Line 56: Line 56:
==REACTOR SAFETY==
==REACTOR SAFETY==


===71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a) ===
===71111.05XT - Fire Protection - NFPA 805     Fire Protection Inspection Requirements (IP Section 02.01a) ===
{{IP sample|IP=IP 71111.05|count=4}}
{{IP sample|IP=IP 71111.05|count=4}}
The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:
The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

Latest revision as of 05:43, 18 December 2019

Triennial Fire Protection Inspection Report 05000395/2019012
ML19301A443
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/25/2019
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Stoddard D
Dominion Energy
References
IR 2019012
Download: ML19301A443 (13)


Text

ber 25, 2019

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000395/2019012

Dear Mr. Stoddard:

On October 3, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station and discussed the results of this inspection with Mr. George Lippard III and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 05000395 License No. NPF-12

Enclosure:

Inspection Report 05000395/2019012 w/Attachment: Supplemental Information

Inspection Report

Docket Number: 05000395 License Number: NPF-12 Report Number: 05000395/2019012 Enterprise Identifier: I-2019-012-0013 Licensee: Dominion Energy Facility: Virgil C. Summer Nuclear Station Location: Jenkinsville, SC Inspection Dates: September 16, 2019 to October 03, 2019 Inspectors: P. Braaten, Reactor Inspector E. Coffman, Senior Reactor Inspector (Lead Inspector)

J. Dymek, Reactor Inspector M. Singletary, Reactor Inspector Approved By: Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Virgil C. Summer Nuclear Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items Type Issue Number Title Report Section Status NOV 05000395/2017002-01 Closure of Previous NRC- 71111.05XT Closed identified SL-IV Cited Violation NOV 05000395/2016007-01 Closure of Previous NRC- 71111.05XT Closed identified SL-IV Cited Violation

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a)

The inspectors evaluated fire protection program implementation in the following selected areas and/or fire zones, including analyzed electrical circuits:

(1) Fire Zone CB06 - Control Building Relay Room (CB 436 ft)

Analyzed Circuits:

  • Pressurizer Backup Heaters
(2) Fire Zone AB01.04, Auxiliary Building General Area (AB 388 ft)

Analyzed Circuits:

  • Alternate Seal Injection (ASI) Pump XPP0230 Local Disconnect Switch
  • ASI Diesel Generator XEG0101 Local Disconnect Switch
  • 'A' Component Cooling Water Booster Pump
  • LCV-115C-CS and LCV-115E-CS, Volume Control Tank Level Control Valves to Charging Pump Suction
(3) Fire Zone IB20, Intermediate Building 1DA 7.2kV Switchgear Room (IB 463 ft)

Analyzed Circuits:

  • 1DA 7.2kV Switchgear
  • Letdown Line Isolation Valves LCV-459-CS and LCV-460-CS
  • XPP0043A, 'A' Charging/Safety Injection Pump
  • 1DA2 480V Switchgear Bus, Unit 5C
  • XVG-8000A-RC, Pressurizer Power Operated Relief Valve Inlet Isolation Valve
(4) Fire Zone DG01.02, A Emergency Diesel Generator Room (DG 436 ft and 463 ft)

B.5.b Inspection Activities (IP Section 02.03) (1 Sample)

The inspectors evaluated the following B.5.b Mitigating Strategies:

(1) Refueling Water Storage Tank (RWST) make-up using fire service water

INSPECTION RESULTS

Observation: Closure of Two Previous NRC Identified SL-IV Cited Violations 71111.05XT The inspectors reviewed the licensees response to NOVs05000395/2016007-01 and 05000395/2017002-01 and determined that the reasons, corrective actions taken and plans to address recurrence, and the date when full compliance was achieved for these violations is adequately addressed and captured on the docket.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 3, 2019, the inspectors presented the triennial fire protection inspection results to Mr. George Lippard III and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.05XT Calculations 43035-CALC-08 VC Summer NFPA 805 FRE Report Rev. 3A

DC00070-008 BDBMG CST and RWST Flow Rate Calculations Rev. 1A

DC00340-001 Fire PRA Final Report Rev. 1A

DC00340-001 Fire PRA Fire Risk Quantization Report, Task 5.14 Rev. 0

2

DC00340-003 V.C. Summer NFPA 805 FRE Report Rev. 3A

DC00340-007 Fire Human Reliability Analysis Rev. 1A

DC0780D-001 NFPA Code of Record-Fire Detection Rev. 2A

TR-08620-312 Nuclear Safety Capability Assessment Fire Shutdown Rev. 2

Analysis

TR07800-007 Fire PRA Fire Ignition Frequency Analysis (Task 5.6) Rev. 3

TR07800-008 Non-Power Operational Modes Transition Review Rev. 1

TR07800-009 NFPA 805 and Fire PRA Circuit Analysis, Task 4.4 Rev. 1

TR07800-033 Fire Safety Analysis Report Rev. 0A

TR08620-015 Nuclear Safety Equipment Report Rev. 1

TR08620-034 Fire Response Abnormal Operating Procedures Technical Rev. 1

Basis Document

TR08620-036 NFPA 805 Recovery Actions, Feasibility/Reliability Study Rev. 1

TR08620-036 NFPA 805 Recovery Actions, Feasibility/Reliability Study Rev. 2

Corrective Action CR-16-05919 Corrective actions were not taken to resolve NRC-identified 11/23/2016

Documents severity level IV non-cited violation,05000395/2016001-01,

which resulted in a cited violation

CR-16-06023 Receipt of NRC Problem and Identification Report 11/30/2016

05000395/2016007

CR-17-00537 Licensing Basis documentation associated with NFPA 805 02/01/2017

CR-17-04331 Receipt of Inspection Report 05000395/2017002 and NOV 08/09/2017

CR-17-04335 Corrective action(s) to restore compliance for the Oil 08/09/2017

Collection Devices for Reactor Coolant Pump Motors

CR-19-00607 Cable that supplies power to MVB03116C-SW has 02/15/2019

KaoWool wrapped around its metal conduit for Fire

Protection.

Inspection Type Designation Description or Title Revision or

Procedure Date

CR-19-02334 Use of data from an unapproved Flowserve Report in the 06/27/2019

station's Fire PRA

Corrective Action CR-19-03076 Discrepancies in the FP1AB-388 and FP1AB-388A fire pre- 08/29/2019

Documents plans

Resulting from CR-19-03342 Discrepancies in the FP1IB-412 fire pre-plan 09/19/2019

Inspection CR-19-03463 Total count for medium voltage HEAFs was incorrect for 09/30/2019

Fire Area IB-20

CR-19-03465 Total count for medium voltage HEAFs was incorrect for 09/30/2019

Fire Area IB-20

CR-19-03491 Fire hydrant FHHH #21 missing label 10/01/2019

Drawings 1MS-55-040 Low Pressure CO2 Fire Extinguishing System Schematic Rev. 4

Arrangement, Sheet 1

1MS-55-040 Low Pressure CO2 Fire Extinguishing System Schematic Rev. 6

Arrangement, Sheet 3

1MS-55-085 Diesel Generator Building/Diesel Fire Pump Room, Sheet Rev. 14

B-023-311 Penetration Seal Typical Design, Wall and Floor Detail, Rev. 0

Sheet 1

B-208-021- Letdown Orifice Isolation XVT 8149A Rev. 9

CS0083A

B-208-021- Letdown Isolation Orifice Isolation XVT-8149A Rev. 7

CS0083B

B-208-021- Letdown Isolation Orifice Isolation XVT-8149A Rev. 11

CS0083C

B-208-032- EF Isolation From Turbine Driven PP to Steam Gen "A" IFV- Rev. 12

EF0037B 3536

B-208-067- Main Steam to EFW Pump Turbine Rev. 11

MS0046

B-208-082- Pressure Power Relief Valve PCV 444B Rev. 16

RC0050

B-208-201- Electrical Elementary Diagram Service Water Pump A Rev. 8

SW0001

D-912-157 Building Service System Flow Diagram Intermediate Rev. 12

Inspection Type Designation Description or Title Revision or

Procedure Date

Building ESF SWGR

E-201-240 Electrical, Fire, Pressure and Radiation Barrier Details-Wall Rev. 7

and Floor Openings, Sheet 5

E-206-005 Simplified Plant Electrical Distribution Rev. 32

E-214-073 Arrangement of Cable Trays Auxiliary Building North Above Rev. 5

385-0 and 397-0

E-221-650 Conduit Layout Fire Protection Auxiliary Building above El. Rev. 3

388' & 397'

E-302-671 Chemical and Volume Control Rev. 12

E-302-672 Chemical and Volume Control Rev. 14

E-302-673 Chemical and Volume Control Rev. 21

E-302-674 Chemical and Volume Control Rev. 14

E-302-675 Chemical and Volume Control Rev. 37

E-922-612 Building Service HVAC Control Complex Floor Elevation Rev. 24

436-0

Engineering ECR 50909 RCP Oil Lift Pump Enclosure 01/4/2018

Changes

Engineering 14-03 PRA Evaluation of Fire Procedure Time Estimates Rev. 2

Evaluations TR0780E-001 Safe Shutdown Separation Fire Protection Engineering Rev. 0A

Equivalency Evaluations

TR0780E-005 Fire Protection Engineering Equivalency Evaluations Rev. 0B

TR0780E-006 Fire Protection Equivalency Evaluation, Attachment FEAT- Rev. 0H

Fire Plans FP1AB-388 Auxiliary Building El. 388 Rev. 1

FP1AB-388A Auxiliary Building El. 400 Rev. 1

FP1CB-436 Control Building El. 436 Rev. 1

FP1DG-436 Diesel Generator Building El. 436 Rev. 1

FP1DG-463 Diesel Generator Building El. 463 Rev. 1

FP1IB-412 Intermediate Building El. 412' Rev. 2

FP1IB-463 Intermediate Building El. 463 Rev. 2

FP1IDX-001 Fire Preplan Index Rev. 3

FP1LGD-001 Fire Preplan Legend Rev. 1

Inspection Type Designation Description or Title Revision or

Procedure Date

Miscellaneous Diesel Fire Pump Fuel Oil Storage Tank Sample Analysis 08/20/2019

1MS-54-418 Air Balance Inc. Submittal Data, U.L. Classified Fire 10/28/1977

Seal/Fire Door Model 319W

1MS-54-420 Air Balance Inc. Submittal Data, U.L. Classified Fire 10/09/1978

Seal/Fire Door Model 119L

1MS-54-425 Air Balance Fire/Seal Schedule 09/19/1978

1MS-54-429 S&R Products Electro-Thermal Link 10/25/1978

1MS-55-042 Relay Room CO2 Heat Collector, Cardox Corporation 01/19/1978

Detect-A-Fire 140F, Stock No.150112

1MS-94B-1717 Simplex Incipient Detection Equipment Rev. 0

DBD-FP NFPA 805 Fire Protection Rev. 2

EE-02 Cable and Conduit Routing Rev. 1H

EE-09 NFPA 805 Circuit Selection, Circuit Analysis, and Circuit Rev. 0B

Routing

RC-18-0091 License Amendment Request - LAR-16-01490 NFPA 805 08/28/2018

Program Revisions

RC-18-0091 License Amendment Request to Revise NFPA 805 Program 08/29/2018

RCA 17-00537 Regulatory/Current License Basis Noncompliance 05/02/2019

VCS-TQP-0606 Fire Protection Training Rev. 0C

WCAP-16175-P Model for Failure of RCP Seals Given Loss of Seal Cooling 01/2004

in CE NSSS Plants

WCAP-16175-P- Model for Failure of RCP Seals Given Loss of Seal Cooling 03/2007

A in CE NSSS Plants

Procedures AOP-900, Operational Impacts of Loss of Electrical Buses Due to Fire Rev. 1

Appendix A

AOP-900, Post Fire Transition to Cold Shutdown - Other Potentially Rev. 0

Appendix B Affected Components

AOP-900, Local Operator Actions Rev. 1

Appendix C

AOP-900.01 Fire Response Initial Actions Rev. 3

AOP-900.02 Control Room Evacuation Due to Fire Rev. 2

AOP-900.04 Control Building Fire Zone Response Actions Rev. 4

AOP-900.05 Intermediate Building Fire Zone Response Actions Rev. 1

Inspection Type Designation Description or Title Revision or

Procedure Date

AOP-900.06 Auxiliary Building and Fuel Handling Building Fire Zone Rev. 1

Response Actions

AOP-900.10 Diesel Generator Fire Zone Response Actions Rev. 0

BDMG-2.0 Beyond Design Basis Mitigating Guideline Rev. 2

EC-03 Processing Engineering Change Packages Rev. 6I

ES-0427 Program / Issue Screening Rev. 3F

ES-0911 NFPA 805 - Fire Protection Monitoring Program Rev. 0

FPP-020 Program Administration Rev. 6E

FPP-022 Fire Prevention Rev. 5A

FPP-024 Fire Suppression Rev. 5

FSP-2.0 Flex Support Procedure - Alternate EFW Suction Source Rev. 1

ICP-230.006 Incipient Detection Functional Check Rev. 1

ICP-500.030 Incipient Detection Maintenance Procedure Rev. 1A

OAP-100.6 Control Room Conduct and Control of Shift Activities Rev. 4N

SAP-0131 Fire Protection Program Rev. 10B

SAP-0142 Station Housekeeping Program Rev. 17E

SAP-131A Fire Protection Surveillances and Compensatory Measures Rev. 4A

STP-128.012 NFPA 805 Required Fire Hydrant Inspection Rev. 8

STP-128.021 Fire Service Water Flow Test Rev. 11B

STP-128.024 CO2 System Functional Refuel Test Rev. 10

STP-606.002 Fire Pump Diesel Engine Fuel Oil Storage Tank Oil Analysis Rev. 9D

STP-728.402 Fire Yard Hydrant Annual Inspection and Hydrostatic Rev. 6

Testing

TR07870-019 Penetration Seal Design Guide Rev. 0

VCS-ERP-0050 ERU Equipment Inventory Rev. 4

VCS-ERP-0130 BDB Emergency Equipment Management Rev. 0A

Self-Assessment CR-19-00506 71111.05XT Triennial Fire Protection Self Assessment 04/12/2019

QA-AUD-2017-03 Fire Protection Audit Notification 01/31/2017

QA-AUD-201804 Fire Protection Annual 03/26/2018

QA-AUD-201903 Fire Protection Bi/Triennial 03/27/2019

Work Orders 1610548 CO2 System Functional Test 01/19/2017

1610897 Fire Hose Hydro Test 06/26/2017

Inspection Type Designation Description or Title Revision or

Procedure Date

1615983 DG Building Pre-Action Sprinkler Operability Test 07/25/2017

1615983 Diesel Generator Pre-action Sprinkler System OPS Testing 07/25/2017

1706346 ESF SWGR RM. 1DA Air Handling Unit XFD-0178 01/02/2018

Inspection

1714790 CO2 Valve Line-up Verification 01/31/2018

1800412 CO2 System Functional Test 05/24/2018

1801620 Intermediate Building El. 436-0 Simplex 4100 UT1B2 05/29/2018

1801620 Smoke Detector Functional Test 05/09/2019

1801625 Smoke Detection Functional Test 05/29/2018

1801625 Intermediate Building El. 436-0 Simplex 4100 UT1B2 05/29/2018

1801690 Fire Hose Visual Inspection 04/23/2018

1802465 Incipient Detection Surveillance 01/02/2019

1810811 CO2 Valve Line-up Verification 08/02/2018

1811319-001 DG Building Preaction Sprinkler Operability Test 01/15/2019

1812537-001 Control Room Evacuation Panel Emergency Tool Locker 06/29/2019

Inventory List

1816495 Relay Room Cooling, XFD-0016 Inspection 01/30/2019

1817412-001 IB Preaction Sprinkler System Operability Testing 02/14/2019

1904113-001 Smoke Detector Functional Test Zone N Control Building 04/03/2019

448'

1904467-001 Smoke Detector Functional Test Zone XX Control Building 04/10/2019

448'

10