IR 05000266/2008402
| ML080580456 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/25/2008 |
| From: | Eric Duncan Plant Support Branch II |
| To: | Mccarthy J Florida Power & Light Energy Point Beach |
| References | |
| IR-08-402 | |
| Download: ML080580456 (4) | |
Text
February 25, 2008
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS);
Dear Mr. McCarthy:
On January 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 18, 2008, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents
EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
Exemption number: 5 Nuclear Regulatory Commission review required before public release.
Dale Lawver, RIII/DRS/PSB Name and organization of person making determination.
Date of determination: 01/28/08___
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-266; 50-301 License No. DPR-24; DPR-27
Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);
w/Attachment: Supplemental Information
cc w/encl:
D. Riffle, NSIR/DSO/DDSO
cc w/o encl:
M. Nazar, Senior Vice President and Nuclear
Chief Operating Officer
J. Stall, Senior Vice President and
Chief Nuclear Officer
R. Kundalkar, Vice President, Nuclear Technical Services
Licensing Manager, Point Beach Nuclear Plant
M. Ross, Managing Attorney A. Fernandez, Senior Attorney
K. Duveneck, Town Chairman
Town of Two Creeks
Chairperson
Public Service Commission of Wisconsin
J. Kitsembel, Electric Division
Public Service Commission of Wisconsin
P. Schmidt, State Liaison Officer
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-266; 50-301 License No. DPR-24; DPR-27
Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);
w/Attachment: Supplemental Information
cc w/encl:
D. Riffle, NSIR/DSO/DDSO
cc w/o encl:
M. Nazar, Senior Vice President and Nuclear
Chief Operating Officer
J. Stall, Senior Vice President and
Chief Nuclear Officer
R. Kundalkar, Vice President, Nuclear Technical Services
Licensing Manager, Point Beach Nuclear Plant
M. Ross, Managing Attorney A. Fernandez, Senior Attorney
K. Duveneck, Town Chairman
Town of Two Creeks
Chairperson
Public Service Commission of Wisconsin
J. Kitsembel, Electric Division
Public Service Commission of Wisconsin
P. Schmidt, State Liaison Officer
SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\\DRS\\Work in Progress\\POI 2008 402 DRS OUO.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII
RIII
RIII
RIII
NAME DLawver:co JKutlesa for MKunowski DFunk EDuncan DATE 2/21/08 2/20/08 2/21/08 2/25/08 OFFICIAL RECORD COP Y Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Letter to James McCarthy from Eric Duncan dated February 25, 2008.
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS); 05000301/2008402(DRS)
DISTRIBUTION:
TEB CFL EMH1 LXR1 RidsNrrDirsIrib MAS KGO JKH3 CAA1 RGK LSL (electronic IRs only)
C. Pederson, DRP (hard copy - IRs only)
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.