Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan
ML20058L159
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/24/1990
From: Lyster M
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058L169 List:
References
PY-CEI-NRR-1196, NUDOCS 9008070025
Download: ML20058L159 (3)


Text

-

. s t-ig . .

~.

9_

6200 Ook Tree Boulevard Mail Address-Indepenoence 0H : PO Box 9406'.

_ *' s 7I6-447-310 0 Cleveland. OH 44101- A66' .

?

July 24, 1990

-PY-CEI/NRR-1196.L

, U.S.-Nuclear Regulatory Commission g,  ; Document Control Desk y;} Washington, D. C. 20555 >

,w p9, Perry Nuclear Power Plant

( s Docket No. 50-4f0 i Revised Inservice e Inspection (ISI) Program Plan Centlement 1 Pursuant to 10 CFR 50.55a(g)(5)(i) and 10 CFR 50.4, we are submitting a ,

s revised 10 year; Inservice Inspection-(ISI) Program Plan for the Perry Nuclear 4 ,

Power Plant, Unit 1.

The revised ISI Program Plan has been retitled " Inservice Examination Program" l j (ISEP) and hasLbeen incorporated into PNPP's Operations Manual, Volume OM7D. j Attachment 1 provides.a summary of changes to PNPP's inservice examination program encompassed:by this revision. No reduction to the work scope of the 9 PNPP programs _have-been made as a result ~of this revision,.and no new-relief  ;

< requests are included.' Since the program has now been incorporated into our Operations Manual, it is being reissued, and it replaces in-its entirety the

' previous-ISI' Program Plan-submitted via letter PY-CEI/NRR-0614L on March 31, u .1987 and' approved by the NRC on April 25, 1930. PNPP's revised inservice examination program continues to comply with 10 CFR 50.55a and Section XI of l 4  ;

-the ASME Boiler and Pressure Vessel Code, 1983 Edition, Summer 1983 Addenda. I Because PNPP's ISI Program Plan is a controlled document, please replace your  !

copy of the superseded =ISI Program Plan as indicated on the attached document transmit'tal form and. return the signed form to' acknowledge receipt of the .;

. Inservice Examination Program (ISEP).

i lIf you have any questions, niease feel free to call.

3T Sinc, ely, f

L .g

[g -

Mb Michael D.

LL

/ ster M Vice President, Nuclear - Perry

$ e

\

MDL:njc Enclosures nP cc: NRR Project Manager Sr. Resident Inspector USNRC Region III J. Harris, State of Ohio D. Jagger, State of Ohio, Division of Boiler Inspection w/o ISEP 9008070025 900724 Operating componies. I ig g ,

Cleveland Electric Illuminating Toledo Edison DR ADOCK 0%4JO $

c. b, )..

e, , . :.

' ~

Attcchr nt 1 '

PY-CEI/NRR-1196 L ,

PNPP's Inservice Inspection-(ISI) Program he.s been updated to provide a ,

A. comprehensive document containing all- components subject to ASME Section' XI in-service examination and inspection requ.trements with the exception of pumps, valves,-' snubber functional tests and specific system pressure tests,- 7

-% ~ vhich are delineated in separate PNPP aaministrative procedures. In addition,'  ;

. augmented component inspection requirements beyond~the minimum requirements of ,

ASME Section XI, have been reorganized-for clarity and incorporated into the 3 program to provide for ease of administration and control. Augmented items I are those items subject to examination requirements as the result of PNPP  ;

commitments to various~ documents, e.g., NUREG's, Regulatory Guides, SILs, etc.

The following is a summary of the changes made to PNPP's ISI Program. J (1) ISI Program re-titled as Inservice Examination Program (ISEP) and incorporated into PNPP Operations Manuali Volume OM7D. i (2) All ASME Section XI nonexempt components and component parts incorporated into ISEP to provide a comprehensive document containing all components subject. to ASME Section XI examination and ' inspection requirements with j exceptions noted above. (Previous program only listed those non-exempt I components and component parts rglected for examination).

l (3) ISI' boundary drawings (P& ids) inwrporated into ISEP. l (4)' Isometric Drawings revised and incorporated into ISEP.

(5) -Inservice Examination Tables updated by (1) incorporation of revised isometric drawing identification numbers,-(2) deletion of calibration i block column (3) deletion of' relief requests column, and (4) replacement of scheduling criteria from " outage" to " period". l (6) Relief requests incorporated into ISE7.

(7)' Relief requests revised by incorporation of epplicable reference to ISEP and incormration of revised isometric drawing numbers.

(8)' Snubber ISI (Tech Spec) requirements incorporated into ISEP with exception of functional tests.

(9) General requirements of system pressure tests incorporated into ISEP.

(Specific pressure test requirements contained in separate volume of PNPP Operations Manual).

(10) Augmented component inspectior guirements reorganized for clarity and incorporated into ISEP as t', -.1 bed above.

(11) Incorporated additional ASME Section XI items identified by project personnel as appropriate for inclusion into PNPP's ISEP.

(12) Revised the schedule for component supports to provide for 100%

examination of ASME Section XI and augmented component supports within PNPP's first 10-year inspection interval.

NJC/ CODED /3596 l

l LY

+ ,

y .r. .

TheClevelandElectricIlluminatkagCompany Perry Nuclear Power Plant

-CONTROLLED DOCUMENT TRANSNITTAL j l

Tot Document Control Detal July 13, 1990' The controlled doeunent(s) listed below is (are) attached for inclusion into

_ your - Inservice Examination Program (Inservice Inspection Program Plan).

Controlled Revision Temporary Remove &

Copy No.  ! Number Change No. Insert Destroy 474' O N/A Comolete re-issue Present-ISI Pro--

eram Plan -

1 i

^

f

, NOTE: Revision number above indicates revision number of PNPP Operations Manual,

~

Volume 0M7D not revision number of ISI Program Plan.

Please sign below ack.nowledging receipt & inclusion into your Inservice Examination Pro-gram (Inservice Insoection Pronram Plan) and return this form tot Perry Nuclear Power Plant Licensing Unit, E210 ,

P.O. Boa 97 ,

Perry, Ohio 44081.  !

Signature Date

~

Title i l