{{#Wiki_filter:February 25, 2008 Mr. James McCarthy Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS);
{{#Wiki_filter:ary 25, 2008
 
==SUBJECT:==
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS);
5000301/2008402(DRS)
5000301/2008402(DRS)


==Dear Mr. McCarthy:==
==Dear Mr. McCarthy:==
On January 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 18, 2008, with you and other members of your staff.
On January 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 18, 2008, with you and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified.
No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Enclosure Contains Sensitive Unclassified Act (5 U.S.C. 552)   Non-Safeguards Information. Upon separation, this page is decontrolled.
 
Exemption number: 5 Nuclear Regulatory Commission review required before public release.
Exemption number: 5 Nuclear Regulatory Commission review required before public release.


Dale Lawver, RIII/DRS/PSB Name and organization of person making determination.
Dale Lawver, RIII/DRS/PSB Name and organization of person making determination.


Date of determination: 01/28/08___ Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Date of determination: 01/28/08___ Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);
/RA/
05000301/2008402(DRS) w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO  
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);
05000301/2008402(DRS)
w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
 
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety  
/RA/
 
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);
Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS); 05000301/2008402(DRS)
05000301/2008402(DRS)
w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\POI 2008 402 DRS OUO.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DLawver:co JKutlesa for MKunowski DFunk EDuncan DATE 2/21/08 2/20/08 2/21/08 2/25/08 OFFICIAL RECORD COP Y Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Letter to James McCarthy from Eric Duncan dated February 25, 2008.
w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon K. Duveneck, Town Chairman  separation, this page is decontrolled.


SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS); 05000301/2008402(DRS)
Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\POI 2008 402 DRS OUO.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII  RIII  RIII NAME DLawver:co JKutlesa for MKunowski  DFunk  EDuncan DATE 2/21/08  2/20/08  2/21/08  2/25/08 OFFICIAL RECORD COP Y Letter to James McCarthy from Eric Duncan dated February 25, 2008.


SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS); 05000301/2008402(DRS)
DISTRIBUTION:
DISTRIBUTION:
TEB CFL EMH1 LXR1 RidsNrrDirsIrib MAS KGO JKH3 CAA1 RGK LSL (electronic IR's only)
TEB CFL EMH1 LXR1 RidsNrrDirsIrib MAS KGO JKH3 CAA1 RGK LSL (electronic IRs only)
C. Pederson, DRP (hard copy - IR's only) DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.
C. Pederson, DRP (hard copy - IRs only)
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.
}}
}}

Latest revision as of 19:09, 14 November 2019

IR 05000266-08-402(DRS); 05000301-08-402(DRS); 01/14/2008 - 01/18/2008; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter
ML080580456
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/25/2008
From: Eric Duncan
Plant Support Branch II
To: Mccarthy J
Florida Power & Light Energy Point Beach
References
IR-08-402
Download: ML080580456 (4)


Text

ary 25, 2008

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS);

5000301/2008402(DRS)

Dear Mr. McCarthy:

On January 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 18, 2008, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Enclosure Contains Sensitive Unclassified Act (5 U.S.C. 552) Non-Safeguards Information. Upon separation, this page is decontrolled.

Exemption number: 5 Nuclear Regulatory Commission review required before public release.

Dale Lawver, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 01/28/08___ Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);

05000301/2008402(DRS)

w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);

05000301/2008402(DRS)

w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon K. Duveneck, Town Chairman separation, this page is decontrolled.

Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\POI 2008 402 DRS OUO.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DLawver:co JKutlesa for MKunowski DFunk EDuncan DATE 2/21/08 2/20/08 2/21/08 2/25/08 OFFICIAL RECORD COP Y Letter to James McCarthy from Eric Duncan dated February 25, 2008.

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS); 05000301/2008402(DRS)

DISTRIBUTION:

TEB CFL EMH1 LXR1 RidsNrrDirsIrib MAS KGO JKH3 CAA1 RGK LSL (electronic IRs only)

C. Pederson, DRP (hard copy - IRs only)

DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.