Forwards Perry Nuclear Power Plant-Unit 1,Offgas Sys Charcoal Adsorber Combustion Events Final Rept. Temp & Combustion Product Plots of 860706 & 0602 Events Also Encl
ML20203G074
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/29/1986
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20203G077 List:
References
PY-CEI-NRR-0508, PY-CEI-NRR-508, NUDOCS 8607310305
Download: ML20203G074 (1)


Text

r f THE CLEVELAND ELECTR P.o. box 5000 - CLEVELAND. ohio 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG - 55 PUBLICSOUARE Serving The Best Location in the Nation July 29, 1986 MURRAY R. EDELMAN PY-CEI/NRR-0508 L SR VICE PRESIDENT NUC LE A R Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Off-Gas System Unusual Events Final Report

Dear Mr. Denton:

This letter provides our final report (Attachment 1) of the Perry off-gas system charcoal adsorber combustion events that occurred on June 20 and July 6, 1986. Included in this report are the chemical and physical analysis results for the original charcoal as well as for the replacement charcoal; the metallurgical analysis results for the adsorber vessels; descriptions of the unloading, drying and reloading processes; the initiating events analyses; and other pertinent items. We have included several photographs of the vessels and the activities associated with recovery from these events. We have also included a separate attachment of the temperature and combustion products plots of both events (Attachment 2).

We are presently loading the replacement charcoal. The charcoal adsorber vessel trains will be helium leak tested following loading. The off-gas vault refrigeration system testing will then be completed. Additional evaluation is underway to verify the acceptability of the vessel weld metal. The evaluation will be completed this week and we expect it to show that the weld metal was unaffected by these events. If it proves otherwise, we will inform you.

Please feel f ree to contact me if you have any further questions or comments.

Very truly yours, W fl/  %

B607310305Byh4o Murray delman M PDR ADOCK O PDR Senior Vice President YI' S Nuclear Group }g

,, A MRE:njc E,W p&