IR 05000395/2017502: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 33: Line 33:
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Sincerely,/RA/ Eugene F. Guthrie, Chief Operator Licensing Branch 2 Division of Reactor Safety Docket Nos. 50-395 License Nos. NPF-12  
Sincerely,
/RA/ Eugene F. Guthrie, Chief Operator Licensing Branch 2 Division of Reactor Safety Docket Nos. 50-395 License Nos. NPF-12 Enclosure:
NRC IR 05000395/2017502 w/Attachment: Supplementary Information


===Enclosure:===
cc: Distribution via Listserv
NRC IR 05000395/2017502


===w/Attachment:===
________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DCO RII:DRS RII:DRP RII:DRS SIGNATURE SPS EMAIL JDH9 CAF2 EMAIL SPS FOR CMR2EMAIL EFG LJB4 EFG NAME S. SANCHEZ J. HICKMAN C. FONTANA C. READ E. GUTHRIE L. SUGGS E. GUTHRIE DATE 11/15 /2017 11/15/2017 11/ /2017 11/27 /2017 11/ 28 /2017 11/29 /2017 11/ 29/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure U.S. NUCLEAR REGULATORY COMMISSION
Supplementary Information
 
cc: Distribution via Listserv


________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DCO RII:DRS RII:DRP RII:DRS SIGNATURE SPS EMAIL JDH9 CAF2 EMAIL SPS FOR CMR2EMAIL EFG LJB4 EFG NAME S. SANCHEZ J. HICKMAN C. FONTANA C. READ E. GUTHRIE L. SUGGS E. GUTHRIE DATE 11/15 /2017 11/15/2017 11/ /2017 11/27 /2017 11/ 28 /2017 11/29 /2017 11/ 29/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos: 05000395  
==REGION II==
Docket Nos: 05000395  


License No: NPF-12  
License No: NPF-12  
Line 74: Line 73:
==REACTOR SAFETY==
==REACTOR SAFETY==


===Cornerstone:===
===Cornerstone: Emergency Preparedness===
Emergency Preparedness


1EP1 Exercise Evaluation
1EP1 Exercise Evaluation

Revision as of 22:45, 9 May 2019

U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000395/2017502
ML17333A558
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 11/29/2017
From: Guthrie E F
Division of Reactor Safety II
To: Lippard G A
South Carolina Electric & Gas Co
References
IR 2017502
Download: ML17333A558 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 29, 2017

Mr. George III Vice President Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 (Mail Code 800) Jenkinsville, SC 29065

SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000395/2017502

Dear Mr. Lippard:

On November 3, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Virgil C. Summer Nuclear Station. The enclosed inspection report (IR) documents the inspection results that were discussed on November 3, 2017, with you and members of your staff.

The NRC inspectors did not identify any findings or violations of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,

/RA/ Eugene F. Guthrie, Chief Operator Licensing Branch 2 Division of Reactor Safety Docket Nos. 50-395 License Nos. NPF-12 Enclosure:

NRC IR 05000395/2017502 w/Attachment: Supplementary Information

cc: Distribution via Listserv

________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DCO RII:DRS RII:DRP RII:DRS SIGNATURE SPS EMAIL JDH9 CAF2 EMAIL SPS FOR CMR2EMAIL EFG LJB4 EFG NAME S. SANCHEZ J. HICKMAN C. FONTANA C. READ E. GUTHRIE L. SUGGS E. GUTHRIE DATE 11/15 /2017 11/15/2017 11/ /2017 11/27 /2017 11/ 28 /2017 11/29 /2017 11/ 29/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure U.S. NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos: 05000395

License No: NPF-12

Report No: 05000395/2017502

Licensee: South Carolina Electric & Gas (SCE&G) Company

Facility: Virgil C. Summer Nuclear Station

Location: Jenkinsville, SC

Dates: October 30 through November 3, 2017

Inspectors: Steven P. Sanchez, Senior Emergency Preparedness Inspector Christopher A. Fontana, Emergency Preparedness Inspector John D. Hickman, Emergency Preparedness Inspector Carey Read, Resident Inspector (Surry)

Approved by: Eugene Guthrie, Chief Operator Licensing Branch 2

Division of Reactor Safety

SUMMARY

Inspection Report (IR) 05000395/2017502; 10/30/2017 - 11/03/2017; Virgil C. Summer Nuclear Station; Exercise and Baseline Inspection

This report covers an inspection by three emergency preparedness and one resident inspector.

No findings of significance were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6.

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

a. Inspection Scope

The onsite inspection consisted of the following review and assessment:

  • The adequacy of the licensee's performance in the biennial exercise, conducted on October 31, 2017, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center, Operations Support Center, and the Emergency Operations Facility.
  • Other performance areas, such as the emergency response organization's (ERO) recognition of abnormal plant conditions; command and control, intra- and inter- facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
  • The post-exercise critique process and the presentation to the licensee's senior management conducted on November 2, 2017, to evaluate the licensee's self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.

The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on November 2, 2017.

This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis as defined in Inspection Procedure (IP) 71114.01, "Exercise Evaluation". This inspection activity satisfied three inspection samples for PI verification on an annual basis as defined in IP 71151, "Performance Indicator Verification".

b. Findings

No findings were identified.

1EP4 Emergency Action Level and Emergency Plan Changes

a. Inspection Scope

Since the last NRC inspection of this program area, one revision to the emergency plan, one revision to the emergency action levels, and several revisions to emergency plan implementing procedures had been made. The licensee determined that, in accordance with 10 CFR 50.54(q), the emergency plan continued to meet the requirements of 10 CFR 50.47(b), and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to futu re NRC inspection in their entirety.

The inspection was conducted in accordanc e with NRC Inspection Procedure (IP) 71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria. The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise

Evaluation - Scenario Review," to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspectors sampled licensee submittals relative to the performance indicators (PIs) listed below for the period July 1, 2016, through September 30, 2017. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, was used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Drill/Exercise Performance (DEP)
  • Emergency Response Organization (ERO) Readiness
  • Alert and Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors verified the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. Licensee procedures, records, and other documents reviewed within this inspection area, are listed in the

. This inspection satisfied three inspection samples for PI verification on an annual basis. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis as defined in Inspection Procedure (IP) 71114.01, "Exercise Evaluation" & This inspection activity satisfied three inspection samples for PI verification on an annual basis as defined in IP 71151, "Performance Indicator Verification".

b. Findings

No findings were identified.

4OA6 Meetings

On November 3, 2017, the inspection team presented the inspection results to Mr. G. Lippard and other members of the plant staff. The inspectors confirmed that no

proprietary information was provided.

ATTACHMENT: Supplementary Information

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

M. Cekovsky, Emergency Preparedness Specialist
B. Dalick, Supervisor, Licensing
R. Haselden, General Manager, Organizational / Development Effectiveness
R. Justice, General Manager, Nuclear Plant Operations
H. Kirkland, Licensing Engineer
G. Lindamood, Santee Cooper
G. Lippard, Vice President, Nuclear Operations
M. Moore, Supervisor, Nuclear Licensing
W. Stuart, General Manager, Engineering Services
T. Tharp, Supervisor, Emergency Preparedness
B. Thompson, Manager, Nuclear Licensing
R. Williamson, Manager, Emergency Preparedness
S. Zarandi, General Manager, Nuclear Support Services

LIST OF DOCUMENTS REVIEWED

1EP1 Exercise Evaluation

Procedures

EP-100, V.C. Summer Radiation Emergency Plan, Rev.
68
EPD-17-01B, October 31, 2017, V.C. Summer Nuclear Station C-ERO Evaluated Exercise
Scenario Manual, Rev. 1
EPM-100.010, Emergency Field Flash of Emergency Diesel Generator, Rev. 1, Change C
EPP-001, Activation & Implementation of Emergency Plan, Rev. 31
EPP-012, Onsite Personnel Accountability and Evacuation, Rev. 13
SAP-0999, Corrective Action Program, Rev. 15
VCS-EPAP-0105, Conduct of Drills and Exercises, Rev. 0
VCS-EPMP-0106, Offsite Notification System (ONS), Rev. 0
VCS-EPP-0001.2, Alert, Rev. 0
VCS-EPP-0001.3, Site Area Emergency, Rev. 0
VCS-EPP-0001.4, General Emergency, Rev. 0
VCS-EPP-0002, Communication & Notification, Rev. 2
VCS-EPP-0020, Emergency Personnel Exposure Control, Rev. 0
VCS-EPP-0023, Technical Support Center, Rev. 0
VCS-EPP-0028, Operational Support Center Units 1, 2, & 3, Rev. 0
VCS-EPP-0051, Emergency Operations Center, Rev. 0
Records and Data V.C. Summer Graded Exercise, 11/2/17 Management Debrief
EPD-17-01B, October 31, 2017, V.C. Summer Nuclear Station C-ERO Evaluated Exercise
Scenario Manual. Rev. 1
Control Room Simulator, Operations Support Center, Technical Support Center, and
Emergency Operations Facility /Joint Information Center - Documentation packages (logs, event notification forms, Protective Action Recommendations, Media releases, and Radiological Dose Assessments)
Corrective Action Program Documents (Condition Reports)
CR-15-04449, Risk significant planning standard items identified in the 9/22/15 NRC evaluated exercise
CR-16-00490, Gap in EP training procedure and update of the OSC facility
CR-16-01267, Classification was not timely
CR-16-05172, Incorrect ERO Notification was activated
CR-17-02101, Deficiencies identified during QA walk-down of Emergency Facilities
CR-17-02105, Health Physics Drill performed during Graded Exercise, missed objective
CR-17-05781, Unexpected PAR made during 10/31/17 NRC evaluated exercise
CR-17-05785, Non-RSPS items from 10/31/17 evaluated exercise
CR-17-05786, Minor errors identified on ENFs during 10/31/17 evaluated exercise
CR-17-05787, An unsat drill objective was identified during the 10/31/17 evaluated exercise
CR-17-05828, Observations identified by the NRC during the 2017 NRC EP inspection
1EP4 Emergency Action Level and Emergency Plan Changes

Procedures

EP-100, V.C. Summer Radiation Emergency Plan, Revs. 67 and 68
EPP-005, Offsite Dose Calculation, Rev. 21
SAP-0999, Corrective Action Program, Rev. 15
VC1-EPAP-0108, Emergency Action Level Reference Manual - Unit 1, Rev. 1
VC1-EPP-0108, Emergency Action Level Technical Bases Document - Unit 1, Rev. 0 & 1
VCS-EPAP-0001, Emergency Plan Changes, Rev. 0
VCS-EPP-0001.1, Unusual Event, Rev. 0
VCS-EPP-0001.2, Alert, Rev. 0
VCS-EPP-0001.3, Site Area Emergency, Rev. 0
VCS-EPP-0001.4, General Emergency, Rev. 0
VCS-SAP-0127, Emergency Preparedness, Rev. 0
VCS-TQP-0917, Emergency Preparedness Training Program, Rev. 0
Change Packages 10
CFR 50.54(q) Screen and Evaluation for
VC1-EPP-0108, Emergency Action Level Technical Bases Document - Unit 1, Rev. 1, dated 10/2/17
CFR 50.54(q) Screen and Evaluation for
EP-100, V.C. Summer Radiation Emergency Plan, Rev. 68, dated 12/12/16
CFR 50.54(q) Screen and Evaluation for
EPP-005, Offsite Dose Calculation, Rev. 21, dated
10/21/16 10
CFR 50.54 (q) Screen for
VCS-EPP-0001.1, Unusual Event, Rev. 0, dated 7/21/16
CFR 50.54 (q) Screen for
VCS-EPP-0001.2, Alert, Rev. 0, dated 7/21/16
CFR 50.54 (q) Screen for
VCS-EPP-0001.3, Site Area Emergency, Rev. 0, dated 7/21/16
CFR 50.54 (q) Screen for
VCS-EPP-0001.4, General Emergency, Rev. 0, dated 7/21/16
Corrective Action Program Documents
CR-16-03673, Programmatic weakness in completing 10CFR50.54(q) screenings & evaluations
CR-16-04976, Wording in 50.54(q)'s did not clearly represent all changes
CR-17-05782, Change was not documented as being evaluated in a 50.54(q) for an EAL change (NRC-identified)
1EP8 Exercise Evaluation

Procedures

EP-100, V.C. Summer Radiation Emergency Plan, Rev.
68
VCS-EPAP-0105, Conduct of Drills and Exercises, Rev. 0
VCS-EPP-0023, Technical Support Center, Rev. 0
VCS-EPP-0028, Operational Support Centers, Rev. 0
VCS-EPP-0051, Emergency Operations Center, Rev. 0
Records and Data
EPD-17-01B, October 31, 2017, V.C. Summer Nuclear Station C-ERO Evaluated Exercise
Scenario Manual, Rev. 1 Updated 8-YR Drill Cycle Matrix, dated 8/29/17
Log of E-Plan Elements Demonstrated in Drills, dated 8/29/17
South Carolina Electric & Gas Company D-ERO Drill Report, dated 3/18/16
South Carolina Electric & Gas Company B-ERO Drill Report, dated 5/11/16 South Carolina Electric & Gas Company ERO Turnover Drill Report, dated 3/16/17 South Carolina Electric & Gas Company D-ERO Drill Report, dated 8/25/17
V. C. Summer Nuclear Station Final After Action Report Exercise Date September 22, 2015,
FEMA, dated 1/1/16
Corrective Action Program Documents
CR-16-05172, Incorrect ERO Notification was activated
CR-16-05811, After Hours Augmented Drill
CR-17-00552, After Hours Augmented Drill
CR-17-02105, Health Physics Drill performed during Graded Exercise missed objective
CR-17-03735, After Hours Augmented Drill
CR-17-03949, D-ERO Drill Deficiencies
CR-17-03959, Notification did not meet the regulatory time of 15 minutes
CR-17-04836, 2017 Biennial Exercise Scenario was not submitted to the NRC within 60 days

4OA1 Performance Indicator Verification

Procedures

SAP-0999, Corrective Action Program, Rev. 15
VCS-EPAP-0106, Emergency Preparedness Performance Indicator Procedure, Rev. 1
Records and Data DEP opportunities documentation for 3

rd & 4 th quarters 2016, and 1

st , 2 nd , & 3 rd quarters 2017 Siren test data for 3

rd & 4 th quarters 2016, and 1

st , 2 nd , & 3 rd quarters 2017 Drill and exercise participation records for 3

rd & 4 th quarters 2016, and 1

st , 2 nd , & 3 rd quarters

2017
Corrective Action Program Documents
CR-15-06676, Unexpected increase in power drain after analog to digital conversion
CR-16-00146, To document the 1Q16 siren growl test
CR-16-01267, Classification was not timely
CR-16-01908, Chopper motor on XAM0055-F5-10 had sporadic sound during initial post maintenance test
CR-16-03445, Downward trend of the administrative PI for ERO support
CR-16-05008, Siren #20 was blown down during hurricane Mathew
CR-16-05034, Siren #N38 failed 4Q EWSS growl test
CR-16-05581, Siren #F11 failed
CR-16-05963, Siren #F40 did not communicate
CR-16-06131, Missed DEP opportunity
CR-17-00809, Inability to communicate with offsite agencies during the 2/15/17 ERO drill
CR-17-02424, ERO duty person's qualification expired while on duty
CR-17-03293, Key ERO member not participating in a DEP exercise in the last 18 months
CR-17-03959, During the 7/27/17 ERO drill the first notification to the offsite agencies did not meet regulatory time of 15 minutes
CR-17-04287, Drill performed that did not count DEP opportunities

LIST OF ACRONYMS

USED [[]]
ADAMS Agencywide Documents Access and Management System
ANS Alert and Notification System
CAP Corrective Action Program
CFR Code of Federal Regulations
CR Condition Report
DEP Drill and Exercise Performance
DHS Department of Homeland Security
ERO Emergency Response Organization
FEMA Federal Emergency Management Agency
IMC Inspection Manual Chapter
IP Inspection Procedure
IR Inspection Report
NCV Non-Cited Violation
NRC Nuclear Regulatory Commission
PI Performance Indicator
PI&R Problem Identification and Resolution

ROP Reactor Oversight Process

SDP Significance Determination Process