{{#Wiki_filter:. e
{{#Wiki_filter:.e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261
* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWABT. VxcB PRESIDENT NucLEAR OPERATIONS Dr. J. Nelson Grace Regional Administrator Region II May 2, 1986 U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta St., N.W. Atlanta, Georgia 30323  
* W. L. STEWABT.
VxcB PRESIDENT                       May 2, 1986 NucLEAR OPERATIONS Dr. J. Nelson Grace                                 Serial No. 86-246 Regional Administrator                               NO/WDC Region II                                           Docket Nos. 50-280 U.S. Nuclear Regulatory Commission                               50-281 Suite 2900                                           License Nos. DPR-32 101 Marietta St., N.W.                                           DPR-37 Atlanta, Georgia 30323


==Dear Dr. Grace:==
==Dear Dr. Grace:==
* VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 Serial No. NO/WDC Docket Nos. License Nos. 86-246 50-280 50-281 DPR-32 DPR-37 REVISIONS TO EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.
* VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 REVISIONS TO EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.
These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).
These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).
Enclosures cc: Document Control Desk (2) Mr. Lester S. Rubenstein, Director -w/o enclosures PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel -w/o enclosures NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A NRC Senior Resident Inspector  
Enclosures cc:   Document Control Desk (2)
-w/o enclosures Surry Power Station r aoosoeo145 gt8&8~ao ~DR ADOCK PDR \ I . I i}}
Mr. Lester S. Rubenstein, Director - w/o enclosures PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel - w/o enclosures NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A NRC Senior Resident Inspector - w/o enclosures Surry Power Station r   aoosoeo145
        ~DR      ADOCK gt8&8~ao PDR
                                            \
                                          . I I
i}}

Revision as of 01:54, 21 October 2019

Forwards Revised App 3 to Emergency Plan & Revs to Emergency Plan Implementing Procedures,Including Rev 16 to EPIP-3.01 Re Callout of Emergency Response Personnel & Rev 3 to EPIP-3.03 Re Activation of Operational Support Ctr
ML18149A148
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/02/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18130A419 List:
References
86-246, NUDOCS 8605080145
Download: ML18149A148 (1)


Text

.e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

  • W. L. STEWABT.

VxcB PRESIDENT May 2, 1986 NucLEAR OPERATIONS Dr. J. Nelson Grace Serial No.86-246 Regional Administrator NO/WDC Region II Docket Nos. 50-280 U.S. Nuclear Regulatory Commission 50-281 Suite 2900 License Nos. DPR-32 101 Marietta St., N.W. DPR-37 Atlanta, Georgia 30323

Dear Dr. Grace:

These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).

Enclosures cc: Document Control Desk (2)

Mr. Lester S. Rubenstein, Director - w/o enclosures PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel - w/o enclosures NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A NRC Senior Resident Inspector - w/o enclosures Surry Power Station r aoosoeo145