ML18136A067: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/16/1979
| issue date = 10/16/1979
| title = Forwards Monthly Operating Rept for Sept 1979
| title = Forwards Monthly Operating Rept for Sept 1979
| author name = STALLINGS C M
| author name = Stallings C
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = HARTFIELD R A
| addressee name = Hartfield R
| addressee affiliation = NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
| addressee affiliation = NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
| docket = 05000280, 05000281
| docket = 05000280, 05000281

Revision as of 07:38, 17 June 2019

Forwards Monthly Operating Rept for Sept 1979
ML18136A067
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/16/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Hartfield R
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18136A068 List:
References
NUDOCS 7910190386
Download: ML18136A067 (1)


Text

  • ELECTRIC AND POWER COMPANY RrcHMoND, V:cuor.N .tA 23261 October 16, 1979 Mr. R. A. Hartfield, Acting Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Hartfield:

Serial No. 838 PO/RMT:baw Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of September, 1979. Very truly yours, [v cUl,.1 L C. M.

Vice President-Power Supply and Production Operations Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies) Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy) Office of Inspection and Enforcement

-Region II