Text

February 27, 2023

SUBJECT:

PALO VERDE GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000528/2023401, 05000529/2023401 AND 05000530/2023401

Dear Adam C. Heflin:

On January 26, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an onsite inspection at the Palo Verde Generating Station. Additional offsite inspection related activities continued through February 15, 2023, when the results of this inspection were discussed with Cary Harbor, Vice President Nuclear Regulatory & Oversight, and other members of your staff.

The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000528, 05000529, 05000530 License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51, and NPF-74

Report Numbers:

05000528/2023401, 05000529/2023401 and 05000530/2023401

Enterprise Identifier:

I-2023-401-0011

Licensee:

Arizona Public Service Company

Facility:

Palo Verde Generating Station

Location:

Tonopah, AZ

Inspection Dates:

January 23, 2023 to February 15, 2023

Inspectors:

T. Weir, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Palo Verde Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1) Tier I: All Requirements

Tier II: All Requirements

Tier III: All Requirements

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On February 15, 2023, the inspectors presented the security baseline inspection results to Cary Harbor, Vice President Nuclear Regulatory & Oversight, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

CR 22-07738, CR

2-11594, CR 22-

11581, CR 22-

10701, CR 22-

10706, 22-05348,

CR 22-04690, CR

2-12546, 21-

08388, 21-09910

Corrective Action

Documents

Resulting from

Inspection

CR 23-00821, CR

23-00823, CR 23-

00824, CR, 23-

00873, CR 23-

00874

LP NANTeL FFD and BOP Observation

06/08/2017

LP NANTeL Generic Plant Access Training

Rev. 12

Physical Security Plan (PSP)

Rev. 23

21-005

Fitness for Duty Audit

AR 2022-02994

HHS Audit

Miscellaneous

FFD22

LP Fatigue Assessor Training

01DP-0AP17

Fatigue

2a

01DP-0EM10

FFD Program

Rev. 46

01OP-0RH03

Collections and Evaluations

Rev. 40

71130.08

Procedures

20DP-0SK40

Access Authorization

Rev. 47