MONTHYEARML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 IR 05000528/20233012023-06-0505 June 2023 NRC Examination Report 05000528/2023301, 05000529/2023301 and 05000530/2023301 IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) IR 05000528/20220062023-03-0101 March 2023 Annual Assessment Letter for Palo Verde Nuclear Generating Station Units 1, 2 and 3 (Report 05000528/2022006, 05000529/2022006, and 05000530/2022006) IR 05000528/20234012023-02-27027 February 2023 NRC Security Inspection Report 05000528/2023401, 05000529/2023401, 05000530/2023401, and 07200044/2023401 (Full Report) IR 05000528/20220042023-01-30030 January 2023 Integrated Inspection Report 05000528/2022004 and 05000529/2022004 and 05000530/2022004 IR 05000528/20220102023-01-17017 January 2023 Design Basis Assurance Inspection (Teams) Inspection Report 05000528/2022010 and 05000529/2022010 and 05000530/2022010 IR 05000528/20220032022-10-24024 October 2022 Units, 1, 2 and 3 Integrated Inspection Report 05000528/2022003, 05000529/2022003, and 05000530/2022003 IR 05000528/20224032022-10-14014 October 2022 Security Baseline Inspection Report 05000528/2022403 and 05000529/2022403 and 05000530/2022403 IR 05000528/20220052022-08-23023 August 2022 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2022005 and 05000529/2022005 and 05000530/2022005) ML22235A6662022-08-23023 August 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000528/2022010, 05000529/2022010, and 05000530/2022010) and Request for Information IR 05000528/20224022022-08-0808 August 2022 Cover Letter Only - Palo Verde Nuclear Generating Station, Units 1, 2, and 3 NRC Security Inspection Report 05000528 2022402, 05000529 2022402, 05000530 2022402, and 07200044 2022402 IR 05000520/20220022022-08-0505 August 2022 Integrated Inspection Report 05000528/2022002 and 05000529/2022002 and 05000520/2022002 IR 05000528/20223012022-06-21021 June 2022 NRC Examination Report 05000528/2022301, 05000529/2022301, and 05000530/2022301 IR 05000528/20220012022-05-0909 May 2022 Integrated Inspection Report 05000528/2022001, 05000529/2022001 and 05000530/2022001 ML22105A0512022-04-19019 April 2022 Review of the 2021 Steam Generator Tube Inspections During Refueling Outage 22 IR 05000528/20224202022-03-0808 March 2022 Security Baseline Inspection Report 05000528/2022420, 05000529/2022420 and 05000530/2022420, Cover Letter IR 05000528/20210062022-03-0202 March 2022 Annual Assessment Letter for Palo Verde Nuclear Generating Station - Units 1, 2 and 3 (Report 05000528/2021006, 05000529/2021006, and 05000530/2021006) IR 05000528/20210042022-02-0707 February 2022 Integrated Inspection Report 05000528/2021004, 05000529/2021004, and 05000530/2021004 IR 05000528/20210032021-11-12012 November 2021 Integrated Inspection Report 05000528/2021003, 05000529/2021003 and 05000530/2021003 IR 05000528/20210152021-10-27027 October 2021 Temporary Instruction 2515/194 Report 05000528/2021015 and 05000529/2021015 and 05000530/2021015 ML21273A3172021-10-0404 October 2021 Station. NON-SENSITIVE IR 05000528/20214042021-09-23023 September 2021 NRC Security Inspection Report 05000528/2021404, 05000529/2021404, 05000530/2021404 and 07200044/2021401 IR 05000528/20214012021-09-14014 September 2021 Security Baseline Inspection Report 05000528/2021401 and 05000529/2021401 and 05000530/2021401 IR 05000528/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Palo Verde Nuclear Generating Station - Units 1, 2 and 3 (Report 05000528/2021005, 05000529/2021005, and 05000530/2021005) IR 05000528/20210022021-08-0909 August 2021 Integrated Inspection Report 05000528/2021002, 05000529/2021002, and 05000530/2021002 and Exercise of Enforcement Discretion IR 07200044/20214012021-07-21021 July 2021 ISFSI, Information Request, Security Inspection Report 07200044/2021401 IR 05000528/20210142021-07-14014 July 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000528/2021014, 05000529/2021014 and 05000530/2021014 IR 05000528/20213012021-06-21021 June 2021 NRC Initial Examination Report 05000528/2021301, 05000529/2021301, and 05000530/2021301 IR 05000528/20214032021-05-28028 May 2021 Security Baseline Inspection Report 05000528/2021403; 05000529/2021403 and 05000530/2021403 (Public) IR 05000528/20210012021-05-12012 May 2021 PV 2021001, Palo Verde Nuclear Generating Station - Integrated Inspection Report 05000528/2021001 and 05000529/2021001 and 05000530/2021001 IR 05000528/20210122021-05-0404 May 2021 Triennial Fire Protection Inspection Report 05000528/2021012, 05000529/2021012 and 05000530/2021012 IR 05000528/20210102021-04-28028 April 2021 Biennial Problem Identification and Resolution Inspection Report 05000528/2021010 and 05000529/2021010 and 05000530/2021010 ML21105A1012021-04-19019 April 2021 Review of the 2020 Steam Generator Tube Inspections During Refueling Outage 22 IR 05000528/20210902021-03-0404 March 2021 Notice of Violation; NRC Inspection Report 05000528/2021090, 05000529/2021090, and 05000530/2021090 IR 05000528/20200062021-03-0303 March 2021 Annual Assessment Letter for Palo Verde, Units 1, 2 and 3, (Report 05000528/2020006, 05000529/2020006, and 05000530/2020006) ML21028A4402021-01-28028 January 2021 PV 2020 004 Integrated Inspection Report CAP IR 05000528/20203012021-01-27027 January 2021 NRC Initial Examination Report 05000528/2020301, 05000529/2020301, and 05000530/2020301 2024-01-10
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
October 13, 2022
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000528/2022403 AND 05000529/2022403 AND 05000530/2022403
Dear Mr. Heflin:
On September 27, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On September 27, 2022, the NRC inspectors discussed the results of this inspection with Mr. E. Pittman, Director Emergency Services, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Kellar, Ray on 10/13/22 Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000528,05000529, 05000530 License Nos. NPF-41, NPF-51, NPF-74
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000528, 05000529 and 05000530 License Numbers: NPF-41, NPF-51 and NPF-74 Report Numbers: 05000528/2022403, 05000529/2022403 and 05000530/2022403 Enterprise Identifier: I-2022-403-0007 Licensee: Arizona Public Service Facility: Palo Verde Nuclear Generating Station Location: Tonopah, AZ Inspection Dates: September 12, 2022 to September 27, 2022 Inspectors: J. Buchanan, Physical Security Inspector N. Cuevas, Resident Inspector D. Hostetter, Physical Security Inspector C. Jewett, Physical Security Inspector E. Lantz, Resident Inspector L. Merker, Senior Resident Inspector Approved By: Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from this IP, dated January 1, 2019.
Equipment Performance, Testing, and Maintenance (1 Sample)
- (1) Tier I: All Requirements Tier II: All Requirements Tier III: All Requirements
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
Main article: IP 71130.07
- (1) Tier I: All Requirements (02.03 d, e, non-applicable)
Tier II: All Requirements Tier III: All Requirements (02.14 a, b, and c, non-applicable)
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the security target set program. The following elements were evaluated:
Review of Power Reactor Target Sets
Main article: IP 71130.14
- (1) 02.01, 02.02 (a-e, f non-applicable), 02.03 (non-applicable), 02.04 (a-b),
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On September 27, 2022, the inspectors presented the security baseline inspection results to Mr. E. Pittman, Director, Emergency Services Division, and other members of the licensee staff.
On September 27, 2022, the inspectors presented the target set inspection results to Mr.
E. Pittman, Director Emergency Services, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.04 Corrective Action 22-06918,
Documents 22-07374,
2-07396,
2-07502,
2-07513,
2-07551,
2-07970,
2-08031,
2-08139,
2-08208,
2-08251,
2-08422,
2-08668,
2-08683,
2-08775.
2-09521,
AND 22-09659.
Corrective Action 22-09617 AND 22-09692
Documents
Resulting from
Inspection
Miscellaneous Quarterly Delay Netting, Doors, Tools, and Slider Testing 06/09/2022
Security Tour Equipment Checks 05-01/2022
thru
05/10/2022
Palo Verde Nuclear Generating Station Security Plan, 23
Training and Qualification Plan, Safeguards Contingency
Plan, and Independent Spent Fuel Storage Installation
Security Program.
Performance Indicators 10/01/2021
thru
06/30/2022
Inspection Type Designation Description or Title Revision or
Procedure Date
Protected Area Intrusion Detection Performance Testing 03/07/2022
thru
03/31/2022
SOCA Access Facility Turnstile Performance Testing 03/31/2022
Protected Area Perimeter Intrusion Detection System 09/02/2021
Performance Testing
Protected Area Perimeter Intrusion Detection System, CCTV 09/07/2021
and PTZ Operability Testing
Proximity Reader, BMS and Turnstile Testing 09/16/2021
thru
09/30/2021
SOCA Access Facility Turnstile Performance Testing 09/12/2021
SOCA Pop-Up Barrier and PA Vehicle Delay Barrier 09/08/2021
Performance Testing
Hardened Barrier Door Performance Testing 09/08/2021
PASE Perimeter Intrusion Detection System Operability 04/05/2022
Testing thru
04/26/2022
SOCA Checkpoint - Outbound Gate Intrusion Detection 03/02/2022
System Operability Testing. thru
04/06/2022
SOCA Perimeter Intrusion Detection System Intrusion 03/03/2022
Detection System Operability Testing thru
04/27/2022
Alarm/Event Condition Report 09/13/2022
Procedures 01DP-0AP12 Condition Reporting Process 15
20DP-0SK28 Security Weapons and Equipment Control 35
20DP-0SK70 Security Ingress Equipment Testing 2
20DP-0SK71 Security Perimeter Intrusion Detection System Testing 9
20DP-0SK72 Security Doors, Hatches, and Turnstiles Testing 3
20DP-0SK77 Security Miscellaneous Testing 1
20DP-0SK99 SOCA Access Facility (SAF) - Post 1 8
20SP-0SK32 Security CAS/SAS Operations 47
77OP-0SK03 Maintenance of Plant Security Systems Components 1
Inspection Type Designation Description or Title Revision or
Procedure Date
Self-Assessments 22-05653
Work Orders 4967363 Outdoor Microwave Link Receiver Zone 133 10/07/2019
5135918 Perform Annual Security UPS & Battery Inspection 08/20/2020
5195732 Outdoor Microwave Link Receiver Zone 04/26/2021
245350 Security Building Basement 11/11/2021
245350 Perform Annual Security UPS & Battery Inspection 11/11/2021
267484 Security Diesel Generator 11/17/2021
294535 Security Diesel Generator 02/15/2022
5304307 SOCA Tamper PM Loop A/B 04/01/2022
5316963 Perform Loss of Power Test for the Security Diesel 05/18/2022
5343644 Perform Loss of Power Test for the Security Diesel 08/31/2022
5344969 Perform Annual Security UPS & Battery Inspection 08/25/2022
thru
11/11/2021
20644 Alarm Station Cameras 02/17/2022
5434939 Communications Cabinet 08/04/2022
5467908 Badging Workstation 08/23/2022
5468177 Excessive Number of Intrusion Alarms 09/09/2022
5468700 Diesel Generator Train A Missile Door 08/24/2022
71130.07 Corrective Action Condition Reports 20-05578, 20-11505, 20-11994, 20-16399, 21-03298, 21- Multiple
Documents 11219, 21-13882, 22-06868, 22-06871, 22-06883, 22-08636
Corrective Action Condition Reports 22-09613, 22-09615, 22-09686, 22-09694, 22-09698 Multiple
Documents
Resulting from
Inspection
Miscellaneous ESD-01 Physical Agility Version 2
ESD-07 Tactical Firearms Qualification 08/18/2022
ESD-30 Familiarization Firearms Enhancement Course 08/18/2022
ESD-31 Familiarization Firearms Enhancement 08/18/2022
ESD-86-06 Power to Arrest, Authority to Detain, and Handcuffing Revision 0
ESD-86-08 Pepper Spray Revision 4
ESD-86-18 Use of Force Revision 4
ESD-86-33 Security Access Facility Revision 4
Inspection Type Designation Description or Title Revision or
Procedure Date
ESD-86-34 Security Owner Controlled Area (SOCA Checkpoint) Revision 5
ESD-86-48 Rifle Revision 0
ESD-86-49 Handgun Revision 0
Familiarization Universal Thermal Mono-Sight 01/07/2022
Fire Course
PVGS Appendix Day Fire Pistol Course 08/06/2020
B
PVGS Appendix Day Rifle Course 08/06/2020
B
PVGS Appendix Night Fire Pistol Course 01/06/2022
B
PVGS Appendix Night Fire Rifle Course 01/06/2022
B
Task Performer Instructor/Job Familiarization Guide 11/01/2018
Evaluator
Procedures 20DP-0SK28 Security Weapons, & Equipment Control Revision 35
20DP-0TR01 Security Personnel Training Revision 28
20DP-0TR02 Conduct of Security Training Revision 21
20DP-0TR03 Security Training Fire Range Operations Revision 5
84DP-0RM30 Record Management Control Revision 35
Physical Security PVNGS Security Plan, Training and Qualification Plan, Revision 23
Plan Safeguards Contingency Plan, and Independent Spent Fuel
Storage Installation
Self-Assessments NRC Security Self-Assessment (22-05652) 06/04/2022
Baseline
Inspection
Readiness
Assessment
Checklist
71130.14 Corrective Action 17-17929, 19-04591, 19-06510, 19-08882, 19-12038, 19-
Documents 13608, 20-01522, 20-02657, 20-12420, 21-06647, 21-11784,
2-06616, 22-07289
Corrective Action 22-10066, 22-10067
Documents
Inspection Type Designation Description or Title Revision or
Procedure Date
Resulting from
Inspection
Miscellaneous PVNGS Target Sets 2
Palo Verde Nuclear Generating Station Target Set Basis 1
PVNGS Design Basis Manual Safety Injection System 41
13-CH-003 Palo Verde Nuclear Generating Station Controls Analysis 0
Package Chemical & Volume Control System Units 1, 2, 3
Group 3, Transmitters
13-NS-C096 Internal Flooding PRA - Characterization of Flood Scenarios 3
OMA-CH-03 Palo Verde Generating Station Ongoing Monitoring and 0
Assessment (OM&A) Report Chemical & Volume Control
System (CH) Units 1, 2, 3 Group 3, Transmitters
Procedures 20DP-0SK51 Target Set Development 6
21SP-0SK11 Security Contingencies 60
40AO-9ZZ24 Deliberate Acts Against PVNGS 32
40DP-9OP20 Watch Standing Practices 49
40EP-9EO11 Lower Mode Functional Recovery 38