ML20237B944
| ML20237B944 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/13/1998 |
| From: | Doering J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20237B946 | List: |
| References | |
| NUDOCS 9808200111 | |
| Download: ML20237B944 (2) | |
Text
_ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ - _ _
John Doering, Jr.
Vice President A
Peach Bottc:n Atornic Power Statica v
PECO NUCLEAR eccoon c - ee, 1848 Lay Road A Unit of PECO Energy Delta, PA 17314-9032 717 456 4000 Fax 717 456 4243 E-mai jdoenng@peco-eneigycom August 13,1998 10 CFR 50.55a Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, DC 20555
Dear Sir / Madam:
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Third 10-Year Interval inservice Interval (ISI) Program Attached for your approval are the proposed alternatives associated with the third, ten-year-interval, inservice Inspection (ISI) Program for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. Also included for your information is a copy of the ISI program for the third interval. This program has been developed in accordance with the 1989 Edition of the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code,Section XI, Subsections IWA, IWB, IWC, IWD, and IWF.
The cunent second interval dates are as follows:
PBAPS, Unit 2 - September 19,1986 to November 4,1998 PBAPS, Unit 3 - December 23,1985 to August 14,1998 The third interval dates are as follows:
PBAPS, Unit 2 - November 5,1998 to November 4,2008 PBAPS, Unit 3 - August 15,1998 to August 14,2008 We request your review and approval by March 15,1999.
l
[
l If you have any questions, please contact us.
Very t
- urs, Doering, r.
Vice President, Peach Bottom Atomic Power Station l
Enclosure:
Specification NE-290, inservice inspection Program for Third Interval Not including Class MC, Primary Containment at Peach Bottom Atomic Power Station, Units 2 and 3", including Appendix A.
cc:
H. J. Miller, Administrator, Region I, USNRC AA McMurtray, USNRC Senior Resident inspector, PBAPS l
9908200111 990813 PDR ADOCK 05000277 i
a eda 1 t -
~ August 13,1998 Paga 2 -
1 bcc:
N.'J. Sproul, Public Service Electric & Gas.
R.1. McLean, State of Maryland A. F. Kirby, Ill, Delmarva Power & Light Company / Atlantic Electric R. R. Janati, Commonwealth of Pennsylvania G. R. Rainey - 63C-3
' C. P Lewis - 63C-3
' J. B. Cotton - 62C-3 M. E. Warner.- PB, A4-1S.
G. L. Johnston - PB, SMB3-2A E. F. Sproat - 6381 R. W. Boyce - 63C-3 R. A. Kankus - 63C-5 G. J. Lengyel-PB, A4-SS J. G. Hufnagel/TRL - 62A-1 PBAPS ISEG - PB, SMB4-6 Commitment Coordinator - 62A-1 Correspondence Control Desk-618-5 1
DAC - 61 B-5 R. E. Simpson - PB, SMB3-6 M. J. Baker - PB, SMB3-6 R, E. Ciemiewicz - 63B-3 '
' A. R. Piha - PB, SMB3-6 a:isiProgram. doc 1
.i'
~
f I
L
__