  • NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE JULY 1986 July 1 The Station was in cold shutdown for the Fifth through Refueling and Ten-Year Inservice Inspection.

July 31 The Reactor Coolant System tenperature and pressure were at ambient conditions.

1 i

Mk 8610100102 860731 DR ADOCK 0500 4

(\

1 -

s . .

OPERATING DATA REPORT DOCKET NO.: 50-334 REPORT DATE: 08/07/86 COMPLETED BY: P.A. SMITH TELEPHONE: (412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JULY 1986
3. LICENSED THERMAL POWER (MWt): 2660
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
11. HOURS TN REPORTING PERIOD: 744.0 5087.0 89855.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 3220.1 48821.1
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 0.0 3217.5 47352.3
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 0.0 8049760.4 111073191.5
17. GROSS ELECT. ENERGY GEN. (MWH): 0.0 2638550.0 35419950.0
18. NET ELECTRICAL ENERGY GEN. (MWH): -3120.0 2480490.0 33006793.0
19. UNIT SERVICE FACTOR: (PERCENT) 0.0 63.2 55.1
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 0.0 63.2 55.1
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 60.2 48.8
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 58.4 47.3 l
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.4 22.6
24. SHUTDOWNS SCHEDULED OVEE NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

Fifth Refueline. May 16. 1986. Scheduled 93 Days

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 8-17-86
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

l FORECAST ACHIEVED l INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

l l

l

e- ..

AVERAGE DAILi UNIT POWER LEVEL DOCXZT No. 50-334 3V?S r;ni:: ;1 UNIT DATE August 8. 1986 CDMPLETED SY P. A. Smith TELEPHONg (412) 643-1825 JULY MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) IMWe Net)

O 0 I t7 0 0 2 18 3 0 19 o 0 0 4 .

M 0 0

$ 21 0 0 6 g 7

0 0 23 O 0 S 24 0 0 9 25 to 0 o 24 0

Ig U 0 0

12 0 23 13 0 0 29 0 0 14 30 0 0

. I$ 31 le 0 INSTRUCTIONS On this format. fist the asurage daily unit powet toet in MWe Net far each day in the reporting imenth. Coinpute to the nearest whole mepwasI.

14/77 )

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO, 50-334 UNIT NAME BVPS Unit il DATE Aunust 8, 1986 REPORT MON TH JULY COMPLETED BY P.A. Smith TELEFilONE (41H 643-1825 "s.

'i ce w ao o 0, e 03% Licensee ,, "$* Cause, & Corrective No. Date ". %5 S 3US Event  ! e, ES j j5

. uj" Report #

{g ja Action to Prevent Recurrence a o o

l 7 860701 S 744 C 4 N/A ZZ ZZZZZZ Station remained shutdown for the Fifth Refueling.

l l

t l

t .

! 1 2 1

F: F.w sed 3 4 Reassm: Method:

5- ScheJ:8cd I:xtubit G Insstiestiims A-Figuipnient Failvie(Lnplaint L-nanua1 fiw PsepasJei.=i of Dasa B Maintenance e4 Test 2-Manual Serae C Refueling .line:) Sheets I.w liensee 3-Automatic Scree i Evens Repine ti l'Ri l ilc t NilRI G D Regulaim) Resteletii* 4-Continued From Previous Month lif till i Opesaine Tsaining A Ikense l'zaminati'* 5-Reduction I -Adnunistrative e

' 9-Other , 5 G Opetaliimal I esees Il aplaint ,

I shehis 1 SJnw bmsc

~

e l^8/77) 11 Othee Ilisplaiol l-

4 ..

MAJOR MAINTENANCE

1. Expansion of 50 steam generator tubes
2. Overhaul of high pressure turbine
3. Staked Main Condenser
4. Reactor Vessel Ten-Year Inspection
5. Overhaul of Instrument Air Compressors (IA-C-1A & IB)
6. Overhaul of Main Steam Trip Valves (TV-MS-101A,B C)
7. Maintenance of Reactor Coolant System loop stop valve (M0V-RC-591) i i

l

3-s 9

'Af Telephone (412) 393-6000 Nuclear Group P.O. Box 4 snippinopon. pA tso77.ooo4 August 8, 1986 Beaver Valley Power Station, Unit No.1 Docket No. 50-334. License No. DPR-66 Monthly Operating Report i

i

11. S. Ncclear Regulatory Commission Director, Office of Management Information & Program Control Washington, D. C. 20555

{ Gentlemen:

In accordance wi th Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of July,1986.

! Very trul yours, Carey Vice President Nuclear Group rw Enclosures cc: NRC Regional Office King of Prussia, PA l