Responds to Generic Ltr 90-01 Re Regulatory Impact Survey
ML20012B985
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/09/1990
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-90-01, GL-90-1, PY-CEI-NRR-1147, NUDOCS 9003190266
Download: ML20012B985 (8)


Text

g

^

q m ..-

er :c

N
THE CLEVELAND ELECTRIC' ILLUMINATING COMPANY P.O. 80x 97 e' PERRY, OHIO 44001 - W TELEPHONE ' (216) 214 3737 3' ADDRE8610 CENTER ROAD FROM CLEVELAND: 4 4 1200 5 TELEX: 241600 ANSWERBACK: CEIPRYO  ;

Al Kaplan Serving The Best location in the Nation -

PERRY NUCLEAR POWER PLANT VICL PRESIDENT NUCLE AR OROUP - #

March 9,~1990:

PY-CEI/NRR-ll47 L U.S. Nuclear Regulatory Commission  :

Document Control Desk-Washington, D. C. '20555 Perry Nuclear Power Plant

. Docket No. 50-440 ,;

Regulatory Impact Survey (Generic Letter 90-01)

'Gentlement You requested data on management time spent on various inspections and audits

-which are imposed by.various government and private organizations listed in

.th'e' Generic Letter. Instructions provided.were later modified by a February.

16, 1990 NUMARC letter. The completed Generic Letter questionnaires 1

(attached);were accordingly revised before completion.

'If you haveiany-questions, please feel: free to call.

Very truly your ,-

"0 '

Al~.Kaplan

  • Vice President Nuclear Group

'AK:nje-Attachment cc: 'T. Colburn P.'Hiland

,O N

'\ \

9003190266 900309 ['s,>

PDR.-ADOCK- 05000440 dc P- PDC W

&i . ,

j) ')'jl.

'ec.'-

j.

j '.

1 p

j; '

PY-CEI/NRR-1147 L h.

3 1m

SUMMARY

OF PNPP NANAGEMENT TIME DEMANDS 4 ,

TOTAL HOURS / YEAR NRC. Team Inspections 4070 NRC Resident 2057 INP0- 3340 ANI. 827 PUC0= 1040

-QA 4427 15761 i

e 4

?

i i

t

,p ,2  := ,; ,

(l:

[' PY-CEI/NRR-1147~L, h

< NRC REGULATORY IMPACT QUEST.TONNAIRE-i h

1. Type of inspection, audit or evaluation: NRC Team Inspections .
2. Based on actual experience over the past 24 months, about how often is this activity conducted? Routine inspections about 30 per year, special I annual inspections (e.g. diagnostic, OSTI, AIT's etc.) 1 or 2 per year.

ih

3. Operations covered: Tech Spec compliance, design control, operating occurrences ,

4 .~ Extent of the activity-(hov-many people, for-how long):. 5-16~ inspectors, 1 to 4 weeks. ,

5. Approximate hours (on an annual basis) which the following managers must.

spend in direct involvement in response.to the activity described in Item

  1. 1.

a.- Plant Department Heads (Directors)- 280 (number involved) 5

b. Plant Manager 40
c. Corporate Nuclear Department Heads 30 (number involved). _1
d. Vice President - Nuclear Group 50 (number involved) 1
e. Other Management & Supervisors 3670 l

+

l l

7

__m__

cc i "lt .!

j-_ );c: *L l p.

,' 1 PY-CEI/NRR-1147 L NRC REGULATORY IMPACT QUESTIONNAIRE I 8

, 1. Type of inspection, audit or evaluation: NRC Resident

[2. Based cni actual experience over the past 24 months, about how often is i this activity conducted? Continuous

3. . Operatione covered -Tech Spec compliance and USAR consistency _
4. Extent of the activity (how many people, for how long): 2 inspectors i

assigned on site

25. ' Approximate hours (on an' annual basis) which the-following managers must spend in direct involvement in response to the activity described in Item e
  1. 1.
a. Plant Department Heads (Directors) 170 (number involved) 5 -t
b. Plant Manager 35 ,
c. Corporate Nuclear Department Heads 102 (number involved) 1 d.

Vice President - Nuclear Group 15

e. Other Management & Supervisors 1735 a i

(

-b

,,;,:v -

4-s PY-CEI/NRR-1147 L .

NRC REGULATORY IMPACT QUESTIONNAIRE I

1. Type of inspection, audit or evaluation _ INPO
2. Based on actual experience over the past 24 months, about how often is  !

this activity conducted? 1-2 evaluations per year (plant & corporate)

3. Operations covered:_ Plant operations, technical support, maintenance, .

engineering, safety review functions, QA, radiation protection, chemistry, training =

r

4. Extent of the activity (how many people, for how long): 15-20 ,

personnel, 2-3 veeks

5. Approximate hours.(on an annual basis) which the following managers must spend in direct-involvement in response to the activity described in Item-
  1. 1. -
a. . Plant Department Heads (Directors) 175- (number involved) 5 ___
b. Plant Manager 50 ac. Corporate Nuclear Department Heads 50 (number involved) 1 d.- Vice President - Nuclear Group 15
e. Other Management & Supervisors 3050 D'

~

If"p;;-Mh.: e

  • v..

i

.:. . r; <

PY-CEI/NRR-1147 L j

. , NRC REGULATORY IMPACT QUESTI0letAIRB

1. = :. Type of inspection, audit or evaluation: ANI C 2.- Based on actual-experience over the past 24 months, about how often is ,

inis activity conducted? Several times per year 3.- Operations covered: Fire protection, safe shutdown-- .

(

4.- Extent of the activity (how many-people, for hov long): 2-3 personnel, about 3 days

, 5. Approximate hours (on an annual basis) which the following managers must ,

spend in direct involvement in response to the activity described in Item ,

  1. 1.
a. Plant Department Heads (Directors) 16- (number involved) 5
b. Plant Manager i
c. Corporate Nuclear Department. Heads -

(number involved) -  ;

d. Vice President - Nuclear Group -
e. Other Managemtat & Supervisors 810 1

. v. .

.. n

  • I i

PY-CEI/NRR-1147 L j

'NRC REGULATORY IMPACT QUESTIONNAIRE l

-1. Type of inspection, audit or evaluation: Public Utility Commission

2. . Based on actual experience over the past124 months, about how often is j this activity conducted? Several times per year )

3 .' Operations covered: Rate hearings and special topics .

4. Extent of the activity (how many people, for how long): Rate hearing -- 1 5-20 personnel up to several years, but on an infrequent schedules other topics 5-10 personnel involved in one day site visits i
5. Approximate hours (on an annual basis) which the following managers must-spend in direct involvement in response to.the activity described in Item .j
  1. 1.

a.. Plant Department Heads (Directors) lin (number involved) 5 b.- Plant Manager 10

c. Corporate Nuclear Department Heads._100 (number involved) 1
d. Vice President - Nuclear Group 20 Le. Other Management & Supervisors 800'

___.__m -

es m s e, te ..

h b] , 6 . . i f' j

.c PY-CEI/NRR-1147 L NRC REGULATORY IMPACT QUESTIONNAIRE ll t
1. . Type of inspection, audit or evaluation: Quality Assurance
2. . Based on actual experience over the past 24 months, about hov often is this' activity conducted? About 30 audits per year ,
3. . Operations covered: Plant operations, maintenance, surveillance testing, ,

i.

l '

and support activities within scope of USAR. t 1, i

4. Extent of the activity (how many people, for how long): Typically 1-involves 2-4 auditors over a 5 week period l
5. Approximate hours-(on an annual basis) which the following managers must spend in' direct involvement in response to the activity-described.in Item s  ;
  1. 1. l L
a. Plant Department Heads (Directors) 145 (number involved) 5 b.. Plant Manager 2
c. Corporate Nuclear Department Heads -

(number involved) c d. Vice President - Nuclear Group '20

e. Other Management & Supervisors '4260 NJC/ CODED /3219 e