Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-III-98-009, on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill1998-01-23023 January 1998 PNO-III-98-009:on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill PNO-III-93-066, on 931202,licensee Commenced Shutdown to Replace Seal on RRP a Due to Indications of Increasing Degradation.License Estimates Outage Will Last Seven Days. Region III Will Monitor Plant Shutdown & Outage Activities1993-12-0202 December 1993 PNO-III-93-066:on 931202,licensee Commenced Shutdown to Replace Seal on RRP a Due to Indications of Increasing Degradation.License Estimates Outage Will Last Seven Days. Region III Will Monitor Plant Shutdown & Outage Activities PNO-III-93-002B, on 930109,plant Shutdown for Leak Testing Other Maint Activities,Including Testing of Msiv.One Fuel Assembly Identified as Containing One Leaking Rod & Nine Fuel Assemblies Identified as Having Potential Leaks1993-02-0101 February 1993 PNO-III-93-002B:on 930109,plant Shutdown for Leak Testing Other Maint Activities,Including Testing of Msiv.One Fuel Assembly Identified as Containing One Leaking Rod & Nine Fuel Assemblies Identified as Having Potential Leaks PNO-III-93-002A, on 930109,plant Shut Down to Replace Leaking Fuel Bundle & Other Maint Acitivities,Including Testing of Main Steam Isolation Valves.Four Fuel Assemblies Have Been Confirmed as Containing One or More Leaking Rods1993-01-21021 January 1993 PNO-III-93-002A:on 930109,plant Shut Down to Replace Leaking Fuel Bundle & Other Maint Acitivities,Including Testing of Main Steam Isolation Valves.Four Fuel Assemblies Have Been Confirmed as Containing One or More Leaking Rods PNO-III-93-002, on 930109,unit Was Shut Down to Identify & Replace Leaking Fuel Bundle & to Perform Other Maint Activities.All Fuel Bundles Will Be Tested for Leakage & Any Leaking Bundles Will Be Replaced1993-01-11011 January 1993 PNO-III-93-002:on 930109,unit Was Shut Down to Identify & Replace Leaking Fuel Bundle & to Perform Other Maint Activities.All Fuel Bundles Will Be Tested for Leakage & Any Leaking Bundles Will Be Replaced PNO-III-92-058, on 921022,licensee Identified 7 Inch Long Crack at Weld Interface Between First 18 Inch Weldlet & 30 Inch Condensate Header for Number 4 Direct Contact Feedwater Heater.Licensee Decided to Commence Plant Shutdown1992-10-26026 October 1992 PNO-III-92-058:on 921022,licensee Identified 7 Inch Long Crack at Weld Interface Between First 18 Inch Weldlet & 30 Inch Condensate Header for Number 4 Direct Contact Feedwater Heater.Licensee Decided to Commence Plant Shutdown PNO-III-91-054, on 911222,36-inch Fiberglass Pipe Carrying Circulating Cooling Water from Cooling Towers to Plant Broke Outside Turbine Bldg.Leak Subsequently Stopped When Operators Closed Valve in Broken Line1991-12-23023 December 1991 PNO-III-91-054:on 911222,36-inch Fiberglass Pipe Carrying Circulating Cooling Water from Cooling Towers to Plant Broke Outside Turbine Bldg.Leak Subsequently Stopped When Operators Closed Valve in Broken Line PNO-III-89-061, on 890913,reactor Recirculation Valve Drifted Open from Normal 56% to About 78% Following Maint.Caused by Solenoid Valve Failure in mid-position Allowing Excessive Oil to Flow to Control Valve.State of Oh Notified1989-09-14014 September 1989 PNO-III-89-061:on 890913,reactor Recirculation Valve Drifted Open from Normal 56% to About 78% Following Maint.Caused by Solenoid Valve Failure in mid-position Allowing Excessive Oil to Flow to Control Valve.State of Oh Notified PNO-III-89-032, on 890425,while Plant Was in First Refueling Outage,Approx 30,000 Gallons of Condensate Storage Tank Water Inadvertently Was Drained Into Suppression Pool,W/Some Water Entering Drywell Over Weir Wall1989-04-28028 April 1989 PNO-III-89-032:on 890425,while Plant Was in First Refueling Outage,Approx 30,000 Gallons of Condensate Storage Tank Water Inadvertently Was Drained Into Suppression Pool,W/Some Water Entering Drywell Over Weir Wall PNO-III-88-104, on 881221,licensee Detected Increased Airborne Radioactivity in Turbine & Offgas Bldgs.Airborne Activity Escaped from Offgas Treatment Sys When Water Seals in Sys Drain Lines Were Lost1988-12-22022 December 1988 PNO-III-88-104:on 881221,licensee Detected Increased Airborne Radioactivity in Turbine & Offgas Bldgs.Airborne Activity Escaped from Offgas Treatment Sys When Water Seals in Sys Drain Lines Were Lost PNO-III-88-081, on 880916,reactor Operators Observed Decrease in Flow Through Offgas Sys,Coupled W/Drop in Generator Electrical Output & Decrease in Main Condenser Vacuum. Plant Shut Down for Investigation Into Offgas Problem1988-09-19019 September 1988 PNO-III-88-081:on 880916,reactor Operators Observed Decrease in Flow Through Offgas Sys,Coupled W/Drop in Generator Electrical Output & Decrease in Main Condenser Vacuum. Plant Shut Down for Investigation Into Offgas Problem PNO-III-88-078, on 880904,fire Occurred in Two Charcoal Adsorber Tanks in Offgas Sys.Cause Under Investigation. Nitrogen Purge of Tanks Performed & Temps Reduced1988-09-0606 September 1988 PNO-III-88-078:on 880904,fire Occurred in Two Charcoal Adsorber Tanks in Offgas Sys.Cause Under Investigation. Nitrogen Purge of Tanks Performed & Temps Reduced PNO-III-88-058, on 880623,reactor Scrammed from 84% Power Due to Turbine Trip.Caused by Damaged Latching Mechanism in Turbine Control Sys.Latching Mechanism Repaired1988-06-24024 June 1988 PNO-III-88-058:on 880623,reactor Scrammed from 84% Power Due to Turbine Trip.Caused by Damaged Latching Mechanism in Turbine Control Sys.Latching Mechanism Repaired PNO-III-88-055, on 880616,reactor Scrammed Due to High Power Level in Reactor Core.Caused by Spurious Signal Generated After Reinsertion of Printed Circut Board in Recirculation Control Sys.Cause of Spurious Signal Under Investigation1988-06-17017 June 1988 PNO-III-88-055:on 880616,reactor Scrammed Due to High Power Level in Reactor Core.Caused by Spurious Signal Generated After Reinsertion of Printed Circut Board in Recirculation Control Sys.Cause of Spurious Signal Under Investigation PNO-III-88-045, on 880518,licensee Began Plant Shutdown from 100% Power to Repair Hydrogen Seal Oil Sys for Main Generator.Caused by Sys Level Controller Failure.Seal Oil Sys Repair & Main Generator Inspection Scheduled1988-05-18018 May 1988 PNO-III-88-045:on 880518,licensee Began Plant Shutdown from 100% Power to Repair Hydrogen Seal Oil Sys for Main Generator.Caused by Sys Level Controller Failure.Seal Oil Sys Repair & Main Generator Inspection Scheduled PNO-III-88-012, on 880222,unit Operating at Approx 100% Power,Drywell Floor Drain Sump Instrumentation Detected Unidentified Leakage Increase from 2.5 Gpm to 4.6 Gpm1988-02-23023 February 1988 PNO-III-88-012:on 880222,unit Operating at Approx 100% Power,Drywell Floor Drain Sump Instrumentation Detected Unidentified Leakage Increase from 2.5 Gpm to 4.6 Gpm PNO-III-87-146, on 871129,one Valve Did Not Perform Properly During Surveillance Testing of Msiv.Caused by Deformation of Seal Matls in solenoid-operated Pilot Valve Due to Excessive Heat from Steam Leaks.Valves Rebuilt1987-11-30030 November 1987 PNO-III-87-146:on 871129,one Valve Did Not Perform Properly During Surveillance Testing of Msiv.Caused by Deformation of Seal Matls in solenoid-operated Pilot Valve Due to Excessive Heat from Steam Leaks.Valves Rebuilt PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems1987-11-0303 November 1987 PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems PNO-III-87-137, on 871027,reactor Srammed & ECCS Actuation Occurred Due to Deenergized Bus L12.Caused by Operator Mistakenly Tripping Supply Breaker from Transformer to Bus. Power Restored1987-10-27027 October 1987 PNO-III-87-137:on 871027,reactor Srammed & ECCS Actuation Occurred Due to Deenergized Bus L12.Caused by Operator Mistakenly Tripping Supply Breaker from Transformer to Bus. Power Restored PNO-III-87-094, on 870709,w/unit in Shutdown for Maint,Smoke from Smoldering Fire in Main Condenser Observed.Smoke Emanated from Smoldering Piping Insulation Inside Condenser. Cause of Fire Unknown.No Release of Radioactivity Occurred1987-07-0909 July 1987 PNO-III-87-094:on 870709,w/unit in Shutdown for Maint,Smoke from Smoldering Fire in Main Condenser Observed.Smoke Emanated from Smoldering Piping Insulation Inside Condenser. Cause of Fire Unknown.No Release of Radioactivity Occurred PNO-III-87-093, on 870630,operators Manually Tripped Reactor Following Detection of Hydrogen in Isophase Bus Ducting. Caused by Failed Main Generator Bushing.Unit Expected to Remain in Hot Shut Down While Bushing Being Replaced1987-07-0101 July 1987 PNO-III-87-093:on 870630,operators Manually Tripped Reactor Following Detection of Hydrogen in Isophase Bus Ducting. Caused by Failed Main Generator Bushing.Unit Expected to Remain in Hot Shut Down While Bushing Being Replaced PNO-III-87-083A, on 870617,while Operating at 29% Power During Reactor Recirculation Test,Recirculation Pumps Tripped & Natural Circulation Established.Ait Being Sent to Site.Corrected Version of PNO-III-87-0831987-06-18018 June 1987 PNO-III-87-083A:on 870617,while Operating at 29% Power During Reactor Recirculation Test,Recirculation Pumps Tripped & Natural Circulation Established.Ait Being Sent to Site.Corrected Version of PNO-III-87-083 PNO-III-87-056A, on 870413,operators Manually Scrammed Unit from 3% Power Due to Steam Leak from Drain Line in Condenser Bay.Caused by Weld Failure During Excessive Turbulence.Parts of Line Replaced,Rerouted & Secured W/Addl Supports1987-04-28028 April 1987 PNO-III-87-056A:on 870413,operators Manually Scrammed Unit from 3% Power Due to Steam Leak from Drain Line in Condenser Bay.Caused by Weld Failure During Excessive Turbulence.Parts of Line Replaced,Rerouted & Secured W/Addl Supports PNO-III-87-056, on 870413,unit Manually Scrammed Upon Discovery of Steam Leak from Turbine Bldg Condenser Bay Drain Line.Caused by Weld Failure.Cause of Failure Under Investigation1987-04-14014 April 1987 PNO-III-87-056:on 870413,unit Manually Scrammed Upon Discovery of Steam Leak from Turbine Bldg Condenser Bay Drain Line.Caused by Weld Failure.Cause of Failure Under Investigation PNO-III-87-011, on 870123,licensee Began Shutdown from 5% Power to Repair Steam Isolation Valve for Turbine in RCIC Sys.During Testing,Valve Would Not Open Because of Failure of Motor Operator.Repair Expected to Take More than 2 Days1987-01-23023 January 1987 PNO-III-87-011:on 870123,licensee Began Shutdown from 5% Power to Repair Steam Isolation Valve for Turbine in RCIC Sys.During Testing,Valve Would Not Open Because of Failure of Motor Operator.Repair Expected to Take More than 2 Days PNO-III-87-004, rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected1987-01-0707 January 1987 PNO-III-87-004:rept Submitted on 870107 to State of Oh Governor Rf Celeste Re Emergency Planning at Facilities Recommended That Plants Be Limited to 5% Power Until Emergency Planning Deficiencies Corrected PNO-III-86-157, on 861230,while Operating at 8% Power,Util Began Unit Shut Down Because of High Conductivity (Water Impurity) Above Tech Spec Limits in Rcs.Caused by Tube Leak in Main Condenser.Condenser Tubes to Be Inspected1986-12-31031 December 1986 PNO-III-86-157:on 861230,while Operating at 8% Power,Util Began Unit Shut Down Because of High Conductivity (Water Impurity) Above Tech Spec Limits in Rcs.Caused by Tube Leak in Main Condenser.Condenser Tubes to Be Inspected PNO-III-86-155, on 861223,US Court of Appeals,Sixth Circuit, Cincinnati,Oh,Lifted Stay Which Restricted Operation of Plant to 5 Percent Power.Licensee Plans to Start Plant Up During Weekend of 861227 & Resume Power Ascension Testing1986-12-24024 December 1986 PNO-III-86-155:on 861223,US Court of Appeals,Sixth Circuit, Cincinnati,Oh,Lifted Stay Which Restricted Operation of Plant to 5 Percent Power.Licensee Plans to Start Plant Up During Weekend of 861227 & Resume Power Ascension Testing PNO-III-86-133, on 861113,NRC Issued Full Power Ol.Plant Startup Expected on 861116,following Maint & Mod Outage1986-11-13013 November 1986 PNO-III-86-133:on 861113,NRC Issued Full Power Ol.Plant Startup Expected on 861116,following Maint & Mod Outage PNO-III-86-115, US Court of Appeals,Sixth Circuit,In Cincinnati,Oh,Rescinded 860904 Order Prohibiting NRC from Voting on Issuance of Full Power OL for Facility.State of Oh Will Be Notified1986-10-14014 October 1986 PNO-III-86-115:US Court of Appeals,Sixth Circuit,In Cincinnati,Oh,Rescinded 860904 Order Prohibiting NRC from Voting on Issuance of Full Power OL for Facility.State of Oh Will Be Notified PNO-III-86-089, on 860904,electrical Fire Started in Listed Control Room Cabinet.Div 1 Containment Atmosphere Monitoring,Suppression Pool Makeup & Drywell Vacuum Relief Sys Declared Inoperable.Fire Extinguished.Damages Listed1986-09-0404 September 1986 PNO-III-86-089:on 860904,electrical Fire Started in Listed Control Room Cabinet.Div 1 Containment Atmosphere Monitoring,Suppression Pool Makeup & Drywell Vacuum Relief Sys Declared Inoperable.Fire Extinguished.Damages Listed PNO-III-86-082, on 860815,R Celeste,Governor of Ohio, Announced Withdrawal of Support & Implementing Directive for Emergency Plans for Two Facilities.Ltr Sent to Lw Zech Encl1986-08-15015 August 1986 PNO-III-86-082:on 860815,R Celeste,Governor of Ohio, Announced Withdrawal of Support & Implementing Directive for Emergency Plans for Two Facilities.Ltr Sent to Lw Zech Encl PNO-III-86-059A, on 860623,util Continued to Maintain Nitrogen Atmosphere on Both Trains of Offgas Sys Charcoal Adsorbers.Highest Temp Reading 182 F at Bottom of Third Tank in Train B.Fire Out.Unusual Event Terminated1986-06-23023 June 1986 PNO-III-86-059A:on 860623,util Continued to Maintain Nitrogen Atmosphere on Both Trains of Offgas Sys Charcoal Adsorbers.Highest Temp Reading 182 F at Bottom of Third Tank in Train B.Fire Out.Unusual Event Terminated PNO-III-86-059, on 860620,licensee Determined That Fire Existed in off-gas Treatment Sys Charcoal Absorbers.Caused by Space Heater.Reactor Shut Down at Time of Event & Will Remain Shut Down1986-06-20020 June 1986 PNO-III-86-059:on 860620,licensee Determined That Fire Existed in off-gas Treatment Sys Charcoal Absorbers.Caused by Space Heater.Reactor Shut Down at Time of Event & Will Remain Shut Down PNO-III-86-055, on 860606,during Initial Criticality,Two Intermediate Source Range Monitors Did Not Respond to Neutron Flux & Were Declared Inoperable.Cause Not Stated. Channels Will Be Repaired1986-06-0606 June 1986 PNO-III-86-055:on 860606,during Initial Criticality,Two Intermediate Source Range Monitors Did Not Respond to Neutron Flux & Were Declared Inoperable.Cause Not Stated. Channels Will Be Repaired PNO-III-86-056, on 860606,Cuyahoga County (State of Oh) Commission Proposed Extension of Emergency Planning Zone Beyond Current 10-mile Radius.Meeting W/Governor Celeste to Discuss Emergency Planning Requested1986-06-0606 June 1986 PNO-III-86-056:on 860606,Cuyahoga County (State of Oh) Commission Proposed Extension of Emergency Planning Zone Beyond Current 10-mile Radius.Meeting W/Governor Celeste to Discuss Emergency Planning Requested PNO-III-86-028, on 860318,OL Issued.License Limited to Fuel Loading & Operation Up to 5% Power.Fuel Loading Will Take About 2 Wks to Complete1986-03-19019 March 1986 PNO-III-86-028:on 860318,OL Issued.License Limited to Fuel Loading & Operation Up to 5% Power.Fuel Loading Will Take About 2 Wks to Complete PNO-III-86-023, on 860308,licensee Noted Drywell Pressure Instrument Isolated by Mispositioned Valve on Sys Declared Operable for Fuel Load.Mispositioning May Have Occurred During Mod & Maint Activities.Corrective Program Initiated1986-03-14014 March 1986 PNO-III-86-023:on 860308,licensee Noted Drywell Pressure Instrument Isolated by Mispositioned Valve on Sys Declared Operable for Fuel Load.Mispositioning May Have Occurred During Mod & Maint Activities.Corrective Program Initiated PNO-III-86-009B, on 860206,small Earthquake Occurred.No After Shock Felt & No Instrumentation Registered Tremor. Earthquake on 860131 Resulted in No Structural Damage to Plant1986-02-0606 February 1986 PNO-III-86-009B:on 860206,small Earthquake Occurred.No After Shock Felt & No Instrumentation Registered Tremor. Earthquake on 860131 Resulted in No Structural Damage to Plant PNO-III-86-009A, on 860131,earthquake Experienced at Plant. Site Response Activities Accomplished by Implementing Emergency Plan,Although Action Not Required Prior to Licensing.No Significant Damage Noted1986-02-0303 February 1986 PNO-III-86-009A:on 860131,earthquake Experienced at Plant. Site Response Activities Accomplished by Implementing Emergency Plan,Although Action Not Required Prior to Licensing.No Significant Damage Noted PNO-III-86-009, on 860131,earthquake Felt at Plant.No Significant Damage Reported.Some Site Personnel Evacuated. Site Area Emergency Declared.Supporting Documentation Encl1986-01-31031 January 1986 PNO-III-86-009:on 860131,earthquake Felt at Plant.No Significant Damage Reported.Some Site Personnel Evacuated. Site Area Emergency Declared.Supporting Documentation Encl PNO-III-85-053, on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs1985-06-26026 June 1985 PNO-III-85-053:on 850625,utils Announced Signing of Agreement to Combine Under New Holding Company,Scheduled by End of 1985.Utils Will Retain Local Identity & Considerable Autonomy.Affiliation Will Increase Efficiency & Lower Costs 1998-01-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20212A8531999-09-13013 September 1999 Notice of Violation from Insp on 990712-30.Violation Noted: from 980324-990730,TS SR 3.5.1.4 & 3.5.2.5 Failed to Require Each ECCS Pump to Develop Pump Differential Pressure Greater than or Equal to ECCS Total Flow Resistance IR 05000440/19990131999-09-13013 September 1999 Insp Rept 50-440/99-13 on 990712-30.Violations Noted. Major Areas Inspected:Effectiveness of Pnpp Program for Identification,Resolution & Prevention of Technical Issues & Problems That Could Degrade Quality of Plant Operations IR 05000440/19990091999-09-0909 September 1999 Insp Rept 50-440/99-09 on 990709-0825.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20211M6521999-08-31031 August 1999 Revised Page Number 4, P2 Status of EP Facilities,Equipment & Resources IR 05000440/19990121999-08-12012 August 1999 Insp Rept 50-440/99-12 on 990712-16.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000440/19990081999-07-22022 July 1999 Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000440/19990031999-06-10010 June 1999 Insp Rept 50-440/99-03 on 990407-0517.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20207B1291999-05-20020 May 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violation Noted:Centerior Energy Corp Through Actions of RPM Discriminated Againt Rps,On 970716,as Result of RPS Engaging in Protected Activities ML20209B8891999-05-17017 May 1999 EN-99-019:on 990520,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based Upon Severity Level II Violation Involving Radiation Protection Manager Discrimination Against Supervisor IR 05000440/19990071999-05-12012 May 1999 Insp Rept 50-440/99-07 on 990412-16.No Violations Noted. Major Areas Inspected:Rp Performance & Oversight of Refueling Outage Activities ML20196A3131999-05-10010 May 1999 Notice of Violation from Investigation on 990129.Violation Noted:On 970114,K Wierman Employed as Training Instructor at Plant & Deliberately Submitted Info to Util That Wierman Knew to Be Incomplete or Inaccurate ML20206Q2301999-05-10010 May 1999 Notice of Violation from Investigation Completed on 990129. Violation Noted:On 970114,info Required by Commission Regulations Not Maintained Complete & Accurate in All Matl Respects IR 05000440/19990061999-05-0606 May 1999 Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Major Areas Inspected:Inservice Insp Efforts & Overlay Repairs of N4C Feedwater Nozzle IR 05000440/19990021999-05-0303 May 1999 Insp Rept 50-440/99-02 on 990225-0406.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000440/19990051999-04-0202 April 1999 Insp Rept 50-440/99-05 on 990301-05.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Npps ML20204E7901999-03-17017 March 1999 Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19990041999-03-17017 March 1999 Insp Rept 50-440/99-04 on 990222-26.No Violations Noted. Major Areas Inspected:Radiation Protection Program & Radiological Planning for Upcoming Refueling Outage,Which Included Review of Rwps,Alara Reviews & Dose Goals IR 05000440/19980191998-12-23023 December 1998 Insp Rept 50-440/98-19 on 981021-1202.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20210Q9291998-12-10010 December 1998 Investigation Rept 3-1998-007.No Noncompliance Noted.Major Areas Investigated:Alleged Discrimination Against Radiation Protection Supervisor for Testifying as Witness in Dept of Labor Proceedings IR 05000440/19980221998-11-25025 November 1998 Chemistry & RP Insp Rept 50-440/98-22 on 981102-06.No Violations Noted:Major Areas Inspected:Implementation of Chemistry Program,Meteorological Monitoring Program & Control & Monitoring of Personnel Radiation Dose IR 05000440/19980211998-11-18018 November 1998 Insp Rept 50-440/98-21 on 981019-22.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program ML20195C7361998-11-10010 November 1998 Insp Rept 50-440/98-18 on 980909-1020.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20195C7231998-11-10010 November 1998 Notice of Violation from Insp on 980909-1020.Violation Noted:On 980902,inspectors Identified That Fire Watch Did Not Verify That Special Instructions of Burn Permit B98-DG-83,used for Welding Conducted on DG Were Met IR 05000440/19980171998-10-0707 October 1998 Insp Rept 50-440/98-17 on 980831-0914.Violations Noted. Major Areas Inspected:Review of Implementation of Solid Radwaste Mgt & Shipping Program.Insp Also Reviewed Conduct of Radiological Environ Monitoring Program ML20154H1681998-10-0707 October 1998 Notice of Violation from Insp on 980831-0914.Violation Noted:As of 980415,licensee Had Not Made Adequate Surveys to Assure Compliance with 10CFR20.2006 IR 05000440/19980161998-09-25025 September 1998 Insp Rept 50-440/98-16 on 980723-0908.No Violations Noted. Major Areas Inspected:Resident Inspectors Evaluation of Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20151V3521998-09-0808 September 1998 Notice of Violation from Insp on 980727-31.Violation Noted: on 971219,licensee Conducted Breath Analysis as Part of for Cause Test Based on Odor of Alcohol,However Drug Portion of for Cause Test Not Conducted in Timely Manner IR 05000440/19980151998-09-0808 September 1998 Insp Rept 50-440/98-15 on 980727-31.Violations Noted. Major Areas Inspected:Effectiveness of Selected Elements of Security Program IR 05000440/19980131998-08-21021 August 1998 Insp Rept 50-440/98-13 on 980605-0722.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980141998-08-19019 August 1998 Insp Rept 50-440/98-14 on 980620-24 & 0720-22.No Violations Noted.Major Areas Inspected:Licensee C/A for Issues Identified by NRC Inspections & Licensee Event Repts Submitted to NRC ML20236R8251998-07-16016 July 1998 Insp Rept 50-440/98-11 on 980518-22.Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures, Training,Equipment & Supporting Documentation for Maint of medium-voltage & low-voltage Power Circuit Breakers ML20236R8111998-07-16016 July 1998 Notice of Violation from Insp on 980518-22.Violations Noted: as of 980520,as-tested Instantaneous Trip Function of Circuit Breaker EF1B04 Used for Emergency Closed Cooling Pump Motor 1P42C001A,inadequate ML20236N0231998-07-0909 July 1998 Notice of Violation from Insp on 980421-0604.Violation Noted:Inspectors Identified That on 980504,operations Personnel Failed to Verify 1 Restoration Items Specified in Surveillance Instruction Sys Restoration Checklist ML20236N0281998-07-0909 July 1998 Insp Rept 50-440/98-10 on 980421-0604.Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support ML20236L8941998-07-0808 July 1998 Errata to Notice of Violation from Insp Rept 50-440/97-21 on 971202-980127.Violation Noted:On 980106,combustible Matl W/No Transient Combustible Permit in Fire Area Containing Redundant Trains of safety-related Equipment,Identified ML20249C5641998-06-25025 June 1998 Notice of Violation from Insp on 980601-05.Violation Noted: on 980504-21,an Individual,Conducting Radiologically Restricted Area Entries Under Radiation Work Permits 980003, 980047 & 980051 Did Not Wear Thermoluminescent Dosimeter IR 05000440/19980121998-06-25025 June 1998 Insp Rept 50-440/98-12 on 980601-05.Violations Noted.Major Areas Inspected:Plant Support ML20217M1311998-04-29029 April 1998 Insp Rept 50-440/98-07 on 980223-0305.Violations Noted. Major Areas Inspected:Operations,Engineering & Maintenance ML20217M1141998-04-29029 April 1998 Notice of Violation from Insp on 980223-0305.Violation Noted:On 980227,licensed Operator Incorrectly Removed Red Tag & Installed Fuse for Annulus Exhaust Gas Treatment Sys Instead of Installing Fuse for ESW Ventilation Sys IR 05000440/19980051998-04-27027 April 1998 Insp Rept 50-440/98-05 on 980209-0408.No Violations Noted. Major Areas Inspected:Portions of Licensee Fire Protection Program ML20212H3331998-04-0909 April 1998 EN-97-106A:on 971218,licensee Responded to NOV & Proposed Imposition of Civil Penalty in Amount $100,000.Licensee Denied Violation Re 10CFR50.59 & Requested Remission.Request Denied & Order Imposing Civil Monetary Penalty Issued IR 05000440/19980011998-04-0707 April 1998 SALP 15 Rept 50-440/98-01 for Plant Covering Period from 960915-980228 IR 05000440/19980061998-04-0101 April 1998 Insp Rept 50-440/98-06 on 980128-0310.Violations Noted.Major Areas Inspected:Licensee Operations,Maint & Engineering IR 05000440/19980031998-03-26026 March 1998 Insp Rept 50-440/98-03 on 980223-27.No Violations Noted. Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000440/19980021998-03-12012 March 1998 Insp Rept 50-440/98-02 on 980112-16 & 26-30.No Violations Noted.Major Areas Inspected:Operations,Engineering & Review of Effectiveness of CA Program ML20203D8211998-02-20020 February 1998 Notice of Violation from Insp on 971202-980127.Violation Noted:On 971208,an Inspector Observed Fire Door Between Div 2 & 3 Emergency Diesel Generator Rooms Stuck in Fully Open Position ML20203D8241998-02-20020 February 1998 Insp Rept 50-440/97-21 on 971202-980127.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-III-98-009, on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill1998-01-23023 January 1998 PNO-III-98-009:on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill IR 05000440/19970171998-01-21021 January 1998 Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Noted.Major Areas Inspected:Ep Program IR 05000440/19980041998-01-16016 January 1998 Insp Rept 50-440/98-04 on 980105-09.No Violations Noted. Major Areas Inspected:Radiolological,Environ & Chemistry Sections Programs 1999-09-09
[Table view] |