ML18059A088: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18059A088
| number = ML18059A088
| issue date = 02/28/2018
| issue date = 02/28/2018
| title = Shearon Harris 2017 EOC Assessment Letter
| title = EOC Assessment Letter
| author name = Rose S D
| author name = Rose S
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4
| addressee name = Hamilton T M
| addressee name = Hamilton T
| addressee affiliation = Duke Energy Progress, LLC
| addressee affiliation = Duke Energy Progress, LLC
| docket = 05000400
| docket = 05000400
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd. M/C HNP01 New Hill, NC 27562-0165
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd.
M/C HNP01 New Hill, NC 27562-0165


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORTS 05000400/2017006, 05000400/2017402, 05000400/2017501
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORTS 05000400/2017006, 05000400/2017402, 05000400/2017501


==Dear Ms. Hamilton:==
==Dear Ms. Hamilton:==
The NRC has completed its end-of-cycle performance assessment of Shearon Harris Nuclear Power Plant, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
T. Hamilton 2 This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.Please contact me at 404-997-4609 with any questions you have regarding this letter. Sincerely, /RA/       Steven D. Rose, Chief       Reactor Projects Branch 4       Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63
The NRC has completed its end-of-cycle performance assessment of Shearon Harris Nuclear Power Plant, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,
Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
T. Hamilton                                       2 This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 404-997-4609 with any questions you have regarding this letter.
Sincerely,
                                                  /RA/
Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63


==Enclosure:==
==Enclosure:==
Harris Inspection/Activity Plan   cc Distribution via ListServ T. Hamilton 3
 
Harris Inspection/Activity Plan cc Distribution via ListServ
 
T. Hamilton                                       3


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORTS 05000400/2017006, 05000400/2017402, 05000400/2017501 February 28, 2018 DISTRIBUTION: M. Kowal, RII S. Price, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)     ADAMS Accession No. ML 18059A088 OFFICE RII:DRP RII:DRP RII: DRP RII: DRP NAME DJackson JDodson WDeschaine SRose DATE 2/23/2018 2/27/2018 2/27/2018 2/26/2018 OFFICIAL AGENCY RECORD IP 22 Inspection Activity Plan Report         This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. Page 1 of 3  Enclosure    Harris 03/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count HARRIS INITIAL LICENSE EXAM 3 1 03/05/2018 03/16/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD) EP PROGRAM INSPECTION 2 1 03/26/2018 03/30/2018 IP 71114.02 000717 Alert and Notification System Testing 1 03/26/2018 03/30/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 03/26/2018 03/30/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 03/26/2018 03/30/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 03/26/2018 03/30/2018 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION 1 1 03/26/2018 03/30/2018 IP 71130.02 000734 Access Control 1 03/26/2018 03/30/2018 IP 71151 001338 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 04/09/2018 04/13/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR 1 04/16/2018 04/20/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP RAD HAZARDS & TRANSPORTATION 2 1 04/16/2018 04/20/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 04/16/2018 04/20/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 1 07/30/2018 08/03/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 08/20/2018 08/24/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing TRIENNIAL FIRE PROTECTION INSPECTION 5 1 08/13/2018 08/17/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) 1 08/27/2018 08/31/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 1 10/22/2018 10/26/2018 IP 71007 000689 Reactor Vessel Head Replacement Inspection 1 10/22/2018 10/26/2018 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments IP 22 Inspection Activity Plan Report          This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. Page 2 of 3  Enclosure     DUKE CORP AA/FFD/SGI SECURITY INSPECTION 2 1 11/05/2018 11/09/2018 IP 71130.01 000733 Access Authorization 1 11/05/2018 11/09/2018 IP 71130.06 000738 Protection of Safeguards Information 1 11/05/2018 11/09/2018 IP 71130.08 000740 Fitness For Duty Program RP PUBLIC 2 1 12/10/2018 12/14/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 12/10/2018 12/14/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program 1 12/10/2018 12/14/2018 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 1 1 01/07/2019 01/11/2019 IP 71130.01 000733 Access Authorization 1 01/07/2019 01/11/2019 IP 71130.06 000738 Protection of Safeguards Information 1 01/07/2019 01/11/2019 IP 71130.08 000740 Fitness For Duty Program DESIGN BASES ASSURANCE INSPECTION (PROGRAM) 3 1 02/04/2019 02/08/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) 1 03/04/2019 03/08/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) 1 03/18/2019 03/22/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) EP EXERCISE INSPECTION 6 1 04/29/2019 05/03/2019 IP 71114.01 000716 Exercise Evaluation 1 04/29/2019 05/03/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 04/29/2019 05/03/2019 IP 71114.08 000723 Exercise Evaluation   Scenario Review 1 04/29/2019 05/03/2019 IP 71151 001397 Performance Indicator Verification CYBER SECURITY 1 1 06/03/2019 06/07/2019 IP 71130.10P 000741 Cyber Security 1 06/17/2019 06/21/2019 IP 71130.10P 000741 Cyber Security TRIENNIAL HEAT SINK PERFORMANCE 1 1 06/17/2019 06/21/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial SECURITY BASELINE INSPECTION 2 1 06/24/2019 06/28/2019 IP 71130.02 000734 Access Control 1 06/24/2019 06/28/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 06/24/2019 06/28/2019 IP 71130.07 000739 Security Training 1 06/24/2019 06/28/2019 IP 71151 001338 Performance Indicator Verification HARRIS REQUAL INSPECTION 2 1 08/05/2019 08/09/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance - Biennial IP 22 Inspection Activity Plan Report          This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. Page 3 of 3  Enclosure     MC&A TRIENNIAL INSPECTION 1 1 10/01/2019 12/31/2019 IP 71130.11 000742 Material Control and Accounting (MC&A) UNIT 1 IN-SERVICE INSPECTION 1 1 10/21/2019 10/25/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/21/2019 10/25/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL - WEEK 1 3 1 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/21/2019 10/25/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 10/21/2019 10/25/2019 IP 71124.04 000729 Occupational Dose Assessment 1 10/21/2019 10/25/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 10/21/2019 10/25/2019 IP 71151 000746 Performance Indicator Verification RP OCCUPATIONAL - WEEK 2 3 1 11/18/2019 11/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/18/2019 11/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 11/18/2019 11/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/18/2019 11/22/2019 IP 71124.04 000729 Occupational Dose Assessment 1 11/18/2019 11/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION 5 1 11/18/2019 11/22/2019 IP 71152B 000747 Problem Identification and Resolution 1 12/09/2019 12/13/2019 IP 71152B 000747 Problem Identification and Resolution  
ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORTS 05000400/2017006, 05000400/2017402, 05000400/2017501 February 28, 2018 DISTRIBUTION:
}}
M. Kowal, RII S. Price, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
ADAMS Accession No. ML18059A088 OFFICE       RII:DRP     RII:DRP         RII: DRP   RII: DRP NAME         DJackson   JDodson         WDeschaine SRose DATE         2/23/2018   2/27/2018       2/27/2018 2/26/2018 OFFICIAL AGENCY RECORD
 
IP 22 Inspection Activity Plan Report Harris 03/01/2018 - 12/31/2019 Unit               Start               End                   Activity     CAC               Title                               Staff Count HARRIS INITIAL LICENSE EXAM                                                                                                                                               3 1             03/05/2018         03/16/2018       EXAD             000500   LICENSE EXAM ADMINISTRATION (EXAD)
EP PROGRAM INSPECTION                                                                                                                                                     2 1             03/26/2018         03/30/2018       IP 71114.02       000717   Alert and Notification System Testing 1             03/26/2018         03/30/2018       IP 71114.03       000718   Emergency Response Organization Staffing and Augmentation System 1             03/26/2018         03/30/2018       IP 71114.04       000719   Emergency Action Level and Emergency Plan Changes 1             03/26/2018         03/30/2018       IP 71114.05       000720   Correction of Emergency Preparedness Weaknesses and Deficiencies 1             03/26/2018         03/30/2018       IP 71151         001397   Performance Indicator Verification SECURITY BASELINE INSPECTION                                                                                                                                             1 1             03/26/2018         03/30/2018       IP 71130.02       000734   Access Control 1             03/26/2018         03/30/2018       IP 71151         001338   Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION & RVH EXAM                                                                                                                                   2 1             04/09/2018         04/13/2018       IP 71111.08P     000702   Inservice Inspection Activities - PWR 1             04/16/2018         04/20/2018       IP 71111.08P     000702   Inservice Inspection Activities - PWR RP RAD HAZARDS & TRANSPORTATION                                                                                                                                           2 1             04/16/2018         04/20/2018       IP 71124.01       000725   Radiological Hazard Assessment and Exposure Controls 1             04/16/2018         04/20/2018       IP 71124.08       000732   Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation FORCE-ON-FORCE PLANNING & EXERCISE WEEK                                                                                                                                   7 1             07/30/2018         08/03/2018       IP 71130.03       000735   Contingency Response - Force-On-Force Testing 1             08/20/2018         08/24/2018       IP 71130.03       000735   Contingency Response - Force-On-Force Testing TRIENNIAL FIRE PROTECTION INSPECTION                                                                                                                                     5 1             08/13/2018         08/17/2018       IP 71111.05XT     000697   Fire Protection - NFPA 805 (Triennial) 1             08/27/2018         08/31/2018       IP 71111.05XT     000697   Fire Protection - NFPA 805 (Triennial)
EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS                                                                                                                             3 1             10/22/2018         10/26/2018       IP 71007         000689   Reactor Vessel Head Replacement Inspection 1             10/22/2018         10/26/2018       IP 71111.17T     000709   Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities.                                                                                                       Page 1 of 3 This report shows only on-site and announced inspection procedures.
Enclosure
 
IP 22 Inspection Activity Plan Report DUKE CORP AA/FFD/SGI SECURITY INSPECTION                                                                                                                             2 1             11/05/2018         11/09/2018       IP 71130.01   000733   Access Authorization 1             11/05/2018         11/09/2018       IP 71130.06   000738   Protection of Safeguards Information 1             11/05/2018         11/09/2018       IP 71130.08   000740   Fitness For Duty Program RP PUBLIC                                                                                                                                                             2 1             12/10/2018         12/14/2018       IP 71124.06   000730   Radioactive Gaseous and Liquid Effluent Treatment 1             12/10/2018         12/14/2018       IP 71124.07   000731   Radiological Environmental Monitoring Program 1             12/10/2018         12/14/2018       IP 71151       000746   Performance Indicator Verification SECURITY BASELINE INSPECTION                                                                                                                                         1 1             01/07/2019         01/11/2019       IP 71130.01   000733   Access Authorization 1             01/07/2019         01/11/2019       IP 71130.06   000738   Protection of Safeguards Information 1             01/07/2019         01/11/2019       IP 71130.08   000740   Fitness For Duty Program DESIGN BASES ASSURANCE INSPECTION (PROGRAM)                                                                                                                           3 1             02/04/2019         02/08/2019       IP 71111.21N   000714   Design Bases Assurance Inspection (Programs) 1             03/04/2019         03/08/2019       IP 71111.21N   000714   Design Bases Assurance Inspection (Programs) 1             03/18/2019         03/22/2019       IP 71111.21N   000714   Design Bases Assurance Inspection (Programs)
EP EXERCISE INSPECTION                                                                                                                                               6 1             04/29/2019         05/03/2019       IP 71114.01   000716   Exercise Evaluation 1             04/29/2019         05/03/2019       IP 71114.04   000719   Emergency Action Level and Emergency Plan Changes 1             04/29/2019         05/03/2019       IP 71114.08   000723   Exercise Evaluation Scenario Review 1             04/29/2019         05/03/2019       IP 71151       001397   Performance Indicator Verification CYBER SECURITY                                                                                                                                                       1 1             06/03/2019         06/07/2019       IP 71130.10P   000741   Cyber Security 1             06/17/2019         06/21/2019       IP 71130.10P   000741   Cyber Security TRIENNIAL HEAT SINK PERFORMANCE                                                                                                                                       1 1             06/17/2019         06/21/2019       IP 71111.07T   000700   Heat Sink Performance -Triennial SECURITY BASELINE INSPECTION                                                                                                                                         2 1             06/24/2019         06/28/2019       IP 71130.02   000734   Access Control 1             06/24/2019         06/28/2019       IP 71130.04   000736   Equipment Performance, Testing, and Maintenance 1             06/24/2019         06/28/2019       IP 71130.07   000739   Security Training 1             06/24/2019         06/28/2019       IP 71151       001338   Performance Indicator Verification HARRIS REQUAL INSPECTION                                                                                                                                             2 1             08/05/2019         08/09/2019       IP 71111.11B   000704   Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial This report does not include INPO and OUTAGE activities.                                                                                                   Page 2 of 3 This report shows only on-site and announced inspection procedures.
Enclosure
 
IP 22 Inspection Activity Plan Report MC&A TRIENNIAL INSPECTION                                                                                                                             1 1             10/01/2019         12/31/2019       IP 71130.11   000742   Material Control and Accounting (MC&A)
UNIT 1 IN-SERVICE INSPECTION                                                                                                                         1 1             10/21/2019         10/25/2019       IP 71111.08P   000702   Inservice Inspection Activities - PWR UNIT 1 SG IN-SERVICE INSPECTION                                                                                                                       1 1             10/21/2019         10/25/2019       IP 71111.08P   000702   Inservice Inspection Activities - PWR RP OCCUPATIONAL - WEEK 1                                                                                                                             3 1             10/21/2019         10/25/2019       IP 71124.01   000725   Radiological Hazard Assessment and Exposure Controls 1             10/21/2019         10/25/2019       IP 71124.02   000726   Occupational ALARA Planning and Controls 1             10/21/2019         10/25/2019       IP 71124.03   000727   In-Plant Airborne Radioactivity Control and Mitigation 1             10/21/2019         10/25/2019       IP 71124.04   000729   Occupational Dose Assessment 1             10/21/2019         10/25/2019       IP 71124.05   000729   Radiation Monitoring Instrumentation 1             10/21/2019         10/25/2019       IP 71151       000746   Performance Indicator Verification RP OCCUPATIONAL - WEEK 2                                                                                                                             3 1             11/18/2019         11/22/2019       IP 71124.01   000725   Radiological Hazard Assessment and Exposure Controls 1             11/18/2019         11/22/2019       IP 71124.02   000726   Occupational ALARA Planning and Controls 1             11/18/2019         11/22/2019       IP 71124.03   000727   In-Plant Airborne Radioactivity Control and Mitigation 1             11/18/2019         11/22/2019       IP 71124.04   000729   Occupational Dose Assessment 1             11/18/2019         11/22/2019       IP 71124.05   000729   Radiation Monitoring Instrumentation 1             11/18/2019         11/22/2019       IP 71151       000746   Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION                                                                                                                 5 1             11/18/2019         11/22/2019       IP 71152B     000747   Problem Identification and Resolution 1             12/09/2019         12/13/2019       IP 71152B     000747   Problem Identification and Resolution This report does not include INPO and OUTAGE activities.                                                                                    Page 3 of 3 This report shows only on-site and announced inspection procedures.
Enclosure}}

Latest revision as of 18:57, 21 October 2019

EOC Assessment Letter
ML18059A088
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/28/2018
From: Steven Rose
NRC/RGN-II/DRP/RPB4
To: Hamilton T
Duke Energy Progress
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18059A088 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd.

M/C HNP01 New Hill, NC 27562-0165

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORTS 05000400/2017006, 05000400/2017402, 05000400/2017501

Dear Ms. Hamilton:

The NRC has completed its end-of-cycle performance assessment of Shearon Harris Nuclear Power Plant, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e.,

Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

T. Hamilton 2 This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 404-997-4609 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63

Enclosure:

Harris Inspection/Activity Plan cc Distribution via ListServ

T. Hamilton 3

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORTS 05000400/2017006, 05000400/2017402, 05000400/2017501 February 28, 2018 DISTRIBUTION:

M. Kowal, RII S. Price, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML18059A088 OFFICE RII:DRP RII:DRP RII: DRP RII: DRP NAME DJackson JDodson WDeschaine SRose DATE 2/23/2018 2/27/2018 2/27/2018 2/26/2018 OFFICIAL AGENCY RECORD

IP 22 Inspection Activity Plan Report Harris 03/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count HARRIS INITIAL LICENSE EXAM 3 1 03/05/2018 03/16/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

EP PROGRAM INSPECTION 2 1 03/26/2018 03/30/2018 IP 71114.02 000717 Alert and Notification System Testing 1 03/26/2018 03/30/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 03/26/2018 03/30/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 03/26/2018 03/30/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 03/26/2018 03/30/2018 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION 1 1 03/26/2018 03/30/2018 IP 71130.02 000734 Access Control 1 03/26/2018 03/30/2018 IP 71151 001338 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 04/09/2018 04/13/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR 1 04/16/2018 04/20/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP RAD HAZARDS & TRANSPORTATION 2 1 04/16/2018 04/20/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 04/16/2018 04/20/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 1 07/30/2018 08/03/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 08/20/2018 08/24/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing TRIENNIAL FIRE PROTECTION INSPECTION 5 1 08/13/2018 08/17/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) 1 08/27/2018 08/31/2018 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

EVALUATIONS OF CHANGES, TESTS AND EXPERIMENTS 3 1 10/22/2018 10/26/2018 IP 71007 000689 Reactor Vessel Head Replacement Inspection 1 10/22/2018 10/26/2018 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report DUKE CORP AA/FFD/SGI SECURITY INSPECTION 2 1 11/05/2018 11/09/2018 IP 71130.01 000733 Access Authorization 1 11/05/2018 11/09/2018 IP 71130.06 000738 Protection of Safeguards Information 1 11/05/2018 11/09/2018 IP 71130.08 000740 Fitness For Duty Program RP PUBLIC 2 1 12/10/2018 12/14/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 12/10/2018 12/14/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program 1 12/10/2018 12/14/2018 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 1 1 01/07/2019 01/11/2019 IP 71130.01 000733 Access Authorization 1 01/07/2019 01/11/2019 IP 71130.06 000738 Protection of Safeguards Information 1 01/07/2019 01/11/2019 IP 71130.08 000740 Fitness For Duty Program DESIGN BASES ASSURANCE INSPECTION (PROGRAM) 3 1 02/04/2019 02/08/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) 1 03/04/2019 03/08/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) 1 03/18/2019 03/22/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP EXERCISE INSPECTION 6 1 04/29/2019 05/03/2019 IP 71114.01 000716 Exercise Evaluation 1 04/29/2019 05/03/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 04/29/2019 05/03/2019 IP 71114.08 000723 Exercise Evaluation Scenario Review 1 04/29/2019 05/03/2019 IP 71151 001397 Performance Indicator Verification CYBER SECURITY 1 1 06/03/2019 06/07/2019 IP 71130.10P 000741 Cyber Security 1 06/17/2019 06/21/2019 IP 71130.10P 000741 Cyber Security TRIENNIAL HEAT SINK PERFORMANCE 1 1 06/17/2019 06/21/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial SECURITY BASELINE INSPECTION 2 1 06/24/2019 06/28/2019 IP 71130.02 000734 Access Control 1 06/24/2019 06/28/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 06/24/2019 06/28/2019 IP 71130.07 000739 Security Training 1 06/24/2019 06/28/2019 IP 71151 001338 Performance Indicator Verification HARRIS REQUAL INSPECTION 2 1 08/05/2019 08/09/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report MC&A TRIENNIAL INSPECTION 1 1 10/01/2019 12/31/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

UNIT 1 IN-SERVICE INSPECTION 1 1 10/21/2019 10/25/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/21/2019 10/25/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL - WEEK 1 3 1 10/21/2019 10/25/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 10/21/2019 10/25/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 10/21/2019 10/25/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 10/21/2019 10/25/2019 IP 71124.04 000729 Occupational Dose Assessment 1 10/21/2019 10/25/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 10/21/2019 10/25/2019 IP 71151 000746 Performance Indicator Verification RP OCCUPATIONAL - WEEK 2 3 1 11/18/2019 11/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 11/18/2019 11/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 11/18/2019 11/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1 11/18/2019 11/22/2019 IP 71124.04 000729 Occupational Dose Assessment 1 11/18/2019 11/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 11/18/2019 11/22/2019 IP 71151 000746 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION 5 1 11/18/2019 11/22/2019 IP 71152B 000747 Problem Identification and Resolution 1 12/09/2019 12/13/2019 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

Enclosure