| number = ML18127A004 | | number = ML18127A004 | ||
| issue date = 05/07/2018 | | issue date = 05/07/2018 | ||
| title = | | title = NRC Integrated Inspection Report 05000528/2018001, 05000529/2018001, and 05000530/2018001 | ||
| author name = Miller G | | author name = Miller G | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-D | | author affiliation = NRC/RGN-IV/DRP/RPB-D | ||
| addressee name = Bement R | | addressee name = Bement R | ||
Line 9: | Line 9: | ||
| docket = 05000528, 05000529, 05000530 | | docket = 05000528, 05000529, 05000530 | ||
| license number = NPF-041, NPF-051, NPF-074 | | license number = NPF-041, NPF-051, NPF-074 | ||
| contact person = Miller G | | contact person = Miller G | ||
| document report number = IR 2018001 | | document report number = IR 2018001 | ||
| document type = Inspection Report, Letter | | document type = Inspection Report, Letter | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:==SUBJECT:== | ||
PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001 | |||
==Dear Mr. Bement:== | |||
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report. | |||
NRC inspectors documented one finding of very low safety significance (Green) in this report. | |||
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | |||
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. | |||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74 | |||
===Enclosure:=== | |||
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/ Attachment: | |||
1. Supplemental Information 2. O | |||
==Inspection Report== | |||
Docket Numbers: 05000528, 05000529, 05000530 License Numbers: NPF-41, NPF-51, NPF-74 Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 Enterprise Identifier: I-2018-001-0013 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: C. Peabody, Senior Resident Inspector D. Reinert, PhD, Resident Inspector D. You, Resident Inspector L. Carson, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector Approved By: Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects Enclosure | |||
=SUMMARY= | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, | |||
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
NRC and self-revealed findings, violations, and additional items are summarized in the table below. | |||
List of Findings and Violations Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Green [H.12] - Human 71111.12 - | |||
Systems NCV 05000528/2018001-01 Performance, Avoid Maintenance Closed Complacency Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, | |||
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. | |||
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center. | |||
=PLANT STATUS= | |||
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018, and remained at or near rated thermal power for the remainder of the inspection period. | |||
Units 2 and 3 operated at or near rated thermal power for the entire inspection period. | |||
==INSPECTION SCOPES== | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
==REACTOR SAFETY== | |||
==71111.04 - Equipment Alignment Partial Walkdown== | |||
{{IP sample|IP=IP 71111.04|count=3}} | |||
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains: | |||
: (1) Unit 1 containment spray system B on January 4, 2018 | |||
: (2) Unit 2 auxiliary feedwater system A on January 30, 2018 | |||
: (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018 | |||
===Complete Walkdown (1 Sample)=== | |||
The inspectors evaluated system configurations during a complete walkdown of the Unit 3 containment spray system on January 18, 2018. | |||
==71111.05AQ - Fire Protection Annual/Quarterly Quarterly Inspection== | |||
{{IP sample|IP=IP 71111.05AQ|count=5}} | |||
The inspectors evaluated fire protection program implementation in the following selected areas: | |||
: (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018 | |||
: (2) Unit 2 control room, Fire Zone 17, on January 19, 2018 | |||
: (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A, on January 23, 2018 | |||
: (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018 | |||
: (5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018 | |||
==71111.07 - Heat Sink Performance Heat Sink== | |||
{{IP sample|IP=IP 71111.07|count=1}} | |||
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018. | |||
==71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification== | |||
{{IP sample|IP=IP 71111.11|count=1}} | |||
The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018. | |||
===Operator Performance (1 Sample)=== | |||
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018. | |||
The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and FWIV-174, 177, on February 27, 2018. | |||
==71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness== | |||
{{IP sample|IP=IP 71111.12|count=2}} | |||
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions: | |||
: (1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185 in Units 2 and 3 | |||
: (2) Diesel fuel oil transfer pump predictive engineering cable testing | |||
==71111.13 - Maintenance Risk Assessments and Emergent Work Control== | |||
{{IP sample|IP=IP 71111.13|count=5}} | |||
The inspectors evaluated the risk assessments for the following planned and emergent work activities: | |||
: (1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 2018 | |||
: (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018 | |||
: (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018 | |||
: (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018 | |||
: (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018 | |||
==71111.15 - Operability Determinations and Functionality Assessments== | |||
{{IP sample|IP=IP 71111.15|count=9}} | |||
The inspectors evaluated the following operability determinations and functionality assessments: | |||
: (1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on January 3, 2018 | |||
: (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018 | |||
: (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, failed to re-open during breaker maintenance on January 31, 2018 | |||
: (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018 | |||
: (5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI-659, on February 23, 2018 | |||
: (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018 | |||
: (7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A T-drains on March 6, 2018 | |||
: (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018 | |||
: (9) Unit 2 steam generator sodium concentration increase on March 12, 2018 | |||
==71111.18 - Plant Modifications== | |||
{{IP sample|IP=IP 71111.18|count=1}} | |||
The inspectors evaluated the following temporary or permanent modifications: | |||
: (1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-connect valve, SI-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018 | |||
==71111.19 - Post Maintenance Testing== | |||
{{IP sample|IP=IP 71111.19|count=6}} | |||
The inspectors evaluated the following post maintenance tests: | |||
: (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018 | |||
: (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018 | |||
: (3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018 | |||
: (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018 | |||
: (5) Unit 2 essential cooling water pump A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018 | |||
: (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018 | |||
==71111.20 - Refueling and Other Outage Activities== | |||
{{IP sample|IP=IP 71111.20|count=1}} | |||
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry. | |||
==71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Routine== | |||
{{IP sample|IP=IP 71111.22|count=6}} | |||
: (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018 | |||
: (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018 | |||
: (3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed surveillance on February 28, 2018 | |||
: (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018 | |||
: (5) Unit 3, essential chiller A vibration analysis on March 8, 2018 | |||
: (6) Unit 1 containment spray pump B inservice test on March 22, 2018 | |||
===In-service (1 Sample)=== | |||
: (1) Unit 2 containment spray pump A inservice test on March 1, 2018 | |||
==71114.02 - Alert and Notification System Testing== | |||
{{IP sample|IP=IP 71114.02|count=1}} | |||
The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016 - February 20, 2018. | |||
==71114.03 - Emergency Response Organization Staffing and Augmentation System== | |||
{{IP sample|IP=IP 71114.03|count=1}} | |||
The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff their emergency response facilities in accordance with emergency plan commitments. | |||
==71114.04 - Emergency Action Level and Emergency Plan Changes== | |||
{{IP sample|IP=IP 71114.04|count=1}} | |||
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016 - February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval. | |||
==71114.05 - Maintenance of Emergency Preparedness== | |||
{{IP sample|IP=IP 71114.05|count=1}} | |||
The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness. | |||
==71114.06 - Drill Evaluation Emergency Planning Drill== | |||
{{IP sample|IP=IP 71114.06|count=1}} | |||
The inspectors evaluated a full-scale emergency preparedness drill on February 13, | |||
==RADIATION SAFETY== | |||
==71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning== | |||
{{IP sample|IP=IP 71124.02|count=1}} | |||
The inspectors evaluated the licensees radiological work planning by reviewing the following activities: | |||
: (1) RWP 2017-9-1016, RMC Operations and Routine Tasks | |||
: (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection | |||
: (3) RWP 2017-3002, Reactor Destack/Restack | |||
: (4) RWP 2017-3015, Cavity Decontamination | |||
: (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel Verification of Dose Estimates and Exposure Tracking Systems (1 Sample) | |||
The inspectors evaluated dose estimates and exposure tracking. | |||
==71124.04 - Occupational Dose Assessment Source Term Characterization== | |||
{{IP sample|IP=IP 71124.04|count=1}} | |||
===The inspectors evaluated the licensees source term characterization. | |||
External Dosimetry=== | |||
{{IP sample|IP=IP 71124.04|count=1}} | |||
The inspectors evaluated the licensees external dosimetry program. | |||
===Internal Dosimetry (1 Sample)=== | |||
The inspectors evaluated the licensees internal dosimetry program. | |||
===Special Dosimetric Situations (1 Sample)=== | |||
The inspectors evaluated the licensees performance for special dosimetric situations. | |||
==OTHER ACTIVITIES - BASELINE== | |||
===71151 - Performance Indicator Verification === | |||
{{IP sample|IP=IP 71151|count=15}} | |||
The inspectors verified licensee performance indicators submittals listed below: | |||
: (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 - | |||
December 31, 2017) | |||
: (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 - | |||
December 31, 2017) | |||
: (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 - | |||
December 31, 2017) | |||
: (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - | |||
December 31, 2017) | |||
: (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31, 2017) | |||
: (6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017) | |||
: (7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 - | |||
December 31, 2017) | |||
==71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues== | |||
{{IP sample|IP=IP 71152|count=1}} | |||
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues: | |||
: (1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018 | |||
===71153 - Follow-up of Events and Notices of Enforcement Discretion Events === | |||
{{IP sample|IP=IP 71153|count=1}} | |||
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensees response on February 15 - 16, | |||
==INSPECTION RESULTS== | |||
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Report Aspect Section Mitigating Green [H.12] - | |||
==71111.12 - Systems NCV 05000528/2018001-01 Human Maintenance | |||
== | |||
Closed Performance, Effectiveness Avoid Complacency The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A. | |||
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center. | |||
=====Description:===== | |||
On November 12, 2017, the licensee was conducting a 24-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump. | |||
Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24-hour surveillance run on November 14, 2017. | |||
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis. | |||
Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re-landed onto the secondary stabs of the breaker and motor control center chassis. The licensees work planners had not recognized the possibility that removing and re-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections. | |||
The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position for only a few seconds. The licensees apparent cause investigation identified that nonintrusive as-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order. | |||
The post-maintenance test was not written in accordance with station procedure 30DP-9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in part, that the post-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation. | |||
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created. | |||
Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re-terminating motor control center secondary stab connections. As an interim measure, the inspectors confirmed that all safety-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing. | |||
Corrective Action Reference: Condition Report 17-16497 | |||
=====Performance Assessment:===== | |||
Performance Deficiency: The licensees failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency. | |||
Screening: The performance deficiency is more-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel oil transfer pump A. Without an appropriate post-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable. | |||
Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time. | |||
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12]. | |||
=====Enforcement:===== | |||
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings. | |||
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017. | |||
Disposition: This violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff. | |||
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff. | |||
On April 11, 2018, the inspector presented the quarterly residents inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff. | |||
=SUPPLEMENTAL INFORMATION= | |||
DOCUMENTS REVIEWED | |||
Section 1R04: Equipment Alignment | |||
Procedures | |||
Number Title Revision | |||
40ST-9AF07 Auxiliary Feedwater Pump AFA-P01 Monthly Valve 6 | |||
Alignment | |||
40ST-9SI13 LPSI and CS System Alignment Verification 33 | |||
Condition Reports (CRs) | |||
16-17321 17-03027 | |||
Drawings | |||
Number Title Revision | |||
03-M-HJP-001 P&I Diagram Control Building HVAC 14 | |||
03-M-HJP-002 P&I Diagram Control Building HVAC 14 | |||
03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49 | |||
03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & 6 | |||
Cont. Spray Discharge | |||
03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF 7 | |||
Pump Suction Lines | |||
Miscellaneous | |||
Number Title Revision | |||
STM-30D System Training Manual Volume 30D: Control Building 6 | |||
HVAC System (HJ) | |||
Section 1R05: Fire Protection | |||
Procedures | |||
Number Title Revision | |||
14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13 | |||
Condition Reports (CRs) | |||
17-03870 18-00999 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
PVNGS Pre-Fire Strategies Manual 26 | |||
13-MM-0650 Fire Protection & Spray System Sub 007 | |||
13-MS-A083 NFPA Code Applicability and Conformance Review 007 | |||
4834415 Fire Safety Component Condition Record November 3, 2016 | |||
4834430 Fire Safety Component Condition Record November 3, 2016 | |||
4843902 Fire Safety Component Condition Record December 6, 2016 | |||
Unit 3 Tamper/Vital/Security Tour - Post 31 February 7, 2018 | |||
4971714 Open Door/Hatch/Floor Plug Permit January 29, 2018 | |||
4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018 | |||
Section 1R07: Heat Sink Performance | |||
Procedures | |||
Number Title Revision | |||
73DP-9ZZ21 Heat Exchanger Visual Inspection 6 | |||
73DP-9ZZ11 Heat Exchanger Program 15 | |||
Condition Reports (CRs) | |||
18-03133 18-03138 18-03139 | |||
Work Orders (WOs) | |||
4591574 4591575 4667054 4667055 4667098 | |||
Section 1R11: Licensed Operator Requalification Program and Licensed Operator | |||
Performance | |||
Procedures | |||
Number Title Revision | |||
40OP-9MB01 Main Generation and Excitation 63 | |||
40DP-9OP02 Conduct of Operations 72 | |||
Procedures | |||
Number Title Revision | |||
40AL-9RK6A Panel B06A Alarm Responses 18 | |||
Condition Reports (CRs) | |||
18-02797 18-02593 18-03215 | |||
Miscellaneous | |||
Number Title Date | |||
Current Alarm Status Report February 16, 2018 | |||
Section 1R12: Maintenance Effectiveness | |||
Procedures | |||
Number Title Revision | |||
2MT-9ZZ74 Molded Case Circuit Breaker Test 48 | |||
30DP-9WP04 Post-Maintenance Testing Development 19 | |||
Condition Reports (CRs) | |||
17-08025-005 17-08025 17-16497 | |||
Work Orders (WOs) | |||
25959 4925966 4925967 4925969 4685719 | |||
4788985 | |||
Section 1R13: Maintenance Risk Assessments and Emergent Work Control | |||
Procedures | |||
Number Title Revision | |||
40DP-9AP21 Protected Equipment 7 | |||
70DP-0RA05 Assessment and Management of Risk when Performing 23 | |||
Maintenance in Modes 1 and 2 | |||
40MT-9ZZ01 Operations Maintenance Activities 5 | |||
40DP-9RS01 Operations Department Online Nuclear Risk Management 4 | |||
Mode 1 and 2 | |||
Condition Reports (CRs) | |||
18-00249 185-00136 18-00336 18-02544 | |||
Miscellaneous | |||
Number Title Date | |||
Schedulers Evaluation for PV Unit 1 January 4, 2018 | |||
Schedulers Evaluation for PV Unit 1 February 23, 2018 | |||
Schedulers Evaluation for PV Unit 3 February 1, 2018 | |||
Schedulers Evaluation for PV Unit 2 March 19, 2018 | |||
Unit 3 Archived Operator Logs January 29, 2018 - | |||
February 4, 2018 | |||
Section 1R15: Operability Determinations and Functionality Assessments | |||
Procedures | |||
Number Title Revision | |||
40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71 | |||
40AL-9RK6A Panel B06A Alarm Responses 18 | |||
74DP-9CY04 Systems Chemistry Specifications 94 | |||
Condition Reports (CRs) | |||
17-18475 12-01397 17-17856 13-01198 18-03127 | |||
17-16393 18-03215 18-03291 18-02839 18-01610 | |||
18-02334 3127427 18-02468 18-03980 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11 | |||
18-02334-003 Engineering Evaluation February 15, 2018 | |||
28056 Adverse CRDR July 19, 2013 | |||
EQ Program Manual 26 | |||
Section 1R18: Plant Modifications | |||
Condition Reports (CRs) | |||
18-04116 | |||
Work Orders (WOs) | |||
4989102 | |||
Miscellaneous | |||
Number Title Date | |||
DEC-01035 Design Equivalent Change April 12, 2017 | |||
Section 1R19: Post-Maintenance Testing | |||
Procedures | |||
Number Title Revision | |||
40OP-9CH12 Refueling Water Tank (RWT) Operations 41 | |||
2MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent 4 | |||
Relays | |||
2MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous 4 | |||
Overcurrent Relays | |||
40OP-9EW02 Essential Cooling Water System (EW) Train B 26 | |||
40ST-9DG01 Diesel Generator A Test 49 | |||
73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load 13 | |||
and Hot Start Test Train B | |||
40ST-9DG02 Diesel Generator B Test 54 | |||
Condition Reports (CRs) | |||
18-00136 18-00197 18-01931 18-00210 18-00290 | |||
18-00336 18-00377 18-00346 18-04731 18-04732 | |||
Work Orders (WOs) | |||
4964492 4822983 4981967 4726747 4821113 | |||
4847651 4965079 4972486 4847637 | |||
Drawings | |||
Number Title Revision | |||
01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15 | |||
01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13 | |||
13-M018-00141 Control Schematic (Starting Sequence Control) 25 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018 | |||
during Surveillance Run 1/5/2018 | |||
Section 1R20: Refueling and Other Outage Activities | |||
Procedures | |||
Number Title Revision | |||
40OP-9MB01 Main Generation and Excitation 63 | |||
Section 1R22: Surveillance Testing | |||
Procedures | |||
Number Title Revision | |||
73DP-9CL02 Containment Leakage Rate Testing Program 33 | |||
73ST-9XI20 Atmospheric Dump Valves - Inservice Test 47 | |||
73ST-9SI06 Containment Spray Pumps and Check valves - Inservice 42 | |||
Test | |||
73ST-9DF01 Diesel Fuel Oil Transfer Pumps - Inservice Test 34 | |||
40DP-9OP06 Operations Department Repetitive Task Program 130 | |||
73ST-9SI06 Containment Spray Pumps and Check Valves- Inservice 42 | |||
Test | |||
Condition Reports (CRs) | |||
16-15793 18-03304 18-01314 18-03825 | |||
Work Orders (WOs) | |||
22921 4840032 4843076 4843390 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication 18 | |||
Loops Uncertainty Calculation | |||
18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018 | |||
18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for March 2, 2018 | |||
SB-200, 202, and 205 | |||
Section 1EP2: Alert and Notification System Testing | |||
Miscellaneous Documents | |||
Number Title Date | |||
ID/Letter Palo Verde Nuclear Generating Station Alert and May 26, 2017 | |||
Number: Notification System (ANS) FEMA 350 Report - | |||
240-02802 May 2017 | |||
Palo Verde Nuclear Generating Station, Alert and May 2017 | |||
Notification System (ANS), FEMA 350 Report | |||
Palo Verde Nuclear Generating Station Siren Operating November 2015 | |||
Manual January 4, 2018 | |||
Letter from FEMA Region IX to Director, Division of September 19, | |||
Emergency Management, State of Arizona 2017 | |||
State of Arizona/Maricopa County Offsite Emergency November 2017 | |||
Response Plan, Palo Verde Nuclear Generating Station | |||
The Maricopa County Sheriffs Office Emergency August 2016 | |||
Response to Palo Verde Nuclear Generating Station | |||
Work Orders (WOs) | |||
474965/0 | |||
Section 1EP3: Emergency Response Organization Staffing and Augmentation | |||
Procedures | |||
Number Title Revision | |||
EP-0902 Notifications 10 | |||
EP-0901 Classifications 10 | |||
40AL-9RK7C Panel B07C Alarm Responses 15 | |||
40AO-9ZZ21 Acts of Nature 37 | |||
79IS-9SM01 Analysis of Seismic Event 27 | |||
Miscellaneous Documents | |||
Number Title Date | |||
240-02799 2017 1 Quarter - Emergency Preparedness | |||
st | |||
March 21, 2017 | |||
JF/MA Augmentation Drill Report | |||
240-02803 2017 2nd Quarter - Emergency Preparedness June 6, 2017 | |||
CS/MA Augmentation Drill Report | |||
240-02797 2017 3rd Quarter - Emergency Preparedness July 25, 2017 | |||
Augmentation Drill Report (After Hours) | |||
240-02808 2017 3rd Quarter - Emergency Preparedness September 6, 2017 | |||
Augmentation Drill Report | |||
240-02817 2017 4th Quarter - Emergency Preparedness December 13, | |||
CS/ma Augmentation Drill Report 2017 | |||
240-02790 2016 2nd Quarter - Emergency Preparedness June 23, 2016 | |||
JF/MA Augmentation Drill Report | |||
240-02791 2016 3rd Quarter - Emergency Preparedness August 3, 2016 | |||
JF/MA Augmentation Drill Report | |||
240-02798 December 5, 2016, Alert Event Report January 17, 2017 | |||
Section 1EP4: Emergency Action Level and Emergency Plan Changes | |||
Procedure | |||
Number Title Revision | |||
16DP-0EP22 Emergency Plan Maintenance 11, 12 | |||
Miscellaneous Documents | |||
Number Title Date | |||
Evaluation Replace the Meteorological Instrumentation and Data August 8, 2017 | |||
Tracking Number Transmission System (MDTS) | |||
2017-001E | |||
Evaluation EP-0900, Rev. 16 August 17, 2017 | |||
Tracking Number | |||
2017-003E | |||
Evaluation EP-0901, Rev. 10 August 21, 2017 | |||
Tracking Number | |||
2017-004E | |||
Screening 74RM-9EF42, Radiation Monitor Alarm Setpoint April 16, 2017 | |||
Tracking Number Determination, Rev. 30 | |||
2017-002S | |||
Screening Procedure EP-0901, Classifications, Added New EALs August 20, 2017 | |||
Tracking Number form EPLAN R60, Revise PV Proc Format | |||
2017-022S | |||
Miscellaneous Documents | |||
Number Title Date | |||
Screening EP-905, Revision 9, Protective Actions June 7, 2017 | |||
Tracking Number | |||
2017-014S | |||
Screening DMWO 3452940 Palo Verde Nuclear Generating September 8, | |||
Tracking Number Station Radio Replacement Project 2017 | |||
2017-023S | |||
Screening 40AO-9ZZ18 R018 Fire Outside Control Room September 26, | |||
Tracking Number 2017 | |||
2017-029S | |||
EPM Tracking DEC-00720 Allow Solar-Charged Offsite Sirens to February 18, | |||
Number Replace AC-Charged Offsite Sirens 2015 | |||
2015-006S | |||
Section 1EP5: Maintenance of Emergency Preparedness | |||
Procedures | |||
Number Title Revision | |||
01DP-0AP12 Condition Reporting Process 28 | |||
01DP-0AP12-01 Condition Reporting Process Administrative Guide 4 | |||
EP-0905 Protective Actions 9 | |||
EP-0902 Notifications 8, 9, 10 | |||
16DP-0EP31 Emergency Preparedness Equipment Out-of-Service 9 | |||
16DP-0EP27 Emergency Preparedness Equipment Testing 10 | |||
16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5 | |||
Condition Reports (CRs) | |||
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501 | |||
16-14593 16-14934 16-16710 17-02188 17-03147 17-03149 | |||
17-03202 17-03605 17-03721 17-03736 17-03826 17-03828 | |||
17-03829 17-03884 17-04633 17-06893 17-08328 17-10906 | |||
17-10949 17-11437 17-13663 17-14927 17-15449 17-15797 | |||
17-15884 17-16771 17-17091 17-17218 17-17739 17-18443 | |||
18-03244 | |||
Miscellaneous Documents | |||
Number Title Revision/Date | |||
KLD TR-983 Palo Verde Nuclear Generating Station, December 7, | |||
2017 Population Update Analysis 2017 | |||
KLD TR-895 Palo Verde Nuclear Generating Station, December 8, | |||
2016 Population Update Analysis 2016 | |||
Updated Review of Palo Verde Nuclear Generating September 29, | |||
Station Emergency Plan 2016 Letters of Agreement 2016 | |||
Letter # 240- 2017 Review of Palo Verde Nuclear Generating Station December 26, | |||
2819 Emergency Plan Letters of Agreement 2017 | |||
NAD Audit 2016- Nuclear Assurance Department (NAD) Audit Plan and December 14, | |||
010 Report, 2016-010, Emergency Preparedness 2016 | |||
Palo Verde Nuclear Generating Station After Action August 18, | |||
Report/Improvement Plan, Exercise Date - June 1, 2017 | |||
2017, Radiological Emergency Preparedness Program | |||
ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017 | |||
Report (Revised) | |||
ID: 240-02816 2017 Health Physics Drill Report (November 2017) December 12, | |||
2017 | |||
ID: 240-02818 1709 ERO Mini Drill - ERO Blue Team December 21, | |||
(December 2017) 2017 | |||
NAD Audit 2017- Nuclear Assurance Department (NAD) Audit Plan and January 25, | |||
008 Report, 2017-008, Emergency Preparedness 2018 | |||
240-02812 1704 and 1705 ERO Mini Drills - ERO White Team and October 18, | |||
CS/MA Green Team (June and July 2017) 2017 | |||
240-02813 1706 ERO Mini Drill - ERO Gold Team (July 2017) October 18, | |||
CS/MA 2017 | |||
240-02814 1707 ERO Mini Drill - ERO Red Team (August 2017) October 18, | |||
TW/MA Revision 1 2017 | |||
Emergency Response Facility Telephone Book, January 1, | |||
1st Quarter Edition 2018 2018 | |||
240-02801 1702 IPZ Evaluated Exercise - ERO White Team April 6, 2017 | |||
JF/MA (March 2017) | |||
240-02797 1608 ERO Mini Drill - ERO Red Team January 4, | |||
JF/MA (December 2016) 2017 | |||
240-02792 1604 and 1605 ERO Drills September 14, | |||
JF/MA 2016 | |||
240-02793 1606 ERO Mini Drill - ERO Green Team October 4, | |||
JF/MA (September 2016) 2016 | |||
Miscellaneous Documents | |||
Number Title Revision/Date | |||
240-02795 1609 Off-Hours Drive-in Augmentation Drill - December 2, | |||
JF/MA (November 2016) 2016 | |||
240-02796 2016 Health Physics Drill Report (November 2016) December 7, | |||
2016 | |||
Evaluation Evaluate Adding STSC ENS Communicator Duties to September 7, | |||
Report 16-11134 STSC Communicator 2016 | |||
17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass September 28, | |||
Break 2017 | |||
17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11, | |||
2017 | |||
Level 4 Default Values Used in Dose Assessment November 30, | |||
Evaluation 2017 | |||
Report 17- | |||
15797-001 | |||
Document No. Master Agreement Between Arizona Public Service 0 | |||
500599510 Company and Westinghouse Electric Company LLC for | |||
Goods and Services (Effective January 29, 2016 to | |||
December 31, 2018) | |||
Palo Verde Nuclear Generating Station After Action May 26, 2017 | |||
Report/Improvement Plan, Exercise Dates - March 7-8, | |||
2017, Radiological Emergency Preparedness Program | |||
(REPP) | |||
240-02789 2016 Health Physics Drill Report (Re-Demonstration) June 9, 2016 | |||
JF/TW | |||
240-02788 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016 | |||
JF/MA | |||
Palo Verde Nuclear Generating Station After Action February 9, | |||
Report/Improvement Plan, Exercise Date - 2017 | |||
November 16, 2016, Radiological Emergency | |||
Preparedness Program (REPP) | |||
240-02787 1602 IPZ Exercise - ERO Green Team (March 2016) March 25, 2016 | |||
JF/MA | |||
Palo Verde Nuclear Generating Station After Action February 9, | |||
Report/Improvement Plan, Exercise Date - 2017 | |||
November 16, 2016, Radiological Emergency | |||
Preparedness Program (REPP) | |||
Level 3 Evaluation Report 18-02668-002 March 22, 2018 | |||
Work Orders (WOs) | |||
4782667 4783959/0 4787729/0 4787847/0 4836236 | |||
4836263/0 4860832/0 4862234/0 4862502/0 4885361/0 | |||
4889725/0 4896971/0 4901070 4916668/0 4918303/0 | |||
4918455/0 4937577/0 4947802/0 | |||
Section 1EP6: Drill Evaluation | |||
Procedures | |||
Number Title Revision | |||
EP-0900 Emergency Response Organization (ERO) Position 16 | |||
Checklists | |||
EP-0901 Classifications 10 | |||
Condition Reports (CRs) | |||
18-02352 18-02503 18-02655 | |||
Section 2RS2: Occupational ALARA Planning and Controls | |||
Procedures | |||
Number Title Revision | |||
75DP-0RP03 ALARA Program Overview 06 | |||
75DP-0RP06 ALARA Committee 07 | |||
75DP-0RP08 Managing Radiological Risk 02 | |||
75RP-9RP02 Radiation Work Permits 31 | |||
75RP-9RP25 Temporary Shielding 14 | |||
75TD-9RP02 ALARA Work Planning 11 | |||
Audits and Self-Assessments | |||
Title Date | |||
PVGS Integrated Performance Assessment Report Radiation September 14, 2017 | |||
Protection 2nd Quarter 2017 | |||
2016 Annual ALARA/Management Evaluation Report June 23, 2017 | |||
2016 Annual Radiation Protection Program Summary Report July 27, 2017 | |||
Condition Reports (CRs) | |||
17-15502 17-15529 17-15802 17-16741 17-17944 | |||
17-18180 18-01890 | |||
Radiation Work Permits/ALARA Reviews | |||
Number Title | |||
RWP 2017-9-1016 RMC Operations and Routine Tasks | |||
RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection | |||
RWP 2017-3002 Reactor Destack/Restack | |||
RWP 2017-3015 Cavity Decontamination | |||
RWP 2017-3039 10-Year In-Service Inspection Vessel | |||
Miscellaneous | |||
Title Date | |||
ALARA 5-Year Plan 2015 - 2019 November 2015 | |||
1R20 Radiological Safety Summary In Perspective November 7, 2017 | |||
2R20 Radiological Safety Summary In Perspective May 9, 2017 | |||
3R19 Radiological Safety Summary In Perspective November 10, 2016 | |||
Section 2RS4 : Occupational Dose Assessment | |||
Procedures | |||
Number Title Revision | |||
75DP-0RP01 RP Program Overview 11 | |||
75DP-0RP06 Managing Radiological Risk 2 | |||
75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect 12 | |||
Dosimetry, and Anticipated EPD Dose Rate Alarm | |||
75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5 | |||
75RP-9ME25 TLD Reader Calibration and Response Check 6 | |||
75RP-9RP03 Bioassay Analysis 10 | |||
75RP-9RP05 Contamination Dose Evaluation 7 | |||
75RP-9RP16 Special Dosimetry 24 | |||
75RP-9QE21 Calibration of Self-Indicating Dosimeters 13 | |||
Procedures | |||
Number Title Revision | |||
75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM- 10 | |||
Calibrator | |||
Audits and Self-Assessments | |||
Title Date | |||
2016 Annual ALARA/Management Evaluation Report June 23, 2017 | |||
2016 Annual Radiation Protection Program Summary Report July 27, 2017 | |||
Condition Reports (CRs) | |||
17-14033 17-14127 17-14527 17-15700 18-01423 | |||
Self-Reading Dosimeter Calibration Records | |||
Number Title Date | |||
837097 Self-Reading Dosimeter September 8, 2017 | |||
836204 Self-Reading Dosimeter September 9, 2017 | |||
833059 Self-Reading Dosimeter September 30, 2017 | |||
810641 Self-Reading Dosimeter gamma/neutron December 12, 2017 | |||
810633 Self-Reading Dosimeter gamma/neutron December 12, 2017 | |||
810552 Self-Reading Dosimeter gamma/neutron December 13, 2017 | |||
Miscellaneous | |||
Number Title Date | |||
2017 Multi-Pack TLD Results 2017 | |||
100536 NVLAP Accreditation Report April 8, 2016 | |||
100536 NVLAP Proficiency Testing Results - TLD May 2, 2016 | |||
100536 NVLAP Proficiency Testing Results-EPD August 5, 2016 | |||
100536 NVLAP Accreditation Report February 15, 2018 | |||
2017 Unit 1 Dry Active Waste December 1, 2017 | |||
2017 Unit 2 Dry Active Waste May 18, 2017 | |||
2016 Unit 3 Dry Active Waste December 22, 2016 | |||
25116 Intake Dose Assessment April 21, 2016 | |||
Miscellaneous | |||
Number Title Date | |||
47194 Personnel Dosimetry Processing Report November 15, 2017 | |||
Section 4OA1: Performance Indicator Verification | |||
Miscellaneous | |||
Number Title Date | |||
2016-002-01 Licensee Event Report June 27, 2017 | |||
2017-001-00 June 27, 2017 June 14, 2017 | |||
Palo Verde Plant Computer PI ProcessBook | |||
Palo Verde Control Room Logs (1/1/17 - 12/31/17) | |||
Section 4OA2: Problem Identification and Resolution | |||
Procedures | |||
Number Title Revision | |||
40ST-9DG01 Diesel Generator A Test 49 | |||
Condition Reports (CRs) | |||
17-15901 18-03517 17-15838 17-11155 17-09750 | |||
16-03783 | |||
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion | |||
Condition Reports (CRs) | |||
18-02544 18-02688 18-02664 18-02605 18-02716 | |||
The following items are requested for the | |||
Occupational Radiation Safety Inspection | |||
at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 | |||
February 12 to 16, 2018 | |||
Integrated Report 2018001 | |||
Inspection areas are listed in the attachments below. | |||
Please provide the requested information on or before January 26, 2018. | |||
Please submit this information using the same lettering system as below. For example, all | |||
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled | |||
1- A, applicable organization charts in file/folder 1- B, etc. | |||
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at | |||
least 30 days later than the onsite inspection dates, so the inspectors will have access to the | |||
information while writing the report. | |||
In addition to the corrective action document lists provided for each inspection procedure listed | |||
below, please provide updated lists of corrective action documents at the entrance meeting. | |||
The dates for these lists should range from the end dates of the original lists to the day of the | |||
entrance meeting. | |||
If more than one inspection procedure is to be conducted and the information requests appear | |||
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which | |||
file the information can be found. | |||
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or | |||
louis.carson@nrc.gov. | |||
PAPERWORK REDUCTION ACT STATEMENT | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, | |||
control number 3150-0011. | |||
2. Occupational ALARA Planning and Controls (71124.02) | |||
Date of Last Inspection: October 20, 2017 | |||
A. List of contacts and telephone numbers for ALARA program personnel | |||
B. Applicable organization charts | |||
: [[contact::C. Copies of audits]], self-assessments, and LERs, written since date of last inspection, | |||
focusing on ALARA | |||
D. Procedure index for ALARA Program | |||
E. Please provide specific procedures related to the following areas noted below. | |||
Additional Specific Procedures may be requested by number after the inspector reviews | |||
the procedure indexes. | |||
1. ALARA Program | |||
2. ALARA Committee | |||
3. Radiation Work Permit Preparation | |||
F. A summary list of corrective action documents (including corporate and sub-tiered | |||
systems) written since date of last inspection, related to the ALARA program. In addition | |||
to ALARA, the summary should also address Radiation Work Permit violations, | |||
Electronic Dosimeter Alarms, and RWP Dose Estimates | |||
NOTE: The lists should indicate the significance level of each issue and the search | |||
criteria used. Please provide in document formats which are searchable so that | |||
the inspector can perform word searches. | |||
: [[contact::G. List of work activities greater than 1 rem]], since date of last inspection, | |||
Include original dose estimate and actual dose. | |||
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of | |||
record) | |||
I. Outline of source term reduction strategy | |||
: [[contact::J. If available]], provide a copy of the ALARA outage report for the most recently completed | |||
outages for each unit | |||
K. Please provide your most recent Annual ALARA Report. | |||
4. Occupational Dose Assessment (Inspection Procedure 71124.04) | |||
Date of Last Inspection: January 22, 2016 | |||
A. List of contacts and telephone numbers for the following areas: | |||
1. Dose Assessment personnel | |||
B. Applicable organization charts | |||
: [[contact::C. Audits]], self-assessments, vendor or NUPIC audits of contractor support, and LERs | |||
written since date of last inspection, related to: | |||
1. Occupational Dose Assessment | |||
D. Procedure indexes for the following areas: | |||
1. Occupational Dose Assessment | |||
E. Please provide specific procedures related to the following areas noted below. | |||
Additional Specific Procedures will be requested by number after the inspector reviews | |||
the procedure indexes. | |||
1. Radiation Protection Program | |||
2. Radiation Protection Conduct of Operations | |||
3. Personnel Dosimetry Program | |||
4. Radiological Posting and Warning Devices | |||
5. Air Sample Analysis | |||
6. Performance of High Exposure Work | |||
7. Declared Pregnant Worker | |||
8. Bioassay Program | |||
F. List of corrective action documents (including corporate and sub-tiered systems) written | |||
since date of last inspection, associated with: | |||
1. National Voluntary Laboratory Accreditation Program (NVLAP) | |||
2. Dosimetry (TLD/OSL, etc.) problems | |||
3. Electronic alarming dosimeters | |||
4. Bioassays or internally deposited radionuclides or internal dose | |||
5. Neutron dose | |||
NOTE: The lists should indicate the significance level of each issue and the search | |||
criteria used. Please provide in document formats which are searchable so that | |||
the inspector can perform word searches. | |||
: [[contact::G. List of positive whole body counts since date of last inspection]], names redacted if | |||
desired | |||
H. Part 61 analyses/scaling factors | |||
I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP) | |||
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent | |||
results | |||
ML18127A004 | |||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: JDixon Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB | |||
NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy | |||
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ | |||
DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18 | |||
OFFICE C:DRS/PS2 TL:IPAT C:DRP/D | |||
NAME HGepford GGeorge GMiller | |||
SIGNATURE /RA/ /RA/ /RA/ | |||
DATE 4/30/18 4/30/2018 5/7/18 | |||
May 7, 2018 | |||
Mr. Robert Bement | |||
Executive Vice President, Nuclear/CNO | |||
Mail Station 7602 | |||
Arizona Public Service Company | |||
P.O. Box 52034 | |||
Phoenix, AZ 85072-2034 | |||
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED | |||
INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND | |||
05000530/2018001 | |||
Dear Mr. Bement: | |||
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection | |||
at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC | |||
inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of | |||
your staff. The results of this inspection are documented in the enclosed report. | |||
NRC inspectors documented one finding of very low safety significance (Green) in this report. | |||
This finding involved a violation of NRC requirements. The NRC is treating this violation as a | |||
non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | |||
If you contest the violation or significance of the NCV, you should provide a response within | |||
days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear | |||
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with | |||
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the | |||
NRC resident inspector at the Palo Verde Nuclear Generating Station. | |||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a | |||
response within 30 days of the date of this inspection report, with the basis for your | |||
disagreement, to the | |||
: [[contact::U.S. Nuclear Regulatory Commission]], ATTN: Document Control Desk, | |||
Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the | |||
NRC resident inspector at the Palo Verde Nuclear Generating Station. | |||
R. Bement 2 | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection | |||
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document | |||
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for | |||
Withholding. | |||
Sincerely, | |||
/RA/ | |||
Geoffrey | |||
: [[contact::B. Miller]], Chief | |||
Project Branch D | |||
Division of Reactor Projects | |||
Docket Nos. 50-528, 50-529, 50-530 | |||
License Nos. NPF-41, NPF-51, NPF-74 | |||
Enclosure: | |||
Inspection Report 05000528/2018001, | |||
05000529/2018001, 05000530/2018001 | |||
w/ Attachment: | |||
1. Supplemental Information | |||
2. Occupational Radiation Safety | |||
Inspection Item Request | |||
U.S. NUCLEAR REGULATORY COMMISSION | |||
Inspection Report | |||
Docket Numbers: 05000528, 05000529, 05000530 | |||
License Numbers: NPF-41, NPF-51, NPF-74 | |||
Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 | |||
Enterprise Identifier: I-2018-001-0013 | |||
Licensee: Arizona Public Service Company | |||
Facility: Palo Verde Nuclear Generating Station | |||
Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 | |||
Inspection Dates: January 1, 2018 to March 31, 2018 | |||
Inspectors: | |||
: [[contact::C. Peabody]], Senior Resident Inspector | |||
: [[contact::D. Reinert]], PhD, Resident Inspector | |||
: [[contact::D. You]], Resident Inspector | |||
: [[contact::L. Carson]], Senior Health Physicist | |||
: [[contact::S. Hedger]], Emergency Preparedness Inspector | |||
Approved By: Geoffrey | |||
: [[contact::B. Miller]], Chief, Project Branch D, Division of Reactor Projects | |||
SUMMARY | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees | |||
performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station, | |||
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight | |||
Process is the NRCs program for overseeing the safe operation of commercial nuclear power | |||
reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
NRC and self-revealed findings, violations, and additional items are summarized in the table | |||
below. | |||
List of Findings and Violations | |||
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump | |||
Cornerstone Significance Cross-cutting Aspect Report | |||
Section | |||
Mitigating Green [H.12] - Human 71111.12 - | |||
Systems NCV 05000528/2018001-01 Performance, Avoid Maintenance | |||
Closed Complacency Effectiveness | |||
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, | |||
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe | |||
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump | |||
: [[contact::A. | |||
Specifically]], following power cable maintenance on November 9, 2017, the instructions for | |||
conducting a post-maintenance test for the transfer pump were inadequate to detect a high | |||
resistance connection in the associated motor control center. | |||
PLANT STATUS | |||
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit | |||
automatically tripped from full power when a control system failure caused a loss of generator | |||
field excitation. The unit was restarted on February 19, 2018, and remained at or near rated | |||
thermal power for the remainder of the inspection period. | |||
Units 2 and 3 operated at or near rated thermal power for the entire inspection period. | |||
INSPECTION SCOPES | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in | |||
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with | |||
their attached revision histories are located on the public website at http://www.nrc.gov/reading- | |||
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared | |||
complete when the IP requirements most appropriate to the inspection activity were met | |||
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection | |||
Program - Operations Phase. The inspectors performed plant status activities described in | |||
IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem | |||
Identification and Resolution. The inspectors reviewed selected procedures and records, | |||
observed activities, and interviewed personnel to assess licensee performance and compliance | |||
with Commission rules and regulations, license conditions, site procedures, and standards. | |||
REACTOR SAFETY | |||
71111.04 - Equipment Alignment | |||
Partial Walkdown (3 Samples) | |||
The inspectors evaluated system configurations during partial walkdowns of the following | |||
systems/trains: | |||
(1) Unit 1 containment spray system B on January 4, 2018 | |||
(2) Unit 2 auxiliary feedwater system A on January 30, 2018 | |||
(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018 | |||
Complete Walkdown (1 Sample) | |||
The inspectors evaluated system configurations during a complete walkdown of the Unit 3 | |||
containment spray system on January 18, 2018. | |||
71111.05AQ - Fire Protection Annual/Quarterly | |||
Quarterly Inspection (5 Samples) | |||
The inspectors evaluated fire protection program implementation in the following selected | |||
areas: | |||
(1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on | |||
January 4, 2018 | |||
(2) Unit 2 control room, Fire Zone 17, on January 19, 2018 | |||
(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A, | |||
on January 23, 2018 | |||
(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018 | |||
(5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018 | |||
71111.07 - Heat Sink Performance | |||
Heat Sink (1 Sample) | |||
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger | |||
performance on February 21, 2018. | |||
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance | |||
Operator Requalification (1 Sample) | |||
The inspectors observed and evaluated risk informed completion time program and | |||
CFR 50.69 program classroom training on January 31, 2018. | |||
Operator Performance (1 Sample) | |||
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main | |||
generator to the grid following a reactor trip caused by a fault in the main generator | |||
excitation system on February 19, 2018. | |||
The inspectors observed and evaluated operator response to Unit 3 loss of A channel | |||
indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and | |||
FWIV-174, 177, on February 27, 2018. | |||
71111.12 - Maintenance Effectiveness | |||
Routine Maintenance Effectiveness (2 Samples) | |||
The inspectors evaluated the effectiveness of routine maintenance activities associated | |||
with the following equipment and/or safety significant functions: | |||
(1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185 | |||
in Units 2 and 3 | |||
(2) Diesel fuel oil transfer pump predictive engineering cable testing | |||
71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples) | |||
The inspectors evaluated the risk assessments for the following planned and emergent | |||
work activities: | |||
(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined | |||
minimum flow recirculation valve SIA-UV660 on January 4, 2018 | |||
(2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a | |||
surveillance run on January 5, 2018 | |||
(3) Unit 3 elevated risk due to planned maintenance on containment spray pump A | |||
atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection | |||
valve SI-687 January 29, 2018 through February 4, 2018 | |||
(4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018 | |||
(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018 | |||
71111.15 - Operability Determinations and Functionality Assessments (9 Samples) | |||
The inspectors evaluated the following operability determinations and functionality | |||
assessments: | |||
(1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on | |||
January 3, 2018 | |||
(2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on | |||
January 25, 2018 | |||
(3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, | |||
failed to re-open during breaker maintenance on January 31, 2018 | |||
(4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on | |||
February 13, 2018 | |||
(5) Unit 1 calculated qualified life of safety injection combined header isolation valves, | |||
SI-660 and SI-659, on February 23, 2018 | |||
(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater | |||
isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018 | |||
(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A | |||
T-drains on March 6, 2018 | |||
(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on | |||
March 7, 2018 | |||
(9) Unit 2 steam generator sodium concentration increase on March 12, 2018 | |||
71111.18 - Plant Modifications (1 Sample) | |||
The inspectors evaluated the following temporary or permanent modifications: | |||
(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross- | |||
connect valve, SI-696, replacement with General Electrical model Spectra breaker per | |||
Design Equivalent Change 01035 on March 15, 2018 | |||
71111.19 - Post Maintenance Testing (6 Samples) | |||
The inspectors evaluated the following post maintenance tests: | |||
(1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve | |||
SIA-UV660 following limit switch adjustment on January 4, 2018 | |||
(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch | |||
replacement following an unplanned cooldown during a monthly surveillance run on | |||
January 9, 2018 | |||
(3) Unit 3 containment spray pump A test following breaker maintenance on | |||
February 6, 2018 | |||
(4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves | |||
on February 28, 2018 | |||
(5) Unit 2 essential cooling water pump A test and flow balance following planned | |||
maintenance to calibrate motor overcurrent relays and replace a high discharge | |||
pressure switch on March 20, 2018 | |||
(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features | |||
fast start test following online maintenance outage on March 23, 2018 | |||
71111.20 - Refueling and Other Outage Activities (1 Sample) | |||
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced | |||
outage due to an unplanned reactor trip caused by a fault in the main generator excitation | |||
circuitry. | |||
71111.22 - Surveillance Testing | |||
The inspectors evaluated the following surveillance tests: | |||
Routine (6 Samples) | |||
(1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018 | |||
(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018 | |||
(3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed | |||
surveillance on February 28, 2018 | |||
(4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018 | |||
(5) Unit 3, essential chiller A vibration analysis on March 8, 2018 | |||
(6) Unit 1 containment spray pump B inservice test on March 22, 2018 | |||
In-service (1 Sample) | |||
(1) Unit 2 containment spray pump A inservice test on March 1, 2018 | |||
71114.02 - Alert and Notification System Testing (1 Sample) | |||
The inspectors evaluated the maintenance and testing of the alert and notification system | |||
between May 1, 2016 - February 20, 2018. | |||
71114.03 - Emergency Response Organization Staffing and Augmentation System (1 Sample) | |||
The inspectors evaluated the readiness of the Emergency Response Organization between | |||
May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff | |||
their emergency response facilities in accordance with emergency plan commitments. | |||
71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample) | |||
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and | |||
practices between May 1, 2016 - February 20, 2018. The evaluation reviewed | |||
screenings and evaluations documenting the implementation of this process. The review | |||
of the change process documentation does not constitute NRC approval. | |||
71114.05 - Maintenance of Emergency Preparedness (1 Sample) | |||
The inspectors evaluated the maintenance of the emergency preparedness program | |||
between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the | |||
emergency plan, the conduct of drills and exercises, licensee audits and assessments, | |||
and the maintenance of equipment important to emergency preparedness. | |||
71114.06 - Drill Evaluation | |||
Emergency Planning Drill (1 Sample) | |||
The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018. | |||
RADIATION SAFETY | |||
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls | |||
Radiological Work Planning (1 Sample) | |||
The inspectors evaluated the licensees radiological work planning by reviewing the | |||
following activities: | |||
(1) RWP 2017-9-1016, RMC Operations and Routine Tasks | |||
(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection | |||
(3) RWP 2017-3002, Reactor Destack/Restack | |||
(4) RWP 2017-3015, Cavity Decontamination | |||
(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel | |||
Verification of Dose Estimates and Exposure Tracking Systems (1 Sample) | |||
The inspectors evaluated dose estimates and exposure tracking. | |||
71124.04 - Occupational Dose Assessment | |||
Source Term Characterization (1 Sample) | |||
The inspectors evaluated the licensees source term characterization. | |||
External Dosimetry (1 Sample) | |||
The inspectors evaluated the licensees external dosimetry program. | |||
Internal Dosimetry (1 Sample) | |||
The inspectors evaluated the licensees internal dosimetry program. | |||
Special Dosimetric Situations (1 Sample) | |||
The inspectors evaluated the licensees performance for special dosimetric situations. | |||
OTHER ACTIVITIES - BASELINE | |||
71151 - Performance Indicator Verification (15 Samples) | |||
The inspectors verified licensee performance indicators submittals listed below: | |||
(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 - | |||
December 31, 2017) | |||
(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 - | |||
December 31, 2017) | |||
(3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 - | |||
December 31, 2017) | |||
(4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 - | |||
December 31, 2017) | |||
(5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31, | |||
2017) | |||
(6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, | |||
2017 - December 31, 2017) | |||
(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 - | |||
December 31, 2017) | |||
71152 - Problem Identification and Resolution | |||
Annual Follow-up of Selected Issues (1 Sample) | |||
The inspectors reviewed the licensees implementation of its corrective action program | |||
related to the following issues: | |||
(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018 | |||
71153 - Follow-up of Events and Notices of Enforcement Discretion | |||
Events (1 Sample) | |||
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation | |||
and licensees response on February 15 - 16, 2018. | |||
INSPECTION RESULTS | |||
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump | |||
Cornerstone Significance Cross-cutting Report | |||
Aspect Section | |||
Mitigating Green [H.12] - 71111.12 - | |||
Systems NCV 05000528/2018001-01 Human Maintenance | |||
Closed Performance, Effectiveness | |||
Avoid | |||
Complacency | |||
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, | |||
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe | |||
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump | |||
: [[contact::A. | |||
Specifically]], following power cable maintenance on November 9, 2017, the instructions for | |||
conducting a post-maintenance test for the transfer pump were inadequate to detect a high | |||
resistance connection in the associated motor control center. | |||
Description: On November 12, 2017, the licensee was conducting a 24-hour surveillance test | |||
run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began | |||
the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer | |||
pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start | |||
on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the | |||
EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run | |||
for its design basis mission time and began troubleshooting the failed fuel oil transfer pump. | |||
Licensee electricians took electrical resistance readings across the connections in the motor | |||
control center for the fuel oil transfer pump breaker. The electricians identified that the direct | |||
cause of the transfer pump failure was a high variable resistance secondary stab connection | |||
in the motor control center cubicle. The electricians removed the breaker and cleaned and | |||
adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as | |||
left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was | |||
successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared | |||
operable following the successful completion of the 24-hour surveillance run on November | |||
14, 2017. | |||
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump | |||
breaker had been removed from service for periodic predictive maintenance on November 9, | |||
2017, under work order 4685719. During this maintenance activity licensee engineers | |||
disconnected the diesel fuel oil transfer pump motor power and control cables for megger | |||
testing. Cable lug screw connections attach each of these cables to the secondary stab | |||
connections on the movable motor breaker and the stationary motor control center chassis. | |||
Cable connections on the secondary stab connections are removed for testing, and then | |||
following testing, the cables are re-landed onto the secondary stabs of the breaker and motor | |||
control center chassis. The licensees work planners had not recognized the possibility that | |||
removing and re-landing the cables on the lug screw connections had the potential to disturb | |||
the motor control center secondary stab connections. | |||
The post-maintenance test associated with the cable testing was a momentary start of the | |||
diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position | |||
for only a few seconds. The licensees apparent cause investigation identified that | |||
nonintrusive as-left quantitative resistance checks could have been used to assess the | |||
integrity of the secondary stab connections. The licensee performs similar checks when | |||
performing individual breaker cubicle preventative maintenance tasks that actively remove | |||
and re-test the individual motor control center bucket. Such a check was the method used by | |||
the electricians to initially diagnose the breaker failure. However, no such quantitative | |||
resistance check was specified in the cable testing work order. | |||
The post-maintenance test was not written in accordance with station procedure 30DP- | |||
9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in | |||
part, that the post-maintenance test shall ensure that equipment performs its intended | |||
function when returned to service following maintenance, that a new deficiency has not been | |||
created, and that the equipment will function as designed for safe and reliable plant operation. | |||
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing | |||
created new failure deficiency by disturbing electrical continuity and creating a high resistance | |||
condition at the secondary stab connection that impacted EDG operability. The post- | |||
maintenance test following the cable testing maintenance was not adequate to ensure that a | |||
new deficiency had not been created. | |||
Corrective Action: The licensee has taken corrective action to revise the work instructions for | |||
performing future cable testing to include quantitative resistance retests when re-terminating | |||
motor control center secondary stab connections. As an interim measure, the inspectors | |||
confirmed that all safety-related 480V electrical breakers that have been subject to this cable | |||
testing have performed satisfactorily during subsequent diesel generator surveillance testing. | |||
Corrective Action Reference: Condition Report 17-16497 | |||
Performance Assessment: | |||
Performance Deficiency: The licensees failure to prescribe appropriate retest activities | |||
following predictive maintenance on diesel fuel oil transfer pump cables is a performance | |||
deficiency. | |||
Screening: The performance deficiency is more-than-minor and a finding because it is | |||
associated with the equipment performance attribute of the mitigating systems cornerstone | |||
objective to ensure the availability, reliability, and capability of systems that respond to | |||
initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, | |||
the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel | |||
oil transfer pump | |||
: [[contact::A. Without an appropriate post-maintenance test]], this activity rendered the | |||
Unit 1 diesel generator A inoperable. | |||
Significance: The inspectors performed the initial significance determination using NRC | |||
Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for | |||
Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that | |||
the finding was of very low safety significance (Green) because the finding did not represent | |||
an actual loss of safety function of a single train for greater that its technical specification | |||
allowed outage time. | |||
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human | |||
performance associated with the avoid complacency aspect. Specifically, licensee work | |||
planners did not consider potential undesired consequences associated with disturbing the | |||
power cables leads, instead relying on past successful tests [H.12]. | |||
Enforcement: | |||
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and | |||
Drawings, requires, in part, that activities affecting quality be prescribed by documented | |||
instructions, procedures, or drawings, of a type appropriate to the circumstances and be | |||
accomplished in accordance with these instructions, procedures, or drawings. | |||
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the | |||
Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, | |||
without documented instructions, procedures, or drawings of a type appropriate to the | |||
circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure | |||
the maintenance was successful and the pump was returned to service, and as a result, the | |||
Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, | |||
2017. | |||
Disposition: This violation is being treated as a non-cited violation consistent with Section | |||
2.3.2.a of the Enforcement Policy. | |||
EXIT MEETINGS AND DEBRIEFS | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
On February 16, 2018, the inspector presented the radiation safety inspection results to | |||
Ms. | |||
: [[contact::M. Lacal]], Senior Vice President, Regulatory and Oversight, and other members of the | |||
licensee staff. | |||
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program | |||
inspection to Mr. | |||
: [[contact::M. McLaughlin]], Vice President, Operations Support, and other members of the | |||
licensee staff. On March 29, 2018, the inspector communicated the inspection results | |||
telephonically to Mr. | |||
: [[contact::T. Weber]], Acting Director, Nuclear Regulatory Affairs, and other members | |||
of the licensee staff. | |||
On April 11, 2018, the inspector presented the quarterly residents inspection results to | |||
Mr. | |||
: [[contact::J. Cadogan]], Senior Vice President, Site Operations, and other members of the licensee | |||
staff. | |||
SUPPLEMENTAL INFORMATION | |||
DOCUMENTS REVIEWED | |||
Section 1R04: Equipment Alignment | |||
Procedures | |||
Number Title Revision | |||
40ST-9AF07 Auxiliary Feedwater Pump AFA-P01 Monthly Valve 6 | |||
Alignment | |||
40ST-9SI13 LPSI and CS System Alignment Verification 33 | |||
Condition Reports (CRs) | |||
16-17321 17-03027 | |||
Drawings | |||
Number Title Revision | |||
03-M-HJP-001 P&I Diagram Control Building HVAC 14 | |||
03-M-HJP-002 P&I Diagram Control Building HVAC 14 | |||
03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49 | |||
03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & 6 | |||
Cont. Spray Discharge | |||
03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF 7 | |||
Pump Suction Lines | |||
Miscellaneous | |||
Number Title Revision | |||
STM-30D System Training Manual Volume 30D: Control Building 6 | |||
HVAC System (HJ) | |||
Section 1R05: Fire Protection | |||
Procedures | |||
Number Title Revision | |||
14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13 | |||
Condition Reports (CRs) | |||
17-03870 18-00999 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
PVNGS Pre-Fire Strategies Manual 26 | |||
13-MM-0650 Fire Protection & Spray System Sub 007 | |||
13-MS-A083 NFPA Code Applicability and Conformance Review 007 | |||
4834415 Fire Safety Component Condition Record November 3, 2016 | |||
4834430 Fire Safety Component Condition Record November 3, 2016 | |||
4843902 Fire Safety Component Condition Record December 6, 2016 | |||
Unit 3 Tamper/Vital/Security Tour - Post 31 February 7, 2018 | |||
4971714 Open Door/Hatch/Floor Plug Permit January 29, 2018 | |||
4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018 | |||
Section 1R07: Heat Sink Performance | |||
Procedures | |||
Number Title Revision | |||
73DP-9ZZ21 Heat Exchanger Visual Inspection 6 | |||
73DP-9ZZ11 Heat Exchanger Program 15 | |||
Condition Reports (CRs) | |||
18-03133 18-03138 18-03139 | |||
Work Orders (WOs) | |||
4591574 4591575 4667054 4667055 4667098 | |||
Section 1R11: Licensed Operator Requalification Program and Licensed Operator | |||
Performance | |||
Procedures | |||
Number Title Revision | |||
40OP-9MB01 Main Generation and Excitation 63 | |||
40DP-9OP02 Conduct of Operations 72 | |||
Procedures | |||
Number Title Revision | |||
40AL-9RK6A Panel B06A Alarm Responses 18 | |||
Condition Reports (CRs) | |||
18-02797 18-02593 18-03215 | |||
Miscellaneous | |||
Number Title Date | |||
Current Alarm Status Report February 16, 2018 | |||
Section 1R12: Maintenance Effectiveness | |||
Procedures | |||
Number Title Revision | |||
2MT-9ZZ74 Molded Case Circuit Breaker Test 48 | |||
30DP-9WP04 Post-Maintenance Testing Development 19 | |||
Condition Reports (CRs) | |||
17-08025-005 17-08025 17-16497 | |||
Work Orders (WOs) | |||
25959 4925966 4925967 4925969 4685719 | |||
4788985 | |||
Section 1R13: Maintenance Risk Assessments and Emergent Work Control | |||
Procedures | |||
Number Title Revision | |||
40DP-9AP21 Protected Equipment 7 | |||
70DP-0RA05 Assessment and Management of Risk when Performing 23 | |||
Maintenance in Modes 1 and 2 | |||
40MT-9ZZ01 Operations Maintenance Activities 5 | |||
40DP-9RS01 Operations Department Online Nuclear Risk Management 4 | |||
Mode 1 and 2 | |||
Condition Reports (CRs) | |||
18-00249 185-00136 18-00336 18-02544 | |||
Miscellaneous | |||
Number Title Date | |||
Schedulers Evaluation for PV Unit 1 January 4, 2018 | |||
Schedulers Evaluation for PV Unit 1 February 23, 2018 | |||
Schedulers Evaluation for PV Unit 3 February 1, 2018 | |||
Schedulers Evaluation for PV Unit 2 March 19, 2018 | |||
Unit 3 Archived Operator Logs January 29, 2018 - | |||
February 4, 2018 | |||
Section 1R15: Operability Determinations and Functionality Assessments | |||
Procedures | |||
Number Title Revision | |||
40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71 | |||
40AL-9RK6A Panel B06A Alarm Responses 18 | |||
74DP-9CY04 Systems Chemistry Specifications 94 | |||
Condition Reports (CRs) | |||
17-18475 12-01397 17-17856 13-01198 18-03127 | |||
17-16393 18-03215 18-03291 18-02839 18-01610 | |||
18-02334 3127427 18-02468 18-03980 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11 | |||
18-02334-003 Engineering Evaluation February 15, 2018 | |||
28056 Adverse CRDR July 19, 2013 | |||
EQ Program Manual 26 | |||
Section 1R18: Plant Modifications | |||
Condition Reports (CRs) | |||
18-04116 | |||
Work Orders (WOs) | |||
4989102 | |||
Miscellaneous | |||
Number Title Date | |||
DEC-01035 Design Equivalent Change April 12, 2017 | |||
Section 1R19: Post-Maintenance Testing | |||
Procedures | |||
Number Title Revision | |||
40OP-9CH12 Refueling Water Tank (RWT) Operations 41 | |||
2MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent 4 | |||
Relays | |||
2MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous 4 | |||
Overcurrent Relays | |||
40OP-9EW02 Essential Cooling Water System (EW) Train B 26 | |||
40ST-9DG01 Diesel Generator A Test 49 | |||
73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load 13 | |||
and Hot Start Test Train B | |||
40ST-9DG02 Diesel Generator B Test 54 | |||
Condition Reports (CRs) | |||
18-00136 18-00197 18-01931 18-00210 18-00290 | |||
18-00336 18-00377 18-00346 18-04731 18-04732 | |||
Work Orders (WOs) | |||
4964492 4822983 4981967 4726747 4821113 | |||
4847651 4965079 4972486 4847637 | |||
Drawings | |||
Number Title Revision | |||
01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15 | |||
01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13 | |||
13-M018-00141 Control Schematic (Starting Sequence Control) 25 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018 | |||
during Surveillance Run 1/5/2018 | |||
Section 1R20: Refueling and Other Outage Activities | |||
Procedures | |||
Number Title Revision | |||
40OP-9MB01 Main Generation and Excitation 63 | |||
Section 1R22: Surveillance Testing | |||
Procedures | |||
Number Title Revision | |||
73DP-9CL02 Containment Leakage Rate Testing Program 33 | |||
73ST-9XI20 Atmospheric Dump Valves - Inservice Test 47 | |||
73ST-9SI06 Containment Spray Pumps and Check valves - Inservice 42 | |||
Test | |||
73ST-9DF01 Diesel Fuel Oil Transfer Pumps - Inservice Test 34 | |||
40DP-9OP06 Operations Department Repetitive Task Program 130 | |||
73ST-9SI06 Containment Spray Pumps and Check Valves- Inservice 42 | |||
Test | |||
Condition Reports (CRs) | |||
16-15793 18-03304 18-01314 18-03825 | |||
Work Orders (WOs) | |||
22921 4840032 4843076 4843390 | |||
Miscellaneous | |||
Number Title Revision/Date | |||
13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication 18 | |||
Loops Uncertainty Calculation | |||
18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018 | |||
18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for March 2, 2018 | |||
SB-200, 202, and 205 | |||
Section 1EP2: Alert and Notification System Testing | |||
Miscellaneous Documents | |||
Number Title Date | |||
ID/Letter Palo Verde Nuclear Generating Station Alert and May 26, 2017 | |||
Number: Notification System (ANS) FEMA 350 Report - | |||
240-02802 May 2017 | |||
Palo Verde Nuclear Generating Station, Alert and May 2017 | |||
Notification System (ANS), FEMA 350 Report | |||
Palo Verde Nuclear Generating Station Siren Operating November 2015 | |||
Manual January 4, 2018 | |||
Letter from FEMA Region IX to Director, Division of September 19, | |||
Emergency Management, State of Arizona 2017 | |||
State of Arizona/Maricopa County Offsite Emergency November 2017 | |||
Response Plan, Palo Verde Nuclear Generating Station | |||
The Maricopa County Sheriffs Office Emergency August 2016 | |||
Response to Palo Verde Nuclear Generating Station | |||
Work Orders (WOs) | |||
474965/0 | |||
Section 1EP3: Emergency Response Organization Staffing and Augmentation | |||
Procedures | |||
Number Title Revision | |||
EP-0902 Notifications 10 | |||
EP-0901 Classifications 10 | |||
40AL-9RK7C Panel B07C Alarm Responses 15 | |||
40AO-9ZZ21 Acts of Nature 37 | |||
79IS-9SM01 Analysis of Seismic Event 27 | |||
Miscellaneous Documents | |||
Number Title Date | |||
240-02799 2017 1 Quarter - Emergency Preparedness | |||
st | |||
March 21, 2017 | |||
JF/MA Augmentation Drill Report | |||
240-02803 2017 2nd Quarter - Emergency Preparedness June 6, 2017 | |||
CS/MA Augmentation Drill Report | |||
240-02797 2017 3rd Quarter - Emergency Preparedness July 25, 2017 | |||
Augmentation Drill Report (After Hours) | |||
240-02808 2017 3rd Quarter - Emergency Preparedness September 6, 2017 | |||
Augmentation Drill Report | |||
240-02817 2017 4th Quarter - Emergency Preparedness December 13, | |||
CS/ma Augmentation Drill Report 2017 | |||
240-02790 2016 2nd Quarter - Emergency Preparedness June 23, 2016 | |||
JF/MA Augmentation Drill Report | |||
240-02791 2016 3rd Quarter - Emergency Preparedness August 3, 2016 | |||
JF/MA Augmentation Drill Report | |||
240-02798 December 5, 2016, Alert Event Report January 17, 2017 | |||
Section 1EP4: Emergency Action Level and Emergency Plan Changes | |||
Procedure | |||
Number Title Revision | |||
16DP-0EP22 Emergency Plan Maintenance 11, 12 | |||
Miscellaneous Documents | |||
Number Title Date | |||
Evaluation Replace the Meteorological Instrumentation and Data August 8, 2017 | |||
Tracking Number Transmission System (MDTS) | |||
2017-001E | |||
Evaluation EP-0900, Rev. 16 August 17, 2017 | |||
Tracking Number | |||
2017-003E | |||
Evaluation EP-0901, Rev. 10 August 21, 2017 | |||
Tracking Number | |||
2017-004E | |||
Screening 74RM-9EF42, Radiation Monitor Alarm Setpoint April 16, 2017 | |||
Tracking Number Determination, Rev. 30 | |||
2017-002S | |||
Screening Procedure EP-0901, Classifications, Added New EALs August 20, 2017 | |||
Tracking Number form EPLAN R60, Revise PV Proc Format | |||
2017-022S | |||
Miscellaneous Documents | |||
Number Title Date | |||
Screening EP-905, Revision 9, Protective Actions June 7, 2017 | |||
Tracking Number | |||
2017-014S | |||
Screening DMWO 3452940 Palo Verde Nuclear Generating September 8, | |||
Tracking Number Station Radio Replacement Project 2017 | |||
2017-023S | |||
Screening 40AO-9ZZ18 R018 Fire Outside Control Room September 26, | |||
Tracking Number 2017 | |||
2017-029S | |||
EPM Tracking DEC-00720 Allow Solar-Charged Offsite Sirens to February 18, | |||
Number Replace AC-Charged Offsite Sirens 2015 | |||
2015-006S | |||
Section 1EP5: Maintenance of Emergency Preparedness | |||
Procedures | |||
Number Title Revision | |||
01DP-0AP12 Condition Reporting Process 28 | |||
01DP-0AP12-01 Condition Reporting Process Administrative Guide 4 | |||
EP-0905 Protective Actions 9 | |||
EP-0902 Notifications 8, 9, 10 | |||
16DP-0EP31 Emergency Preparedness Equipment Out-of-Service 9 | |||
16DP-0EP27 Emergency Preparedness Equipment Testing 10 | |||
16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5 | |||
Condition Reports (CRs) | |||
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501 | |||
16-14593 16-14934 16-16710 17-02188 17-03147 17-03149 | |||
17-03202 17-03605 17-03721 17-03736 17-03826 17-03828 | |||
17-03829 17-03884 17-04633 17-06893 17-08328 17-10906 | |||
17-10949 17-11437 17-13663 17-14927 17-15449 17-15797 | |||
17-15884 17-16771 17-17091 17-17218 17-17739 17-18443 | |||
18-03244 | |||
Miscellaneous Documents | |||
Number Title Revision/Date | |||
KLD TR-983 Palo Verde Nuclear Generating Station, December 7, | |||
2017 Population Update Analysis 2017 | |||
KLD TR-895 Palo Verde Nuclear Generating Station, December 8, | |||
2016 Population Update Analysis 2016 | |||
Updated Review of Palo Verde Nuclear Generating September 29, | |||
Station Emergency Plan 2016 Letters of Agreement 2016 | |||
Letter # 240- 2017 Review of Palo Verde Nuclear Generating Station December 26, | |||
2819 Emergency Plan Letters of Agreement 2017 | |||
NAD Audit 2016- Nuclear Assurance Department (NAD) Audit Plan and December 14, | |||
010 Report, 2016-010, Emergency Preparedness 2016 | |||
Palo Verde Nuclear Generating Station After Action August 18, | |||
Report/Improvement Plan, Exercise Date - June 1, 2017 | |||
2017, Radiological Emergency Preparedness Program | |||
ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017 | |||
Report (Revised) | |||
ID: 240-02816 2017 Health Physics Drill Report (November 2017) December 12, | |||
2017 | |||
ID: 240-02818 1709 ERO Mini Drill - ERO Blue Team December 21, | |||
(December 2017) 2017 | |||
NAD Audit 2017- Nuclear Assurance Department (NAD) Audit Plan and January 25, | |||
008 Report, 2017-008, Emergency Preparedness 2018 | |||
240-02812 1704 and 1705 ERO Mini Drills - ERO White Team and October 18, | |||
CS/MA Green Team (June and July 2017) 2017 | |||
240-02813 1706 ERO Mini Drill - ERO Gold Team (July 2017) October 18, | |||
CS/MA 2017 | |||
240-02814 1707 ERO Mini Drill - ERO Red Team (August 2017) October 18, | |||
TW/MA Revision 1 2017 | |||
Emergency Response Facility Telephone Book, January 1, | |||
1st Quarter Edition 2018 2018 | |||
240-02801 1702 IPZ Evaluated Exercise - ERO White Team April 6, 2017 | |||
JF/MA (March 2017) | |||
240-02797 1608 ERO Mini Drill - ERO Red Team January 4, | |||
JF/MA (December 2016) 2017 | |||
240-02792 1604 and 1605 ERO Drills September 14, | |||
JF/MA 2016 | |||
240-02793 1606 ERO Mini Drill - ERO Green Team October 4, | |||
JF/MA (September 2016) 2016 | |||
Miscellaneous Documents | |||
Number Title Revision/Date | |||
240-02795 1609 Off-Hours Drive-in Augmentation Drill - December 2, | |||
JF/MA (November 2016) 2016 | |||
240-02796 2016 Health Physics Drill Report (November 2016) December 7, | |||
2016 | |||
Evaluation Evaluate Adding STSC ENS Communicator Duties to September 7, | |||
Report 16-11134 STSC Communicator 2016 | |||
17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass September 28, | |||
Break 2017 | |||
17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11, | |||
2017 | |||
Level 4 Default Values Used in Dose Assessment November 30, | |||
Evaluation 2017 | |||
Report 17- | |||
15797-001 | |||
Document No. Master Agreement Between Arizona Public Service 0 | |||
500599510 Company and Westinghouse Electric Company LLC for | |||
Goods and Services (Effective January 29, 2016 to | |||
December 31, 2018) | |||
Palo Verde Nuclear Generating Station After Action May 26, 2017 | |||
Report/Improvement Plan, Exercise Dates - March 7-8, | |||
2017, Radiological Emergency Preparedness Program | |||
(REPP) | |||
240-02789 2016 Health Physics Drill Report (Re-Demonstration) June 9, 2016 | |||
JF/TW | |||
240-02788 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016 | |||
JF/MA | |||
Palo Verde Nuclear Generating Station After Action February 9, | |||
Report/Improvement Plan, Exercise Date - 2017 | |||
November 16, 2016, Radiological Emergency | |||
Preparedness Program (REPP) | |||
240-02787 1602 IPZ Exercise - ERO Green Team (March 2016) March 25, 2016 | |||
JF/MA | |||
Palo Verde Nuclear Generating Station After Action February 9, | |||
Report/Improvement Plan, Exercise Date - 2017 | |||
November 16, 2016, Radiological Emergency | |||
Preparedness Program (REPP) | |||
Level 3 Evaluation Report 18-02668-002 March 22, 2018 | |||
Work Orders (WOs) | |||
4782667 4783959/0 4787729/0 4787847/0 4836236 | |||
4836263/0 4860832/0 4862234/0 4862502/0 4885361/0 | |||
4889725/0 4896971/0 4901070 4916668/0 4918303/0 | |||
4918455/0 4937577/0 4947802/0 | |||
Section 1EP6: Drill Evaluation | |||
Procedures | |||
Number Title Revision | |||
EP-0900 Emergency Response Organization (ERO) Position 16 | |||
Checklists | |||
EP-0901 Classifications 10 | |||
Condition Reports (CRs) | |||
18-02352 18-02503 18-02655 | |||
Section 2RS2: Occupational ALARA Planning and Controls | |||
Procedures | |||
Number Title Revision | |||
75DP-0RP03 ALARA Program Overview 06 | |||
75DP-0RP06 ALARA Committee 07 | |||
75DP-0RP08 Managing Radiological Risk 02 | |||
75RP-9RP02 Radiation Work Permits 31 | |||
75RP-9RP25 Temporary Shielding 14 | |||
75TD-9RP02 ALARA Work Planning 11 | |||
Audits and Self-Assessments | |||
Title Date | |||
PVGS Integrated Performance Assessment Report Radiation September 14, 2017 | |||
Protection 2nd Quarter 2017 | |||
2016 Annual ALARA/Management Evaluation Report June 23, 2017 | |||
2016 Annual Radiation Protection Program Summary Report July 27, 2017 | |||
Condition Reports (CRs) | |||
17-15502 17-15529 17-15802 17-16741 17-17944 | |||
17-18180 18-01890 | |||
Radiation Work Permits/ALARA Reviews | |||
Number Title | |||
RWP 2017-9-1016 RMC Operations and Routine Tasks | |||
RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection | |||
RWP 2017-3002 Reactor Destack/Restack | |||
RWP 2017-3015 Cavity Decontamination | |||
RWP 2017-3039 10-Year In-Service Inspection Vessel | |||
Miscellaneous | |||
Title Date | |||
ALARA 5-Year Plan 2015 - 2019 November 2015 | |||
1R20 Radiological Safety Summary In Perspective November 7, 2017 | |||
2R20 Radiological Safety Summary In Perspective May 9, 2017 | |||
3R19 Radiological Safety Summary In Perspective November 10, 2016 | |||
Section 2RS4 : Occupational Dose Assessment | |||
Procedures | |||
Number Title Revision | |||
75DP-0RP01 RP Program Overview 11 | |||
75DP-0RP06 Managing Radiological Risk 2 | |||
75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect 12 | |||
Dosimetry, and Anticipated EPD Dose Rate Alarm | |||
75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5 | |||
75RP-9ME25 TLD Reader Calibration and Response Check 6 | |||
75RP-9RP03 Bioassay Analysis 10 | |||
75RP-9RP05 Contamination Dose Evaluation 7 | |||
75RP-9RP16 Special Dosimetry 24 | |||
75RP-9QE21 Calibration of Self-Indicating Dosimeters 13 | |||
Procedures | |||
Number Title Revision | |||
75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM- 10 | |||
Calibrator | |||
Audits and Self-Assessments | |||
Title Date | |||
2016 Annual ALARA/Management Evaluation Report June 23, 2017 | |||
2016 Annual Radiation Protection Program Summary Report July 27, 2017 | |||
Condition Reports (CRs) | |||
17-14033 17-14127 17-14527 17-15700 18-01423 | |||
Self-Reading Dosimeter Calibration Records | |||
Number Title Date | |||
837097 Self-Reading Dosimeter September 8, 2017 | |||
836204 Self-Reading Dosimeter September 9, 2017 | |||
833059 Self-Reading Dosimeter September 30, 2017 | |||
810641 Self-Reading Dosimeter gamma/neutron December 12, 2017 | |||
810633 Self-Reading Dosimeter gamma/neutron December 12, 2017 | |||
810552 Self-Reading Dosimeter gamma/neutron December 13, 2017 | |||
Miscellaneous | |||
Number Title Date | |||
2017 Multi-Pack TLD Results 2017 | |||
100536 NVLAP Accreditation Report April 8, 2016 | |||
100536 NVLAP Proficiency Testing Results - TLD May 2, 2016 | |||
100536 NVLAP Proficiency Testing Results-EPD August 5, 2016 | |||
100536 NVLAP Accreditation Report February 15, 2018 | |||
2017 Unit 1 Dry Active Waste December 1, 2017 | |||
2017 Unit 2 Dry Active Waste May 18, 2017 | |||
2016 Unit 3 Dry Active Waste December 22, 2016 | |||
25116 Intake Dose Assessment April 21, 2016 | |||
Miscellaneous | |||
Number Title Date | |||
47194 Personnel Dosimetry Processing Report November 15, 2017 | |||
Section 4OA1: Performance Indicator Verification | |||
Miscellaneous | |||
Number Title Date | |||
2016-002-01 Licensee Event Report June 27, 2017 | |||
2017-001-00 June 27, 2017 June 14, 2017 | |||
Palo Verde Plant Computer PI ProcessBook | |||
Palo Verde Control Room Logs (1/1/17 - 12/31/17) | |||
Section 4OA2: Problem Identification and Resolution | |||
Procedures | |||
Number Title Revision | |||
40ST-9DG01 Diesel Generator A Test 49 | |||
Condition Reports (CRs) | |||
17-15901 18-03517 17-15838 17-11155 17-09750 | |||
16-03783 | |||
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion | |||
Condition Reports (CRs) | |||
18-02544 18-02688 18-02664 18-02605 18-02716 | |||
The following items are requested for the | |||
Occupational Radiation Safety Inspection | |||
at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 | |||
February 12 to 16, 2018 | |||
Integrated Report 2018001 | |||
Inspection areas are listed in the attachments below. | |||
Please provide the requested information on or before January 26, 2018. | |||
Please submit this information using the same lettering system as below. For example, all | |||
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled | |||
1- A, applicable organization charts in file/folder 1- B, etc. | |||
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at | |||
least 30 days later than the onsite inspection dates, so the inspectors will have access to the | |||
information while writing the report. | |||
In addition to the corrective action document lists provided for each inspection procedure listed | |||
below, please provide updated lists of corrective action documents at the entrance meeting. | |||
The dates for these lists should range from the end dates of the original lists to the day of the | |||
entrance meeting. | |||
If more than one inspection procedure is to be conducted and the information requests appear | |||
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which | |||
file the information can be found. | |||
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or | |||
louis.carson@nrc.gov. | |||
PAPERWORK REDUCTION ACT STATEMENT | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, | |||
control number 3150-0011. | |||
2. Occupational ALARA Planning and Controls (71124.02) | |||
Date of Last Inspection: October 20, 2017 | |||
A. List of contacts and telephone numbers for ALARA program personnel | |||
B. Applicable organization charts | |||
: [[contact::C. Copies of audits]], self-assessments, and LERs, written since date of last inspection, | |||
focusing on ALARA | |||
D. Procedure index for ALARA Program | |||
E. Please provide specific procedures related to the following areas noted below. | |||
Additional Specific Procedures may be requested by number after the inspector reviews | |||
the procedure indexes. | |||
1. ALARA Program | |||
2. ALARA Committee | |||
3. Radiation Work Permit Preparation | |||
F. A summary list of corrective action documents (including corporate and sub-tiered | |||
systems) written since date of last inspection, related to the ALARA program. In addition | |||
to ALARA, the summary should also address Radiation Work Permit violations, | |||
Electronic Dosimeter Alarms, and RWP Dose Estimates | |||
NOTE: The lists should indicate the significance level of each issue and the search | |||
criteria used. Please provide in document formats which are searchable so that | |||
the inspector can perform word searches. | |||
: [[contact::G. List of work activities greater than 1 rem]], since date of last inspection, | |||
Include original dose estimate and actual dose. | |||
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of | |||
record) | |||
I. Outline of source term reduction strategy | |||
: [[contact::J. If available]], provide a copy of the ALARA outage report for the most recently completed | |||
outages for each unit | |||
K. Please provide your most recent Annual ALARA Report. | |||
4. Occupational Dose Assessment (Inspection Procedure 71124.04) | |||
Date of Last Inspection: January 22, 2016 | |||
A. List of contacts and telephone numbers for the following areas: | |||
1. Dose Assessment personnel | |||
B. Applicable organization charts | |||
: [[contact::C. Audits]], self-assessments, vendor or NUPIC audits of contractor support, and LERs | |||
written since date of last inspection, related to: | |||
1. Occupational Dose Assessment | |||
D. Procedure indexes for the following areas: | |||
1. Occupational Dose Assessment | |||
E. Please provide specific procedures related to the following areas noted below. | |||
Additional Specific Procedures will be requested by number after the inspector reviews | |||
the procedure indexes. | |||
1. Radiation Protection Program | |||
2. Radiation Protection Conduct of Operations | |||
3. Personnel Dosimetry Program | |||
4. Radiological Posting and Warning Devices | |||
5. Air Sample Analysis | |||
6. Performance of High Exposure Work | |||
7. Declared Pregnant Worker | |||
8. Bioassay Program | |||
F. List of corrective action documents (including corporate and sub-tiered systems) written | |||
since date of last inspection, associated with: | |||
1. National Voluntary Laboratory Accreditation Program (NVLAP) | |||
2. Dosimetry (TLD/OSL, etc.) problems | |||
3. Electronic alarming dosimeters | |||
4. Bioassays or internally deposited radionuclides or internal dose | |||
5. Neutron dose | |||
NOTE: The lists should indicate the significance level of each issue and the search | |||
criteria used. Please provide in document formats which are searchable so that | |||
the inspector can perform word searches. | |||
: [[contact::G. List of positive whole body counts since date of last inspection]], names redacted if | |||
desired | |||
H. Part 61 analyses/scaling factors | |||
I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP) | |||
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent | |||
results | |||
ML18127A004 | |||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
By: JDixon Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB | |||
NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy | |||
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ | |||
DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18 | |||
OFFICE C:DRS/PS2 TL:IPAT C:DRP/D | |||
NAME HGepford GGeorge GMiller | |||
SIGNATURE /RA/ /RA/ /RA/ | |||
DATE 4/30/18 4/30/2018 5/7/18 | |||
}} | }} |
Latest revision as of 21:57, 18 December 2019
ML18127A004 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 05/07/2018 |
From: | Geoffrey Miller NRC/RGN-IV/DRP/RPB-D |
To: | Bement R Arizona Public Service Co |
Miller G | |
References | |
IR 2018001 | |
Download: ML18127A004 (32) | |
Text
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND 05000530/2018001
Dear Mr. Bement:
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC resident inspector at the Palo Verde Nuclear Generating Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC resident inspector at the Palo Verde Nuclear Generating Station. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Geoffrey B. Miller, Chief Project Branch D Division of Reactor Projects Docket Nos. 50-528, 50-529, 50-530 License Nos. NPF-41, NPF-51, NPF-74
Enclosure:
Inspection Report 05000528/2018001, 05000529/2018001, 05000530/2018001 w/ Attachment:
1. Supplemental Information 2. O
Inspection Report
Docket Numbers: 05000528, 05000529, 05000530 License Numbers: NPF-41, NPF-51, NPF-74 Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001 Enterprise Identifier: I-2018-001-0013 Licensee: Arizona Public Service Company Facility: Palo Verde Nuclear Generating Station Location: 5801 South Wintersburg Road, Tonopah, AZ 85354 Inspection Dates: January 1, 2018 to March 31, 2018 Inspectors: C. Peabody, Senior Resident Inspector D. Reinert, PhD, Resident Inspector D. You, Resident Inspector L. Carson, Senior Health Physicist S. Hedger, Emergency Preparedness Inspector Approved By: Geoffrey B. Miller, Chief, Project Branch D, Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Aspect Report Section Mitigating Green [H.12] - Human 71111.12 -
Systems NCV 05000528/2018001-01 Performance, Avoid Maintenance Closed Complacency Effectiveness The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit automatically tripped from full power when a control system failure caused a loss of generator field excitation. The unit was restarted on February 19, 2018, and remained at or near rated thermal power for the remainder of the inspection period.
Units 2 and 3 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment Partial Walkdown
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1 containment spray system B on January 4, 2018
- (2) Unit 2 auxiliary feedwater system A on January 30, 2018
- (3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018
Complete Walkdown (1 Sample)
The inspectors evaluated system configurations during a complete walkdown of the Unit 3 containment spray system on January 18, 2018.
71111.05AQ - Fire Protection Annual/Quarterly Quarterly Inspection
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on January 4, 2018
- (2) Unit 2 control room, Fire Zone 17, on January 19, 2018
- (3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A, on January 23, 2018
- (4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
- (5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018
71111.07 - Heat Sink Performance Heat Sink
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger performance on February 21, 2018.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification
The inspectors observed and evaluated risk informed completion time program and 10 CFR 50.69 program classroom training on January 31, 2018.
Operator Performance (1 Sample)
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main generator to the grid following a reactor trip caused by a fault in the main generator excitation system on February 19, 2018.
The inspectors observed and evaluated operator response to Unit 3 loss of A channel indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and FWIV-174, 177, on February 27, 2018.
71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185 in Units 2 and 3
- (2) Diesel fuel oil transfer pump predictive engineering cable testing
71111.13 - Maintenance Risk Assessments and Emergent Work Control
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 1 elevated risk due to failure of emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 on January 4, 2018
- (2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a surveillance run on January 5, 2018
- (3) Unit 3 elevated risk due to planned maintenance on containment spray pump A atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection valve SI-687 January 29, 2018 through February 4, 2018
- (4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
- (5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018
71111.15 - Operability Determinations and Functionality Assessments
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on January 3, 2018
- (2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on January 25, 2018
- (3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685, failed to re-open during breaker maintenance on January 31, 2018
- (4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on February 13, 2018
- (5) Unit 1 calculated qualified life of safety injection combined header isolation valves, SI-660 and SI-659, on February 23, 2018
- (6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
- (7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A T-drains on March 6, 2018
- (8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on March 7, 2018
- (9) Unit 2 steam generator sodium concentration increase on March 12, 2018
71111.18 - Plant Modifications
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-connect valve, SI-696, replacement with General Electrical model Spectra breaker per Design Equivalent Change 01035 on March 15, 2018
71111.19 - Post Maintenance Testing
The inspectors evaluated the following post maintenance tests:
- (1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve SIA-UV660 following limit switch adjustment on January 4, 2018
- (2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch replacement following an unplanned cooldown during a monthly surveillance run on January 9, 2018
- (3) Unit 3 containment spray pump A test following breaker maintenance on February 6, 2018
- (4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves on February 28, 2018
- (5) Unit 2 essential cooling water pump A test and flow balance following planned maintenance to calibrate motor overcurrent relays and replace a high discharge pressure switch on March 20, 2018
- (6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features fast start test following online maintenance outage on March 23, 2018
71111.20 - Refueling and Other Outage Activities
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced outage due to an unplanned reactor trip caused by a fault in the main generator excitation circuitry.
71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Routine
- (1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
- (2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
- (3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed surveillance on February 28, 2018
- (4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
- (5) Unit 3, essential chiller A vibration analysis on March 8, 2018
- (6) Unit 1 containment spray pump B inservice test on March 22, 2018
In-service (1 Sample)
- (1) Unit 2 containment spray pump A inservice test on March 1, 2018
71114.02 - Alert and Notification System Testing
The inspectors evaluated the maintenance and testing of the alert and notification system between May 1, 2016 - February 20, 2018.
71114.03 - Emergency Response Organization Staffing and Augmentation System
The inspectors evaluated the readiness of the Emergency Response Organization between May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff their emergency response facilities in accordance with emergency plan commitments.
71114.04 - Emergency Action Level and Emergency Plan Changes
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and practices between May 1, 2016 - February 20, 2018. The evaluation reviewed screenings and evaluations documenting the implementation of this process. The review of the change process documentation does not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness
The inspectors evaluated the maintenance of the emergency preparedness program between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the emergency plan, the conduct of drills and exercises, licensee audits and assessments, and the maintenance of equipment important to emergency preparedness.
71114.06 - Drill Evaluation Emergency Planning Drill
The inspectors evaluated a full-scale emergency preparedness drill on February 13,
RADIATION SAFETY
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls Radiological Work Planning
The inspectors evaluated the licensees radiological work planning by reviewing the following activities:
- (1) RWP 2017-9-1016, RMC Operations and Routine Tasks
- (2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
- (3) RWP 2017-3002, Reactor Destack/Restack
- (4) RWP 2017-3015, Cavity Decontamination
- (5) RWP 2017-3039, 10-Year In-Service Inspection Vessel Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
The inspectors evaluated dose estimates and exposure tracking.
71124.04 - Occupational Dose Assessment Source Term Characterization
===The inspectors evaluated the licensees source term characterization.
External Dosimetry===
The inspectors evaluated the licensees external dosimetry program.
Internal Dosimetry (1 Sample)
The inspectors evaluated the licensees internal dosimetry program.
Special Dosimetric Situations (1 Sample)
The inspectors evaluated the licensees performance for special dosimetric situations.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
- (1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
- (2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
- (3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -
December 31, 2017)
- (4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -
December 31, 2017)
- (5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31, 2017)
- (6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1, 2017 - December 31, 2017)
- (7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -
December 31, 2017)
71152 - Problem Identification and Resolution Annual Follow-up of Selected Issues
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018
71153 - Follow-up of Events and Notices of Enforcement Discretion Events
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation and licensees response on February 15 - 16,
INSPECTION RESULTS
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump Cornerstone Significance Cross-cutting Report Aspect Section Mitigating Green [H.12] -
==71111.12 - Systems NCV 05000528/2018001-01 Human Maintenance
==
Closed Performance, Effectiveness Avoid Complacency The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump A.
Specifically, following power cable maintenance on November 9, 2017, the instructions for conducting a post-maintenance test for the transfer pump were inadequate to detect a high resistance connection in the associated motor control center.
Description:
On November 12, 2017, the licensee was conducting a 24-hour surveillance test run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
Licensee electricians took electrical resistance readings across the connections in the motor control center for the fuel oil transfer pump breaker. The electricians identified that the direct cause of the transfer pump failure was a high variable resistance secondary stab connection in the motor control center cubicle. The electricians removed the breaker and cleaned and adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared operable following the successful completion of the 24-hour surveillance run on November 14, 2017.
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump breaker had been removed from service for periodic predictive maintenance on November 9, 2017, under work order 4685719. During this maintenance activity licensee engineers disconnected the diesel fuel oil transfer pump motor power and control cables for megger testing. Cable lug screw connections attach each of these cables to the secondary stab connections on the movable motor breaker and the stationary motor control center chassis.
Cable connections on the secondary stab connections are removed for testing, and then following testing, the cables are re-landed onto the secondary stabs of the breaker and motor control center chassis. The licensees work planners had not recognized the possibility that removing and re-landing the cables on the lug screw connections had the potential to disturb the motor control center secondary stab connections.
The post-maintenance test associated with the cable testing was a momentary start of the diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position for only a few seconds. The licensees apparent cause investigation identified that nonintrusive as-left quantitative resistance checks could have been used to assess the integrity of the secondary stab connections. The licensee performs similar checks when performing individual breaker cubicle preventative maintenance tasks that actively remove and re-test the individual motor control center bucket. Such a check was the method used by the electricians to initially diagnose the breaker failure. However, no such quantitative resistance check was specified in the cable testing work order.
The post-maintenance test was not written in accordance with station procedure 30DP-9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in part, that the post-maintenance test shall ensure that equipment performs its intended function when returned to service following maintenance, that a new deficiency has not been created, and that the equipment will function as designed for safe and reliable plant operation.
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing created new failure deficiency by disturbing electrical continuity and creating a high resistance condition at the secondary stab connection that impacted EDG operability. The post-maintenance test following the cable testing maintenance was not adequate to ensure that a new deficiency had not been created.
Corrective Action: The licensee has taken corrective action to revise the work instructions for performing future cable testing to include quantitative resistance retests when re-terminating motor control center secondary stab connections. As an interim measure, the inspectors confirmed that all safety-related 480V electrical breakers that have been subject to this cable testing have performed satisfactorily during subsequent diesel generator surveillance testing.
Corrective Action Reference: Condition Report 17-16497
Performance Assessment:
Performance Deficiency: The licensees failure to prescribe appropriate retest activities following predictive maintenance on diesel fuel oil transfer pump cables is a performance deficiency.
Screening: The performance deficiency is more-than-minor and a finding because it is associated with the equipment performance attribute of the mitigating systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, on November 9, 2017, the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel oil transfer pump A. Without an appropriate post-maintenance test, this activity rendered the Unit 1 diesel generator A inoperable.
Significance: The inspectors performed the initial significance determination using NRC Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that the finding was of very low safety significance (Green) because the finding did not represent an actual loss of safety function of a single train for greater that its technical specification allowed outage time.
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human performance associated with the avoid complacency aspect. Specifically, licensee work planners did not consider potential undesired consequences associated with disturbing the power cables leads, instead relying on past successful tests [H.12].
Enforcement:
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and be accomplished in accordance with these instructions, procedures, or drawings.
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies, without documented instructions, procedures, or drawings of a type appropriate to the circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure the maintenance was successful and the pump was returned to service, and as a result, the Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14, 2017.
Disposition: This violation is being treated as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On February 16, 2018, the inspector presented the radiation safety inspection results to Ms. M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the licensee staff.
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program inspection to Mr. M. McLaughlin, Vice President, Operations Support, and other members of the licensee staff. On March 29, 2018, the inspector communicated the inspection results telephonically to Mr. T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members of the licensee staff.
On April 11, 2018, the inspector presented the quarterly residents inspection results to Mr. J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee staff.
SUPPLEMENTAL INFORMATION
DOCUMENTS REVIEWED
Section 1R04: Equipment Alignment
Procedures
Number Title Revision
40ST-9AF07 Auxiliary Feedwater Pump AFA-P01 Monthly Valve 6
Alignment
40ST-9SI13 LPSI and CS System Alignment Verification 33
Condition Reports (CRs)
16-17321 17-03027
Drawings
Number Title Revision
03-M-HJP-001 P&I Diagram Control Building HVAC 14
03-M-HJP-002 P&I Diagram Control Building HVAC 14
03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49
03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & 6
Cont. Spray Discharge
03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF 7
Pump Suction Lines
Miscellaneous
Number Title Revision
STM-30D System Training Manual Volume 30D: Control Building 6
HVAC System (HJ)
Section 1R05: Fire Protection
Procedures
Number Title Revision
14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13
Condition Reports (CRs)
17-03870 18-00999
Miscellaneous
Number Title Revision/Date
PVNGS Pre-Fire Strategies Manual 26
13-MM-0650 Fire Protection & Spray System Sub 007
13-MS-A083 NFPA Code Applicability and Conformance Review 007
4834415 Fire Safety Component Condition Record November 3, 2016
4834430 Fire Safety Component Condition Record November 3, 2016
4843902 Fire Safety Component Condition Record December 6, 2016
Unit 3 Tamper/Vital/Security Tour - Post 31 February 7, 2018
4971714 Open Door/Hatch/Floor Plug Permit January 29, 2018
4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018
Section 1R07: Heat Sink Performance
Procedures
Number Title Revision
73DP-9ZZ21 Heat Exchanger Visual Inspection 6
73DP-9ZZ11 Heat Exchanger Program 15
Condition Reports (CRs)
18-03133 18-03138 18-03139
Work Orders (WOs)
4591574 4591575 4667054 4667055 4667098
Section 1R11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Number Title Revision
40OP-9MB01 Main Generation and Excitation 63
40DP-9OP02 Conduct of Operations 72
Procedures
Number Title Revision
40AL-9RK6A Panel B06A Alarm Responses 18
Condition Reports (CRs)
18-02797 18-02593 18-03215
Miscellaneous
Number Title Date
Current Alarm Status Report February 16, 2018
Section 1R12: Maintenance Effectiveness
Procedures
Number Title Revision
2MT-9ZZ74 Molded Case Circuit Breaker Test 48
30DP-9WP04 Post-Maintenance Testing Development 19
Condition Reports (CRs)
17-08025-005 17-08025 17-16497
Work Orders (WOs)
25959 4925966 4925967 4925969 4685719
4788985
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Procedures
Number Title Revision
40DP-9AP21 Protected Equipment 7
70DP-0RA05 Assessment and Management of Risk when Performing 23
Maintenance in Modes 1 and 2
40MT-9ZZ01 Operations Maintenance Activities 5
40DP-9RS01 Operations Department Online Nuclear Risk Management 4
Mode 1 and 2
Condition Reports (CRs)
18-00249 185-00136 18-00336 18-02544
Miscellaneous
Number Title Date
Schedulers Evaluation for PV Unit 1 January 4, 2018
Schedulers Evaluation for PV Unit 1 February 23, 2018
Schedulers Evaluation for PV Unit 3 February 1, 2018
Schedulers Evaluation for PV Unit 2 March 19, 2018
Unit 3 Archived Operator Logs January 29, 2018 -
February 4, 2018
Section 1R15: Operability Determinations and Functionality Assessments
Procedures
Number Title Revision
40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71
40AL-9RK6A Panel B06A Alarm Responses 18
74DP-9CY04 Systems Chemistry Specifications 94
Condition Reports (CRs)
17-18475 12-01397 17-17856 13-01198 18-03127
17-16393 18-03215 18-03291 18-02839 18-01610
18-02334 3127427 18-02468 18-03980
Miscellaneous
Number Title Revision/Date
03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11
18-02334-003 Engineering Evaluation February 15, 2018
28056 Adverse CRDR July 19, 2013
EQ Program Manual 26
Section 1R18: Plant Modifications
Condition Reports (CRs)
18-04116
Work Orders (WOs)
4989102
Miscellaneous
Number Title Date
DEC-01035 Design Equivalent Change April 12, 2017
Section 1R19: Post-Maintenance Testing
Procedures
Number Title Revision
40OP-9CH12 Refueling Water Tank (RWT) Operations 41
2MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent 4
Relays
2MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous 4
Overcurrent Relays
40OP-9EW02 Essential Cooling Water System (EW) Train B 26
40ST-9DG01 Diesel Generator A Test 49
73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load 13
and Hot Start Test Train B
40ST-9DG02 Diesel Generator B Test 54
Condition Reports (CRs)
18-00136 18-00197 18-01931 18-00210 18-00290
18-00336 18-00377 18-00346 18-04731 18-04732
Work Orders (WOs)
4964492 4822983 4981967 4726747 4821113
4847651 4965079 4972486 4847637
Drawings
Number Title Revision
01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15
01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13
13-M018-00141 Control Schematic (Starting Sequence Control) 25
Miscellaneous
Number Title Revision/Date
18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018
during Surveillance Run 1/5/2018
Section 1R20: Refueling and Other Outage Activities
Procedures
Number Title Revision
40OP-9MB01 Main Generation and Excitation 63
Section 1R22: Surveillance Testing
Procedures
Number Title Revision
73DP-9CL02 Containment Leakage Rate Testing Program 33
73ST-9XI20 Atmospheric Dump Valves - Inservice Test 47
73ST-9SI06 Containment Spray Pumps and Check valves - Inservice 42
Test
73ST-9DF01 Diesel Fuel Oil Transfer Pumps - Inservice Test 34
40DP-9OP06 Operations Department Repetitive Task Program 130
73ST-9SI06 Containment Spray Pumps and Check Valves- Inservice 42
Test
Condition Reports (CRs)
16-15793 18-03304 18-01314 18-03825
Work Orders (WOs)
22921 4840032 4843076 4843390
Miscellaneous
Number Title Revision/Date
13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication 18
Loops Uncertainty Calculation
18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018
18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for March 2, 2018
SB-200, 202, and 205
Section 1EP2: Alert and Notification System Testing
Miscellaneous Documents
Number Title Date
ID/Letter Palo Verde Nuclear Generating Station Alert and May 26, 2017
Number: Notification System (ANS) FEMA 350 Report -
240-02802 May 2017
Palo Verde Nuclear Generating Station, Alert and May 2017
Notification System (ANS), FEMA 350 Report
Palo Verde Nuclear Generating Station Siren Operating November 2015
Manual January 4, 2018
Letter from FEMA Region IX to Director, Division of September 19,
Emergency Management, State of Arizona 2017
State of Arizona/Maricopa County Offsite Emergency November 2017
Response Plan, Palo Verde Nuclear Generating Station
The Maricopa County Sheriffs Office Emergency August 2016
Response to Palo Verde Nuclear Generating Station
Work Orders (WOs)
474965/0
Section 1EP3: Emergency Response Organization Staffing and Augmentation
Procedures
Number Title Revision
EP-0902 Notifications 10
EP-0901 Classifications 10
40AL-9RK7C Panel B07C Alarm Responses 15
40AO-9ZZ21 Acts of Nature 37
79IS-9SM01 Analysis of Seismic Event 27
Miscellaneous Documents
Number Title Date
240-02799 2017 1 Quarter - Emergency Preparedness
st
March 21, 2017
JF/MA Augmentation Drill Report
240-02803 2017 2nd Quarter - Emergency Preparedness June 6, 2017
CS/MA Augmentation Drill Report
240-02797 2017 3rd Quarter - Emergency Preparedness July 25, 2017
Augmentation Drill Report (After Hours)
240-02808 2017 3rd Quarter - Emergency Preparedness September 6, 2017
Augmentation Drill Report
240-02817 2017 4th Quarter - Emergency Preparedness December 13,
CS/ma Augmentation Drill Report 2017
240-02790 2016 2nd Quarter - Emergency Preparedness June 23, 2016
JF/MA Augmentation Drill Report
240-02791 2016 3rd Quarter - Emergency Preparedness August 3, 2016
JF/MA Augmentation Drill Report
240-02798 December 5, 2016, Alert Event Report January 17, 2017
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Procedure
Number Title Revision
16DP-0EP22 Emergency Plan Maintenance 11, 12
Miscellaneous Documents
Number Title Date
Evaluation Replace the Meteorological Instrumentation and Data August 8, 2017
Tracking Number Transmission System (MDTS)
2017-001E
Evaluation EP-0900, Rev. 16 August 17, 2017
Tracking Number
2017-003E
Evaluation EP-0901, Rev. 10 August 21, 2017
Tracking Number
2017-004E
Screening 74RM-9EF42, Radiation Monitor Alarm Setpoint April 16, 2017
Tracking Number Determination, Rev. 30
2017-002S
Screening Procedure EP-0901, Classifications, Added New EALs August 20, 2017
Tracking Number form EPLAN R60, Revise PV Proc Format
2017-022S
Miscellaneous Documents
Number Title Date
Screening EP-905, Revision 9, Protective Actions June 7, 2017
Tracking Number
2017-014S
Screening DMWO 3452940 Palo Verde Nuclear Generating September 8,
Tracking Number Station Radio Replacement Project 2017
2017-023S
Screening 40AO-9ZZ18 R018 Fire Outside Control Room September 26,
Tracking Number 2017
2017-029S
EPM Tracking DEC-00720 Allow Solar-Charged Offsite Sirens to February 18,
Number Replace AC-Charged Offsite Sirens 2015
2015-006S
Section 1EP5: Maintenance of Emergency Preparedness
Procedures
Number Title Revision
01DP-0AP12 Condition Reporting Process 28
01DP-0AP12-01 Condition Reporting Process Administrative Guide 4
EP-0905 Protective Actions 9
EP-0902 Notifications 8, 9, 10
16DP-0EP31 Emergency Preparedness Equipment Out-of-Service 9
16DP-0EP27 Emergency Preparedness Equipment Testing 10
16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5
Condition Reports (CRs)
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501
16-14593 16-14934 16-16710 17-02188 17-03147 17-03149
17-03202 17-03605 17-03721 17-03736 17-03826 17-03828
17-03829 17-03884 17-04633 17-06893 17-08328 17-10906
17-10949 17-11437 17-13663 17-14927 17-15449 17-15797
17-15884 17-16771 17-17091 17-17218 17-17739 17-18443
18-03244
Miscellaneous Documents
Number Title Revision/Date
KLD TR-983 Palo Verde Nuclear Generating Station, December 7,
2017 Population Update Analysis 2017
KLD TR-895 Palo Verde Nuclear Generating Station, December 8,
2016 Population Update Analysis 2016
Updated Review of Palo Verde Nuclear Generating September 29,
Station Emergency Plan 2016 Letters of Agreement 2016
Letter # 240- 2017 Review of Palo Verde Nuclear Generating Station December 26,
2819 Emergency Plan Letters of Agreement 2017
NAD Audit 2016- Nuclear Assurance Department (NAD) Audit Plan and December 14,
010 Report, 2016-010, Emergency Preparedness 2016
Palo Verde Nuclear Generating Station After Action August 18,
Report/Improvement Plan, Exercise Date - June 1, 2017
2017, Radiological Emergency Preparedness Program
ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017
Report (Revised)
ID: 240-02816 2017 Health Physics Drill Report (November 2017) December 12,
2017
ID: 240-02818 1709 ERO Mini Drill - ERO Blue Team December 21,
(December 2017) 2017
NAD Audit 2017- Nuclear Assurance Department (NAD) Audit Plan and January 25,
008 Report, 2017-008, Emergency Preparedness 2018
240-02812 1704 and 1705 ERO Mini Drills - ERO White Team and October 18,
CS/MA Green Team (June and July 2017) 2017
240-02813 1706 ERO Mini Drill - ERO Gold Team (July 2017) October 18,
CS/MA 2017
240-02814 1707 ERO Mini Drill - ERO Red Team (August 2017) October 18,
TW/MA Revision 1 2017
Emergency Response Facility Telephone Book, January 1,
1st Quarter Edition 2018 2018
240-02801 1702 IPZ Evaluated Exercise - ERO White Team April 6, 2017
JF/MA (March 2017)
240-02797 1608 ERO Mini Drill - ERO Red Team January 4,
JF/MA (December 2016) 2017
240-02792 1604 and 1605 ERO Drills September 14,
JF/MA 2016
240-02793 1606 ERO Mini Drill - ERO Green Team October 4,
JF/MA (September 2016) 2016
Miscellaneous Documents
Number Title Revision/Date
240-02795 1609 Off-Hours Drive-in Augmentation Drill - December 2,
JF/MA (November 2016) 2016
240-02796 2016 Health Physics Drill Report (November 2016) December 7,
2016
Evaluation Evaluate Adding STSC ENS Communicator Duties to September 7,
Report 16-11134 STSC Communicator 2016
17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass September 28,
Break 2017
17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11,
2017
Level 4 Default Values Used in Dose Assessment November 30,
Evaluation 2017
Report 17-
15797-001
Document No. Master Agreement Between Arizona Public Service 0
500599510 Company and Westinghouse Electric Company LLC for
Goods and Services (Effective January 29, 2016 to
December 31, 2018)
Palo Verde Nuclear Generating Station After Action May 26, 2017
Report/Improvement Plan, Exercise Dates - March 7-8,
2017, Radiological Emergency Preparedness Program
(REPP)
240-02789 2016 Health Physics Drill Report (Re-Demonstration) June 9, 2016
JF/TW
240-02788 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016
JF/MA
Palo Verde Nuclear Generating Station After Action February 9,
Report/Improvement Plan, Exercise Date - 2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
240-02787 1602 IPZ Exercise - ERO Green Team (March 2016) March 25, 2016
JF/MA
Palo Verde Nuclear Generating Station After Action February 9,
Report/Improvement Plan, Exercise Date - 2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
Level 3 Evaluation Report 18-02668-002 March 22, 2018
Work Orders (WOs)
4782667 4783959/0 4787729/0 4787847/0 4836236
4836263/0 4860832/0 4862234/0 4862502/0 4885361/0
4889725/0 4896971/0 4901070 4916668/0 4918303/0
4918455/0 4937577/0 4947802/0
Section 1EP6: Drill Evaluation
Procedures
Number Title Revision
EP-0900 Emergency Response Organization (ERO) Position 16
Checklists
EP-0901 Classifications 10
Condition Reports (CRs)
18-02352 18-02503 18-02655
Section 2RS2: Occupational ALARA Planning and Controls
Procedures
Number Title Revision
75DP-0RP03 ALARA Program Overview 06
75DP-0RP06 ALARA Committee 07
75DP-0RP08 Managing Radiological Risk 02
75RP-9RP02 Radiation Work Permits 31
75RP-9RP25 Temporary Shielding 14
75TD-9RP02 ALARA Work Planning 11
Audits and Self-Assessments
Title Date
PVGS Integrated Performance Assessment Report Radiation September 14, 2017
Protection 2nd Quarter 2017
2016 Annual ALARA/Management Evaluation Report June 23, 2017
2016 Annual Radiation Protection Program Summary Report July 27, 2017
Condition Reports (CRs)
17-15502 17-15529 17-15802 17-16741 17-17944
17-18180 18-01890
Radiation Work Permits/ALARA Reviews
Number Title
RWP 2017-9-1016 RMC Operations and Routine Tasks
RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection
RWP 2017-3002 Reactor Destack/Restack
RWP 2017-3015 Cavity Decontamination
RWP 2017-3039 10-Year In-Service Inspection Vessel
Miscellaneous
Title Date
ALARA 5-Year Plan 2015 - 2019 November 2015
1R20 Radiological Safety Summary In Perspective November 7, 2017
2R20 Radiological Safety Summary In Perspective May 9, 2017
3R19 Radiological Safety Summary In Perspective November 10, 2016
Section 2RS4 : Occupational Dose Assessment
Procedures
Number Title Revision
75DP-0RP01 RP Program Overview 11
75DP-0RP06 Managing Radiological Risk 2
75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect 12
Dosimetry, and Anticipated EPD Dose Rate Alarm
75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5
75RP-9ME25 TLD Reader Calibration and Response Check 6
75RP-9RP03 Bioassay Analysis 10
75RP-9RP05 Contamination Dose Evaluation 7
75RP-9RP16 Special Dosimetry 24
75RP-9QE21 Calibration of Self-Indicating Dosimeters 13
Procedures
Number Title Revision
75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM- 10
Calibrator
Audits and Self-Assessments
Title Date
2016 Annual ALARA/Management Evaluation Report June 23, 2017
2016 Annual Radiation Protection Program Summary Report July 27, 2017
Condition Reports (CRs)
17-14033 17-14127 17-14527 17-15700 18-01423
Self-Reading Dosimeter Calibration Records
Number Title Date
837097 Self-Reading Dosimeter September 8, 2017
836204 Self-Reading Dosimeter September 9, 2017
833059 Self-Reading Dosimeter September 30, 2017
810641 Self-Reading Dosimeter gamma/neutron December 12, 2017
810633 Self-Reading Dosimeter gamma/neutron December 12, 2017
810552 Self-Reading Dosimeter gamma/neutron December 13, 2017
Miscellaneous
Number Title Date
2017 Multi-Pack TLD Results 2017
100536 NVLAP Accreditation Report April 8, 2016
100536 NVLAP Proficiency Testing Results - TLD May 2, 2016
100536 NVLAP Proficiency Testing Results-EPD August 5, 2016
100536 NVLAP Accreditation Report February 15, 2018
2017 Unit 1 Dry Active Waste December 1, 2017
2017 Unit 2 Dry Active Waste May 18, 2017
2016 Unit 3 Dry Active Waste December 22, 2016
25116 Intake Dose Assessment April 21, 2016
Miscellaneous
Number Title Date
47194 Personnel Dosimetry Processing Report November 15, 2017
Section 4OA1: Performance Indicator Verification
Miscellaneous
Number Title Date
2016-002-01 Licensee Event Report June 27, 2017
2017-001-00 June 27, 2017 June 14, 2017
Palo Verde Plant Computer PI ProcessBook
Palo Verde Control Room Logs (1/1/17 - 12/31/17)
Section 4OA2: Problem Identification and Resolution
Procedures
Number Title Revision
40ST-9DG01 Diesel Generator A Test 49
Condition Reports (CRs)
17-15901 18-03517 17-15838 17-11155 17-09750
16-03783
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion
Condition Reports (CRs)
18-02544 18-02688 18-02664 18-02605 18-02716
The following items are requested for the
Occupational Radiation Safety Inspection
at Palo Verde Nuclear Generating Station, Units 1, 2, and 3
February 12 to 16, 2018
Integrated Report 2018001
Inspection areas are listed in the attachments below.
Please provide the requested information on or before January 26, 2018.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
1- A, applicable organization charts in file/folder 1- B, etc.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or
louis.carson@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection: October 20, 2017
A. List of contacts and telephone numbers for ALARA program personnel
B. Applicable organization charts
- C. Copies of audits, self-assessments, and LERs, written since date of last inspection,
focusing on ALARA
D. Procedure index for ALARA Program
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
2. ALARA Committee
3. Radiation Work Permit Preparation
F. A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection, related to the ALARA program. In addition
to ALARA, the summary should also address Radiation Work Permit violations,
Electronic Dosimeter Alarms, and RWP Dose Estimates
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
- G. List of work activities greater than 1 rem, since date of last inspection,
Include original dose estimate and actual dose.
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
record)
I. Outline of source term reduction strategy
- J. If available, provide a copy of the ALARA outage report for the most recently completed
outages for each unit
K. Please provide your most recent Annual ALARA Report.
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
Date of Last Inspection: January 22, 2016
A. List of contacts and telephone numbers for the following areas:
1. Dose Assessment personnel
B. Applicable organization charts
written since date of last inspection, related to:
1. Occupational Dose Assessment
D. Procedure indexes for the following areas:
1. Occupational Dose Assessment
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations
3. Personnel Dosimetry Program
4. Radiological Posting and Warning Devices
5. Air Sample Analysis
6. Performance of High Exposure Work
7. Declared Pregnant Worker
8. Bioassay Program
F. List of corrective action documents (including corporate and sub-tiered systems) written
since date of last inspection, associated with:
1. National Voluntary Laboratory Accreditation Program (NVLAP)
2. Dosimetry (TLD/OSL, etc.) problems
3. Electronic alarming dosimeters
4. Bioassays or internally deposited radionuclides or internal dose
5. Neutron dose
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
- G. List of positive whole body counts since date of last inspection, names redacted if
desired
H. Part 61 analyses/scaling factors
I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent
results
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JDixon Yes No Publicly Available Sensitive NRC-002
OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB
NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/
DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18
OFFICE C:DRS/PS2 TL:IPAT C:DRP/D
NAME HGepford GGeorge GMiller
SIGNATURE /RA/ /RA/ /RA/
DATE 4/30/18 4/30/2018 5/7/18
May 7, 2018
Mr. Robert Bement
Executive Vice President, Nuclear/CNO
Mail Station 7602
Arizona Public Service Company
P.O. Box 52034
Phoenix, AZ 85072-2034
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NRC INTEGRATED
INSPECTION REPORT 05000528/2018001, 05000529/2018001, AND
Dear Mr. Bement:
On March 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at your Palo Verde Nuclear Generating Station Units 1, 2, and 3. On April 11, 2018, the NRC
inspectors discussed the results of this inspection with Mr. Jack Cadogan and other members of
your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented one finding of very low safety significance (Green) in this report.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a
non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within
days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with
copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the
NRC resident inspector at the Palo Verde Nuclear Generating Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the
- U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the
NRC resident inspector at the Palo Verde Nuclear Generating Station.
R. Bement 2
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
Sincerely,
/RA/
Geoffrey
- B. Miller, Chief
Project Branch D
Division of Reactor Projects
Docket Nos. 50-528, 50-529, 50-530
License Nos. NPF-41, NPF-51, NPF-74
Enclosure:
Inspection Report 05000528/2018001,
05000529/2018001, 05000530/2018001
w/ Attachment:
1. Supplemental Information
2. Occupational Radiation Safety
Inspection Item Request
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Numbers: 05000528, 05000529, 05000530
License Numbers: NPF-41, NPF-51, NPF-74
Report Numbers: 05000528/2018001, 05000529/2018001, and 05000530/2018001
Enterprise Identifier: I-2018-001-0013
Licensee: Arizona Public Service Company
Facility: Palo Verde Nuclear Generating Station
Location: 5801 South Wintersburg Road, Tonopah, AZ 85354
Inspection Dates: January 1, 2018 to March 31, 2018
Inspectors:
- C. Peabody, Senior Resident Inspector
- D. Reinert, PhD, Resident Inspector
- D. You, Resident Inspector
- L. Carson, Senior Health Physicist
- S. Hedger, Emergency Preparedness Inspector
Approved By: Geoffrey
- B. Miller, Chief, Project Branch D, Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees
performance by conducting an integrated inspection at Palo Verde Nuclear Generating Station,
Units 1, 2, and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight
Process is the NRCs program for overseeing the safe operation of commercial nuclear power
reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC and self-revealed findings, violations, and additional items are summarized in the table
below.
List of Findings and Violations
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
Cornerstone Significance Cross-cutting Aspect Report
Section
Mitigating Green [H.12] - Human 71111.12 -
Systems NCV 05000528/2018001-01 Performance, Avoid Maintenance
Closed Complacency Effectiveness
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump
- A.
Specifically, following power cable maintenance on November 9, 2017, the instructions for
conducting a post-maintenance test for the transfer pump were inadequate to detect a high
resistance connection in the associated motor control center.
PLANT STATUS
Unit 1 began the inspection period at rated thermal power. On February 15, 2018, the unit
automatically tripped from full power when a control system failure caused a loss of generator
field excitation. The unit was restarted on February 19, 2018, and remained at or near rated
thermal power for the remainder of the inspection period.
Units 2 and 3 operated at or near rated thermal power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors performed plant status activities described in
IMC 2515 Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem
Identification and Resolution. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess licensee performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following
systems/trains:
(1) Unit 1 containment spray system B on January 4, 2018
(2) Unit 2 auxiliary feedwater system A on January 30, 2018
(3) Unit 3 control building heating ventilation and air conditioning B on March 16, 2018
Complete Walkdown (1 Sample)
The inspectors evaluated system configurations during a complete walkdown of the Unit 3
containment spray system on January 18, 2018.
71111.05AQ - Fire Protection Annual/Quarterly
Quarterly Inspection (5 Samples)
The inspectors evaluated fire protection program implementation in the following selected
areas:
(1) Unit 3 main turbine operating deck and bearings area, Fire Zones 9 and 10, on
January 4, 2018
(2) Unit 2 control room, Fire Zone 17, on January 19, 2018
(3) Unit 2 containment spray pump A room and adjacent corridor, Fire Zones 30A and 88A,
on January 23, 2018
(4) Unit 1 high pressure safety injection pump B room, Fire Zone 31B on February 2, 2018
(5) Unit 3 vital switchgear room A, Fire Zone 5A, on February 8, 2018
71111.07 - Heat Sink Performance
Heat Sink (1 Sample)
The inspectors evaluated Unit 1 diesel generator A lube oil and jacket water heat exchanger
performance on February 21, 2018.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Operator Requalification (1 Sample)
The inspectors observed and evaluated risk informed completion time program and
CFR 50.69 program classroom training on January 31, 2018.
Operator Performance (1 Sample)
The inspectors observed and evaluated operator performance synchronizing the Unit 1 main
generator to the grid following a reactor trip caused by a fault in the main generator
excitation system on February 19, 2018.
The inspectors observed and evaluated operator response to Unit 3 loss of A channel
indication for main steam and feedwater isolation valves, MSIV-170, 171, 180, 181, and
FWIV-174, 177, on February 27, 2018.
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness (2 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated
with the following equipment and/or safety significant functions:
(1) Reach rod operator gear box maintenance on safety injection valves SI-184 and SI-185
in Units 2 and 3
(2) Diesel fuel oil transfer pump predictive engineering cable testing
71111.13 - Maintenance Risk Assessments and Emergent Work Control (5 Samples)
The inspectors evaluated the risk assessments for the following planned and emergent
work activities:
(1) Unit 1 elevated risk due to failure of emergency core cooling system A combined
minimum flow recirculation valve SIA-UV660 on January 4, 2018
(2) Unit 1 emergent risk due to diesel generator A unexpectedly shutdown during a
surveillance run on January 5, 2018
(3) Unit 3 elevated risk due to planned maintenance on containment spray pump A
atmospheric dump valves SG-179A and SG-184A, and low pressure safety injection
valve SI-687 January 29, 2018 through February 4, 2018
(4) Unit 1 elevated risk due to diesel generator A super outage on February 26, 2018
(5) Unit 2 elevated risk due to diesel generator B super outage on March 19, 2018
71111.15 - Operability Determinations and Functionality Assessments (9 Samples)
The inspectors evaluated the following operability determinations and functionality
assessments:
(1) Unit 2 abnormal trend for containment sump level transmitter, RDL-411, on
January 3, 2018
(2) Unit 1 essential spray pond A pressure relief valves lifting during pump starts on
January 25, 2018
(3) Unit 3 containment spray discharge to shutdown cooling heat exchanger valve, SI-685,
failed to re-open during breaker maintenance on January 31, 2018
(4) Unit 1 diesel generator B fuel oil leak from cylinder 8L fuel oil jerk pump on
February 13, 2018
(5) Unit 1 calculated qualified life of safety injection combined header isolation valves,
SI-660 and SI-659, on February 23, 2018
(6) Unit 3 loss of indication of the train A main steam isolation valves and feedwater
isolation valves (MSIV-170, 171, 180, 181 and FWIV-174, 177) on February 27, 2018
(7) Unit 1 auxiliary feedwater bypass motor operated valves SG-138A and SG-139A
T-drains on March 6, 2018
(8) Unit 1 essential cooling water pump A oil samples appear to contain metal or debris on
March 7, 2018
(9) Unit 2 steam generator sodium concentration increase on March 12, 2018
71111.18 - Plant Modifications (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
(1) Unit 1 480V electrical breaker for containment spray to low pressure safety cross-
connect valve, SI-696, replacement with General Electrical model Spectra breaker per
Design Equivalent Change 01035 on March 15, 2018
71111.19 - Post Maintenance Testing (6 Samples)
The inspectors evaluated the following post maintenance tests:
(1) Unit 1 emergency core cooling system A combined minimum flow recirculation valve
SIA-UV660 following limit switch adjustment on January 4, 2018
(2) Unit 1 diesel generator A cooldown relay, power supply, and test hand switch
replacement following an unplanned cooldown during a monthly surveillance run on
January 9, 2018
(3) Unit 3 containment spray pump A test following breaker maintenance on
February 6, 2018
(4) Unit 3 30-volt power supply replacement for lost indication to main steam isolation valves
on February 28, 2018
(5) Unit 2 essential cooling water pump A test and flow balance following planned
maintenance to calibrate motor overcurrent relays and replace a high discharge
pressure switch on March 20, 2018
(6) Unit 2 diesel generator A emergency mode simulated engineered safeguards features
fast start test following online maintenance outage on March 23, 2018
71111.20 - Refueling and Other Outage Activities (1 Sample)
The inspectors evaluated activities from February 15 - 19, 2018, for the Unit 1 forced
outage due to an unplanned reactor trip caused by a fault in the main generator excitation
circuitry.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Routine (6 Samples)
(1) Unit 1 diesel fuel oil transfer pump A inservice test on January 24, 2018
(2) Unit 1 atmospheric dump valve 178 stroke time testing on February 9, 2018
(3) Unit 2 containment leakage type B and C testing, SR 3.0.3 entry for missed
surveillance on February 28, 2018
(4) Unit 3 diesel fuel oil transfer pump A inservice test on March 7, 2018
(5) Unit 3, essential chiller A vibration analysis on March 8, 2018
(6) Unit 1 containment spray pump B inservice test on March 22, 2018
In-service (1 Sample)
(1) Unit 2 containment spray pump A inservice test on March 1, 2018
71114.02 - Alert and Notification System Testing (1 Sample)
The inspectors evaluated the maintenance and testing of the alert and notification system
between May 1, 2016 - February 20, 2018.
71114.03 - Emergency Response Organization Staffing and Augmentation System (1 Sample)
The inspectors evaluated the readiness of the Emergency Response Organization between
May 1, 2016 - February 20, 2018. Inspectors also evaluated the licensees ability to staff
their emergency response facilities in accordance with emergency plan commitments.
71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)
The inspectors evaluated the 10 CFR 50.54(q) emergency plan change process and
practices between May 1, 2016 - February 20, 2018. The evaluation reviewed
screenings and evaluations documenting the implementation of this process. The review
of the change process documentation does not constitute NRC approval.
71114.05 - Maintenance of Emergency Preparedness (1 Sample)
The inspectors evaluated the maintenance of the emergency preparedness program
between May 1, 2016 - February 20, 2018. The evaluation reviewed activations of the
emergency plan, the conduct of drills and exercises, licensee audits and assessments,
and the maintenance of equipment important to emergency preparedness.
71114.06 - Drill Evaluation
Emergency Planning Drill (1 Sample)
The inspectors evaluated a full-scale emergency preparedness drill on February 13, 2018.
RADIATION SAFETY
71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
Radiological Work Planning (1 Sample)
The inspectors evaluated the licensees radiological work planning by reviewing the
following activities:
(1) RWP 2017-9-1016, RMC Operations and Routine Tasks
(2) RWP 2018-1-1523, Temporary Mat Insulation Fiber Inspection
(3) RWP 2017-3002, Reactor Destack/Restack
(4) RWP 2017-3015, Cavity Decontamination
(5) RWP 2017-3039, 10-Year In-Service Inspection Vessel
Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)
The inspectors evaluated dose estimates and exposure tracking.
71124.04 - Occupational Dose Assessment
Source Term Characterization (1 Sample)
The inspectors evaluated the licensees source term characterization.
External Dosimetry (1 Sample)
The inspectors evaluated the licensees external dosimetry program.
Internal Dosimetry (1 Sample)
The inspectors evaluated the licensees internal dosimetry program.
Special Dosimetric Situations (1 Sample)
The inspectors evaluated the licensees performance for special dosimetric situations.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification (15 Samples)
The inspectors verified licensee performance indicators submittals listed below:
(1) IE01: Unplanned Scrams per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
(2) IE03: Unplanned Power Changes per 7000 Critical Hours Sample (January 1, 2017 -
December 31, 2017)
(3) IE04: Unplanned Scrams with Complications (USwC) Sample (January 1, 2017 -
December 31, 2017)
(4) MS05: Safety System Functional Failures (SSFFs) Sample (April 1, 2017 -
December 31, 2017)
(5) EP01: Drill/Exercise Performance (DEP) Sample (January 1, 2017 - December 31,
2017)
(6) EP02: Emergency Response Organization (ERO) Drill Participation Sample (January 1,
2017 - December 31, 2017)
(7) EP03: Alert and Notification System (ANS) Reliability Sample (January 1, 2017 -
December 31, 2017)
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program
related to the following issues:
(1) Multiple failures of diesel generator underfrequency protective relay on March 26, 2018
71153 - Follow-up of Events and Notices of Enforcement Discretion
Events (1 Sample)
The inspectors evaluated the Unit 1 reactor trip following a loss of main generator excitation
and licensees response on February 15 - 16, 2018.
INSPECTION RESULTS
Inadequate Post Maintenance Test Instructions for Diesel Fuel Oil Transfer Pump
Cornerstone Significance Cross-cutting Report
Aspect Section
Mitigating Green [H.12] - 71111.12 -
Systems NCV 05000528/2018001-01 Human Maintenance
Closed Performance, Effectiveness
Avoid
Complacency
The inspectors reviewed a self-revealed, Green, non-cited violation of 10 CFR Part 50,
Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to prescribe
appropriate work instructions for maintenance on the Unit 1 diesel fuel oil transfer pump
- A.
Specifically, following power cable maintenance on November 9, 2017, the instructions for
conducting a post-maintenance test for the transfer pump were inadequate to detect a high
resistance connection in the associated motor control center.
Description: On November 12, 2017, the licensee was conducting a 24-hour surveillance test
run of Unit 1 diesel generator (EDG) A. The EDG was fully loaded at 10:19 a.m. which began
the 24-hour test period. At 10:53 a.m., control room operators received a fuel oil transfer
pump A inoperable equipment status alarm. The diesel fuel oil transfer pump A did not start
on a diesel fuel oil day tank low level signal. Operators manually unloaded and stopped the
EDG a few minutes later and declared the Unit 1 EDG A inoperable due to its inability to run
for its design basis mission time and began troubleshooting the failed fuel oil transfer pump.
Licensee electricians took electrical resistance readings across the connections in the motor
control center for the fuel oil transfer pump breaker. The electricians identified that the direct
cause of the transfer pump failure was a high variable resistance secondary stab connection
in the motor control center cubicle. The electricians removed the breaker and cleaned and
adjusted the connection. Electricians reinstalled the breaker and confirmed an acceptable as
left connection resistance of less than 0.2 ohms. The diesel fuel oil transfer pump was
successfully retested with a 20 minute functional run and the Unit 1 EDG A was declared
operable following the successful completion of the 24-hour surveillance run on November
14, 2017.
The licensees apparent cause investigation determined that the diesel fuel oil transfer pump
breaker had been removed from service for periodic predictive maintenance on November 9,
2017, under work order 4685719. During this maintenance activity licensee engineers
disconnected the diesel fuel oil transfer pump motor power and control cables for megger
testing. Cable lug screw connections attach each of these cables to the secondary stab
connections on the movable motor breaker and the stationary motor control center chassis.
Cable connections on the secondary stab connections are removed for testing, and then
following testing, the cables are re-landed onto the secondary stabs of the breaker and motor
control center chassis. The licensees work planners had not recognized the possibility that
removing and re-landing the cables on the lug screw connections had the potential to disturb
the motor control center secondary stab connections.
The post-maintenance test associated with the cable testing was a momentary start of the
diesel fuel oil transfer pump. The transfer pumps control switch was held in the start position
for only a few seconds. The licensees apparent cause investigation identified that
nonintrusive as-left quantitative resistance checks could have been used to assess the
integrity of the secondary stab connections. The licensee performs similar checks when
performing individual breaker cubicle preventative maintenance tasks that actively remove
and re-test the individual motor control center bucket. Such a check was the method used by
the electricians to initially diagnose the breaker failure. However, no such quantitative
resistance check was specified in the cable testing work order.
The post-maintenance test was not written in accordance with station procedure 30DP-
9WP04, Post-Maintenance Testing Development, Revision 19, Step 4.1.1, which states, in
part, that the post-maintenance test shall ensure that equipment performs its intended
function when returned to service following maintenance, that a new deficiency has not been
created, and that the equipment will function as designed for safe and reliable plant operation.
The act of de-terminating and re-terminating the diesel fuel oil transfer pump cable for testing
created new failure deficiency by disturbing electrical continuity and creating a high resistance
condition at the secondary stab connection that impacted EDG operability. The post-
maintenance test following the cable testing maintenance was not adequate to ensure that a
new deficiency had not been created.
Corrective Action: The licensee has taken corrective action to revise the work instructions for
performing future cable testing to include quantitative resistance retests when re-terminating
motor control center secondary stab connections. As an interim measure, the inspectors
confirmed that all safety-related 480V electrical breakers that have been subject to this cable
testing have performed satisfactorily during subsequent diesel generator surveillance testing.
Corrective Action Reference: Condition Report 17-16497
Performance Assessment:
Performance Deficiency: The licensees failure to prescribe appropriate retest activities
following predictive maintenance on diesel fuel oil transfer pump cables is a performance
deficiency.
Screening: The performance deficiency is more-than-minor and a finding because it is
associated with the equipment performance attribute of the mitigating systems cornerstone
objective to ensure the availability, reliability, and capability of systems that respond to
initiating events to prevent undesirable consequences. Specifically, on November 9, 2017,
the licensee performed cable testing that disturbed the power cables for the Unit 1 diesel fuel
oil transfer pump
- A. Without an appropriate post-maintenance test, this activity rendered the
Unit 1 diesel generator A inoperable.
Significance: The inspectors performed the initial significance determination using NRC
Inspection Manual Chapter 0609, Appendix A, Significance Determination Process for
Findings at Power, Exhibit 2, Mitigating Systems Screening Questions and determined that
the finding was of very low safety significance (Green) because the finding did not represent
an actual loss of safety function of a single train for greater that its technical specification
allowed outage time.
Cross-cutting Aspect: The finding has a cross-cutting aspect in the area of human
performance associated with the avoid complacency aspect. Specifically, licensee work
planners did not consider potential undesired consequences associated with disturbing the
power cables leads, instead relying on past successful tests [H.12].
Enforcement:
Violation: Title 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and
Drawings, requires, in part, that activities affecting quality be prescribed by documented
instructions, procedures, or drawings, of a type appropriate to the circumstances and be
accomplished in accordance with these instructions, procedures, or drawings.
Contrary to the above, on November 9, 2017, the licensee performed maintenance on the
Unit 1 diesel fuel oil transfer pump A, an activity affecting quality to which Appendix B applies,
without documented instructions, procedures, or drawings of a type appropriate to the
circumstances. Specifically, work order 4685719 did not include appropriate testing to ensure
the maintenance was successful and the pump was returned to service, and as a result, the
Unit 1 diesel generator A was rendered inoperable from November 9, 2017 to November 14,
2017.
Disposition: This violation is being treated as a non-cited violation consistent with Section
2.3.2.a of the Enforcement Policy.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On February 16, 2018, the inspector presented the radiation safety inspection results to
Ms.
- M. Lacal, Senior Vice President, Regulatory and Oversight, and other members of the
licensee staff.
On March 2, 2018, the inspector provided a debrief for the emergency preparedness program
inspection to Mr.
- M. McLaughlin, Vice President, Operations Support, and other members of the
licensee staff. On March 29, 2018, the inspector communicated the inspection results
telephonically to Mr.
- T. Weber, Acting Director, Nuclear Regulatory Affairs, and other members
of the licensee staff.
On April 11, 2018, the inspector presented the quarterly residents inspection results to
Mr.
- J. Cadogan, Senior Vice President, Site Operations, and other members of the licensee
staff.
SUPPLEMENTAL INFORMATION
DOCUMENTS REVIEWED
Section 1R04: Equipment Alignment
Procedures
Number Title Revision
40ST-9AF07 Auxiliary Feedwater Pump AFA-P01 Monthly Valve 6
Alignment
40ST-9SI13 LPSI and CS System Alignment Verification 33
Condition Reports (CRs)
16-17321 17-03027
Drawings
Number Title Revision
03-M-HJP-001 P&I Diagram Control Building HVAC 14
03-M-HJP-002 P&I Diagram Control Building HVAC 14
03-M-SIP-001 P&I Diagram Safety Injection & Shutdown Cooling System 49
03-P-SIF-0207 Auxiliary Building Isometric Safety Injection System LPSI & 6
Cont. Spray Discharge
03-P-SIF-0201 Auxiliary Building Isometric Safety Injection System ESF 7
Pump Suction Lines
Miscellaneous
Number Title Revision
STM-30D System Training Manual Volume 30D: Control Building 6
HVAC System (HJ)
Section 1R05: Fire Protection
Procedures
Number Title Revision
14FT-9FP70 Appendix R & Former Tech Spec Penetration Seal Surveillance 13
Condition Reports (CRs)
17-03870 18-00999
Miscellaneous
Number Title Revision/Date
PVNGS Pre-Fire Strategies Manual 26
13-MM-0650 Fire Protection & Spray System Sub 007
13-MS-A083 NFPA Code Applicability and Conformance Review 007
4834415 Fire Safety Component Condition Record November 3, 2016
4834430 Fire Safety Component Condition Record November 3, 2016
4843902 Fire Safety Component Condition Record December 6, 2016
Unit 3 Tamper/Vital/Security Tour - Post 31 February 7, 2018
4971714 Open Door/Hatch/Floor Plug Permit January 29, 2018
4971687 Open Door/Hatch/Floor Plug Permit January 29, 2018
Section 1R07: Heat Sink Performance
Procedures
Number Title Revision
73DP-9ZZ21 Heat Exchanger Visual Inspection 6
73DP-9ZZ11 Heat Exchanger Program 15
Condition Reports (CRs)
18-03133 18-03138 18-03139
Work Orders (WOs)
4591574 4591575 4667054 4667055 4667098
Section 1R11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Number Title Revision
40OP-9MB01 Main Generation and Excitation 63
40DP-9OP02 Conduct of Operations 72
Procedures
Number Title Revision
40AL-9RK6A Panel B06A Alarm Responses 18
Condition Reports (CRs)
18-02797 18-02593 18-03215
Miscellaneous
Number Title Date
Current Alarm Status Report February 16, 2018
Section 1R12: Maintenance Effectiveness
Procedures
Number Title Revision
2MT-9ZZ74 Molded Case Circuit Breaker Test 48
30DP-9WP04 Post-Maintenance Testing Development 19
Condition Reports (CRs)
17-08025-005 17-08025 17-16497
Work Orders (WOs)
25959 4925966 4925967 4925969 4685719
4788985
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
Procedures
Number Title Revision
40DP-9AP21 Protected Equipment 7
70DP-0RA05 Assessment and Management of Risk when Performing 23
Maintenance in Modes 1 and 2
40MT-9ZZ01 Operations Maintenance Activities 5
40DP-9RS01 Operations Department Online Nuclear Risk Management 4
Mode 1 and 2
Condition Reports (CRs)
18-00249 185-00136 18-00336 18-02544
Miscellaneous
Number Title Date
Schedulers Evaluation for PV Unit 1 January 4, 2018
Schedulers Evaluation for PV Unit 1 February 23, 2018
Schedulers Evaluation for PV Unit 3 February 1, 2018
Schedulers Evaluation for PV Unit 2 March 19, 2018
Unit 3 Archived Operator Logs January 29, 2018 -
February 4, 2018
Section 1R15: Operability Determinations and Functionality Assessments
Procedures
Number Title Revision
40ST-9ZZm1 Operations Mode 1 Surveillance Logs 71
40AL-9RK6A Panel B06A Alarm Responses 18
74DP-9CY04 Systems Chemistry Specifications 94
Condition Reports (CRs)
17-18475 12-01397 17-17856 13-01198 18-03127
17-16393 18-03215 18-03291 18-02839 18-01610
18-02334 3127427 18-02468 18-03980
Miscellaneous
Number Title Revision/Date
03-E-SGF-023 Control Wiring Diagram Main Steam Isolation Valves 11
18-02334-003 Engineering Evaluation February 15, 2018
28056 Adverse CRDR July 19, 2013
EQ Program Manual 26
Section 1R18: Plant Modifications
Condition Reports (CRs)
18-04116
Work Orders (WOs)
4989102
Miscellaneous
Number Title Date
DEC-01035 Design Equivalent Change April 12, 2017
Section 1R19: Post-Maintenance Testing
Procedures
Number Title Revision
40OP-9CH12 Refueling Water Tank (RWT) Operations 41
2MT-9ZZ13 Testing and Calibration of 121FC66K01A Time Overcurrent 4
Relays
2MT-9ZZ17 Testing and Calibration of 12PJC11AV1A Instantaneous 4
Overcurrent Relays
40OP-9EW02 Essential Cooling Water System (EW) Train B 26
40ST-9DG01 Diesel Generator A Test 49
73ST-9DG08 Class 1E Diesel Generator Load Reject 24 Hour Rated Load 13
and Hot Start Test Train B
40ST-9DG02 Diesel Generator B Test 54
Condition Reports (CRs)
18-00136 18-00197 18-01931 18-00210 18-00290
18-00336 18-00377 18-00346 18-04731 18-04732
Work Orders (WOs)
4964492 4822983 4981967 4726747 4821113
4847651 4965079 4972486 4847637
Drawings
Number Title Revision
01-E-DGB-007 Elementary Diagram: Diesel Engine Control 15
01-E-DGF-007 Control Wiring Diagram: Diesel Engine 13
13-M018-00141 Control Schematic (Starting Sequence Control) 25
Miscellaneous
Number Title Revision/Date
18-00210-004 Engineering Evaluation: EDG 1A Unexpected Cooldown January 8, 2018
during Surveillance Run 1/5/2018
Section 1R20: Refueling and Other Outage Activities
Procedures
Number Title Revision
40OP-9MB01 Main Generation and Excitation 63
Section 1R22: Surveillance Testing
Procedures
Number Title Revision
73DP-9CL02 Containment Leakage Rate Testing Program 33
73ST-9XI20 Atmospheric Dump Valves - Inservice Test 47
73ST-9SI06 Containment Spray Pumps and Check valves - Inservice 42
Test
73ST-9DF01 Diesel Fuel Oil Transfer Pumps - Inservice Test 34
40DP-9OP06 Operations Department Repetitive Task Program 130
73ST-9SI06 Containment Spray Pumps and Check Valves- Inservice 42
Test
Condition Reports (CRs)
16-15793 18-03304 18-01314 18-03825
Work Orders (WOs)
22921 4840032 4843076 4843390
Miscellaneous
Number Title Revision/Date
13-JC-SI-0215 Containment Spray Pump Discharge Flow Indication 18
Loops Uncertainty Calculation
18-01314-002 Engineering Evaluation: ADV 178 Fast Stroke Time January 26, 2018
18-03304-002 Engineering Evaluation: SR 3.0.3 Evaluation for March 2, 2018
SB-200, 202, and 205
Section 1EP2: Alert and Notification System Testing
Miscellaneous Documents
Number Title Date
ID/Letter Palo Verde Nuclear Generating Station Alert and May 26, 2017
Number: Notification System (ANS) FEMA 350 Report -
240-02802 May 2017
Palo Verde Nuclear Generating Station, Alert and May 2017
Notification System (ANS), FEMA 350 Report
Palo Verde Nuclear Generating Station Siren Operating November 2015
Manual January 4, 2018
Letter from FEMA Region IX to Director, Division of September 19,
Emergency Management, State of Arizona 2017
State of Arizona/Maricopa County Offsite Emergency November 2017
Response Plan, Palo Verde Nuclear Generating Station
The Maricopa County Sheriffs Office Emergency August 2016
Response to Palo Verde Nuclear Generating Station
Work Orders (WOs)
474965/0
Section 1EP3: Emergency Response Organization Staffing and Augmentation
Procedures
Number Title Revision
EP-0902 Notifications 10
EP-0901 Classifications 10
40AL-9RK7C Panel B07C Alarm Responses 15
40AO-9ZZ21 Acts of Nature 37
79IS-9SM01 Analysis of Seismic Event 27
Miscellaneous Documents
Number Title Date
240-02799 2017 1 Quarter - Emergency Preparedness
st
March 21, 2017
JF/MA Augmentation Drill Report
240-02803 2017 2nd Quarter - Emergency Preparedness June 6, 2017
CS/MA Augmentation Drill Report
240-02797 2017 3rd Quarter - Emergency Preparedness July 25, 2017
Augmentation Drill Report (After Hours)
240-02808 2017 3rd Quarter - Emergency Preparedness September 6, 2017
Augmentation Drill Report
240-02817 2017 4th Quarter - Emergency Preparedness December 13,
CS/ma Augmentation Drill Report 2017
240-02790 2016 2nd Quarter - Emergency Preparedness June 23, 2016
JF/MA Augmentation Drill Report
240-02791 2016 3rd Quarter - Emergency Preparedness August 3, 2016
JF/MA Augmentation Drill Report
240-02798 December 5, 2016, Alert Event Report January 17, 2017
Section 1EP4: Emergency Action Level and Emergency Plan Changes
Procedure
Number Title Revision
16DP-0EP22 Emergency Plan Maintenance 11, 12
Miscellaneous Documents
Number Title Date
Evaluation Replace the Meteorological Instrumentation and Data August 8, 2017
Tracking Number Transmission System (MDTS)
2017-001E
Evaluation EP-0900, Rev. 16 August 17, 2017
Tracking Number
2017-003E
Evaluation EP-0901, Rev. 10 August 21, 2017
Tracking Number
2017-004E
Screening 74RM-9EF42, Radiation Monitor Alarm Setpoint April 16, 2017
Tracking Number Determination, Rev. 30
2017-002S
Screening Procedure EP-0901, Classifications, Added New EALs August 20, 2017
Tracking Number form EPLAN R60, Revise PV Proc Format
2017-022S
Miscellaneous Documents
Number Title Date
Screening EP-905, Revision 9, Protective Actions June 7, 2017
Tracking Number
2017-014S
Screening DMWO 3452940 Palo Verde Nuclear Generating September 8,
Tracking Number Station Radio Replacement Project 2017
2017-023S
Screening 40AO-9ZZ18 R018 Fire Outside Control Room September 26,
Tracking Number 2017
2017-029S
EPM Tracking DEC-00720 Allow Solar-Charged Offsite Sirens to February 18,
Number Replace AC-Charged Offsite Sirens 2015
2015-006S
Section 1EP5: Maintenance of Emergency Preparedness
Procedures
Number Title Revision
01DP-0AP12 Condition Reporting Process 28
01DP-0AP12-01 Condition Reporting Process Administrative Guide 4
EP-0905 Protective Actions 9
EP-0902 Notifications 8, 9, 10
16DP-0EP31 Emergency Preparedness Equipment Out-of-Service 9
16DP-0EP27 Emergency Preparedness Equipment Testing 10
16DP-0EP28 Emergency Facility/Kit Inventories and Inspections 5
Condition Reports (CRs)
16-08461 16-09213 16-11134 16-11930 16-12640 16-13501
16-14593 16-14934 16-16710 17-02188 17-03147 17-03149
17-03202 17-03605 17-03721 17-03736 17-03826 17-03828
17-03829 17-03884 17-04633 17-06893 17-08328 17-10906
17-10949 17-11437 17-13663 17-14927 17-15449 17-15797
17-15884 17-16771 17-17091 17-17218 17-17739 17-18443
18-03244
Miscellaneous Documents
Number Title Revision/Date
KLD TR-983 Palo Verde Nuclear Generating Station, December 7,
2017 Population Update Analysis 2017
KLD TR-895 Palo Verde Nuclear Generating Station, December 8,
2016 Population Update Analysis 2016
Updated Review of Palo Verde Nuclear Generating September 29,
Station Emergency Plan 2016 Letters of Agreement 2016
Letter # 240- 2017 Review of Palo Verde Nuclear Generating Station December 26,
2819 Emergency Plan Letters of Agreement 2017
NAD Audit 2016- Nuclear Assurance Department (NAD) Audit Plan and December 14,
010 Report, 2016-010, Emergency Preparedness 2016
Palo Verde Nuclear Generating Station After Action August 18,
Report/Improvement Plan, Exercise Date - June 1, 2017
2017, Radiological Emergency Preparedness Program
ID: 240-02806 2017 Onsite Contaminated Injury/Health Physics Drill June 23, 2017
Report (Revised)
ID: 240-02816 2017 Health Physics Drill Report (November 2017) December 12,
2017
ID: 240-02818 1709 ERO Mini Drill - ERO Blue Team December 21,
(December 2017) 2017
NAD Audit 2017- Nuclear Assurance Department (NAD) Audit Plan and January 25,
008 Report, 2017-008, Emergency Preparedness 2018
240-02812 1704 and 1705 ERO Mini Drills - ERO White Team and October 18,
CS/MA Green Team (June and July 2017) 2017
240-02813 1706 ERO Mini Drill - ERO Gold Team (July 2017) October 18,
CS/MA 2017
240-02814 1707 ERO Mini Drill - ERO Red Team (August 2017) October 18,
TW/MA Revision 1 2017
Emergency Response Facility Telephone Book, January 1,
1st Quarter Edition 2018 2018
240-02801 1702 IPZ Evaluated Exercise - ERO White Team April 6, 2017
JF/MA (March 2017)
240-02797 1608 ERO Mini Drill - ERO Red Team January 4,
JF/MA (December 2016) 2017
240-02792 1604 and 1605 ERO Drills September 14,
JF/MA 2016
240-02793 1606 ERO Mini Drill - ERO Green Team October 4,
JF/MA (September 2016) 2016
Miscellaneous Documents
Number Title Revision/Date
240-02795 1609 Off-Hours Drive-in Augmentation Drill - December 2,
JF/MA (November 2016) 2016
240-02796 2016 Health Physics Drill Report (November 2016) December 7,
2016
Evaluation Evaluate Adding STSC ENS Communicator Duties to September 7,
Report 16-11134 STSC Communicator 2016
17-11437-002 Actual Event Investigation, Unit 3 Ammonia Sight glass September 28,
Break 2017
17-13663-001 Actual Event Investigation, Unit 2 Loss of Annunciators October 11,
2017
Level 4 Default Values Used in Dose Assessment November 30,
Evaluation 2017
Report 17-
15797-001
Document No. Master Agreement Between Arizona Public Service 0
500599510 Company and Westinghouse Electric Company LLC for
Goods and Services (Effective January 29, 2016 to
December 31, 2018)
Palo Verde Nuclear Generating Station After Action May 26, 2017
Report/Improvement Plan, Exercise Dates - March 7-8,
2017, Radiological Emergency Preparedness Program
(REPP)
240-02789 2016 Health Physics Drill Report (Re-Demonstration) June 9, 2016
JF/TW
240-02788 2016 Contaminated Injury/Health Physics Drill Report April 22, 2016
JF/MA
Palo Verde Nuclear Generating Station After Action February 9,
Report/Improvement Plan, Exercise Date - 2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
240-02787 1602 IPZ Exercise - ERO Green Team (March 2016) March 25, 2016
JF/MA
Palo Verde Nuclear Generating Station After Action February 9,
Report/Improvement Plan, Exercise Date - 2017
November 16, 2016, Radiological Emergency
Preparedness Program (REPP)
Level 3 Evaluation Report 18-02668-002 March 22, 2018
Work Orders (WOs)
4782667 4783959/0 4787729/0 4787847/0 4836236
4836263/0 4860832/0 4862234/0 4862502/0 4885361/0
4889725/0 4896971/0 4901070 4916668/0 4918303/0
4918455/0 4937577/0 4947802/0
Section 1EP6: Drill Evaluation
Procedures
Number Title Revision
EP-0900 Emergency Response Organization (ERO) Position 16
Checklists
EP-0901 Classifications 10
Condition Reports (CRs)
18-02352 18-02503 18-02655
Section 2RS2: Occupational ALARA Planning and Controls
Procedures
Number Title Revision
75DP-0RP03 ALARA Program Overview 06
75DP-0RP06 ALARA Committee 07
75DP-0RP08 Managing Radiological Risk 02
75RP-9RP02 Radiation Work Permits 31
75RP-9RP25 Temporary Shielding 14
75TD-9RP02 ALARA Work Planning 11
Audits and Self-Assessments
Title Date
PVGS Integrated Performance Assessment Report Radiation September 14, 2017
Protection 2nd Quarter 2017
2016 Annual ALARA/Management Evaluation Report June 23, 2017
2016 Annual Radiation Protection Program Summary Report July 27, 2017
Condition Reports (CRs)
17-15502 17-15529 17-15802 17-16741 17-17944
17-18180 18-01890
Radiation Work Permits/ALARA Reviews
Number Title
RWP 2017-9-1016 RMC Operations and Routine Tasks
RWP 2018-1-1523 Temporary Mat Insulation Fiber Inspection
RWP 2017-3002 Reactor Destack/Restack
RWP 2017-3015 Cavity Decontamination
RWP 2017-3039 10-Year In-Service Inspection Vessel
Miscellaneous
Title Date
ALARA 5-Year Plan 2015 - 2019 November 2015
1R20 Radiological Safety Summary In Perspective November 7, 2017
2R20 Radiological Safety Summary In Perspective May 9, 2017
3R19 Radiological Safety Summary In Perspective November 10, 2016
Section 2RS4 : Occupational Dose Assessment
Procedures
Number Title Revision
75DP-0RP01 RP Program Overview 11
75DP-0RP06 Managing Radiological Risk 2
75RP-9ME23 Exposure Evaluation for Lost, Damaged, or Suspect 12
Dosimetry, and Anticipated EPD Dose Rate Alarm
75RP-9ME24 Dosimetry Processing, Evaluation, and Documentation 5
75RP-9ME25 TLD Reader Calibration and Response Check 6
75RP-9RP03 Bioassay Analysis 10
75RP-9RP05 Contamination Dose Evaluation 7
75RP-9RP16 Special Dosimetry 24
75RP-9QE21 Calibration of Self-Indicating Dosimeters 13
Procedures
Number Title Revision
75RP-9QE26 Operation and Verification of the Merlin Gerin Model CDM- 10
Calibrator
Audits and Self-Assessments
Title Date
2016 Annual ALARA/Management Evaluation Report June 23, 2017
2016 Annual Radiation Protection Program Summary Report July 27, 2017
Condition Reports (CRs)
17-14033 17-14127 17-14527 17-15700 18-01423
Self-Reading Dosimeter Calibration Records
Number Title Date
837097 Self-Reading Dosimeter September 8, 2017
836204 Self-Reading Dosimeter September 9, 2017
833059 Self-Reading Dosimeter September 30, 2017
810641 Self-Reading Dosimeter gamma/neutron December 12, 2017
810633 Self-Reading Dosimeter gamma/neutron December 12, 2017
810552 Self-Reading Dosimeter gamma/neutron December 13, 2017
Miscellaneous
Number Title Date
2017 Multi-Pack TLD Results 2017
100536 NVLAP Accreditation Report April 8, 2016
100536 NVLAP Proficiency Testing Results - TLD May 2, 2016
100536 NVLAP Proficiency Testing Results-EPD August 5, 2016
100536 NVLAP Accreditation Report February 15, 2018
2017 Unit 1 Dry Active Waste December 1, 2017
2017 Unit 2 Dry Active Waste May 18, 2017
2016 Unit 3 Dry Active Waste December 22, 2016
25116 Intake Dose Assessment April 21, 2016
Miscellaneous
Number Title Date
47194 Personnel Dosimetry Processing Report November 15, 2017
Section 4OA1: Performance Indicator Verification
Miscellaneous
Number Title Date
2016-002-01 Licensee Event Report June 27, 2017
2017-001-00 June 27, 2017 June 14, 2017
Palo Verde Plant Computer PI ProcessBook
Palo Verde Control Room Logs (1/1/17 - 12/31/17)
Section 4OA2: Problem Identification and Resolution
Procedures
Number Title Revision
40ST-9DG01 Diesel Generator A Test 49
Condition Reports (CRs)
17-15901 18-03517 17-15838 17-11155 17-09750
16-03783
Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion
Condition Reports (CRs)
18-02544 18-02688 18-02664 18-02605 18-02716
The following items are requested for the
Occupational Radiation Safety Inspection
at Palo Verde Nuclear Generating Station, Units 1, 2, and 3
February 12 to 16, 2018
Integrated Report 2018001
Inspection areas are listed in the attachments below.
Please provide the requested information on or before January 26, 2018.
Please submit this information using the same lettering system as below. For example, all
contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled
1- A, applicable organization charts in file/folder 1- B, etc.
If information is placed on ims.certrec.com, please ensure the inspection exit date entered is at
least 30 days later than the onsite inspection dates, so the inspectors will have access to the
information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed
below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the
entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear
to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which
file the information can be found.
If you have any questions or comments, please contact Louis Carson at (817) 200-1221 or
louis.carson@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget,
control number 3150-0011.
2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection: October 20, 2017
A. List of contacts and telephone numbers for ALARA program personnel
B. Applicable organization charts
- C. Copies of audits, self-assessments, and LERs, written since date of last inspection,
focusing on ALARA
D. Procedure index for ALARA Program
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews
the procedure indexes.
1. ALARA Program
2. ALARA Committee
3. Radiation Work Permit Preparation
F. A summary list of corrective action documents (including corporate and sub-tiered
systems) written since date of last inspection, related to the ALARA program. In addition
to ALARA, the summary should also address Radiation Work Permit violations,
Electronic Dosimeter Alarms, and RWP Dose Estimates
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
- G. List of work activities greater than 1 rem, since date of last inspection,
Include original dose estimate and actual dose.
H. Site dose totals and 3-year rolling averages for the past 3 years (based on dose of
record)
I. Outline of source term reduction strategy
- J. If available, provide a copy of the ALARA outage report for the most recently completed
outages for each unit
K. Please provide your most recent Annual ALARA Report.
4. Occupational Dose Assessment (Inspection Procedure 71124.04)
Date of Last Inspection: January 22, 2016
A. List of contacts and telephone numbers for the following areas:
1. Dose Assessment personnel
B. Applicable organization charts
written since date of last inspection, related to:
1. Occupational Dose Assessment
D. Procedure indexes for the following areas:
1. Occupational Dose Assessment
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures will be requested by number after the inspector reviews
the procedure indexes.
1. Radiation Protection Program
2. Radiation Protection Conduct of Operations
3. Personnel Dosimetry Program
4. Radiological Posting and Warning Devices
5. Air Sample Analysis
6. Performance of High Exposure Work
7. Declared Pregnant Worker
8. Bioassay Program
F. List of corrective action documents (including corporate and sub-tiered systems) written
since date of last inspection, associated with:
1. National Voluntary Laboratory Accreditation Program (NVLAP)
2. Dosimetry (TLD/OSL, etc.) problems
3. Electronic alarming dosimeters
4. Bioassays or internally deposited radionuclides or internal dose
5. Neutron dose
NOTE: The lists should indicate the significance level of each issue and the search
criteria used. Please provide in document formats which are searchable so that
the inspector can perform word searches.
- G. List of positive whole body counts since date of last inspection, names redacted if
desired
H. Part 61 analyses/scaling factors
I. The most recent National Voluntary Laboratory Accreditation Program (NVLAP)
accreditation report or, if dosimetry is provided by a vendor, the vendors most recent
results
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JDixon Yes No Publicly Available Sensitive NRC-002
OFFICE DRP/SRI DRP/RI DRP/RI C:DRS/EB1 C:DRS/EB2 C:DRS/OB
NAME CPeabody DReinert DYou TFarnholtz JDrake VGaddy
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/
DATE 4/30/18 5/1/2018 5/1/18 04/30/2018 4/30/18 4/30/18
OFFICE C:DRS/PS2 TL:IPAT C:DRP/D
NAME HGepford GGeorge GMiller
SIGNATURE /RA/ /RA/ /RA/
DATE 4/30/18 4/30/2018 5/7/18