IR 05000266/2019012

From kanterella
Jump to navigation Jump to search
Triennial Fire Protection Inspection Report 05000266/2019012 and 05000301/2019012
ML19345E354
Person / Time
Site: Point Beach  
Issue date: 12/11/2019
From: Robert Daley
NRC/RGN-III
To: Craven R
Nextera Energy
References
IR 2019012
Preceding documents:
Download: ML19345E354 (11)


Text

December 11, 2019

SUBJECT:

POINT BEACH NUCLEAR PLANT - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000266/2019012 AND 05000301/2019012

Dear Mr. Craven:

On November 7, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with Mr. James Wilson and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety

Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2019012 and 05000301/2019012

Enterprise Identifier: I-2019-012-0024

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

October 7, 2019 to November 7, 2019

Inspectors:

J. Benjamin, Senior Reactor Inspector

G. Hausman, Senior Reactor Inspector

J. Robbins, Reactor Inspector

Approved By:

Robert C. Daley, Chief

Engineering Branch 3

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a)

(1) Unit 1, Control Room (Abandonment)

Fire Compartment 326GRP, Fire Area A31 (Fire Zones 326, 328, 329, 330, 331)

Analyzed Circuits: (Include if applicable)

  • 1(2)P-023A, Reactor Water Makeup Pump
(2) Unit 1, North Office in Computer Room Fire Compartment 333GRP, Fire Area A32 (Fire Zones 333, 334, 335, 336)

Analyzed Circuits: (Include if applicable)

  • 1SI-00825A, Reactor Water Storage Tank to Safety Injection Suction Motor Operated Valve
(3) Monitor Tank Room Fire Compartment 187GRP, Fire Area A01-B (Fire Zones 187, 196)

Analyzed Circuits: (Include if applicable)

  • 1(2)RC-00430, Pressurizer Power Operated Relief Valve
(4) Unit 2, Turbine Building General Area Fire Compartment 583GRP, Fire Area A01-E (Fire Zones 218, 222, 223, 224, 542, 547, 583, 584, 587, 588)

Analyzed Circuits: (Include if applicable)

B.5.b Inspection Activities (IP Section 02.03) (2 Samples)

(1) Make-Up to Condensate Storage Tank (CST)
(2) Portable Sprays

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 7, 2019, the inspectors presented the triennial fire protection inspection results to Mr. James Wilson and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05XT Calculations

27094-CALC-01

Water Supply and Suppression System Hydraulic Analysis -

Fire Protection Water Supply System

27094-CALC-02

Water Based Fire Suppression System Supply Calculations 3

Corrective Action

Documents

AR 02223092

0-PT-FP-005 Unsatisfactory Results

2/21/2017

AR 02328459

NFPA 805 - Modeling Error Found in SI Reset Logic

09/19/2019

Corrective Action

Documents

Resulting from

Inspection

AR 02331103

2019 TFP NRC Observation on Last Man Standing

10/10/2019

AR 02333470

2019 FPTI - AOP-40A Documentation Concerns

10/29/2019

AR 02334360

2019 TFP - 2NI-00032 Cable Logics Missing Cables

11/05/2019

PCR 02331216

Recommend Revising EDMG-2

10/14/2019

Drawings

165130

Reactor Coolant System

290587

Fire Protection Plan for Turbine Building, Aux Building, and

Containment Elevation 26' 0"

07/01/1992

290590

Fire Protection Plan for Turbine Building, Aux Building, and

Containment Elevation 44' 0"

07/01/1992

290600

Fire Protection Plan for Turbine Building, Aux Building, and

Containment Elevation 66' 0"

07/01/1992

R2168-001-

187GRP,

Ignition Source Sketch, Monitor Tank Room Fire

Compartment 187GRP

R2168-001-

333GRP,

Ignition Source Sketch, North Office in Computer Room,

Fire Compartment 333GRP

Engineering

Changes

EC 260347

20V Vital Cable Short Circuit Protection for Unit 1 and 2

EC 285584

NFPA 805 - 120VAC Cable Protection and 125VDC Fuse

Coordination

EC 286252

480VAC Cable Protection

Engineering

Evaluations

FPPDD

Fire Protection Program Design Document

FPTE 002

Technical Evaluation of Inadvertent Suppression Actuation

at Point Beach Nuclear Plant

FPTE 003

Technical Evaluation of Emergency Lighting Capability at

Point Beach Nuclear Plant,

FPTE 004

Technical Evaluation of Fire Damper Tests at Point Beach

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Nuclear Plant

FPTE 005

Technical Evaluation for Appendix R Hot Shutdown

Components Out-of-Service

FPTE 2013-002

Inventory and Pressure Control Calculations

FPTE 2015-003

Evaluation of Selective Coordination and Cable Protection

for NFPA 805

FPTE 2016-001

Radioactive Release Review

2/20/2016

FPTE 2016-003

NFPA 805 Nuclear Safety Capability Assessment

FPTE 2016-005

NFPA 805 Recovery Action Feasibility Evaluation

FPTE 2016-007

NFPA 805 Monitoring Program Phase 1: Scoping

Equipment and Programmatic Elements

FPTE 2016-027

PBNP Detailed Fire Modeling Report - Fire Compartment

333GRP North Office in Computer Room - EL 60' - 0"

FPTE 2016-050

NP 1.9.9 Transient Combustible Control

PBN-BFJR-16-

070

Point Beach Nuclear Plant Fire Risk Evaluations dated

December 2016

PRA 8.18

Fire PRA Quantification Notebook

SL-009526

B.5.b Phases 2 & 3 Report, July 2008

Fire Plans

PFP-2-TB8

Pre-Fire Plan Unit 2 Turbine Building Elevation 8 FT

Miscellaneous

EDMG-2

Loss of Large Areas of The Plant Due to Fire or Explosion

EDMG-1

PBNP Emergency Management Guideline

Equipment Data

Base Plant

Nomenclature

Manual, Section

1.7

Administrative and Technical, Abbreviations and Acronyms

F-2016001

Ansul Fire Extinguisher and Parts Catalog

2016

F-7602

ANSUL Portable, Wheeled Units and Pre-Engineered

Systems Hydrostatic Test Instructions

2/20/2012

ML070590730

Point Beach, Units 1 and 2, Response Providing

Information Regarding Implementation Details for the

Phase 2 and 3 Mitigation Strategies

2/27/2007

ML081340110

TI 2515/171, Verification of Site-Specific Implementation of

B.5.b Phase 2 & 3 Mitigating Strategies

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ML090080533

IR 05000266-08-008, 05000301-08-008, on 12/15/2008 -

2/18/2008, Point Beach Nuclear Plant, Units 1 and 2, TI

2515/171 Verification of Site-Specific Implementation of

B.5.b, Phase 2 and 3 Mitigating Strategies

01/06/2009

NFPA 805

Performance-Based Standard for Fire Protection for Light

Water Reactor Electric Generating Plants, 2001 Edition

2/09/2001

NP 1.9.14

Fire Protection Plan

NPL 2018-0056

Letter of Agreement - Two Creeks Volunteer Fire

Department

11/27/2018

NPL 2018-0057

Office of the City Manager

First Responder - Mishicot Area Ambulance

Second Responder - City of Two Rivers Ambulance

11/28/2018

NPL 2018-0060

Letter of Agreement - Mishicot Area Ambulance Service

11/29/2018

NPM 2019-0077

MPEP Minutes Focusing on Scoping Report

05/22/2019

PBN LOC 18A

007S

AOP-40 Fire Response Series Implementation

PBN LP 1275

Lesson Plan: Control Room Inaccessibility

R2092-001-002

Fire Protection Code Conformance Review (June 2013)

TRM

Technical Requirements Manual

2

VTM 00147A1,

Book 2

ANSUL Dry Chemical Piped Systems

WCAP-13644-

000

Design Bases Document for the Wisconsin Electric Point

Beach Nuclear Plant Chemical and Volume Control System

Procedures

0-FP-FP-003

Electrical Motor-Driven Fire Pump Functional Test

0-PT-FP-002

Diesel Engine-Driven Fire Pump Functional Test

0-PT-FP-004

Annual Fire Pump Capacity Test

0-PT-FP-013

Quarterly Operations B.5.B Fire Equipment Inventory

Report

AOP-40

Response to Fire

AOP-40A

Control Room Abandonment

CMP 2.5.2.2

Setup Parameters for Category 2 Air Operated

Valves

FP-AA-104-1001

Fire Protection Performance and Trending

FP-AA-104-1004

Control of Combustible and Ignition Sources

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

FP-AA-104-1006

Implementation of the NFPA 805 Monitoring Program

FPTE 007

Technical Evaluation of PBNP Point-to-Point Portable

Radio Communications for a Fire Event

MI 28.3

Fire Door Maintenance and Repair

NP 1.9.14

Fire Protection Plan

NP 1.9.9

Transient Combustible Control

NP 7.7.13

Fire Protection Engineering and Technical Evaluations

OI 82

Communication System Operation

OM 3.27

Control of Fire Protection and NFPA 805 Equipment

OM 4.3.8

Control of Time Critical and Time Sensitive Operator

Actions

&16

OP-AA-107

Extensive Damage Management Program

OP-AA-109

Control of Time Critical Operator Actions and Time

Sensitive Actions,

PC 73 Part 2

Monthly Surveillance of Fire Hose Stations

PC 73 Part 3

Service Testing of Fire Hose and Fire Hose Stations

PC 75 Part 3

Smoke Heat Ventilation Systems Surveillance Test

PC 77 Part 5

Automatic Wet-Pipe Protection System Alarm Verification

Test

RF 70

Fire Hose and Fire Station Service Test Unit 1

RMP 9094

Diesel Fire Pump Battery Surveillance

TS 76

Quarterly Automatic Sprinkler and Water Spray System

Surveillance Test

Work Orders

40409709

Perform O-PT-FP-013 Operations B.5.B Fire 40409709 01

Equipment Inventory Report

06/22/2016

40437105

Perform PC-21.6 B.5.B Miscellaneous and Flex Checks

09/15/2016

40497945

0-PT-FP-005 Underground Fire Main Test

08/30/2017

40569158

0-PT-FP-005 Underground Fire Main Test

08/16/2018

40620525

0-PT-FP-008 Service Testing of Fire Hoses and Hose

Stations

07/26/2019

40634580

0-PT-FP-014 Portable Diesel Fire Pump Functional Test

X-935

09/25/2019

40635666

PC-73.8 Fire Hose Test

09/25/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40649545

PC 76 Part 4, Annual Maintenance Inspection of Nitrogen

Cylinder-Operated Wheeled Fire Extinguishers

09/10/2019