s e
NOV 4 1965
-l MEMORANDUM FOR:
Dennis M. Crutchfield, Assistant Director for Safety Assessment Division of Licensing i
FROM:
Dennis F. Kirsch, Acting Director Divsion of Reactor Safety and Projects Region V
SUBJECT:
PROOF AND REVIEW 0F THE PALO VERDE UNIT 2 TECHNICAL SPECIFICATIONS to this memorandum provides our proof and review comments regarding the Technical Specifications for Palo Verde Unit 2.
If you have questions regarding these comments, please contact Chris Sorensen of my staff on FTS 463-3781.
D. F. Kirsch, Acting Director Divsion of Reactor Safety and Projects
~
Region V h
up u ai,$D \\"
=
n
-?.
RN d
40
- 8 RS rensen:jb LM/ller AChaffee DKirsch
,i 10
/85 10/p/85 10/5 /85 10/3 /85 l
1 8707070182 870512 PDR FOIA CRADER87-279 PDR
)
l s
~
~
I w
i ENCLOSURE 1 6.2.2.2.c Should allow the Plant Manager or his deputy or higher levels of management to authorize deviation from overtime guidelines, not supervisory personnel.
4 1
3.7.1.6 This is a confusing LCO and Action Statement. Palo Verde has one ADV per steam line, two steam lines per SG.
Does this LCO uean that all four APV's must be operable in Modes 1-4 or just one per SG? Should be more specific here.
4.5.3.
Should be more specific with these surveillance requirements.
Which surveillance requirements from Specification 4.5.2 are applichble?
b 3.6 i.
D 9
e
.- f k
1 1
j
~
v s.
t2/09/85 11:31 NO.Oli 002 ATTACHMENT 1 PALO VERDE NUCLEAR GENERATING STATION, UNIT 2.
OPERATING LICENSE NPF-46 This attachment identifies items which must be completed to the NRC staff's satisfaction in accordance with the schedule identified below.
1.
Prior to entering any operational mode for the first time, including initial fuel loading, APS shall a..
Have completed a review of the surveillance procedures applicable to the change of mode, and determined that the procedures demonstrate the operability of the required systems with respect to all acceptance criteria defined in the Technical Specifications.
Have dispatched written n' tification to the NRC Regional Administrator, b.
o Region V, that the action defined in (a), above, has been compler.ed for the mode or modes to be entered.
2.
APS shall test Reactor Coolant Gas Vent Valve 2J-RCB-HV-108 and demonstrate its operability during Mode 3 prior to initial entry into Mode 2.
3.
APS shall fulfill the comitment concerning all " proximate" supports (e.g. pipe supports located near a critical component such as a pump nozzle) prior to initial entry into Mode 2 in accordance with ANPP Letter 31473 dated December 2, 1984 4
APS shall enlarge the pipe penetration where the Reactor Coolant Gas Vent piping passes through the pressurizer compartment blowout panel, as stated in EER 85-RC-200, prior to initial entry into Mode 4.-
~
5.
APS shall test the emergency lighting system and demonstrate its operability prior to initial entry into Mode 2.
6.
Prior to February 16, 1986, APS shall a.
Replace coaxial wiring to the security radio antennas in the Radwaste and Auxiliary Buildings, b.
Relocate the security radio base stations from the 160-feet level of the Corridor Building to a more central location.
. -j c.
Install and evaluate a passive antenna system on the 74-foot level l
of the Control Building.
t N
l
J2/09/85 11:32
,NO.011 003
! _l s
~
7.
Prior to initial criticality of Unit 2. APS shall a.
Evaluate the effectiveness of the changes of item 6 above, b.
If the results of this evaluation detennine that significant deficiencies still exist, establish an. action plan to provide i
adequate security communications, including interim measures.
8 With respect to the Radiation Monitoring System, APS shall perfonn-compensatory measures, complete testing and make operable all elements of the system in accordance with the schedule and comitments presented in ANPP Letter 34129 dated November 29, 1985.
.-f,