Line 3: Line 3:
| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Non-Public Security Inspection Plan for Arkansas Nuclear One NRC Physical Security Inspection Report Numbers 05000313/2016401 and 05000368/2016401)
| title = Non-Public Security Inspection Plan for Arkansas Nuclear One NRC Physical Security Inspection Report Numbers 05000313/2016401 and 05000368/2016401)
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Warren C
| addressee name = Warren C
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " August 31, 2016  
{{#Wiki_filter:ugust 31, 2016


Mr. Clay Warren, Acting Site Vice President
==SUBJECT:==
NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2016401 AND 05000368/2016401)


Arkansas Nuclear One Entergy Operations, Inc.
==Dear Mr. Warren:==
On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Arkansas Nuclear One. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.


1448 SR 333 Russellville, AR 72802-0967
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2016401 AND 05000368/2016401)
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.


==Dear Mr. Warren:==
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.
On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Arkansas Nuclear One. The results of that review have been transmitted to you separately in a publicly av ailable assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.
 
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.
 
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Mark S. Haire, Chief Plant Support Branch 1  
/RA/
 
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:
Division of Reactor Safety  
Inspection Plan cc w/encl:
 
Mr. Jonathan Laplante Director, Security Operations Entergy Operations, Inc.
Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:
Inspection Plan  
 
cc w/encl: Mr. Jonathan Laplante Director, Security Operations Entergy Operations, Inc.
 
1340 Echelon Parkway Jackson, MS 39213
 
Mr. Gregory D. Brown Manager, Security Entergy Operations, Inc.
 
Arkansas Nuclear One


1448 S.R. 333 Russellville, AR 72802
1340 Echelon Parkway Jackson, MS 39213 Mr. Gregory D. Brown Manager, Security Entergy Operations, Inc.


cc w/o encl:
Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802 cc w/o encl:
Electronic Distribution for Arkansas Nuclear One, Units 1 and 2
Electronic Distribution for Arkansas Nuclear One, Units 1 and 2
}}
}}

Latest revision as of 14:43, 30 October 2019

Non-Public Security Inspection Plan for Arkansas Nuclear One NRC Physical Security Inspection Report Numbers 05000313/2016401 and 05000368/2016401)
ML16242A081
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/31/2016
From: Mark Haire
Division of Reactor Safety IV
To: Warren C
Entergy Operations
References
IR 2016401
Download: ML16242A081 (4)


Text

ugust 31, 2016

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR ARKANSAS NUCLEAR ONE (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000313/2016401 AND 05000368/2016401)

Dear Mr. Warren:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Arkansas Nuclear One. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Enclosure:

Inspection Plan cc w/encl:

Mr. Jonathan Laplante Director, Security Operations Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. Gregory D. Brown Manager, Security Entergy Operations, Inc.

Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802 cc w/o encl:

Electronic Distribution for Arkansas Nuclear One, Units 1 and 2