IR 05000528/2023403

From kanterella
Jump to navigation Jump to search
NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report)
ML23313A170
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/13/2023
From: Ray Kellar
NRC/RGN-IV/DRSS/PSB
To: Heflin A
Arizona Public Service Co
References
IR 2023403
Download: ML23313A170 (9)


Text

November 13, 2023

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000528/2023403 AND 05000529/2023403 AND 05000530/2023403

Dear Adam Heflin:

On November 2, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On November 7, 2023, the NRC inspectors discussed the results of this inspection with Cory Harbor, Vice President, Nuclear Regulatory & Oversight and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000528, 05000529, 05000530 License Nos. NPF-41, NPF-51, NPF-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000528, 05000529 and 05000530

License Numbers:

NPF-41, NPF-51 and NPF-74

Report Numbers:

05000528/2023403, 05000529/2023403 and 05000530/2023403

Enterprise Identifier:

I-2023-403-0006

Licensee:

Arizona Public Service

Facility:

Palo Verde Nuclear Generating Station

Location:

Tonopah, AZ

Inspection Dates:

October 30, 2023 to November 03, 2023

Inspectors:

R. Lanfear, Physical Security Inspector

T. Weir, Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Physical Security Branch

Division of Radiological Safety & Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Palo Verde Nuclear Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1)

  • Tier I: All requirements
  • Tier II: All requirements
  • Tier III: All requirements

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) October 1, 2022 through September 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 7, 2023, the inspectors presented the security baseline inspection results to Cary Harbor, Vice President, Nuclear Regulatory & Oversight and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

23-03368, 23-

01393, 23-03198,

2-01353, 22-

08561, 22-08562,

2-08564, 23-

00055, 22-10097,

23-06617

Corrective Action

Documents

Resulting from

Inspection

23-11601, 23-

11485

Miscellaneous

Audit 2023-005

Fitness for Duty (FFD) and Access Authorization (AA)

20DP-0SK23

Personnel Escorted Access Processing

20DP-0SK39

Palo Verde Badging Procedure

20DP-0SK40

Access Authorization

Procedures

20DP-0SK46

Personnel Access Data System (PADS) Process

71130.01

Self-Assessments

Access

Authorization

Readiness

Access Authorization Readiness

06/02/2023

Corrective Action

Documents

2-04696, 22-

265, 22-08871,

23-05971, 23-

04622, 23-05971,

23-01140, 23-

08061, 23-07314,

23-03374, 23-

249, 23-03592,

23-03368, 23-

00055, 23-10097,

23-06617

71130.02

Corrective Action

Documents

23-11608, 23-

11602, 23-11564,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Resulting from

Inspection

23-11565

20DP-0SK21

Protected Area Security Extension (PASE) and Security

Headquarters Access Control and Operation

Rev. 34

20DP-0SK23

Personnel Escorted Access Processing

Rev. 38

20DP-0SK24

Protected Area Warehouse, Sally Port and ISFSI Access

Rev. 46

20DP-0SK26

Security Escort Duties

Rev. 24

20DP-0SK30

Security Lock and Key Control

Rev. 50

20DP-0SK42

Personnel Access to Protected and Vital Areas

Rev. 39

20DP-0SK43

Control of Safeguards Information

Rev. 37

20DP-0sK45

SOCA Vehicle Access, Egress and Parking Controls

Rev. 23

20DP-0SK55

Protected and Vital Area Vehicle Access

Rev. 14

20DP-0SK70

Security Ingress Equipment Testing

Rev. 2

20DP-0SK72

Security Doors, Hatches, and Turnstiles Testing

Rev. 3

Procedures

20DP-0SK99

SOCA Access Control

Rev. 8

23-001

Nuclear Security Audit

Rev. 0

Self-Assessments

23-07414

NRC Security Baseline Inspection Readiness Assessment

Checklist

07/18/2023