| issue date = 02/25/2008
| issue date = 02/25/2008
| title = IR 05000266-08-402(DRS); 05000301-08-402(DRS); 01/14/2008 - 01/18/2008; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter
| title = IR 05000266-08-402(DRS); 05000301-08-402(DRS); 01/14/2008 - 01/18/2008; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter
| author name = Duncan E R
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = McCarthy J
| addressee name = Mccarthy J
| addressee affiliation = Florida Power & Light Energy Point Beach, LLC
| addressee affiliation = Florida Power & Light Energy Point Beach, LLC
| docket = 05000266, 05000301
| docket = 05000266, 05000301
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 25, 2008 Mr. James McCarthy Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS);
[[Issue date::February 25, 2008]]
 
Mr. James McCarthy Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
 
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS);
5000301/2008402(DRS)
5000301/2008402(DRS)


Line 42: Line 37:
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic  
Sincerely,
 
/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);
===Enclosure:===
05000301/2008402(DRS) w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO  
Inspection Report 05000266/2008402(DRS);
05000301/2008402(DRS)  
 
===w/Attachment:===
Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO  


cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer  
cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer  
Line 57: Line 47:
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety  
Sincerely,
 
/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety  
Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic
 
===Enclosure:===
Inspection Report 05000266/2008402(DRS); 05000301/2008402(DRS)


===w/Attachment:===
Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS); 05000301/2008402(DRS)
Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\POI 2008 402 DRS OUO.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DLawver:co JKutlesa for MKunowski DFunk EDuncan DATE 2/21/08 2/20/08 2/21/08 2/25/08 OFFICIAL RECORD COP Y Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Letter to James McCarthy from Eric Duncan dated February 25, 2008.
w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\POI 2008 402 DRS OUO.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DLawver:co JKutlesa for MKunowski DFunk EDuncan DATE 2/21/08 2/20/08 2/21/08 2/25/08 OFFICIAL RECORD COP Y Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Letter to James McCarthy from Eric Duncan dated February 25, 2008.


SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS); 05000301/2008402(DRS)  
SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS); 05000301/2008402(DRS)  

Revision as of 14:23, 12 July 2019

IR 05000266-08-402(DRS); 05000301-08-402(DRS); 01/14/2008 - 01/18/2008; Point Beach Nuclear Plant, Units 1 and 2; Routine Security Baseline Inspection - Cover Letter
ML080580456
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/25/2008
From: Eric Duncan
Plant Support Branch II
To: Mccarthy J
Florida Power & Light Energy Point Beach
References
IR-08-402
Download: ML080580456 (4)


Text

February 25, 2008 Mr. James McCarthy Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS);

5000301/2008402(DRS)

Dear Mr. McCarthy:

On January 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Point Beach Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 18, 2008, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Nuclear Regulatory Commission review required before public release.

Dale Lawver, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 01/28/08___ Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS);

05000301/2008402(DRS) w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO

cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/ Eric Duncan, Chief Plant Support Branch Division of Reactor Safety

Docket No. 50-266; 50-301 License No. DPR-24; DPR-27 Nonpublic Enclosure: Inspection Report 05000266/2008402(DRS); 05000301/2008402(DRS)

w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO cc w/o encl: M. Nazar, Senior Vice President and Nuclear Chief Operating Officer J. Stall, Senior Vice President and Chief Nuclear Officer R. Kundalkar, Vice President, Nuclear Technical Services Licensing Manager, Point Beach Nuclear Plant M. Ross, Managing Attorney A. Fernandez, Senior Attorney K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin P. Schmidt, State Liaison Officer SEE PREVIOUS CONCURRENCES DOCUMENT NAME: G:\DRS\Work in Progress\POI 2008 402 DRS OUO.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DLawver:co JKutlesa for MKunowski DFunk EDuncan DATE 2/21/08 2/20/08 2/21/08 2/25/08 OFFICIAL RECORD COP Y Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Letter to James McCarthy from Eric Duncan dated February 25, 2008.

SUBJECT: POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008402(DRS); 05000301/2008402(DRS)

DISTRIBUTION:

TEB CFL EMH1 LXR1 RidsNrrDirsIrib MAS KGO JKH3 CAA1 RGK LSL (electronic IR's only)