline

WO 5260630

Surveillance Test under 77ST-9RG04

10/18/2021

WO 5310146

Surveillance Test under 77ST-9RG05

04/19/2022

Work Orders

WO 5310234

Meteorological System Calibration (Primary System)

01/19/2021

Radiation

Surveys

0-M-20220614-1

2-RW-023 (2) Sealands 22-1-018 and 22-2-017

06/14/2022

71124.08

Shipping Records

2-RW-023

LSA shipment of DAW in two 20' Sealand (intermodal)

containers [ID #'s 22-2-017 and 22-1-018].

06/14/2022

Corrective Action

Documents

21-06337

Radiation Protection Index

Indicator Analysis Detail

04/10/2022

Miscellaneous

RCTSAI 1566

21 ANNUAL RADIOACTIVE EFFLUENT RELEASE

REPORT

04/21/2022

71151

Procedures

93DP-0LC10

SSFF Mitigating Systems Performance Indicator

Corrective Action

Documents

16-11253, 22-02105, 22-02181, 22-02224

Drawings

M018-00825

  1. 160 Slip Ring Assy 29 Dia

Engineering

Changes

DEC-01011

71152A

Miscellaneous

13-JN-0109

Installation Specification for Soldering and Circuit Board

Repair

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

VTD-P292-00003

Portec Inc. Instructions for the Installation, Operations, and

Maintenance of Horizontal A.C. Synchronous Generators

and A.C. Synchronous and Induction Motors (Pub. #SM-

117);

Procedures

2MT-9PE01

Cleaning, Inspection, and Testing of the Class 1E Diesel

Generator

Work Orders

4601202, 4840682, 4903834, 5074228, 5297453, 5297620,

23702

Miscellaneous

System IQ: System Health reports as of current period -

Fourth Quarter 2021

01DP-0AP44

Top Ten Technical Issues

73DP-0AP05

Engineering Programs Management and Health Reporting

71152S

Procedures

73TD-0ZZ03

Strategic Engineering Handbook

Corrective Action

Documents

2-05012, 22-03722, 22-03778

Drawings

01-E-SAF-004

Control Wiring Diagram Engineered Safety Features

Actuation System BOP-ESFAS Intertying Circuits Train B

Units 1, 2, and 3 RK Alarm Typer

05/04/2022

Phoenix Risk Monitor - PVGS Unit 2 Current Risk Summary

Report as of 5/4/2022 21:40

05/04/2022

Phoenix Risk Monitor - PVGS Unit 3 Current Risk Summary

Report as of 5/4/2022 21:40

05/04/2022

EN 55878

Event Notification for the Valid Specified System Actuations

of Unit 2 and Unit 3 Emergency Diesel Generators and Unit

Auxiliary Feedwater Pump

05/04/2022

EN 55926

Event Notification for the Invalid Specified System Actuations

of the Unit 1 Auxiliary Feedwater System Train B and

Essential Spray Pond System Train B

06/03/2022

Miscellaneous

VTD-G063-00002

General Atomic (Sorrento Division) Instruction Manual for

Balance of Plant Engineered Safety Features Actuation

System (BOP ESFAS)

40AL-9RK1A

Panel B01A Alarm Responses

40AL-9RK1C

Panel B01C Alarm Responses

71153

Procedures

40AL-9RK2A

Panel B02A Alarm Responses

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40AL-9RK7A

Panel B07A Alarm Responses

40AO-9ZZ12

Degraded Electrical Power

40ST-9ZZ37

Inoperable Power Sources Action Statement

Work Orders

5307398