PNO-III-80-164A, on 800919,no Addl Cracking in Core Spray Piping Has Been Identified Other than Pipe Cracks Previously Identified.Licensee Intends to Replace Defective Piping Elbows W/Different Matl

From kanterella
Jump to navigation Jump to search
PNO-III-80-164A:on 800919,no Addl Cracking in Core Spray Piping Has Been Identified Other than Pipe Cracks Previously Identified.Licensee Intends to Replace Defective Piping Elbows W/Different Matl
ML20148D717
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 09/19/1980
From: Chrissotimos N, Danielson D, Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-80-164A, NUDOCS 8010090258
Download: ML20148D717 (1)


._ . _ -_ __

,; r e u t u,4..,uo .w . 4 . . n . . w . .

Date: Septembsr 19, 1980 pg;LIMmAmN011r ICA110N of CVENT OR UNusVAl. OCCURENCL -PHO-lll-80-164A This preliminary notification constitutes The E ARLY noticepresented inf ortnation of eventsisof_f0551BLE as_

safety or pubMc interest significance.

Tnitia11y received without verific.ation or evaluation and is bas'icaYly all

~

that is known by IE staff as of this date.

Teeility: Commonwealth Edison Compr.ny Quad Cities Nuclear Power Station (Dock.et Number 50-254)

Cordova, T1.

Subjeel,, CRACKS IF CORF SPRA*7 PTPTNG (UPDATE) , ,

The licence huw cumpleted the ultrasonic inservice inspection of core cprsy system piping located in the drywell. No cracking or similar adverse conditions werc identified other than the piping cracks identified in the original PN.

The licensee currently intends to replace the defective piping elbowv with replace-ment elbows fabricated of a different material.

The Resident Inspectors and Support InupecLurs from Region III havn reviewed the liccusce's in:;pection program and will continue to f ollow this matter through the comp'.etion of eiping repaire.

Neither the liconsaa nor Region ill (Chicago) are planning u uews release. The StafA of Illinois had been notified when PNo-TII-80-164 was issued and will be inforacd of aigni fican t davalopmentx.

Thic inf ormatie'n is current as of 12:30 p.m. . Septmher 19, 1980.

cuateett WChrissMrkne, 309/654-2227 R. T.. Spessard, 312/932-2547; D. Danielson, 312/932-2603; P. Reimann, 312/9'12-2M8 Distribution: Transmitted H St. 5. J. Chilk, SECY Comissioner Hendrie C. C. Kammerer, CA Chairman Ahearne Cormnissioner Bradford Comissioner Gilinsky (For Distribution)

ACRS P. Bldg. IE:X005 (IE:HQ Dist.

Transmitted: MNBB H. R. Denton, NRR (6 mir./page W. J. Dircks, EDO R. H. Vollmer, NRR Landow ,_

C. Michelson, AEOD R. J. Mattson, NRR J. J. Cummings, Ol A J.1. Touchard, PA D. F. Ross, NRR N. M. Haller, MPA 0. Eisenhut, NRR MAIL C. W. Kerr, OSP S. H. Hanauer M inogue, SD H. K. Shapar. ELO IE: X005 Willste Bldg Document Mgt. Br. (For POR/l J. G. Davis, fi Ri$-~~

Regional Offices T. E. Murley, R1:S PRELIMINARY N011FICATION "

w)h

  • T Y

~

o o o 8010090253 o c d. _S.S 6

i