Submits Work Items & Schedule for Completion of Security Communications Deficiency from Preoperational Physical Security Insps on 851003-10 & 1111-14,including Replacement of Coaxial Wire to Bldg Radio Antennas by 860215
ML20234D395
Person / Time
Site: Palo Verde, 05000000
Issue date: 11/14/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20234D050 List:
References
FOIA-87-279 ANPP-33995-EEVB, NUDOCS 8707070196
Download: ML20234D395 (2)


Text

<' e Arizona Nuclear Power Project P.O. Box 52034

.~

ANPP-33995-EEVB/GEC -

November 14, 1985 -

1 I

l i

Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S. Nuclear Regulatory' Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368

Subject:

Palo Verde Nuclear Generating Station (PVNGS) 3 Unit 2 I Docket No. STN 50-529 Physical Security Program Deficiency File: 85-056-026;85-001-493

Dear Mr. Martin:

Based upon discussions with Messrs. D.W. Schaefer and L.R. Norderhaug of your Safeguards Preparedness Branch, the following work items and related schedule are submitted as resolution of the security communica-tions deficiency arising from pre-operational physical security inspections conducted by representatives of your office on October 3-10, 1985 and November 11-14, 1985.

To be complete by February 15, 1986:

1. Replace coaxial wiring to the radio antennas in the Radwaste and Auxiliary Buildings.
2. Relocate the base stations from the 160 foot level of the Corridor Building to a more central location.
3. Install and evaluate a passive antenna system on the 74 foot icvel of the Control Building. .:.

~ E.

Upon completion _ of the above and prior to initial criticality of Unit 2, evaluate the effectiveness of the above changes. If the results of this evaluation determine that significant communications deficiencies still exist, establish an action plan to provide adequate security communications, including interim meacures.

\^

8707070196 870512 PDR FDIA i

GRABERB7-279 PDR

{-

~

~

. s.

~~

Mr. J. B. Martin Physical Security Program Deficiency ANPP-33995-EEVB/GEG Page Two

~.

A report will be provided to apprise you of the resolution of this deficiency.

If you have any concerns or questions, please contact me at your earliest convenience.

Very truly yours, E.E. Van Brunt, Jr.

Executive Vice President Project Director EEVBJr/GEC/bsc cc: A.C. Gehr R.P. Zimmerman E.A. Licitra M.D. Schuster Y

I

.I

-=

i n ]

- A. Yus new .. <.2. M.CE

[NA$)

^

so,

,,,f. l a r. p a Arizona Nuclear Power Project P O. sox 52034

  • PMotNIX, AAdoNA 66C72-234 November 22, 1985 ANPP-34083-EEYBNPQ Dr. Harold T.. Denton, Director Office of Naclear Reactor Regulation U.S. Nuclea.: Regulatory Commission Washington, D.C. 20555

Subject:

Y ** Palo 2Verde Nuclear Generating Station (PVNCS)

Unit Certification Regarding the Design, Construction and Pre-Operational Tasting of Palo Verde Nuclear Generating Station Unit 2 ^

Docket No. STN 50-529 File 85-036-026: G.1.01.10 --

References (1) Letter APS, from D. G. Eisenhut, NRC, to E. E.

dated February 24, 1983: Subject Van Brunt, Jr.,

Regarding the Design and Construction of the certification Palo Verde Nuclear Generating Stations Units 1, 2 and 3 (2) Letter from E. E. Van Brunt, Jr. , APS , to C. W.

NRC, dated November 14, 1964;

Subject:

FSAR Update Knighton,

Dear Dr.; Denton:

Arizona Public Service Company (APS), the applicant for that Palo design,Verde Nuclear and construction, Generating Station (PVNGS) Unit 2, wishe se you pre-operational testing are complete except as noted herein and that we expect essentially organization to be operationally ready on December 2,1985, to comm e ' the processSpecifications Technical leading to for theUnit fuel2: loading of the unit in accordance wit .

A.

FSAR and Licensing Commitraents Status subject 10 CFR Part 50.71(e) recognices that the FSAR is a living do -

therein to its actual state atto periodic updating todescription conforn theset plant forth .  !

knowledge, any point in time.  !

the FSAR to conform to a currentReference 2 identified To the besttheofknown our chan status. to update i handled in a manner compatible with 10 CTR Part 50.59. Future discrepan P

S

}

/ &' ~

bft' .

, l,

  • .A
  • Dr. Harold R. Denton Certification Regarding the Design, construction and Pre-Operational Testing of Palo Verde Nuclear Generating Station Unit 2 ANPP-34083 Page 2 -

'., 3. Remaining Work Items .

The open item tracking systems in use at completion of outstanding hardware deficiencies, Palo Verde identify and track disclosed during pre-operational testing test deficiencies items requiring resolution. int,pection issues and other identify restraints to plant Entries are operational r,eviewed modes.

and classified so as to currently on the tracking systems are Outstanding items both number and scope. typical of an operating plant in will be closed out or dispositioned prior to commencem e oad.

Similarily, through items 1 will classified be closed out as restraints to any of Operatio nal Modes 3 mode is commenced.

or dispositioned before operation in such C. .

Items Not complete for Which Schedular Eremotions Have Been S b u m tted _

ltems required regulatory requirements bywhich the will FSAR, not other licensing commitments 2 are listed in Attachment 1.

justifications be completed by fuel load of Unit for interin operationRequests. for schedular exemption and/or submitted. respecting auch ittaa have been D. Preoperational Tests Attachment 2 lists those Phase 1 (preoperational)  ?{

performed after initial fuel load per FSAR 14.2.5. tests which will be ~ ;{

To the best of my knowledge and items which bear upon y,our issuancethe foregoing addresses the remaining es fuel loading and low povar op6 ration of Palo Verdeof an operating license authorizing  ;

the completion of such ite=s as noted, except Unit 2. In summary, with where schedular exemptions are I

1 I

1

. ~

I S

Dr. Harold R. Denton Certification Regarding the Design. Construction and Pre-Operational Testing of Palo Verde Nuclear Generating Station Unit 2 )

ANPP-34083 )

Page 3 -

f l

]

4

'. appropriate, I presently expect that we will be ready to commence the process leading to the fuel loading of Palo Verde Unit 2 on December 2, 1985. 1 Accordingly, we request that a forty year operating license be issued on December 2, 1985.

Very truly yours, .

. . CLLL A m E. E. Van Brunt, Jr.

Executive Vice President

. Project Director EE7B/WFQ/ dim Attachment 2

cc: Mr. John B. Martin, Administrator U.S. Nuclear Regulatory Commission . -

Region V '-

2.450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 -

R. P. Zi= merman E. A. Licitra _

?

G. W. Knighton #

F. Miraglia

  • D. Canacy A. C. Gehr J. R. Bynum 4

De 80 9

e

ATTACP. MENT _1, Schedular Exemptions SUBJECT ANPP LETTER # DATE Supplement 1 to NUREG-0737 335165 November 8, 1985 Equipment Qualification 33605 September 30, 1985 Post Accident Sampling S'ystem 33573 September 26, 1985 l Pressurizer Vent Valve OLc-108) 34078 November 22, 1985 Auxiliary Spray system 33713, 33771 ' october 15, 22, 1985 ,

Hodifications .

'.' Auxiliary Spray System 53905 November 4, 1985 Modifications AIVS 33712 October 12, 1985

)

0 9

e 4

O 4 0 g

e d

M P j e

Sh

~

L -

o , d

. - Y.c *

  • 0 ATTACHMENT 2' TESTS TO BE PERFORMED AFTER INITIAL FUEL I4AD
  • I (To Be Performed Per FSAR 14.2.5 Phase I Testa')

The Following Tem?e Have Not Been Performed 91PE-2LR02 Liquid Radwaste Evaporator Test 92PE-2QF06

- In Plant Communications (Safety Frequency Radio Frequency) 92PE-2SB20 DNBR Calculator to PMS Data Link 92PE-2SQ01 Radiation Monitoring Preop 92PE-2SQO2 Post Accident Radiation Monitor 92PE-25QO3 Digital Radiation Monitoring System s

92PE-ISQ04 Safety Related Radiation Monitoring 91PE-2SS02 cas Aulyzer Test 93PE-2QD02 Modular Energency Lighting Units 1

., l

'N 0

0 e

em

l e . v , , .. .

1 I

i l .

) i STATE OF ARIZONA )

) as.

COUNTY OF MARICOPA) -

1, F4 win E. Yan Brunt, Jr.,

President, Arizona Nuclear Power Project, represent that that I am Executive Vice been signed by me on behalf of Arizona . the foregoing document has authority to do so, Public Service *l' that I have read such document and know its contentsCo and that to the best of my knowledge and belief, the statements mad are true.

I

~ ..

e-m C a 'l ( L . 4LLL hoLUL Edwin E. Van Brunt, Jr. ' N Sworn to before me this .$ S- day of 7)etwer b' ; 1985.

'.'.' \,