POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000266/2019501 AND 05000301/2019501 | |||
==Dear Mr. Craven:== | ==Dear Mr. Craven:== | ||
On June 13, 2019 | On June 13, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Point Beach Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report. | ||
, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Point Beach Nuclear Plant, Units 1 and 2 | |||
The NRC inspectors did not identify any finding or violation of more-than-minor significance. | |||
. | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
Sincerely, | Sincerely, | ||
/RA/ Rhex A. Edwards, III, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 | /RA/ | ||
Rhex A. Edwards, III, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 | |||
===Enclosure:=== | ===Enclosure:=== | ||
As stated | As stated | ||
==Inspection Report== | ==Inspection Report== | ||
Docket | Docket Numbers: 05000266 and 05000301 License Numbers: DPR-24 and DPR-27 Report Numbers: 05000266/2019501 and 05000301/2019501 Enterprise Identifier: I-2019-501-0016 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI Inspection Dates: June 10, 2019, to June 13, 2019 Inspectors: M. Garza, Emergency Preparedness Inspector G. Hansen, Senior Emergency Preparedness Inspector R. Ng, Project Engineer J. Park, Reactor Inspector Approved By: Rhex A. Edwards, III, Acting Chief Operations Branch Division of Reactor Safety Enclosure | ||
DPR-24 and DPR-27 Report Numbers: | |||
05000266/2019501 and 05000301/2019501 Enterprise Identifier: | |||
I-2019-501-0016 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI Inspection Dates: | |||
June 10, 2019 | |||
, to June 13, 2019 Inspectors: | |||
M. Garza, Emergency Preparedness Inspector G. Hansen , Senior Emergency Preparedness Inspector R. Ng, Project Engineer J. Park, Reactor Inspector Approved By: | |||
Rhex A. Edwards, III, Acting Chief Operations Branch Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Emergency Preparedness Biennial Exercise inspection at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | ||
List of Findings and Violations No findings or violations of more-than-minor significance were identified. | |||
Additional Tracking Items None. | Additional Tracking Items None. | ||
=INSPECTION SCOPES= | |||
= | ===Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. | ||
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
-Water Reactor Inspection Program | |||
- Operations Phase. | |||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
Line 65: | Line 57: | ||
==71114.01 - Exercise Evaluation== | ==71114.01 - Exercise Evaluation== | ||
===Inspection Review (IP Section 02.01 | ===Inspection Review (IP Section 02.01-02.11)=== | ||
-02.11)=== | |||
{{IP sample|IP=IP 71114.01|count=1}} | {{IP sample|IP=IP 71114.01|count=1}} | ||
The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of an Alert, Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies. | The inspectors evaluated the Biennial Emergency Plan Exercise. On June 11, 2019, the exercise scenario simulated an event at the Point Beach Nuclear Plant that initiated with the declaration and notification of an Unusual Event in response to a dropped fuel transfer cask damaging the spent fuel pool (SFP) liner, resulting in SFP leakage and rising radiation levels in the area of the SFP. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of an Alert, Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies. | ||
==71114.08 - Exercise Evaluation Scenario Review== | ==71114.08 - Exercise Evaluation Scenario Review== | ||
===Inspection Review (IP Section 02.01 | ===Inspection Review (IP Section 02.01 - 02.04)=== | ||
- 02.04)=== | |||
{{IP sample|IP=IP 71114.08|count=1}} | {{IP sample|IP=IP 71114.08|count=1}} | ||
The inspectors reviewed and evaluated the proposed scenario for Biennial Emergency Plan Exercise on May 9, 2019. | The inspectors reviewed and evaluated the proposed scenario for Biennial Emergency Plan Exercise on May 9, 2019. | ||
==OTHER ACTIVITIES | ==OTHER ACTIVITIES - BASELINE== | ||
- BASELINE== | |||
===71151 - Performance Indicator Verification The inspectors verified licensee Performance Indicators submittals listed below: | |||
EP01: Drill/Exercise Performance (IP Section 02.12) === | |||
- March 2019 | {{IP sample|IP=IP 71151|count=1}} | ||
July 2018 - March 2019 EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)=== | |||
July 2018 - March 2019 | |||
===EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)=== | |||
July 2018 - March 2019 | |||
==INSPECTION RESULTS== | ==INSPECTION RESULTS== | ||
Line 97: | Line 85: | ||
==EXIT MEETINGS AND DEBRIEFS== | ==EXIT MEETINGS AND DEBRIEFS== | ||
The inspectors verified no proprietary information was retained or documented in this report. | The inspectors verified no proprietary information was retained or documented in this report. | ||
* On June 13, 2019, the inspectors presented the Emergency Preparedness Biennial Exercise inspection results to Robert Craven and other members of the licensee staff. | |||
On June 13, 2019, the | |||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection | Inspection Type Designation Description or Title Revision or | ||
Description or Title Revision or Date 71114.01 Corrective Action | Procedure Date | ||
2017 Pre-IPX - TSC and Behaviors Need Improvement | 71114.01 Corrective Action CR 02219462 2017 Pre-IPX - TSC and Behaviors Need Improvement | ||
CR 02220555 | Documents CR 02220555 Recurring Improvement Items | ||
Recurring Improvement Items | CR 02226076 2017 IPX - Controller Performance Issues | ||
CR 02226076 | CR 02226079 2017 IPX - Site Area Emergency DEP Failure | ||
2017 IPX - Controller Performance Issues | CR 02226082 2017 IPX - DEP Failure for Alert Classification | ||
CR 02226079 | CR 02226092 2017 IPX - Scenario Development & Validation Improvement | ||
2017 IPX - Site Area Emergency DEP Failure | Opportunity | ||
CR 02226082 | CR 02246338 1Q18 EP Drill - Missed ERO Activation Time | ||
2017 IPX - DEP Failure for Alert Classification | CR 02250880 WANO EP Drill - Unsat Objective for Exchange of Public Info | ||
CR 02226092 | - JIC | ||
2017 IPX - Scenario Development & Validation Improvement Opportunity | CR 02269333 Communication Drill with State and Counties Deficiencies | ||
CR 02246338 | CR 02272608 Site Drill Cycle Tracking Process not IAW Fleet Guidance | ||
1Q18 EP Drill | CR 02273647 Adverse Trend - Fleet EP Procedure Compliance | ||
- Missed ERO Activation Time | CR 02282119 3Q18 EP Drill DEP Failure | ||
CR 02250880 | CR 02282167 EMNET Phone Did Not Work Properly During Drill | ||
WANO EP Drill | CR 02301888 EMNET Phone System Not Functioning as Designed | ||
CR 02306331 1Q19 EP Drill - Control Room Objective Failure | |||
- JIC | Procedures EP 7.0 Point Beach Nuclear Plant Emergency Plan, Emergency 66 | ||
Communication Drill with State and Counties Deficiencies | Facilities and Equipment | ||
CR 02272608 | EP, Appendix B Emergency Plan Manual, Emergency Classification 32 | ||
Site Drill Cycle Tracking Process not IAW Fleet Guidance | EPIP 1.2 Emergency Classification 54 | ||
CR 02273647 | EPIP 1.2.1 Emergency Action Level Technical Basis 23 | ||
Adverse Trend | EPIP 1.3 Dose Assessment and Protective Action Recommendations 52 | ||
- Fleet EP Procedure Compliance | EPIP 2.1 Notifications - ERO, State and Counties, and NRC 58 | ||
CR 02282119 | EPIP 4.1 Technical Support Center (TSC) Activation and Evacuation 55 | ||
3Q18 EP Drill DEP Failure | EPIP 4.2 Operations Support Center (OSC) Activation and Evacuation 29 | ||
CR 02282167 | EPIP 4.3 Emergency Operations Facility (EOF) Activation and 48 | ||
EMNET Phone Did Not Work Properly During Drill | Evacuation | ||
CR 02301888 | EPIP 4.8 Joint Information Center Activation and Evacuation 10 | ||
EMNET Phone System Not Functioning as Designed | 71114.08 PBN EPR 192 Point Beach Nuclear Plant Emergency Preparedness 2019 | ||
CR 02306331 | 2D NRC Exercise | ||
1Q19 EP Drill | Inspection Type Designation Description or Title Revision or | ||
- Control Room Objective Failure | Procedure Date | ||
Procedures | 71151 Miscellaneous Emergency Response Organization (ERO) Drill Participation July 2018 - | ||
EP 7.0 Point Beach Nuclear Plant Emergency Plan, Emergency Facilities and Equipment | Data March 2019 | ||
EP, Appendix B | Alert Notification System (ANS) Reliability Data July 2018 - | ||
Emergency Plan Manual, Emergency Classification | March 2019 | ||
EPIP 1.2 Emergency Classification | Drill and Exercise Participation (DEP) Opportunities Data July 2018 - | ||
EPIP 1.2.1 Emergency Action Level Technical Basis | March 2019 | ||
EPIP 1.3 Dose Assessment and Protective Action Recommendations | 6 | ||
EPIP 2.1 Notifications | |||
- ERO, State and Counties, and NRC | |||
EPIP 4.1 Technical Support Center (TSC) Activation and Evacuation | |||
EPIP 4.2 Operations Support Center (OSC) Activation and Evacuation | |||
EPIP 4.3 Emergency Operations Facility (EOF) Activation and Evacuation | |||
EPIP 4.8 Joint Information Center Activation and Evacuation | |||
71114.08 PBN EPR 192 | |||
Inspection | |||
Description or Title Revision or Date 71151 Miscellaneous | |||
Emergency Response Organization (ERO) Drill Participation | |||
Alert Notification System (ANS) Reliability Data | |||
July 2018 | |||
Drill and Exercise Participation (DEP) Opportunities Data | |||
July 2018 | |||
}} | }} |
Revision as of 16:29, 19 October 2019
ML19198A280 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 07/17/2019 |
From: | Rhex Edwards Division of Reactor Safety III |
To: | Craven R Point Beach |
References | |
IR 2019501 | |
Download: ML19198A280 (8) | |
Text
uly 17, 2019
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000266/2019501 AND 05000301/2019501
Dear Mr. Craven:
On June 13, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Point Beach Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more-than-minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Rhex A. Edwards, III, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000266 and 05000301 License Numbers: DPR-24 and DPR-27 Report Numbers: 05000266/2019501 and 05000301/2019501 Enterprise Identifier: I-2019-501-0016 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant, Units 1 and 2 Location: Two Rivers, WI Inspection Dates: June 10, 2019, to June 13, 2019 Inspectors: M. Garza, Emergency Preparedness Inspector G. Hansen, Senior Emergency Preparedness Inspector R. Ng, Project Engineer J. Park, Reactor Inspector Approved By: Rhex A. Edwards, III, Acting Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Emergency Preparedness Biennial Exercise inspection at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more-than-minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
===Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71114.01 - Exercise Evaluation
Inspection Review (IP Section 02.01-02.11)
The inspectors evaluated the Biennial Emergency Plan Exercise. On June 11, 2019, the exercise scenario simulated an event at the Point Beach Nuclear Plant that initiated with the declaration and notification of an Unusual Event in response to a dropped fuel transfer cask damaging the spent fuel pool (SFP) liner, resulting in SFP leakage and rising radiation levels in the area of the SFP. The scenario conditions simulated the escalation of the significance of the event, requiring the declaration of an Alert, Site Area Emergency, and then a General Emergency, as well as the development of Protective Action Recommendations that were communicated to the required state and local government agencies.
71114.08 - Exercise Evaluation Scenario Review
Inspection Review (IP Section 02.01 - 02.04)
The inspectors reviewed and evaluated the proposed scenario for Biennial Emergency Plan Exercise on May 9, 2019.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee Performance Indicators submittals listed below:
EP01: Drill/Exercise Performance (IP Section 02.12) ===
July 2018 - March 2019 EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)===
July 2018 - March 2019
EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)
July 2018 - March 2019
INSPECTION RESULTS
No findings or violations were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 13, 2019, the inspectors presented the Emergency Preparedness Biennial Exercise inspection results to Robert Craven and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71114.01 Corrective Action CR 02219462 2017 Pre-IPX - TSC and Behaviors Need Improvement
Documents CR 02220555 Recurring Improvement Items
CR 02226076 2017 IPX - Controller Performance Issues
CR 02226079 2017 IPX - Site Area Emergency DEP Failure
CR 02226082 2017 IPX - DEP Failure for Alert Classification
CR 02226092 2017 IPX - Scenario Development & Validation Improvement
Opportunity
CR 02246338 1Q18 EP Drill - Missed ERO Activation Time
CR 02250880 WANO EP Drill - Unsat Objective for Exchange of Public Info
- JIC
CR 02269333 Communication Drill with State and Counties Deficiencies
CR 02272608 Site Drill Cycle Tracking Process not IAW Fleet Guidance
CR 02273647 Adverse Trend - Fleet EP Procedure Compliance
CR 02282119 3Q18 EP Drill DEP Failure
CR 02282167 EMNET Phone Did Not Work Properly During Drill
CR 02301888 EMNET Phone System Not Functioning as Designed
CR 02306331 1Q19 EP Drill - Control Room Objective Failure
Procedures EP 7.0 Point Beach Nuclear Plant Emergency Plan, Emergency 66
Facilities and Equipment
EP, Appendix B Emergency Plan Manual, Emergency Classification 32
EPIP 1.2 Emergency Classification 54
EPIP 1.2.1 Emergency Action Level Technical Basis 23
EPIP 1.3 Dose Assessment and Protective Action Recommendations 52
EPIP 2.1 Notifications - ERO, State and Counties, and NRC 58
EPIP 4.1 Technical Support Center (TSC) Activation and Evacuation 55
EPIP 4.2 Operations Support Center (OSC) Activation and Evacuation 29
EPIP 4.3 Emergency Operations Facility (EOF) Activation and 48
Evacuation
EPIP 4.8 Joint Information Center Activation and Evacuation 10
71114.08 PBN EPR 192 Point Beach Nuclear Plant Emergency Preparedness 2019
2D NRC Exercise
Inspection Type Designation Description or Title Revision or
Procedure Date
71151 Miscellaneous Emergency Response Organization (ERO) Drill Participation July 2018 -
Data March 2019
Alert Notification System (ANS) Reliability Data July 2018 -
March 2019
Drill and Exercise Participation (DEP) Opportunities Data July 2018 -
March 2019
6