January 30, 2023
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - INTEGRATED INSPECTION REPORT 05000528/2022004 AND 05000529/2022004 AND 05000530/2022004
Dear Adam Heflin:
On December 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On January 6, 2023, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000528, 05000529, 05000530 License Nos. NPF-41, NPF-51, NPF-74
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000528, 05000529 and 05000530
License Numbers:
Report Numbers:
05000528/2022004, 05000529/2022004 and 05000530/2022004
Enterprise Identifier:
I-2022-004-0006
Licensee:
Arizona Public Service
Facility:
Palo Verde Nuclear Generating Station
Location:
Tonopah, AZ
Inspection Dates:
October 1 to December 31, 2022
Inspectors:
L. Merker, Senior Resident Inspector
N. Cuevas, Resident Inspector
E. Lantz, Resident Inspector
A. Sanchez, Senior Project Engineer
N. Hernandez, Senior Operations Engineer
B. Bergeon, Senior Operations Engineer
G. George, Senior Reactor Inspector
J. Lee, Reactor Inspector
D. You, Operations Engineer
A. Athar, Resident Inspector
A. Donley, Resident Inspector
C. Wynar, Resident Inspector
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Units 1 and 2 operated at or near full power for the duration of the inspection period.
Unit 3 entered the inspection period near full power during a coastdown for refueling outage
3R23. On October 7, 2022, the unit was shut down for the refueling outage. On November 9,
2022, the unit reached criticality. During power ascension, the licensee identified a power supply issue in the turbine electrohydraulic control system and lowered power from 68 to 12 percent power to replace the power swap over relay on November 15, 2022. On November 16, 2022, the licensee began power ascension and returned to full power on November 18, 2022, where it remained at or near full power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2, high-pressure safety injection train A due to high safety significance, on October 6, 2022
- (2) Unit 3, safety injection train A in the gravity feed configuration for shutdown risk management during refueling outage 3R23, on October 28, 2022
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the Unit 3 essential chilled water train B following maintenance outage on November 30, 2022.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 3, turbine-driven and motor-driven auxiliary feedwater pump rooms, fire zones 72 and 73, on October 5, 2022
- (2) Unit 3, containment building 80-foot elevation, fire zones 66A, 66B, 67A, and 67B, on October 13, 2022
- (3) Unit 1, class 1E 120 VDC equipment rooms and battery rooms, fire zones 6A, 7A, 8A, and 9A, on November 3, 2022
- (4) Unit 1, upper cable spreading room, fire zone 20, on November 25, 2022
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Unit 2, essential pipe density tunnel due to water intrusion, on October 14, 2022
71111.07A - Heat Exchanger/Sink Performance
Annual Review (IP Section 03.01) (1 Sample)
The inspectors evaluated readiness and performance of:
- (1) Unit 3, essential cooling water heat exchanger B, on November 28, 2022
71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)
- (1) The inspectors verified that the Unit 3 reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined, and accepted by reviewing the following activities from October 10-20, 2022:
03.01.a - Nondestructive Examination and Welding Activities.
- ultrasonic examination, high-pressure safety injection long term recirculation loop 1, pipe to elbow weld 39-14
- ultrasonic examination, high-pressure safety injection long term recirculation loop 1, elbow to pipe weld 39-1
- ultrasonic examination, pressurizer surge line, weld overlay weld 5-34-OL
- dye penetrant examination, 3MRCEX02 - pressurizer heater weld
- visual 2 examination, pressurizer bottom head instrument nozzles 5-37-5 and 5-37-6
- visual 3 examination, auxiliary and downcomer feedwater steam generator #2, component no. 3-SG-011-H-016
- visual 3 examination, auxiliary and downcomer feedwater steam generator #2, component no. 13-AF-006-H-001
- visual 3 examination, reactor coolant pump 2a column supports, 18-12, 18-13, 18-14, 18-15, 18-21, and 18-22
- welding package, ewb-e01 heat exchanger and nozzle assemblies
- welding package, 3MRCEX02 - pressurizer heater weld 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities.
- The inspector reviewed the following documents associated with boric acid leaks and evaluations: condition report (CR) 22-06370-002 for pipe cap of valve SIA-V866, CR 21-09517 for packing leak on valve SIA-V084, CR 21-13762-003 for leakage on pulsation discharge damper of accumulator CHE-X07, CR 21-05561-002 for packing leak on valve CHE-V962, CR 22-06707-002 for packing leak on valve SIB-UV-616.
Problem Identification and Resolution.
The inspectors reviewed 11 condition reports associated with inservice inspection activities. No findings or violations of more than minor significance were identified.
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on August 17 to September 30, 2022.
71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)
- (1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on August 17 to September 30, 2022.
Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.
Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.
Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.
Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.
Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.
Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46. The inspectors reviewed a rod control operating system modification to simulator A, and the associated crew training and testing plan.
Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
The inspectors observed and evaluated licensed operator performance in the control room during the following activities:
- (1) Unit 3, dilution to estimated critical boron concentration and reactor startup, on November 9, 2022
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator requalification simulator training activities, on December 1, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 3, emergency diesel generator train A, on November 14, 2022
- (2) Unit 1, safety injection train A pumps combined recirculation to refueling water tank valve SIA-UV-660, on December 2, 2022
- (3) Unit 2, turbine-driven auxiliary feedwater pump, on December 28, 2022
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 2, emergent high risk maintenance to replace temperature control valve CEN-TV-0033 positioner on the main turbine exciter cooling water heat exchanger, on October 28, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (8 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 2, high-pressure safety injection train B to loop 2 check valve PSI-BV-532 operability determination due to leakage, on October 3, 2022
- (2) Unit 3, steam generator 1, line 2 safety relief valve SGE-PSV-579 operability determination due to as-left relief pressure setpoint being outside surveillance test acceptance criteria, on October 5, 2022
- (3) Unit 2, essential spray pond train B operability determination due to exceeding demolition limits during wall repairs, on October 6, 2022
- (4) Unit 3, safety injection tank 2A pressure relief valve SIE-PSV-211 operability determination due to being in contact with steam line piping insulation, on October 12, 2022
- (5) Unit 3, turbine-driven auxiliary feedwater pump operability determination for lube oil pressure outside band during surveillance testing, on November 18, 2022
- (6) Unit 1, emergency diesel generator train A operability determination for abnormal voltage fluctuations during surveillance testing, on November 18, 2022
- (7) Unit 3, core protection calculator channels C and D operability determination due to channel deviation during surveillance testing, on December 1, 2022
- (8) Unit 3, emergency diesel generator train A operability determination for misaligned fuel line support bolt, on December 16, 2022
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 3, permanent modification to upgrade the control element drive mechanism control system with the new advanced rod control hybrid system to address component obsolescence and equipment failure issues, on November 23, 2022
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (6 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
- (1) Unit 3, letdown into regenerating heat exchanger isolation valve CHA-UV-0516 following planned preventive maintenance, on October 19, 2022
- (2) Unit 2, main turbine stator inlet temperature control valve CEN-TV-0033 following emergent maintenance to replace the valve positioner, on October 28, 2022
- (3) Unit 1, emergency diesel generator train B testing following maintenance outage, on November 9, 2022
- (4) Unit 1, emergency diesel generator train A testing, following troubleshooting and swapping of the automatic voltage regulator, on November 15, 2022
- (5) Unit 3, essential chilled water train B following maintenance outage, on November 18, 2022
- (6) Unit 1, safety injection train B pumps combined recirculation to refueling water tank valve SIB-UV-659 following loss of control room indication troubleshooting, on December 1, 2022
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated the Unit 3 refueling outage 3R23 activities from October 7 through November 10, 2022. Operating Experience Smart Sample 2007-03, Crane and Heavy Lift Inspection, Supplemental Guidance to [Inspection Procedure]
===71111.20 and [Inspection Procedure] 71111.13, revision 3, was used to inform this sample.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01)===
- (1) Unit 1, emergency diesel generator train A testing, on October 11, 2022
- (2) Unit 3, recirculation actuation signal train A relay K104 functional test, on October 27, 2022
- (3) Unit 3, integrated safeguards testing train B, on December 15, 2022
Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)
- (1) Unit 3, letdown regenerative heat exchanger isolation containment isolation valve CHA-UV-0516 testing, on October 21,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10)===
- (1) Unit 1 (October 1, 2021, through September 30, 2022)
- (2) Unit 2 (October 1, 2021, through September 30, 2022)
- (3) Unit 3 (October 1, 2021, through September 30, 2022)
BI02: RCS Leak Rate Sample (IP Section 02.11) (3 Samples)
- (1) Unit 1 (October 1, 2021, through September 30, 2022)
- (2) Unit 2 (October 1, 2021, through September 30, 2022)
- (3) Unit 3 (October 1, 2021, through September 30, 2022)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Units 1, 2, and 3, effectiveness of corrective actions following discovery of the fuel building exhaust radiation monitor upstream and downstream drain valves, HFB-V036 and HFB-V037, inaccurate seismic loading calculations, on December 14, 2022
71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)
- (1) The inspectors reviewed the licensees corrective action program for potential adverse trends that might be indicative of a more significant safety issue. The inspectors performed an in-depth review of the licensees ability to identify issues regarding radiation monitors, evaluate each occurrence, and implement corrective actions. During this review, the inspectors noted an increasing trend in the number of condition reports written on radiation monitors and the radiation monitor communication in all three units. The licensee was aware of the declining performance of the radiation monitoring system, having placed the system in maintenance rule (a)(1) status in 2018 with corrective actions in place to modernize the system due to its age and limited available replacement parts resulting from the original vendor going out of business. The inspectors determined that the licensee has adequately followed site procedures to evaluate and correct the identified issues with the radiation monitor system and continue to monitor system performance while executing the established corrective actions. No more than minor concerns were identified.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 4, 2022, the inspectors presented the Palo Verde Unit 3 inservice inspection exit meeting inspection results to K. Gil, Director, Nuclear Regulatory Affairs, and other members of the licensee staff.
- On November 17, 2022, the inspectors presented the biennial requalification inspection results to C. Harbor, Vice President Nuclear Regulatory Affairs and Oversight, and other members of the licensee staff.
- On January 6, 2023, the inspectors presented the integrated inspection results to A. Heflin, Executive Vice President / Chief Nuclear Officer, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
21-14313, 22-11579, 22-11733, 22-05258
Drawings
2-M-SIP-001
P&I Diagram Safety Injection and Shutdown Cooling
Drawings
2-M-SIP-002
P&I Diagram Safety Injection and Shutdown Cooling
Drawings
03-M-SIP-001
P & I Diagram Safety Injection & Shutdown Cooling System
Drawings
03-M-SIP-002
P & I Diagram Safety Injection & Shutdown Cooling System
Miscellaneous
03-M-ECP-001
P & I Diagram Essential Chilled Water System
Miscellaneous
87-EC-019
Engineering Evaluation Request
Procedures
Appendix 220: LM - Train A Gravity Feed Thru SDC Train A
Procedures
Appendix 227: LM - Train A Gravity Feed Hot Leg Injection
Thru HPSI Pump A
Procedures
Essential Chilled Water Train B
Procedures
Outage GOP
Procedures
Train A High Pressure Safety Injection System Alignment
Verification
Work Orders
5356793
Calculations
13-AC-ZZ-0200
Penetration Seal Qualifications
Calculations
13-MC-FP-0803
Combustible Loads - Control Building
Corrective Action
Documents
19-04199
Fire Plans
Pre-Fire Strategies Manual, Fire Zones 6A, 7A, 8A, and 9A
Fire Plans
Pre-Fire Strategies Manual, Fire Zone 20
Miscellaneous
Pre-fire Strategies Manual
Miscellaneous
13-MC-FP-807
PVNGS Combustible Loading Calculation
Procedures
Appendix R & Former Tech Spec Penetration Seal
Surveillance
Drawings
13-C-ZYS-301
Essential Pipe Density Tunnel Wall Elevation, Sections, and
Details
Miscellaneous
13-MC-ZY-599
Internal Flooding in the Essential Pipe Density Tunnel
Miscellaneous
13-NS-C093
Internal Flooding PRA - Input Data and Walkdown
Validation
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
13-NS-C096
Internal Flooding PRA - Characterization of Flood Scenarios
Miscellaneous
13-NS-C097
Internal Flooding PRA-Estimation of Initiating Frequencies
Calculations
13-MC-SP-0307
SP/EW System Thermal Performance Design Bases
Analysis
Corrective Action
Documents
2-10979, 22-11364, 22-11346, 22-04162
Miscellaneous
Maintenance Rule Performance Criteria Basis Worksheet -
Essential Cooling Water System
Procedures
Tube Plugging of the Essential Cooling Water Heat
Exchanger
Procedures
Essential Cooling Water System (EW) Train B
Procedures
Heat Exchanger Visual Inspection
Procedures
Eddy Current Examination of Tubing
Work Orders
5356621
Corrective Action
Documents
19-08144, 20-01784, 21-00434, 21-02087, 22-03812, 22-
06894, 22-07052, 22-07482, 22-09162, 22-10525, 22-10799
Corrective Action
Documents
Resulting from
Inspection
2-10902, 22-11036, 22-11038, 22-11052, 22-10799, 22-
11104, 22-11099, 22-11173, 22-11073, 22-11075, 22-
11109, 22-11116, 22-11118
Engineering
Evaluations
Assessments
(CR-)
2-06370-002, 22-06375-002, 21-09517, 21-04164,
2104162-002
Miscellaneous
Welder Brazer Performance Qualification Summary
118
Miscellaneous
CUP# 2899
Chemical Use Permit for Nuclear Grade Tape Products
04/22/2016
NDE Reports
2-0962
Liquid Penetrant Examination Report -
3PSCNL043**PIPEXX
10/18/2022
NDE Reports
2-965
Liquid Penetrant Examination Report - PZR Heater
3MRCEX02
10/18/2022
NDE Reports
2-UT-3011
Ultrasonic Examination Report - Zone 39 - HPSI Long Term
Recirc Loop 1 - Weld 39-14
10/11/2022
NDE Reports
2-UT-3012
Ultrasonic Examination Report - Zone 39 - HPSI Long Term
Recirc Loop 1 - Weld 39-15
10/11/2022
NDE Reports
2-UT-3020
Ultrasonic Examination Report - Zone 20 - Pressurizer
10/14/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Surge - Weld 5-34-OL
NDE Reports
2-VT-3095
Visual Examination Report - Zone 59 - Component No. 3-
SG-011-H-016
10/10/2022
NDE Reports
2-VT-3098
Visual Examination Report - Zone 59 - Component No. 13-
AF-006-H-001
10/11/2022
NDE Reports
2-VT-3123
Pressure Test Report - Zone 5 - "VE" Bare Metal Visual
Exams of Pressurizer Bottom Head Instrument Nozzles 5-
37-5 and 5-37-6 in accordance with Code Case N722-1
10/14/2022
NDE Reports
2-VT-3133
Visual Examination Report - Zone 18 - RCP Coolant Pump
2A Column Supports 18-12 through 18-15
10/15/2022
NDE Reports
2-VT-3134
Visual Examination Report - Zone 18 - RCP Coolant Pump
2A Column Supports 18-21 and 18-22
10/15/2022
Procedures
Condition Reporting Process
Procedures
Chemical Control Program
Procedures
Boric Acid Walkdown Leak Detection
Procedures
Boric Acid Corrosion Control Program
Procedures
Liquid Penetrant Examination
Procedures
Visual Examination of Component Supports
Procedures
MN756-A00002
PDI Generic Procedure for the Ultrasonic Examination of
Austenitic Pipe Welds, PDI-UT-2
004
Procedures
MN756-A00004
PDI Generic Procedure for the Ultrasonic Examination of
Weld Overlaid Similar and Dissimilar Metal Welds, PDI-UT-8
003
Work Orders
4874312, 5077003, 5207085, 5224288, 5333956, 5333960,
5344322, 5348607, 5357408, 5393566, 5423854
Corrective Action
Documents
21-14210, 21-11051, 21-01938, 21-06538, 22-08247, 22-
09928, 22-04716, SR 4378, 22-08239, 21-2894, 04-
2745719, 22-10287, 22-10289, 22-10457, 22-08239
Miscellaneous
22 Biennial RO Written Exam Week 2
09/21/2022
Miscellaneous
22 Biennial SRO Written Exam Week 2
09/21/2022
Miscellaneous
SST Final data
2/14/2021
Miscellaneous
Simulator to Unit Differences
05/19/2022
Miscellaneous
Simulator Configuration Management Committee (SCMC)
Agenda
03/23/2021
Miscellaneous
Simulator Configuration Management Committee (SCMC)
01/26/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Meeting Minutes
Miscellaneous
Simulator Configuration Management Committee (SCMC)
Meeting Minutes
03/23/2021
Miscellaneous
Simulator Configuration Management Committee (SCMC)
Meeting Minutes
11/11/2019
Miscellaneous
Simulator Configuration Management Committee (SCMC)
Meeting Minutes
2/2/2020
Miscellaneous
LOCT 2022 Annual Exam Remedial Training Evaluation
JPM A11
08/26/2022
Miscellaneous
LOCT 2022 Cycle 4 RO Exam 1 Remedial Training
07/29/2022
Miscellaneous
LOCT 2022 Cycle 2 SRO Exam 1 Remedial Training
03/22/2022
Miscellaneous
LOCT NLR21 Remedial Training Evaluation SES004M09
01/13/2022
Miscellaneous
LOCT 2021 Annual Operating Exam Remedial Training
Evaluation SES009R06
05/16/2022
Miscellaneous
LOCT 2021 Annual Operating Exam Remedial Training
Evaluation SES003M00
09/24/2021
Miscellaneous
LOCT 2021 Cycle 2 SRO Written Exam 2
05/28/2021
Miscellaneous
LOCT 2021 Cycle 4 RO Exam 1
07/16/2021
Miscellaneous
LOCT 2021 Cycle 5 RO Exam 2
11/19/2021
Miscellaneous
Shift Technical Advisor Remedial Training Evaluation SES-
STA-11-00
09/2/2021
Miscellaneous
CCM03
Malfunction Tests
06/07/2021
Miscellaneous
EGM09A
Malfunction Tests
06/07/2021
Miscellaneous
FWM23
Malfunction Tests
06/07/2021
Miscellaneous
IAM05
Malfunctions Test
2/14/2021
Miscellaneous
JPM 040.01
Declare Emergency Action Levels
Miscellaneous
JPM 041.01
Declare Emergency Action Levels
Miscellaneous
JPM 109.01
Declare Emergency Action Levels
Miscellaneous
JPM 111.01
Declare Emergency Action Levels
Miscellaneous
JPM 134.01
Declare Emergency Action Levels
Miscellaneous
JPM 141.01
Declare Emergency Action Levels
Miscellaneous
JPM 149.01
Declare Emergency Action Levels
Miscellaneous
JPM A12
22 PVNGS NRC Annual Exam
08/24/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
JPM A6
22 PVNGS NRC Annual Exam
01/15/2016
Miscellaneous
JPM P2
22 PVNGS NRC Annual Exam
07/24/2018
Miscellaneous
JPM P6
22 PVNGS NRC Annual Exam
07/24/2018
Miscellaneous
JPM P8
22 PVNGS NRC Annual Exam
07/25/2018
Miscellaneous
JPM S10
22 PVNGS NRC Annual Exam
07/15/2018
Miscellaneous
JPM S11
22 PVNGS NRC Annual Exam
08/03/2022
Miscellaneous
JPM S12
22 PVNGS NRC Annual Exam
01/14/2018
Miscellaneous
JPM S12
22 PVNGS NRC Annual Exam
09/27/2022
Miscellaneous
JPM S4
22 PVNGS NRC Annual Exam
07/20/2018
Miscellaneous
JPM S6
22 PVNGS NRC Annual Exam
07/24/2018
Miscellaneous
MCM02A
Malfunction Tests
06/07/2021
Miscellaneous
Oconee Nuclear Station Second Simulator Testing Schedule
04/19/2011
Miscellaneous
Program Office Review of Oconee's Simulation Facility
"Testing and Test Credit Plan" Scheme
06/01/2011
Miscellaneous
MTI-003
Transient Test Comparison
03/17/2021
Miscellaneous
NIM02A
Malfunction Tests
06/07/2021
Miscellaneous
RCM01A
Malfunction Tests
06/07/2021
Miscellaneous
RDM11
Malfunction Tests
06/07/2021
Miscellaneous
SES-0-03-T-07
LOCT Simulator Evaluation Scenario
Miscellaneous
SES-0-03-T-08
LOCT Simulator Evaluation Scenario
Miscellaneous
SES-0-05-P-09
LOCT Simulator Evaluation Scenario
Miscellaneous
SES-0-09-AG-06
LOCT Simulator Evaluation Scenario
Miscellaneous
SES-0-09-AG-07
LOCT Simulator Evaluation Scenario
Miscellaneous
SES-0-09-P-10
LOCT Simulator Evaluation Scenario
Miscellaneous
THOR1A
Malfunction Tests
05/25/2022
Procedures
Licensed Operator Medical Examinations
Procedures
Licensed Operator Requalification Program
Procedures
LOR Training Program
Procedures
LOR Annual and Biennial Evaluation
Procedures
LOR Exam Bank
Procedures
LOR Two-Year Training Plan
Procedures
LOR Conduct of Simulator Training
Procedures
Initial Operator License and Licensed Operator Programs
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Operator Licensing and Requalification Process
Procedures
LOCT Biennial Written Exam Development and Sample Plan
Procedures
LOCT Annual and Biennial Exam Administration
Procedures
NRC Examination Security
Procedures
Systematic Approach to Training (SAT)
Procedures
Simulator Configuration
Procedures
Licensed Operator Continuing Training Program Description
Procedures
Conduct of Operations
Procedures
NLR10-15-001
Operator License Activation/Reactivation Card
Corrective Action
Documents
2-12116
Miscellaneous
NLR22B010500
Licensed Operator Continuing Training Classroom Lesson:
Ovation and ARCH
2/28/2021
Miscellaneous
NLR22S030401
Licensed Operator Continuing Training Simulator Scenario:
Ovation
05/19/2022
Miscellaneous
NLR22S050100
Licensed Operator Continued Training Simulator Scenario -
LOAF
11/13/2022
Miscellaneous
NLR22S050301
Licensed Operator Continued Training Classroom Lesson -
Loss of PMS
11/18/2022
Miscellaneous
WNA-TM-00463-
CVER1
Licensed Operator Continuing Training Classroom Lesson:
ARCH Cycle 3 Operator Training
04/28/2022
Procedures
Management of Critical Evolutions and Infrequently
Performed Tests or Evolutions
Procedures
Panel B04A Alarm Responses
58A
Procedures
Conduct of Operations
Procedures
Operations with PMS Out of Service
Procedures
Initial Reactor Startup Following Refuelings
61C
Procedures
Calculation of Estimated Critical Condition
Procedures
DNBR/LHR/AZTILT/ASI with COLSS Out of Service
Corrective Action
Documents
2-09187, 21-12436, 22-08517, 21-00183, 22-07259, 22-
261, 22-12462, 10-00150
Miscellaneous
MRFF Evaluation 21-00183-004
Miscellaneous
MRFF Evaluation 22-09187-007
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
CRDR 3282707
Miscellaneous
EWR 3319152
Miscellaneous
PVNGS-Design Basis Manual, Diesel Generator, Class 1E
Standby Generation, Fuel Oil Storage and Transfer System
Miscellaneous
Maintenance Rule Performance Criteria Basis Worksheet -
Miscellaneous
Performance Monitoring Group - Unit 1 Containment Spray
Train A
Miscellaneous
Performance Monitoring Group - Unit 1 High Pressure
Safety Injection Train A
Miscellaneous
Performance Monitoring Group - Unit 1 Low Pressure
Safety Injection A
Miscellaneous
Maintenance Rule Performance Criteria Basis Worksheet -
Miscellaneous
Unit 2 Maintenance Rule SSC Unavailability (UA) Report
11/02/2022
Miscellaneous
Performance Monitoring Group, Auxiliary Feedwater Train A
Unit 2
2/26/2022
Miscellaneous
Auxiliary Feedwater, Risk Significance Determination of
Maintenance Rule Function(s)
Miscellaneous
13-NS-C025
Risk Informed Performance Criteria
Miscellaneous
13-NS-C075
MSPI Bases Document
Miscellaneous
2-07259-004
MRFF Evaluation
Miscellaneous
DEC-00536
Substitute Bolted Bonnet Solenoid Operated Valves (SOV)
for the Combined Recirc Header to RWT Isolation Valves
Miscellaneous
EVT-AF-2022-
28523
Maintenance Rule Event
Miscellaneous
EVT-AF-2022-
436372
Maintenance Rule Event
Miscellaneous
EVT-SI-2022-
28772
Maintenance Rule Event Report: 1JSIAUV0660
Miscellaneous
JN603-A00026
Target Rock SOV Model No. 77L-002BB Project Technical
Manual
Procedures
Diesel Generator A Test
Procedures
Maintenance Rule
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Pump and Valve Inservice Testing Program
Procedures
Train A HPSI Injection and Miscellaneous SI Valves -
Quarterly - Inservice Test
Work Orders
5347215, 5471705, 5471225, 5306526, 5472104, 5457808,
256459, 3470020, 5370179
Procedures
Management of Critical Evolutions and Infrequently
Performed Tests or Evolutions
Corrective Action
Documents
2-10130, 18-15131, PVAR 3293681, PVAR 3140020, 22-
07363, 22-07868, 22-07986, 22-07772, 22-11978, 18-
10906, 21-08721, 22-12242, 22-09074, 22-11747, 19-
09886, 16-05323, 22-12762
Drawings
03-M-SIP-002
P&I Diagram Safety Injection and Shutdown Cooling System
Drawings
M018-00545
Fuel Oil Supply & Drain Lines - General Arrangement
Drawings
M018-00663
Diesel Generator Support / Bracket Detail
Miscellaneous
Design Basis Manual: Seismic Topical
Miscellaneous
PVNGS-Design Basis Manual, Diesel Generator, Class 1E
Standby Generation, Fuel Oil Storage and Transfer System
Miscellaneous
DBM, Safety Injection System
Miscellaneous
Engineering Evaluation 17-06376-037
Miscellaneous
Engineering evaluation 3634736
Miscellaneous
Unit 3 Control Room Logs 9/27-9/29/2022
10/04/2022
Miscellaneous
PVNGS Technical Specification Bases
Miscellaneous
13-CN-0397
Specification - Essential Spray Pond Structure Concrete
Repair
Miscellaneous
13-NS-C088
Mission Times for the EW, SP, SI, AF, and DG Systems
Miscellaneous
13-VTD-C710-
00008
Crosby Valve & Gage Co. Instruction Manual for
Miscellaneous Safety Relief Valves
Miscellaneous
Safety Injection System Venting
Miscellaneous
Leak Test of SI/RCS Pressure Isolation Valves
Miscellaneous
HPSI Pump and Check Valve Full Flow Test
Miscellaneous
PVNGS DBM
Safety Injection System
Miscellaneous
PVNGS DBM
Essential Spray Pond System
Miscellaneous
PVNGS DBM
Core Protection Calculator System/Core Operating Limits
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Supervisory System
Miscellaneous
VTD-D970-00002
Terry Turbine Maintenance Guide, Auxiliary Feedwater
Application, EPRI NMAC Technical Report 3002001670
Procedures
Panel B05A Alarm Responses
Procedures
Operations Condition Reporting Process and Operability
Determination/Functional Assessment
Procedures
Essential Auxiliary Feedwater System, 40OP-9AF01
Procedures
Procedures
CPC/CEAC Operations
Procedures
Diesel Generator A Test
Procedures
Operations Mode 1 Surveillance Logs
Procedures
Main Steam and Pressurizer Safety Valve Set Pressure
Verification
Work Orders
257762, 5489138, 5348113, 5362361, 5470681, 5488694,
4761703, 4762123, 5369408
Corrective Action
Documents
2-01754, 22-06836, 22-10674, 22-11037, 22-11740, 22-
11905, 22-12116, 22-12189
Engineering
Changes
4655260
Engineering
Evaluations
E-21-0004
Miscellaneous
JN1017-A00018
Advanced Rod Control Hybrid (ARCH) Design Verification
Test - EC 4655260
Miscellaneous
JN1034-A00197
WNA-GO-00240-CVER1 - ARCH System Technical Manual
Miscellaneous
NLR22B010500
Licensed Operator Continuing Training Classroom Lesson:
Ovation and ARCH
2/28/2021
Miscellaneous
WNA-TM-00461-
CVER1
Licensed Operator Continuing Training Classroom Lesson:
ARCH Cycle 2 Operator Training
2/15/2022
Miscellaneous
WNA-TM-00463-
CVER1
Licensed Operator Continuing Training Classroom Lesson:
ARCH Cycle 3 Operator Training
04/28/2022
Miscellaneous
WNA-TR-05670-
CVER3
APS Palo Verde Unit 3 Ovation Strategic Modernization
Program Rod Control Integrated System Factory
Acceptance Test Report - Phase 4
Procedures
Inspection and Testing of Plant Maintenance and
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Modifications
Procedures
Conduct of Modifications
Corrective Action
Documents
2-11147, 22-10074, 22-11747, 22-12718, 22-12721
Miscellaneous
13-M723-00009
Q Chillers Refrigerant Machine Flow Schematic
Miscellaneous
0002
Carrier Instruction Manual for Centrifugal Refrigeration
Machine
Procedures
Essential Chiller
Procedures
Procedures
Procedures
4.16 kV Class 1E Power (PB)
Procedures
Diesel Generator A Test
Procedures
Diesel Generator B Test
Procedures
Surveillance Testing
Procedures
Train B HPSI Injection and Miscellaneous SI Valves
Quarterly - Inservice Test
Work Orders
5484878, 5353033, 5437781, 5352967, 5353023, 5353050,
5353062, 5362361, 5487473, 5355068, 5488694, 5470681,
5356793, 5491941, 5493651
Calculations
13-NC-RC-0200
Reactor and Spent Fuel Pool Decay Heat Loads
Corrective Action
Documents
21-12744, 21-12769, 22-05971, 22-08470, 22-10387, 22-
10439, 22-10701, 22-10716, 22-10671, 22-10807, 22-
10809, 22-10908, 22-10919, 22-10957, 22-10992, 22-
10994, 22-11040, 22-11072, 22-11077, 22-11068, 22-
11581, 22-11594, 22-11592, 22-11787
Miscellaneous
Unit Three 23rd Refueling Outage Shutdown Risk
Assessment Final Report
Miscellaneous
Unit Three 23rd Refueling Outage Shutdown Risk
Assessment Team Review Report
Miscellaneous
Standard Maneuver Plan: EOC Shutdown 92% to 20% Unit
Cycle 23
Miscellaneous
Fatigue Assessment for Water Resources Auxiliary Operator
Following Motor Vehicle Accident
10/11/2022
Miscellaneous
Fatigue Assessment for Refueling Mechanical Services
10/11/2022
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Mechanic Following Illness from Containment Heat
Miscellaneous
Fatigue Assessment for Maintenance Scaffolder Following
Injury During Scaffold Erection
10/27/2022
Miscellaneous
Fatigue Assessment for Maintenance Scaffolder Following
Observed Unusual Behavior
10/27/2022
Miscellaneous
TD# 289537: 3MDGNC02B**BLOWER - DIESEL
GENERATOR B STARTING AIR COMPRESSOR 2
Miscellaneous
Protected Equipment Scheme: U3R23 Lowered Inventory
Miscellaneous
Operations
Technical
Document TD#
289537
3MDGNC02B**BLOWER - DIESEL GENERATOR B
STARTING AIR COMPRESSOR 2
Procedures
Managing Personnel Fatigue
Procedures
Open/Close the Containment Equipment Access Hatch and
Missile Shield Doors
Procedures
Loss of SFP Level or Cooling
Procedures
Protected Equipment
Procedures
Shutdown Risk Management
Procedures
Initial Reactor Startup Following Refuelings
61C
Procedures
Mode Change Checklist
106
Procedures
Outage GOP
Procedures
Tracking Containment Penetrations
Procedures
Shutdown Risk Assessments
Calculations
13-JC-ZZ-0201
MOV Thrust, Torque and Actuator Sizing Calculation
Calculations
13-JC-ZZ-0225
Determination of Motor Actuator Stroke Times for DC Motors
Associated with Limitorque MOV Actuators
Calculations
13-JC-ZZ-0400
Motor Operated Valve Thrust and Torque Calculation for
13JAFBHV0030 and 13JAFBHV0031
Calculations
13-MC-AF-0800
Auxiliary Feedwater ESF Function Response Times
Corrective Action
Documents
2-09074, 3553355, 3779662, 22-10580, 22-10611, 22-
10720, 22-10738
Miscellaneous
Design Basis Manual: Auxiliary Feedwater System
Miscellaneous
13-MS-C003
Engineering Study for ESFAS Valve Stroke Time Adjustment
Evaluation
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Post Maintenance Motor Operated Valve Thermal Overload
Relay Protection and/or Bypass Device Operability
Procedures
ESFAS Train B Subgroup Relay Functional Test
Procedures
ESFAS Train A Subgroup Relay Shutdown Functional Test
Procedures
ESFAS Train B Subgroup Relay Shutdown Functional Test
Procedures
Diesel Generator A Test
Procedures
Motor Operated Valve (MOV) Program
Procedures
Containment Leakage Type B and C Testing
Procedures
Class 1E Diesel Generator and Integrated Safeguards Test
Train B
Procedures
AF Valves - Inservice Test
Work Orders
5355068, 5470681, 5356500, 5356384
71151
Corrective Action
Documents
2-06994
71151
Miscellaneous
Units 1, 2, and 3 RCS Leakage Data, date ranges October
21 - September 2022
10/05/2022
71151
Miscellaneous
Unit 1, 2, and 3 RCS Dose Equivalent Iodine-131 Data, date
ranges October 2021 - September 2022
10/05/2022
71151
Miscellaneous
Nuclear IQ - RCS Activities; date range October 1, 2021
through June 30, 2022
71151
Procedures
Performance Indicator - Barrier Integrity Cornerstone: RCS
Leak Rate
71151
Procedures
ERFDADS (Preferred) Calculation of RCS Water Inventory
71151
Procedures
RCS Dose Equivalent Xe-133, Gross Activity, and Dose
Equivalent I-131 Determination
71151
Procedures
RCS Activity Performance Indicator
71151
Procedures
Systems Chemistry Specifications
110
71151
Procedures
Reactor Coolant System Specific Activity Surveillance
71151
Procedures
NRC ROP PI Data Collection, Verification and Submittal
Corrective Action
Documents
2-05897
Drawings
01-M-HFP-001
P & I Diagram HVAC - Fuel Building
Miscellaneous
PVGS Operator Information Manual
April 2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Miscellaneous
13-MC-HF-0501
Fuel Bldg. - Radiation Monitoring System
Miscellaneous
22-00226
Engineering Design Change
Miscellaneous
22-00227
Engineering Design Change
Miscellaneous
22-00228
Engineering Design Change
Procedures
Emergency Preparedness Equipment Out of Service
Procedures
Safety Function Determination Procedure
Work Orders
5449356, 5449365, 5449366
Corrective Action
Documents
2-00419, 22-00512, 22-00612, 22-00657, 22-00688, 22-
00758, 22-01069, 22-01376, 22-01584, 22-01562, 22-
01759, 22-02191, 22-02438, 22-02654, 22-10743, 22-
05006, 22-05787, 22-06897, 22-06192
Miscellaneous
SQ-1763
Maintenance Rule (a)(1) Issue Tracking Form
Procedures
Appendix 7: List of EOP Radiation Monitors
Procedures
Actions for Non-Functional Radiation Monitors: Preplanned
Alternate Sampling Program
18