|
---|
Category:Inspection Report
MONTHYEARIR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 IR 05000266/20220062023-03-0101 March 2023 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022006 and 05000301/2022006) IR 05000266/20230102023-02-23023 February 2023 Comprehensive Engineering Team Inspection Report 05000266/2023010 and 05000301/2023010 IR 05000266/20220042023-01-24024 January 2023 Integrated Inspection Report 05000266/2022004 and 05000301/2022004 ML23009B7002023-01-24024 January 2023 Review of the Spring 2022 Steam Generator Tub Inspections Report IR 05000266/20224012022-12-0808 December 2022 Security Baseline Inspection Report 05000266/2022401 and 05000301/2022401 IR 05000266/20224042022-12-0202 December 2022 Cyber Security Inspection Report 05000266/2022404 and 05000301/2022404 IR 05000266/20220032022-11-0707 November 2022 Integrated Inspection Report 05000266/2022003 and 05000301/2022003 ML22298A2972022-10-27027 October 2022 Review of the Fall 2021 Steam Generator Tube Inspections Report IR 05000266/20220122022-09-29029 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000266/2022012 and 05000301/2022012 IR 05000266/20220052022-08-26026 August 2022 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005) IR 05000266/20220112022-08-0303 August 2022 Triennial Fire Protection Inspection Report 05000266/2022011 and 05000301/2022011 IR 05000266/20220022022-07-27027 July 2022 Integrated Inspection Report 05000266/2022002 and 05000301/2022002 IR 05000266/20220012022-05-0404 May 2022 Integrated Inspection Report 05000266/2022001 and 05000301/2022001 IR 05000266/20210062022-03-0202 March 2022 Annual Assessment Letter for Point Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021006 and 05000301/2021006) IR 05000266/20220102022-02-0909 February 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000266/2022010 and 05000301/2022010 IR 05000266/20210042022-01-28028 January 2022 Integrated Inspection Report 05000266/2021004 and 05000301/2021004 and Exercise of Enforcement Discretion IR 05000266/20214022021-11-10010 November 2021 Security Baseline Inspection Report 05000266/2021402 and 05000301/2021402 IR 05000266/20210032021-10-20020 October 2021 Integrated Inspection Report 05000266/2021003 and 05000301/2021003 IR 05000266/20215012021-10-0505 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2021501 and 05000301/2021501 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 IR 05000266/20210052021-09-0101 September 2021 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021005 and 05000301/2021005) IR 05000266/20214032021-08-0404 August 2021 Security Baseline Inspection Report 05000266/2021403 and 05000301/2021403 IR 05000266/20210022021-07-29029 July 2021 Integrated Inspection Report 05000266/2021002, 05000301/2021002, and 07200005/2021001 IR 05000266/20210102021-07-0101 July 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000266/2021010 and 05000301/2021010 IR 05000266/20210012021-04-21021 April 2021 Integrated Inspection Report 05000266/2021001 and 05000301/2021001 IR 05000266/20214012021-03-16016 March 2021 Security Baseline Inspection Report 05000266/2021401; 05000301/2021401; Independent Spent Fuel Storage Security Inspection Report 07200005/2021401 IR 05000266/20200062021-03-0404 March 2021 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020006 and 05000301/2020006) IR 05000266/20200902021-02-0909 February 2021 Final Significance Determination of a Green Finding; NRC Inspection Report 05000266/2020090 and 05000301/2020090 IR 05000266/20200042021-02-0808 February 2021 Integrated Inspection Report 05000266/2020004 and 05000301/2020004 IR 05000266/20204022020-12-14014 December 2020 Security Baseline Inspection Report 05000266/2020402 and 05000301/2020402 IR 05000266/20200032020-11-0404 November 2020 Integrated Inspection Report 05000266/2020003 and 05000301/2020003 IR 05000266/20200102020-09-24024 September 2020 Biennial Problem Identification and Resolution Inspection Report 05000266/2020010 and 05000301/2020010 2024-09-18
[Table view] Category:Letter
MONTHYEARML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 2024-09-09
[Table view] |
Text
ber 11, 2019
SUBJECT:
POINT BEACH NUCLEAR PLANT - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000266/2019012 AND 05000301/2019012
Dear Mr. Craven:
On November 7, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with Mr. James Wilson and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000266 and 05000301 License Numbers: DPR-24 and DPR-27 Report Numbers: 05000266/2019012 and 05000301/2019012 Enterprise Identifier: I-2019-012-0024 Licensee: NextEra Energy Point Beach, LLC Facility: Point Beach Nuclear Plant Location: Two Rivers, WI Inspection Dates: October 7, 2019 to November 7, 2019 Inspectors: J. Benjamin, Senior Reactor Inspector G. Hausman, Senior Reactor Inspector J. Robbins, Reactor Inspector Approved By: Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.05XT - Fire Protection - NFPA 805 Fire Protection Inspection Requirements (IP Section 02.01a)
Main article: IP 71111.05
- (1) Unit 1, Control Room (Abandonment)
Fire Compartment 326GRP, Fire Area A31 (Fire Zones 326, 328, 329, 330, 331)
Analyzed Circuits: (Include if applicable)
- 1(2)P-023A, Reactor Water Makeup Pump
- (2) Unit 1, North Office in Computer Room Fire Compartment 333GRP, Fire Area A32 (Fire Zones 333, 334, 335, 336)
Analyzed Circuits: (Include if applicable)
- 1SI-00825A, Reactor Water Storage Tank to Safety Injection Suction Motor Operated Valve
- (3) Monitor Tank Room Fire Compartment 187GRP, Fire Area A01-B (Fire Zones 187, 196)
Analyzed Circuits: (Include if applicable)
- 1(2)RC-00430, Pressurizer Power Operated Relief Valve
- (4) Unit 2, Turbine Building General Area Fire Compartment 583GRP, Fire Area A01-E (Fire Zones 218, 222, 223, 224, 542, 547, 583, 584, 587, 588)
Analyzed Circuits: (Include if applicable)
B.5.b Inspection Activities (IP Section 02.03) (2 Samples)
- (1) Make-Up to Condensate Storage Tank (CST)
- (2) Portable Sprays
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 7, 2019, the inspectors presented the triennial fire protection inspection results to Mr. James Wilson and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.05XT Calculations 027094-CALC-01 Water Supply and Suppression System Hydraulic Analysis - 3
Fire Protection Water Supply System
27094-CALC-02 Water Based Fire Suppression System Supply Calculations 3
Corrective Action AR 02223092 0-PT-FP-005 Unsatisfactory Results 12/21/2017
Documents AR 02328459 NFPA 805 - Modeling Error Found in SI Reset Logic 09/19/2019
Corrective Action AR 02331103 2019 TFP NRC Observation on Last Man Standing 10/10/2019
Documents AR 02333470 2019 FPTI - AOP-40A Documentation Concerns 10/29/2019
Resulting from AR 02334360 2019 TFP - 2NI-00032 Cable Logics Missing Cables 11/05/2019
Inspection PCR 02331216 Recommend Revising EDMG-2 10/14/2019
Drawings 165130 Reactor Coolant System 1
290587 Fire Protection Plan for Turbine Building, Aux Building, and 07/01/1992
Containment Elevation 26' 0"
290590 Fire Protection Plan for Turbine Building, Aux Building, and 07/01/1992
Containment Elevation 44' 0"
290600 Fire Protection Plan for Turbine Building, Aux Building, and 07/01/1992
Containment Elevation 66' 0"
R2168-001- Ignition Source Sketch, Monitor Tank Room Fire 4
187GRP, Compartment 187GRP
R2168-001- Ignition Source Sketch, North Office in Computer Room, 3
333GRP, Fire Compartment 333GRP
Engineering EC 260347 120V Vital Cable Short Circuit Protection for Unit 1 and 2 0
Changes EC 285584 NFPA 805 - 120VAC Cable Protection and 125VDC Fuse 17
Coordination
EC 286252 480VAC Cable Protection 20
Engineering FPPDD Fire Protection Program Design Document 2
Evaluations FPTE 002 Technical Evaluation of Inadvertent Suppression Actuation 2
at Point Beach Nuclear Plant
FPTE 003 Technical Evaluation of Emergency Lighting Capability at 3
Point Beach Nuclear Plant,
FPTE 004 Technical Evaluation of Fire Damper Tests at Point Beach 1
Inspection Type Designation Description or Title Revision or
Procedure Date
Nuclear Plant
FPTE 005 Technical Evaluation for Appendix R Hot Shutdown 3
Components Out-of-Service
FPTE 2013-002 Inventory and Pressure Control Calculations 0
FPTE 2015-003 Evaluation of Selective Coordination and Cable Protection 1
for NFPA 805
FPTE 2016-001 Radioactive Release Review 12/20/2016
FPTE 2016-003 NFPA 805 Nuclear Safety Capability Assessment 0
FPTE 2016-005 NFPA 805 Recovery Action Feasibility Evaluation 2
FPTE 2016-007 NFPA 805 Monitoring Program Phase 1: Scoping 0
Equipment and Programmatic Elements
FPTE 2016-027 PBNP Detailed Fire Modeling Report - Fire Compartment 1
333GRP North Office in Computer Room - EL 60' - 0"
FPTE 2016-050 NP 1.9.9 Transient Combustible Control 2
PBN-BFJR-16- Point Beach Nuclear Plant Fire Risk Evaluations dated 0
070 December 2016
PRA 8.18 Fire PRA Quantification Notebook 1
SL-009526 B.5.b Phases 2 & 3 Report, July 2008 0
Fire Plans PFP-2-TB8 Pre-Fire Plan Unit 2 Turbine Building Elevation 8 FT 1
Miscellaneous EDMG-2 Loss of Large Areas of The Plant Due to Fire or Explosion 14
EDMG-1 PBNP Emergency Management Guideline 5
Equipment Data Administrative and Technical, Abbreviations and Acronyms 5
Base Plant
Nomenclature
Manual, Section
1.7
F-2016001 Ansul Fire Extinguisher and Parts Catalog 2016
F-7602 ANSUL Portable, Wheeled Units and Pre-Engineered 12/20/2012
Systems Hydrostatic Test Instructions
ML070590730 Point Beach, Units 1 and 2, Response Providing 02/27/2007
Information Regarding Implementation Details for the
Phase 2 and 3 Mitigation Strategies
ML081340110 TI 2515/171, Verification of Site-Specific Implementation of 1
B.5.b Phase 2 & 3 Mitigating Strategies
Inspection Type Designation Description or Title Revision or
Procedure Date
ML090080533 IR 05000266-08-008, 05000301-08-008, on 12/15/2008 - 01/06/2009
2/18/2008, Point Beach Nuclear Plant, Units 1 and 2, TI
2515/171 Verification of Site-Specific Implementation of
B.5.b, Phase 2 and 3 Mitigating Strategies
NFPA 805 Performance-Based Standard for Fire Protection for Light 02/09/2001
Water Reactor Electric Generating Plants, 2001 Edition
NP 1.9.14 Fire Protection Plan 22
NPL 2018-0056 Letter of Agreement - Two Creeks Volunteer Fire 11/27/2018
Department
NPL 2018-0057 Office of the City Manager 11/28/2018
First Responder - Mishicot Area Ambulance
Second Responder - City of Two Rivers Ambulance
NPL 2018-0060 Letter of Agreement - Mishicot Area Ambulance Service 11/29/2018
NPM 2019-0077 MPEP Minutes Focusing on Scoping Report 05/22/2019
PBN LOC 18A AOP-40 Fire Response Series Implementation 0
007S
PBN LP 1275 Lesson Plan: Control Room Inaccessibility 18
R2092-001-002 Fire Protection Code Conformance Review (June 2013) 1
TRM Technical Requirements Manual 122
VTM 00147A1, ANSUL Dry Chemical Piped Systems 44
Book 2
WCAP-13644- Design Bases Document for the Wisconsin Electric Point 0
000 Beach Nuclear Plant Chemical and Volume Control System
Procedures 0-FP-FP-003 Electrical Motor-Driven Fire Pump Functional Test 10
0-PT-FP-002 Diesel Engine-Driven Fire Pump Functional Test 27
0-PT-FP-004 Annual Fire Pump Capacity Test 20
0-PT-FP-013 Quarterly Operations B.5.B Fire Equipment Inventory 11
Report
AOP-40 Response to Fire 4
AOP-40A Control Room Abandonment 4
CMP 2.5.2.2 Setup Parameters for Category 2 Air Operated 7
Valves
FP-AA-104-1001 Fire Protection Performance and Trending 4
FP-AA-104-1004 Control of Combustible and Ignition Sources 2
Inspection Type Designation Description or Title Revision or
Procedure Date
FP-AA-104-1006 Implementation of the NFPA 805 Monitoring Program 1
FPTE 007 Technical Evaluation of PBNP Point-to-Point Portable 3
Radio Communications for a Fire Event
MI 28.3 Fire Door Maintenance and Repair 9
NP 1.9.14 Fire Protection Plan 22
NP 1.9.9 Transient Combustible Control 36
NP 7.7.13 Fire Protection Engineering and Technical Evaluations 11
OI 82 Communication System Operation 17
OM 3.27 Control of Fire Protection and NFPA 805 Equipment 71
OM 4.3.8 Control of Time Critical and Time Sensitive Operator 14 &16
Actions
OP-AA-107 Extensive Damage Management Program 13
OP-AA-109 Control of Time Critical Operator Actions and Time 4
Sensitive Actions,
PC 73 Part 2 Monthly Surveillance of Fire Hose Stations 27
PC 73 Part 3 Service Testing of Fire Hose and Fire Hose Stations 23
PC 75 Part 3 Smoke Heat Ventilation Systems Surveillance Test 15
PC 77 Part 5 Automatic Wet-Pipe Protection System Alarm Verification 20
Test
RF 70 Fire Hose and Fire Station Service Test Unit 1 10
RMP 9094 Diesel Fire Pump Battery Surveillance 35
TS 76 Quarterly Automatic Sprinkler and Water Spray System 27
Surveillance Test
Work Orders 40409709 Perform O-PT-FP-013 Operations B.5.B Fire 40409709 01 06/22/2016
Equipment Inventory Report
40437105 Perform PC-21.6 B.5.B Miscellaneous and Flex Checks 09/15/2016
40497945 0-PT-FP-005 Underground Fire Main Test 08/30/2017
40569158 0-PT-FP-005 Underground Fire Main Test 08/16/2018
40620525 0-PT-FP-008 Service Testing of Fire Hoses and Hose 07/26/2019
Stations
40634580 0-PT-FP-014 Portable Diesel Fire Pump Functional Test 09/25/2019
X-935
40635666 PC-73.8 Fire Hose Test 09/25/2019
Inspection Type Designation Description or Title Revision or
Procedure Date
40649545 PC 76 Part 4, Annual Maintenance Inspection of Nitrogen 09/10/2019
Cylinder-Operated Wheeled Fire Extinguishers
9