PNO-V-82-030:on 820622,shipment of low-specific Activity Received Containing Drum w/1 to 1-1/2-inch Hole in Lid of Drum.No Loose Radioactive Contamination.Hole Sealed & Drum Placed in Burial Trench for Disposal
ML20054K823
Person / Time
Site: Quad Cities, 02700048
Issue date: 06/24/1982
From: Pang J, Thomas R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
PNO-V-82-030, PNO-V-82-30, NUDOCS 8207060190
Download: ML20054K823 (1)


PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-V 82-30 Date:06/24/82 j@t::,

This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation and is basically all that is known by IE staff on this date. \

s Licensee Emergency Classification:

Notification of Unusual Event Alert FACILITY: U.S. Ecology, Inc.

Richland, Washington Burial Site Site Area Emergency E0 "

State of Washington and NRC Licensee General Emergency X Not Applicable

SUBJECT:

BANNING OF COMMONWEALTH EDIS0N QUAD CITIES CORD 0VA, ILLIN0IS (NRC LICENSEE)

FOR RADI0 ACTIVE WASTE ~ SHIPMENTS The Region V office was notified by the State Inspector on site that a shipment of LSA waste received on June 22, 1982 from the Commonwealth Edison Quad Cities in Cordova, Illinois contained a drum (No.11) which had a 1 to li inch hole in the lid of the drum. The shipment consisted of 21 drums containing spent resin solidified in concrete. A contamination check indicated no loose radioactive contamination. Based upon the identified item of noncompliance with the Department of Transportation (DOT) regulations, the State of Washington banned Commonwealth Edison Quad Cities Power Station from the use of the burial site and suspended their burial permit effective 10:00 am (PDT)

June 22, 1982. The hole in the lid of the drum has been closed and the drum has been placed in the burial trench for disposal. The NRC Region V office notified the NRC Resident Inspectors at the Commonwealth Edison Quad Cities Power Station at 2:30 pm (PDT) on June 23, 1982.

There has been no media interest.

The Region V office was notified of the action taken by the State of Washington Resident Inspector at 12:35 pm on June 23, 1982.

This item is submitted for information only and is closed for reporting purposes.

CONTACT: J. F. Pang, 463-3844 R. D. Thomas, 463-3763 DISTRIBUTION:

H St. /8 dl ./ MNBBgPhillips /gE/W io:27WillsteggNail:

Chairman Palladino EDO .r NRR / IE / NMSS ./ ADM:DMB Comm. Gilinsky PA OIA RES D0T: Trans Only Comm. Ahearne MPA AE00 Comm. Roberts ELD SECY Air Rights INP0 / 3'Q,

\

ACRS SP so:W NSAC i/ i CA

{

Regions: s' w 25 Licensee: DEGION V: FORM 211 g 4 (Reactor Licensees) g7g190820624 PDR evised 5/11/82)

PNO-V-82-030