PNO-III-87-011, on 870123,licensee Began Shutdown from 5% Power to Repair Steam Isolation Valve for Turbine in RCIC Sys.During Testing,Valve Would Not Open Because of Failure of Motor Operator.Repair Expected to Take More than 2 Days

From kanterella
Jump to navigation Jump to search
PNO-III-87-011:on 870123,licensee Began Shutdown from 5% Power to Repair Steam Isolation Valve for Turbine in RCIC Sys.During Testing,Valve Would Not Open Because of Failure of Motor Operator.Repair Expected to Take More than 2 Days
ML20212R413
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/23/1987
From: Knop R, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-87-011, PNO-III-87-11, NUDOCS 8702020639
Download: ML20212R413 (1)


.-. - = - - - . . _ . _ _ _ . - . . -_

4 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-III-87-11 Date January 23, 1987 DAL/3

'This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III 4

staff on this date.

, Facility: Cleveland Electric Illuminating Licensee Emergency Classification:

Company Notification of an Unusual Event

, Perry Alert

Perry, OH 44081 Site Area Emergency General Emergency

, Docket No. 50-440 X Not Applicable i

Subject:

SHUTDOWN FOR REACTOR CORE ISOLATION COOLING SYSTEM REPAIR i

At about 11 a.m. (EST), on January 23, 1987, the licensee began a shutdown from five percent powar to repair a steam isolation valve for the turbine in the Reactor Core Isolation Cooling i system.

During the testing, the valve would not open because of a failure of the motor operator. A similar incident occurred on January 9,1987; that event involved a bent valve stem.

1 The repair is expected to take more than two days. The resident inspectors will monitor the licensee's repair activities.

The State of Ohio will be notified.

Region III (Chicago) was notified of the shutdown at 11 a.m. (EST), January 23, 1987. This t information is current as of that time.

(, W gjz) i CONTACT: R. Knop R. Warnick FTS 388-5547 FTS 388-5575 1

I l

l 1 DISTRIBUTION:

H. St. ED0 NRR E/W Willste Mail: ADM:DMB

Chairman Zech PA IE NMSS DOT
Trans only

' Conn. Roberts ELD OIA RES i Comm. Asselstine Comm. Bernthal AE00 NRC Ops Ctr ON

' Comm. Carr ACRS SP[.d) Regional Offices c j SECY INP0/.'b7 NSAC /. M

! CA RIII Resident Office j PDR Licensee: c2,'/ / (Corp. Office - Reactor Lic. Only)

/[O i j 8702020639 870123 Region III

-II B7-011 PDR 2 c/