Insp Repts 50-254/99-15 & 50-265/99-15 on 990816-20.No Violations Noted.Major Areas Inspected:Maint Rule Implementation
ML20211F844
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/25/1999
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20211F831 List:
References
50-254-99-15, 50-265-99-15, NUDOCS 9908310088
Download: ML20211F844 (5)


Text

_ .

_

~

.

,

U.S. NUCLEAR REGULATORY COMMISSION REGIONlli Docket Nos: 50-254; 50-265 License Nos: DPR-29; DPR-30 Report Nos: 50-254/99015(DRS); 50-265/99015(DRS)

Licensee: Cornmonwealth Edison Company Facility: Quad Cities Nuclear Power Station Units 1 and 2 Location: 22710 206th Avenue North Cordova,IL 61242 Dates: August 16 - 20,1999 Inspector: M. J. Farber, Reactor Engineer R. A. Langstaff, Reactor Engineer Approved by: Ronald N. Gariner, Chief, Electrical Enginaring Branch Division of Reactor Safety 9908310088 990825 PDR ADOCK 05000254 O PDR

..- _ _ - _ _ _ _ _ _ .

.

i l .

SUMMARY OF FINDINGS Quad Cities Nuclear Power Station, Units 1 & 2 j l NRC Inspection Report 50-254/99015(DRS); 50-265/99014(DRS) l This report covers the pilot baseline inspection of maintenance rule implementation. The inspection period was August 16 -20,1999 and was conducted by two regionalinspector Cornerstone: Initiating Events i

No findings were identified in this cornerston Cornerstone: Mitigating Systems No findings were identified in this comerston Cornerstone: Barrier integrity No findings were identified in this cornerston l

2 l

~

. .

l Report Details I

l l Summarv of Plant Status l l

Both units operated at full power during the week of the inspectio j 1 REACTOR SAFETY Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

, 1R12 Maintenance Rule imolementation (71111-12)

.1 Maintenance Effectiveness 1 Inspection Scooe The inspectors reviewed the maintenance rule functional failure determinations, J performance criteria, and risk significance classification for three systems: the station l blackout diesel generator, s7fe shutdown makeup pump, and feedwater level control systems. Additionally, the inspectors reviewed the maintenance rule (a)(1) goals and action plans for the feedwater level control syste Observations and Findinas There were no findings identified and documented during this inspectio .2 Periodic Evaluation Review Insoection Scope The inspectors reviewed the licensee's periodic evaluation of maintenance rule effectiveness. This periodic evaluation was prepared as required by 10 CFR 50.65(a)(3). The licensee's conclusions with regard to reliability and availability balancing, (a)(1), and (a)(2) evaluations were examined by reviewing maintenance rule implementation for the station blackout diesel generator, safe shutdown makeup pump, and the feedwater level control system Observations and Findinos There were no findings identified and documented during this inspectio A5 Manaaement Meetinas

.1 Exit Meetina Summary The inspector presented the inspection results to Mr. J. Dimmette, Jr., and other members of licensee management in an exit meeting on August 20,1999. The licensee acknowledged the information presented. No proprietary information was identified.

I

u-

. .

s

,

,

PARTIAL LIST OF PERSONS CONTACTED Licensee E. Anderson, Radiation Protection W. Beck, Regulatory Assurance R. Chrzanowski, Nuclear Oversight D. Craddick, Station Engineering S. Darin, System Engineering J. Dimmette Jr., Site Vice President R. Freeman, Maintenance A. Fuhs, Regulatory Assurance R. Ganser, Illinois Dept. Nuclear Safety R. Gideon, Work Control E. Jebsen, Station Engineering R.' Kelley, Dresden Regulatory Assurance S. Laughlin, Station Engineering A. Lewis, Station Engineering M. Mcdonald, Operations D. Peters, Nuclear Oversight C. Peterson, Regulatory Assurance J. Purkis, Station Engineering M. Strait. Corporate Maintenance Rule Coordinator D. Tubbs, Mid-American Energy D. Wozniak, Engineering Manager NRC L. Collins, Resident inspector R. Gardner, Branch Chief C. Miller, Senior Resident inspector R. Walton, Resident inspector LIST OF DOCUMENTS REVIEWED Problem Identification Forms

  • PlF Q1997-03431, QlP 100-17

+ PlF Q1997-04800, U-2 RPV Level Lowering Unexpectedly

.- PIF Q1998-01121, Missing Belts on U-1 SBO Diesel Gen. Radiator Fan

-

PlF Q1998-01184, SBO Fuel Oil Transfer Pump Grease a PlF Q1998-01264, U2 Rx Lvl Master Lvl Controller

. . PlF Q1998-02552,1-A Feed Reg Valve Lock-up, Valve Ramps to Open Position l

  • PlF Q1998-03089, Master Feedwater Controller Erratic Output l

- PlF Q1998-03139, U-1 SBO DG Output Breaker Will Not Close l

  • PlF Q1998-03145, Unit One SBO fuel oil transfer pump surveillance failed

-

PlF Q1998-03725. SBO Diesel Programmable Logic Control Failure upon RTS

'

'

l l

!

l

.

'

, .

!

- PIF Q1998-04135, Unit 1 Reactor Scram on Low Water Level  !

- PIF Q1998-04182, U-2 Feedwater Transient

-

PIF Q1998-04193,2B FW Reg Valve Instability l

- PlF Q1998-04220, Feedwater Valve Leak '

L - PIF Q1998-04413, Oil Leak on Feedwater Reg Hyd Skid

-

PlF Q1998-04843,1-2901-10 Valve Failed QCOP 2900-07 During Q1R15

- PIF Q1998-05468, U2 Feed Reg Viv Lock-Up

-

PlF Q1998-05595,1A Feedwater. Reg Valve Locked Up During Startup

- PlF Q1998-05658, SBO DC Lube oil pump fuse blown  ;

i

- PlF Q1999-00080, U2 Rx Water Low Level  !

l -

PlF Q1999-00297,2C RFP Flow Square Rooter Output Failed  !

- PIF Q1999-00503, U2 Feedwater Level Transient

- PIF Q1999-00724,2-0642A Feed Water Reg Viv Stuck in Position

- PIF Q1999-01289, Safe Shutdown Make-Up Pump Room Cooler ,

-

PIF Q1999-01299, Maintenance Rule System Z0600-01 should be (a)(1), exceeded j OSS Time '

-

PlF Q1999-01823,1 A Feedwater Regulating Valve Locked Up

-

PIF Q1999-01892, Slow Feedwater Reg Valve Response During Feedwater Pump i Swap I

-

PlF Q1999-02007,1 A Feedwater Reg Valve Lockup

- PIF Q1999-02180, U1 SBO Inoperable

- PlF Q1999-02283, Unit 1 SBO DG Overspeed Trip Limit Switch

-

PIF Q1999-02366, U1 SBO Electrical Room High Temperature Expert Panel Meetina Minutes

- Expert Panel Meeting 98-005 Minutes, February 19,1998

- Expert Panel Meeting 98-08 Minutes, March 13,1998 l

- Expert Panel Meeting 98-11 Minutes, March 27,1998

-

Expert Panel Meeting Minutes, August 27,1998

- Expert Panet Meeting Minutes, September 24,1998

- Expert Panel Meeting Minutes, April 15,1999

-

Expert Panel Meeting Minutes, May 20,1999 l

- Expert Panel Meeting Minutes, August 12,1999 Procedures j l

- NSP-ER-3010, Revision 0, Maintenance Rule Reports l  !

l

- Quad Cities Nuclear Generating Station Maintenance Rule Periodic Evaluation, Evaluation Period July 1,1996 to April 30,1998, did June 25,1998 ,

- Maintenance Rule Assessment, dtd August 2,1999 I

- Balancing of Maintenance Rule Reliability and Availability, did August 11,1999

-

Feedwater Control Maintenance Rule (a)(1) Cause Determination and Goat Setting Maintenance Rule - Corrective Actions for Feedwater Level Control, dtd May 5,1999 4 5