Letter Sequence Other |
|---|
EPID:L-2020-SLE-0002, Comment (2) of Raymond Hardy on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC, Point Beach, Units 1 and 2 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
|
MONTHYEARML20329A2482020-11-16016 November 2020 Enclosure 3, Attachment 2, Appendix E Applicants Environmental Report Subsequent Operating License Renewal Point Beach Nuclear Plant Units 1 and 2 Project stage: Other ML20321A1872020-11-16016 November 2020 Single Positive Test Form Collected on 02/11/2020 Project stage: Request ML21033A4022021-01-22022 January 2021 NextEra Energy Point Beach - Point Beach Nuclear Plant - Units 1 and 2 Subsequent License Renewal Project stage: Other ML20351A3922021-01-26026 January 2021 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0002) (Docket No. 50 266 and 50-301) - Letter Project stage: Other PMNS20210090, Environmental Scoping Meeting Related to the Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach), Subsequent License Renewal Application2021-02-0303 February 2021 Environmental Scoping Meeting Related to the Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach), Subsequent License Renewal Application Project stage: Meeting ML21048A0362021-02-0404 February 2021 Comment (1) of Willard Sielaff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21040A2232021-02-0505 February 2021 Comment (2) of Raymond Hardy on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC, Point Beach, Units 1 and 2 Project stage: Request ML21040A2282021-02-0808 February 2021 Comment (3) from Hannah Mortensen on Behalf of Physicians for Social Responsibility Wisconsin on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Point Beach Nuclear Plant, Units 1 & 2 Project stage: Request ML21050A0822021-02-12012 February 2021 Comment (4) of Geralyn Leannah Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A0832021-02-14014 February 2021 Comment (5) of Bruce Krawisz on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A0862021-02-14014 February 2021 Comment (6) of Theresa Deluca Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A0882021-02-16016 February 2021 Comment (7) of Randy Connour on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A0892021-02-16016 February 2021 Comment (8) of Eric Newgent on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21056A5612021-02-17017 February 2021 Physicians for Social Responsibility (Psr) Request for Extension of Scoping Comment Period Project stage: Request ML21042B9452021-02-17017 February 2021 Scoping and Process Meeting - February 17, 2021 Project stage: Meeting ML21062A1922021-02-17017 February 2021 Transcript from Point Beach Nuclear Plant Subsequent License Renewal Scoping Meeting Project stage: Meeting ML21075A3432021-02-17017 February 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Summary Project stage: Meeting ML21050A0992021-02-17017 February 2021 Comment (10) of Ann Rogers Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1052021-02-17017 February 2021 Comment (12) of Shahla Werner Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A0922021-02-17017 February 2021 Comment (9) of Diane Palecek Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1022021-02-17017 February 2021 Comment (11) of John Duffin Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1092021-02-18018 February 2021 Comment (13) of Pamela Richard Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1272021-02-18018 February 2021 Comment (20) from Pam Nelson Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1322021-02-18018 February 2021 Comment (24) of Sandra Couch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Nexteraenergy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1182021-02-18018 February 2021 Comment (16) from Andrew Benson Supporting Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1252021-02-18018 February 2021 Comment (19) of Ellen Atkison Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1222021-02-18018 February 2021 Comment (18) of Kristina Mageau on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1212021-02-18018 February 2021 Comment (17) from Stephen Roddy Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1332021-02-18018 February 2021 Comment (25) of Mark Giese on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1312021-02-18018 February 2021 Comment (23) from Patrick Bosold Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1382021-02-18018 February 2021 Comment (27) of Leonard Kellum Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1342021-02-18018 February 2021 Comment (26) of Jim Yarbrough Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1292021-02-18018 February 2021 Comment (22) from Dennis Schaef on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1162021-02-18018 February 2021 Comment (14) of Marie Luna on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1282021-02-18018 February 2021 Comment (21) of Karl Koessel Opposing Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21050A1172021-02-18018 February 2021 Comment (15) of Joann Nishiura on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Nexteraenergy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1592021-02-19019 February 2021 Comment (29) of Philip Ratcliff on Notice of Lntent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Request ML21062A0162021-02-19019 February 2021 Comment (31) of Karen Wilson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0152021-02-19019 February 2021 Comment (30) of Claire Gervais Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21050A1392021-02-19019 February 2021 Comment (28) of Croitiene Ganmoryn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0182021-02-20020 February 2021 Comment (32) of Larry Troshynski on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0262021-02-21021 February 2021 Comment (35) of Dwight Rousu on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0282021-02-21021 February 2021 Comment (37) of Karen Kirschling on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0272021-02-21021 February 2021 Comment (36) of Ernest Fuller on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0242021-02-21021 February 2021 Comment (34) of Miriam Kurland Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0232021-02-21021 February 2021 Comment (33) of Kristin Womack on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0292021-02-25025 February 2021 Comment (38) of Satya Vayu on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0332021-02-26026 February 2021 Comment (41) of Gerrit Bruhaug Opposing Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0342021-02-26026 February 2021 Comment (42) of Avery Schwab on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request ML21062A0352021-02-26026 February 2021 Comment (43) of Dawn Wallander on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; NextEra Energy Point Beach, LLC, Point Beach Nuclear Plant, Units 1 and 2 Project stage: Request 2021-02-19
[Table View] |
Text
Kenneth A. Mack, Director Licensing and Regulatory Compliance Florida Power & Light Company 15430 Endeavor Drive Jupiter, FL 33478
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 -
SUMMARY
OF THE 2024 SUPPLEMENTAL ENVIRONMENTAL AUDIT RELATED TO THE REVIEW OF THE SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NUMBER:
L-2020-SLE-0002) (DOCKET NUMBERS: 50-266 AND 50-301
Dear Kenneth Mack:
A review team consisting of staff from the U.S. Nuclear Regulatory Commission (NRC or the staff) participated in a virtual environmental audit during the week of September 16 and 17, 2024 for Point Beach Nuclear Plant, Units 1 and 2, as part of the subsequent license renewal application environmental review. A formal exit meeting was conducted on October 16, 2024.
The goal of the audit was to gather information to ensure that the environmental requirements for license renewal, as codified in Title 10 of the Code of Federal Regulations Part 51 Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, were met. An email dated September 5, 2024 (Agencywide Documents Access and Management System [ADAMS] ML24256A140), was sent with enclosure containing an audit plan and agenda with preliminary information needs.
An entrance meeting was held on September 16, 2024, to introduce participants and discuss audit logistics. During the remainder of the audit, the NRC staff participated in smaller groups (breakout sessions) with NextEra Energy, Inc., including NextEra Energy Point Beach, (NextEra) and Enercon Services, Inc. (Enercon) representatives to address the audit needs identified in the audit plan. Enclosure 1 to this letter provides a list of representatives from the NRC, NextEra, and Enercon who participated in the audit.
At the conclusion of the audit, the NRC staff summarized the status of the review with NextEra and Enercon representatives during the exit meeting held on October 16, 2024. Many of the NRCs questions identified in the audit plan or subsequently during the audit sessions were answered through the conduct of the audit. Those that were answered but would need to be documented for use in the NRCs supplemental environmental impact statement could be submitted (a) as a supplement to the application, (b) as responses to requests for additional information (RAIs), or (c) as responses to requests for confirmation of information (RCIs).
October 31, 2024
K. Mack 2 to this letter contains the staffs RCIs and RAIs. We request NextEras response to these items within 30 days of the receipt of this letter.
While the NRC staff did not identify any significant environmental issues during this audit, the staff indicated that the environmental review was ongoing and that any additional information necessary to support the review would be formally requested via the RAI process in the future.
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC's Public Document Room staff at 800- 397-4209 (or 301-415-4737) or via email at pdr.resource@nrc.gov.
If you have any questions, please contact me via email at Kevin.Folk@nrc.gov.
Sincerely, Kevin T. Folk Senior Environmental Project Manager Environmental Project Management Branch 1 Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-266 and 50-301
Enclosures:
As stated cc: Listserv Signed by Folk, Kevin on 10/31/24
K. Mack 3
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 -
SUMMARY
OF THE 2024 SUPPLEMENTAL ENVIRONMENTAL AUDIT RELATED TO THE REVIEW OF THE SUBSEQUENT LICENSE RENEWAL APPLICATION (EPID NUMBER: L-2020-SLE-0002) (DOCKET NUMBERS: 50-266 AND 50-301 DATED:
((DATE:LONG
DISTRIBUTION:
PUBLIC RidsNrrDnrl Resource RidsACRS_MailCTR Resource RidsRgn3MailCenter Resource RidsRgn3Drp Resource RidsRgn3Drs Resource RidsRgn3Ora Resource RidsRgn3Opa Resource RidsNrrOd Resource KFolk, NMSS/REFS KLoomis, NMSS/REFS SKoenick, NMSS/REFS LGibson, NRR/DNRL CTyree, NRR/DNRL MSamson, NRR/DNRL SLee, NRR/DNRL SWall, NRR/DORL DRoth, OGC STurk, OGC TKeene, OEDO/AO SBurnell, HQ/OPA CWolf, OCA VMitlyng, RIII/OPA PChandrathil, RIII/OPA JSteward, RIII/DORS AMuneeruddin, RIII/DORS RRuiz, RIII/DORS MDomke, RIII/DORS ABarker, RIII/FCO HLogaras, RIII/FCO EMAIL:
KMack, NextEra - Kenneth.Mack2@fpl.com JPhillabaum, NextEra - Jerry.Phillabaum@fpl.com KProctor, Jr., NextEra - Kennard.Proctorjr@fpl.com ADAMS Accession No.: ML24296A072 (Package); ML24296A114 (Letter)
OFFICE NE/PM:EPMB1 LA:REFS BC:EPMB1 NE/PM:EPMB1 NAME KFolk AWalker-Smith SKoenick KFolk DATE 10/21/2024 10/22/2024 10/30/2024 10/31/2024 OFFICE RECORD COPY LIST OF PARTICIPANTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 SUBSEQUENT LICENSE RENEWAL APPLICATION SUPPLEMENTAL ENVIRONMENTAL AUDIT September 17, 18, and October 16, 2024 The U.S. Nuclear Regulatory Commission (NRC) team members, NextEra Energy, Inc. (NextEra) and Enercon Services, Inc. (Enercon) staff, as well as their discipline or titles, participating in the supplemental environmental audit are shown below.
Nuclear Regulatory Commission (NRC)
Discipline or Title Team Members Environmental Project Manager Kevin Folk, NMSS Environmental Project Manager (Backup, Training)
Karen Loomis, NMSS Alternatives Robert Hoffman, NMSS Land Use and Visual Resources Caroline Hsu, NMSS Meteorology and Climatology Nancy Martinez, NMSS Air Quality and Noise Nancy Martinez, NMSS Geologic Environment Kevin Folk, NMSS Surface Water Resources Kevin Folk, NMSS Groundwater Resources Kevin Folk, NMSS Terrestrial Resources Caroline Hsu, NMSS Aquatic Resources Briana Arlene, NMSS Federally Protected Ecological Resources Briana Arlene, NMSS Historic and Cultural Resources Jeff Rikhoff, NMSS Socioeconomics Jeff Rikhoff, NMSS Human Health Donald Palmrose, NMSS Environmental Justice Jeff Rikhoff, NMSS Waste Management Leah Parks, NMSS Spent Nuclear Fuel Leah Parks, NMSS Uranium Fuel Cycle Donald Palmrose, NMSS Termination of Operations and Decommissioning Donald Palmrose, NMSS Greenhouse Gases and Climate Change Nancy Martinez, NMSS Cumulative Impacts Jeff Rikhoff, NMSS Environmental Justice Jeffrey Rikhoff, NMSS Postulated Accidents, SAMA Jerry Dozier, NRR Elijah Dickson, NRR NMSS=Office of Nuclear Material Safety and Safeguards; NRR=Office of Nuclear Reactor Regulation; SAMA=severe accident mitigation alternatives.
2 NextEra Energy Discipline or Title Team Members*
Environmental Services Manager Ken Proctor, Jr.
Corporate Licensing Support Jerry Phillabaum Fleet Licensing Manager Maribel Valdez Sr Environmental Services Project Manager Richard Estabrook Alternatives Andrew Watry Land Use and Visual Resources Andrew Watry Air Quality, Noise, Meteorology and Climatology David Taylor Jeremy Olson Geologic Environment, Water Resources (Groundwater and Surface Water)
Andrew Watry Diane Nguyen Terrestrial Resources, Aquatic Resources, Federally Protected Ecological Resources Andrew Watry Kristin Eaton Historic and Cultural Resources Richard Estabrook Socioeconomics Justin Edwardo Human Health Andrew Watry David Taylor Jeremy Olson Waste Management Andrew Watry David Taylor Greenhouse Gas Emissions and Climate Change Andrew Watry Postulated Accidents, SAMA Joseph Stringfellow Other/General Topics Frederick Eichhorst Michael Wavrunek Daniel Lambert Ronald Olson Jason Wiesner Jeffrey Wilbur Rudi Prucha Scott Kahl
- May indicate area of responsibility and/or breakout session attended.
3 ENERCON Discipline or Title Team Members Environmental Licensing Manager Rachel Turney-Work Project Manager Matt Brunton Technical Lead Lisa Santoro Editorial Lead Lisa Hendrick Note Taker Matthew Montz Alternatives Mary Hoganson Emily Keenan Land Use and Visual Resources Fred Woolridge Lisa Santoro Air Quality, Noise, Meteorology and Climatology Derek Allen Jerry Riggs Geologic Environment, Water Resources (Groundwater and Surface Water)
Jennifer Meek Terrestrial Resources, Aquatic Resources, Federally Protected Ecological Resources Rajit Patankar Historic and Cultural Resources Fred Woolridge Gary Edington Socioeconomics Cheyenne Riggs Human Health Mary Hoganson Emily Keenan Waste Management Mary Hoganson Emily Keenan Greenhouse Gas Emissions and Climate Change Jerry Riggs Postulated Accidents, SAMA Neil Johnson Beth Baucom}}