- hVg, T4@
Telephone (412) 393-6000
.O.
xe Shippmgport. PA 15077-0004 May 7,1996 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Reoort U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly O rating Report is submitted for Unit 1 and Unit 2 for the month of A ril,1996.
Respectfully, ff 6v =)
T. P.
oonan Division Vice President, Nuclear Operations /
Plant Manager i
DTJ/stp Enclosures cc: NRC Regional Office King of Prussia, PA 140140 9605140294 960430 PDR ADOCK 05000334 R
PDR The Nuclear Professionals 4
i NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE UNIT 1 APRIL 1996 l
April 1 The Unit began the report period in Mode 6 while shutdown for its through eleventh refueling outage.
i April 23 3
April 24 The Unit entered Mode 5 at 1242 hours0.0144 days <br />0.345 hours <br />0.00205 weeks <br />4.72581e-4 months <br /> while shutdown for its
. eleventh refueling outage.
April 25 The Unit continued in Mode 5 for the remainder of the report period through while shutdown for its eleventh refueling outage.
April 30 l
4 AVEPME LELY UNIT POWER LEVEL D00GT NO.
50-334 UNIT BVPS Unit 1 DATE May 2, 1996 CCMPLEITD BY David T. Jones TELEPHONE (412) 393-7553
!OFIH Anril 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (We-Net)
(We-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
i 5
0 21 0
1 6
0 22 0
1 7
0 23 0
8 0
24 0
I 9
0 25 0
t 10 0
26 0
l 11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
t i
15 0
31 16 0
i l
i INSIRUCTINS this form, list the average daily unit power level Me-Net for each day in I
On j_
the sgdng month. Ocupute to the nearest whole megawatt.
l i.
(
a OPERATING DATA REPORT DOCKET No.:
50 334 REPORT DATE:
05/02/96 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: APRIL 1996
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Not MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2903.0 175319.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
0.0 1966.9 115418.7
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
0.0 1966.9 113319.0
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GEN. (MWH):
0.0 4940959.0 273863021.5 l
- 17. GROSS ELECT. ENERGY GEN. (MWH):
0.0 1636100.0 88450117.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-3310.0 1539150.0 82705974.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 67.8 66.4 5
l
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 0.0 67.8 66.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 63.5 58.8
- 23. UNIT FORCED OUTAGE RATF.: (PERCENT) 0.0 0.0 15.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT WAS SHUTDOWN FOR ITS ELEVENTH REFUELTNG OUTAGE ON MARCH 22. 1996.
1
]
,JHE REFUELING OUTAGE IS SCHEDUT Fn TO IAST FOR 55 DAYS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
05/16/96 j
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
l FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A t
~. - -. - -
UNIT SNUTDOWNS AND POWER REDUCTIONS (120%)
Docket No.
50-334 Unit Name BVPS Unit #1 Date may 2. 1996 Completed By David T.
Jones REPORT MONTN April 1996,__
Telephone (412) 393-7553 e
Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type 1 (Nours)
Reason 2 Dcun Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence 3
960401 S
719.0 C
4 N/A RC FUELXX The Unit remained shutdown for its eleventh refueling outage.
1 2
3 4
F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit H-Some Source.
G-Operational Error (Explain)
N-Other (Emptain)
NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE UNIT 2 APRIL 1996 April 1 The Unit operated at a nominal value of 100% output.
through April 3 April 4 The Unit operated at a nominal value of.100% output until 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> when a scheduled load reduction was commenced for planned end-of-cycle fuel conservation (cycle stretch).
April 5 An output of approximately 47% was achieved at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.
April 6 The Unit remained at approximately 47% output for planned end-of-cycle fuel conservation.
April 7 The Unit remained at approximately 47% output for planned end-of-cycle fuel conservation.
A return to full power was commenced at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />.
April 8 A nominal value of 100% output was achieved at 1405 hours0.0163 days <br />0.39 hours <br />0.00232 weeks <br />5.346025e-4 months <br />.
April 9 The Unit continued to operate at a nominal value of 100% output through for the remainder of the report period.
April 30 i
e J
J
AVHUGE DAILY UNIT POWER LEVEL DOCKET NO.
50-412 LNIT BVPS Unit 2 DATE May 2, 1996 031PLEITD BY David T. Jones TELEPIONE (412) 393-7553 PONIH Aoril 1996 DAY AVERME DAILY POWER LEVEL DAY AVERAGE DAILY POWIR LEVEL (We-Net)
(We-Net)
\\
1 835 17 834 4
a 2
834 18 828 3
831 19 824 4
826 20 822 5
436 21 828 6
355 22 824 r
l 7
373 23 830 i
8 905 24 833 9
834 25 825 10 834 26 829 11 824 27 834 12 821 28 831 13 827 29 826 14 838 30 831 15 831 31 16 835 i
INSIRUCTIONS On this forn, list the average daily unit power level W e-Net for each day in the reporting month. Campute to the nearest whole megawatt.
a OPERATING DATA REPORT DOCKET No.:
50-412 REPORT DATE:
05/02/96 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: APRIL 1996
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A 1
l THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2903.0 74102.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
719.0 2903.0 64384.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
719.0 2881.5 63976.1
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1803545.0 7313751.0 159137754.0
- 17. GROSS ELECT. ENERGY GEN. (MWH):
595348.0 2426340.0 51859669.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
564846.0 2301673.0 49021195.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 99.3 86.3
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 99.3 86.3 l
- 22. UNIT CAPACITY FACTOR (DER): PCT 94.0 94.8 79.1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.7 2.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS SIXTH REFUELING OUTAGE ON AUGUST 30. 1996.
THE REFUELING OUTAGE IS SCHEDUT.Fn TO IAST FOR 45 DAYS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
5
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED I
INITIAL CRITICALITY N/A N/A i
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
l l
l
m
.. i UNIT SNUTDOWNS AND POWER REDUCTIONS (t201)
Docket No.
50-412 Unit Name SVPS Unit 82 Date May 2. 1996 completed By David T.
Jones REPORT MONTH April 1996 Telephone (412) 393-7553 e
Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date
-Typel (Nours)
Reason 2 Down Reactor 3 Report J Code 4 Code 5 Prevent Recurrence 5
960404 S
0 N
5 N/A ZZ ZZZZZZ The Unit reduced output from 1001 to approximately 471 for planned end-of-cycle fuel conservation (cycle stretch).
I 1
2 3
4 F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manuel Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File i
C-Refueling 3-Automatic Scram (NUREG0161).
1 D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit N-Same Source.
G-Operational Error (Explain)
N-Other (Explain) 4 L
.