Monthly Operating Rept for Oct 1983
ML20082T176
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/08/1983
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-1945, NUDOCS 8312150203
Download: ML20082T176 (5)


Text

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . .

4 AVERAGE DAILY UNIT POWER LEVEL

}

tt) .__.

3 DOCKET NO. 50-387 _ _ _

L-

" J One UNIT O DAM 11/08/83 O

7pgg gi COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-2181 October, 1983 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) g 1046 g7 1054 2

1045 g3 1051 3 1043 39 1056 4 1043 20 1056 5 1044 1060 21 6 1051 1059 22 7 1055 1053 23 g 1051 24 1053 9 1051 25 1057 10 1056 26 1058 Ii 1051 27 1058 12 1046 28 1053 13 1038 29 1057 14 1053 1053 30 15 1056 1054 33 ,

16 1054 INS 11tUCT10NS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8312150203 831108 PDR ADOCK 05000387 R PDR

pememmusammunnanmarmavemamammamer-- -

~

pANN4
  • l I'

{

O i / 7 W ' - -

--__ 3 Lb IIIls ; OPERATING DATA REPORT N PPal hO DOCKET NO. 50-387 DATE 11/08/83_

L.A. Kuczynski NIC SY COMPLETED BY TELEPHONE (717)S42-2181 OPERATING STATUS Unit 1 Notes

1. Unit Name: Susquehanna Steam Electric Station October, 1983
2. Reporting Period:

3293

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 1152
5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe): 1068
7. Maximuen Dependable Capacity (Net MWe):

1032

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last keport, Give Reawns:

Items 6 and 7 may vary until sufficient operating data has been gathered.

9. Power Level To Which Restricted,if Any (Net MWe): None
10. Reasons For Restrictions,If Any: None This lionth Yr.-to-Date Cumulative
11. Hours In Reporting Period 745' 3.505 3.505
12. Number Of Hours Reactor Was Critical 745 3,123.4 3,123.4
13. Reactor Reserve Shutdown Hours 0 156.7 156.7 745 3,062.9 3,062.9
14. Hours Generator On.Line 0 0 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 2,457,130 9,223,936 9,223,936
17. Gross Electrical Energy Generated (MWH) 810,720 3,001,530 3,001,530
18. Net Electrical Energy Generated (MWH) 783,807 2,895,421 2;895,421
19. Unit Service Factor 100 87.4 87.4
20. Unit Availability Factor -

100 87.4 87.4

21. Unit Capacity Factor (Using MDC Net) 100.9 80.0 80.0
22. Unit Capacity Factor (Using DER Net) 98.8 77.6 77.6
23. Unit Forced Outage Rate 0.0 12.6 '12.6
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each): .

Unit 1/ Unit 2 Tie-in Outage to commence November 22, 1983.

Scheduled to last 33 days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION .

(4/77)

2 -

y b m m. - o z 3

a y T'c ER C E' o E

n y

D. 'a 2

y

$ _i 'N

=ommeom>x

'd

%w[',a W Tm i 6

E $6kkkpo a a E.R A o E 5-B e5Ej0R

$ m E. 0 " .c ?

5 $.D_ ;i4 RE Duration (Hours)

= m 7a3,3

". W *m 5'; S, E;

~E 5~

g >a #E n* Reason 3

.g c8 n ,7 E28 E

E Method of Shutting C

[ Down Reactor 3 h m m 2 2 5'

o m C E*

M F 3

-2 T N' M h Egm H T

~~M" g 2 n o >

2.g 2 t.* 2 C o

47E System o D">EE2 Y ': Code 4 "g, m E E g g =r 8 S z 2*Bg5 .- -

n m

{ ~. C m._ m aa f Component -

Code 5 m

-s-eQ ,5 W o

? 2 m

m A (a)

O 7 97TPm 0 E M C E

E EB-4E xgE 2>N 2>

PE 2 wm sm m pbh 2

~

S E,M o E Q >U 2 m c2E' c- ma 2 " 5' E EC s

EO. m a< rvi m .O o "r" ,,,

c 2 *.*. n a

  • ^ t-*

m m C 4 m . ~ u e M Y. o2 > ~ o 5

6

""f13 n u-~- m V

. s O

o W

n 4

=X"* u M m M

  • a n e s n
  • N n CD 2 l N LJ C w<

~ 3 M

m co co

- W O* e.a S

9 o'

.,3

.-;/ l

'l

'SUSQUEHANNA STEAM ELECTRIC. STATION

. Docket' Number- 50-387 ' Date 11-08-83 Completed by L.A. Kuczynski. Telephone-(717)S42-2181.

' Challenges to Main Steam Safety Relief Valves t

~

None-Changes'to the Offsite Dose Calculation Manual

'None Major- Changes to Radioactive Waste Treatment Systems None s

\.

PP&L Pennsylvania Power & Light Company

' Two North Ninth Street

  • Allentown, PA 18101
  • 215 / 770 5151 1 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 NOV 141983 Director, Data Autanation &

Managernent Information Division Attention: Mr. M. R. Beebe Management.Informatio'n Branch Office of Resource Management U.S. Nuclear Regulatory Comnission -

Washington, D.C. 20555.

SUSQUEHANNa STEAM ELECI'RIC STATION M NTHLY OPERATING REPORT - OCIOBER.1983 ER 100450 FILE 841 PIA-1945 Docket No. 50-387

Dear Mr. Beebe:

The October 1983 monthly operating report for Susquehanna SES Unit 1 is attached.

Very truly yours,

?

O ow B..D. Kenyo v

Vice Preside (nt-?Alclear Operations

. Attachment cc: .Dr. Thanas E. Murley INPO Records' Center Regional Administrator-Region I Suite 1500 U.S. Nuclear Regulatory Camlission 1100 Circle 75 Parkway 631 Park Avenue Atlanta, Georgia 30339 King of Prussia, PA ' 19406 Director Mr. Thanas E. Pollog Office of ' Inspection and Enforcenent Department of Environmental U.S. Nuclear Regulatory Conmission Resources Washington, D.C. 20555- Bureau of Radiation Protection

. Attn: Document Control Desk (12 copies) P.O. Box 2063 Harrisburg, PA 17120 Mr. G. Rhoads - NRC' Mr. R. Perch - NBC gM-1 1