PNO-III-93-002:on 930109,unit Was Shut Down to Identify & Replace Leaking Fuel Bundle & to Perform Other Maint Activities.All Fuel Bundles Will Be Tested for Leakage & Any Leaking Bundles Will Be Replaced
ML20203G581
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/11/1993
From: Greger L, Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-93-002, PNO-III-93-2, NUDOCS 9712180160
Download: ML20203G581 (1)


I *1 QLpl}brac f1 ].f ntlfDateJanuary4' 11, 1993 s p,1/1

, , , PRELIMINARY NOTIFICATICH OF EVENT OR UNUSUAL OCCURRENCE PN39302 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially f received without verification or evaldation, and is basically all that is known by the Region !!! staff.on this date.

Facility: Licensee Ema aancy Classification Cleveland Electric General Dner0ency Illuminating Co. .____, Site Area Emergency Perry Nuclear Power Station Alert Perry, Ohio Unusual E'v ent L.N/A Subjecti SHUfDOWN TO REPLACE LEAKING TUEL BUNDLE

, On. January 9,1993, the unit was shut down to identify and replace a leaMng -

fuel bundle and t,o perform other maintenance activities.

All fuel bundles will be tested for leakage, and any leaking bundles will be replaci. The outage is expected to last about 40 days.

Evidence of one or more leaking fuel bundles was detected in elevated offgas measurements in mid-1992. The offgas measurerents have been gradually increasing, but are still well within HRC release limits. The licensee has also experienced higher airborne radioactivity levels than normal and i,hort-lived' contamination in various parts of the ply L

  • The licensee's fuel testing and maintenance activities will be monitored by the resident inspectors and inspection specialists from the Region III (Chicago) 6 ',

office. One of the major activities being monitored will be local leak rate testing (LLRT) of the main steam isolation valves (MSIVs). The LLRT on the HSIVs is being performed as a result of previous problems in this area andV'a mM coramitment with the NRC to perform the testing.

The State of Ohio will be notified. The information in this preliminary notification has been reviewed with licensee management.

(his information is current as of 11 a.m. on January 11, 1993.

CONTACT:

~~ ~ ' ~ -~

R. D. Lanksbury L. R. Greger 708/790-5578 708/790-5644 -C/R DISTRIBUTION: h PLA. HISTORIAN, SECY, RECORDS 4

DISTRIBUTION: ,

STANDARD E-MAIL DISTRIBUTION FAX TO: NAIL TO:

INPO _

NSAC _

DCS (Orig)

Llc NRC OPS CTR 00T PDR (8/634-3343) __0E _ (Trans)

A. Byrdsong, NRR ll,llIl,ll".If' Ill'"l.l.'

9712100160 930111 i

im-tite,3-oo2 eon

. _ -. .