IR 05000266/2019012
| ML19345E354 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/11/2019 |
| From: | Robert Daley NRC/RGN-III |
| To: | Craven R Nextera Energy |
| References | |
| IR 2019012 | |
| Preceding documents: |
|
| Download: ML19345E354 (11) | |
Text
December 11, 2019
SUBJECT:
POINT BEACH NUCLEAR PLANT - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000266/2019012 AND 05000301/2019012
Dear Mr. Craven:
On November 7, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with Mr. James Wilson and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety
Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000266 and 05000301
License Numbers:
Report Numbers:
05000266/2019012 and 05000301/2019012
Enterprise Identifier: I-2019-012-0024
Licensee:
NextEra Energy Point Beach, LLC
Facility:
Point Beach Nuclear Plant
Location:
Two Rivers, WI
Inspection Dates:
October 7, 2019 to November 7, 2019
Inspectors:
J. Benjamin, Senior Reactor Inspector
G. Hausman, Senior Reactor Inspector
J. Robbins, Reactor Inspector
Approved By:
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a)
- (1) Unit 1, Control Room (Abandonment)
Fire Compartment 326GRP, Fire Area A31 (Fire Zones 326, 328, 329, 330, 331)
Analyzed Circuits: (Include if applicable)
- 1(2)P-023A, Reactor Water Makeup Pump
- (2) Unit 1, North Office in Computer Room Fire Compartment 333GRP, Fire Area A32 (Fire Zones 333, 334, 335, 336)
Analyzed Circuits: (Include if applicable)
- 1SI-00825A, Reactor Water Storage Tank to Safety Injection Suction Motor Operated Valve
- (3) Monitor Tank Room Fire Compartment 187GRP, Fire Area A01-B (Fire Zones 187, 196)
Analyzed Circuits: (Include if applicable)
- 1(2)RC-00430, Pressurizer Power Operated Relief Valve
- (4) Unit 2, Turbine Building General Area Fire Compartment 583GRP, Fire Area A01-E (Fire Zones 218, 222, 223, 224, 542, 547, 583, 584, 587, 588)
Analyzed Circuits: (Include if applicable)
- 1CV-00110B, Boric Acid Blender Outlet Flow Control Solenoid
B.5.b Inspection Activities (IP Section 02.03) (2 Samples)
- (1) Make-Up to Condensate Storage Tank (CST)
- (2) Portable Sprays
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 7, 2019, the inspectors presented the triennial fire protection inspection results to Mr. James Wilson and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.05XT Calculations
27094-CALC-01
Water Supply and Suppression System Hydraulic Analysis -
Fire Protection Water Supply System
27094-CALC-02
Water Based Fire Suppression System Supply Calculations 3
Corrective Action
Documents
0-PT-FP-005 Unsatisfactory Results
2/21/2017
NFPA 805 - Modeling Error Found in SI Reset Logic
09/19/2019
Corrective Action
Documents
Resulting from
Inspection
2019 TFP NRC Observation on Last Man Standing
10/10/2019
2019 FPTI - AOP-40A Documentation Concerns
10/29/2019
2019 TFP - 2NI-00032 Cable Logics Missing Cables
11/05/2019
PCR 02331216
Recommend Revising EDMG-2
10/14/2019
Drawings
165130
290587
Fire Protection Plan for Turbine Building, Aux Building, and
Containment Elevation 26' 0"
07/01/1992
290590
Fire Protection Plan for Turbine Building, Aux Building, and
Containment Elevation 44' 0"
07/01/1992
290600
Fire Protection Plan for Turbine Building, Aux Building, and
Containment Elevation 66' 0"
07/01/1992
R2168-001-
187GRP,
Ignition Source Sketch, Monitor Tank Room Fire
Compartment 187GRP
R2168-001-
333GRP,
Ignition Source Sketch, North Office in Computer Room,
Fire Compartment 333GRP
Engineering
Changes
20V Vital Cable Short Circuit Protection for Unit 1 and 2
NFPA 805 - 120VAC Cable Protection and 125VDC Fuse
Coordination
480VAC Cable Protection
Engineering
Evaluations
FPPDD
Fire Protection Program Design Document
FPTE 002
Technical Evaluation of Inadvertent Suppression Actuation
at Point Beach Nuclear Plant
FPTE 003
Technical Evaluation of Emergency Lighting Capability at
Point Beach Nuclear Plant,
FPTE 004
Technical Evaluation of Fire Damper Tests at Point Beach
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Nuclear Plant
FPTE 005
Technical Evaluation for Appendix R Hot Shutdown
Components Out-of-Service
FPTE 2013-002
Inventory and Pressure Control Calculations
FPTE 2015-003
Evaluation of Selective Coordination and Cable Protection
for NFPA 805
FPTE 2016-001
Radioactive Release Review
2/20/2016
FPTE 2016-003
NFPA 805 Nuclear Safety Capability Assessment
FPTE 2016-005
NFPA 805 Recovery Action Feasibility Evaluation
FPTE 2016-007
NFPA 805 Monitoring Program Phase 1: Scoping
Equipment and Programmatic Elements
FPTE 2016-027
PBNP Detailed Fire Modeling Report - Fire Compartment
333GRP North Office in Computer Room - EL 60' - 0"
FPTE 2016-050
NP 1.9.9 Transient Combustible Control
PBN-BFJR-16-
070
Point Beach Nuclear Plant Fire Risk Evaluations dated
December 2016
PRA 8.18
Fire PRA Quantification Notebook
SL-009526
B.5.b Phases 2 & 3 Report, July 2008
Fire Plans
Pre-Fire Plan Unit 2 Turbine Building Elevation 8 FT
Miscellaneous
EDMG-2
Loss of Large Areas of The Plant Due to Fire or Explosion
EDMG-1
PBNP Emergency Management Guideline
Equipment Data
Base Plant
Nomenclature
Manual, Section
1.7
Administrative and Technical, Abbreviations and Acronyms
F-2016001
Ansul Fire Extinguisher and Parts Catalog
2016
F-7602
ANSUL Portable, Wheeled Units and Pre-Engineered
Systems Hydrostatic Test Instructions
2/20/2012
Point Beach, Units 1 and 2, Response Providing
Information Regarding Implementation Details for the
Phase 2 and 3 Mitigation Strategies
2/27/2007
TI 2515/171, Verification of Site-Specific Implementation of
B.5.b Phase 2 & 3 Mitigating Strategies
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
IR 05000266-08-008, 05000301-08-008, on 12/15/2008 -
2/18/2008, Point Beach Nuclear Plant, Units 1 and 2, TI
2515/171 Verification of Site-Specific Implementation of
B.5.b, Phase 2 and 3 Mitigating Strategies
01/06/2009
Performance-Based Standard for Fire Protection for Light
Water Reactor Electric Generating Plants, 2001 Edition
2/09/2001
NP 1.9.14
Fire Protection Plan
NPL 2018-0056
Letter of Agreement - Two Creeks Volunteer Fire
Department
11/27/2018
NPL 2018-0057
Office of the City Manager
First Responder - Mishicot Area Ambulance
Second Responder - City of Two Rivers Ambulance
11/28/2018
NPL 2018-0060
Letter of Agreement - Mishicot Area Ambulance Service
11/29/2018
NPM 2019-0077
MPEP Minutes Focusing on Scoping Report
05/22/2019
PBN LOC 18A
007S
AOP-40 Fire Response Series Implementation
PBN LP 1275
Lesson Plan: Control Room Inaccessibility
R2092-001-002
Fire Protection Code Conformance Review (June 2013)
Technical Requirements Manual
2
VTM 00147A1,
Book 2
ANSUL Dry Chemical Piped Systems
000
Design Bases Document for the Wisconsin Electric Point
Beach Nuclear Plant Chemical and Volume Control System
Procedures
0-FP-FP-003
Electrical Motor-Driven Fire Pump Functional Test
0-PT-FP-002
Diesel Engine-Driven Fire Pump Functional Test
0-PT-FP-004
Annual Fire Pump Capacity Test
0-PT-FP-013
Quarterly Operations B.5.B Fire Equipment Inventory
Report
Response to Fire
Control Room Abandonment
CMP 2.5.2.2
Setup Parameters for Category 2 Air Operated
Valves
Fire Protection Performance and Trending
Control of Combustible and Ignition Sources
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Implementation of the NFPA 805 Monitoring Program
FPTE 007
Technical Evaluation of PBNP Point-to-Point Portable
Radio Communications for a Fire Event
MI 28.3
Fire Door Maintenance and Repair
NP 1.9.14
Fire Protection Plan
NP 1.9.9
Transient Combustible Control
NP 7.7.13
Fire Protection Engineering and Technical Evaluations
OI 82
Communication System Operation
OM 3.27
Control of Fire Protection and NFPA 805 Equipment
OM 4.3.8
Control of Time Critical and Time Sensitive Operator
Actions
&16
Extensive Damage Management Program
Control of Time Critical Operator Actions and Time
Sensitive Actions,
PC 73 Part 2
Monthly Surveillance of Fire Hose Stations
PC 73 Part 3
Service Testing of Fire Hose and Fire Hose Stations
PC 75 Part 3
Smoke Heat Ventilation Systems Surveillance Test
PC 77 Part 5
Automatic Wet-Pipe Protection System Alarm Verification
Test
RF 70
Fire Hose and Fire Station Service Test Unit 1
RMP 9094
Diesel Fire Pump Battery Surveillance
TS 76
Quarterly Automatic Sprinkler and Water Spray System
Surveillance Test
Work Orders
40409709
Perform O-PT-FP-013 Operations B.5.B Fire 40409709 01
Equipment Inventory Report
06/22/2016
40437105
Perform PC-21.6 B.5.B Miscellaneous and Flex Checks
09/15/2016
40497945
0-PT-FP-005 Underground Fire Main Test
08/30/2017
40569158
0-PT-FP-005 Underground Fire Main Test
08/16/2018
40620525
0-PT-FP-008 Service Testing of Fire Hoses and Hose
Stations
07/26/2019
40634580
0-PT-FP-014 Portable Diesel Fire Pump Functional Test
X-935
09/25/2019
40635666
PC-73.8 Fire Hose Test
09/25/2019
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
40649545
PC 76 Part 4, Annual Maintenance Inspection of Nitrogen
Cylinder-Operated Wheeled Fire Extinguishers
09/10/2019