ML20094H363

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station
ML20094H363
Person / Time
Site: Beaver Valley
Issue date: 10/31/1995
From: David Jones, Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511140141
Download: ML20094H363 (9)


Text

.. . - - _ ._ _ -

'Af Telephone (412) 393-6000

.O. x4 Shippingport. PA 15077-0004 l

November 7,1995 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Reoort i

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

I In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of

)

i October,1995. l Respectfully, T. P. Noonan Division Vice President, Nuclear Operations /

Plant Manager DTJ/ sip Enclosures cc: NRC Regional Office King of Prussia, PA Q,

se The Nuclear Professionals 951114o143 953g33 DR ADOCK 05o00334 PDR fg

NARRATIVE

SUMMARY

OF

  • MONTHLY OPERATING EXPERIENCE UNIT 1 OCTOBER 1995 October 1 The Unit operated at a nominal value of 100% output during the gh entire repon penod.

October 31 l

(

4 l

f AVERAGE DMLY INIT POWER LEVEL r

DOGET NO. 50-334 LNIT BVPS Unit 1 DME Nov. 2. 1995 03tPIEfED BY David T. Jones TELh w (412) 393-7553 l

10tfIH Oc+r**r 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l C0% 13t) G;% !%t) l 1

1 815 17 _ , , 827 2 819 18 _ 828 3 822 19 825 1

4 821 20 825 I 5 820 21 826 6 815 22 824 i

7 820 23 832 l I

8 821 24 831 .l I

9 830 25 831 l 1

10 832 26 831 I 11 832 27 824 l

12 828 28 821 l 13 825 29 823 14 807 30 829 4

15 819 31 827 l 16 827 i INSTRUCTIONS ,

On this form, list the average daily unit power level PMe-Net for endi day in the reporting month. Ompute to the nearest whole megawatt.

l

. OPERATING DATA REPORT DOCKET NO.: 50-334 REPORT DATE: 11/02/95 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7553 OPERATING STATUS l l

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes l
2. REPORTING PERIOD: OCTOBER 1995
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING.(Net MWe): 835
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX DEPENDABLE CAPACITY (Net MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO UHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A l i

i THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD: 745.0 7296.0 170952.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 745.0 5590.3 112147.1
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 745.0 5518.8 110056.5
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. CROSS THERMAL ENERGY GEN. (MWH): 1968103.0 14282798.0 265609864.5
17. CROSS ELECT. ENERGY GEN. (MWH): 648160.0 4689540.0 85715507.0
18. NET ELECTRICAL ENERGY GEN. (MVH): 614130.0 4408310.0 80132214.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 75.6 66.2
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 75.6 66.2
21. UNIT CAPACITY FACTOR (MDC): PCT 101.8 74.6 60.3
22. UNIT CAPACITY FACTOR (DER): PCT 98.7 72.4 58.5
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 4.3 15.6
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS lith REFUELING OUTAGE ON MARCH 22. 1996. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 55 DAYS.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N /A N/A INITIAL. ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNIT SHUIDOWMS AND POWER REDUCTIONS (t20%) Docket No. 50-334 Unit Name BVPS Unit #1 -

Date November 2. 1995*

Completed By David T. Jones REPORT MONTH October 1995 Telephone (412) 393.T553 l Method of Licensee Cause & Corrective Duratice Shutting Event System Component Action to No. Date Typel (Mours) tessen2 Down Reactor 3_ Report # Code 4 Code 5 Prevent Recurrence NONE e

1 2 3 4 F-Forced Reason: Method: Exhibit F-Instructions for S-Scheduled A Equipment Failure (Explain) 1-Manuel Preparation of Data Entry Sheets R-Maintenance or Test 2-Manuel Scram for Licensee Event Report (LER) File C-Refueting 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd. f rom Previous Month E-Operator Training & License Enem 5-Reduction 5 F-Administrative 9-Other Exhibit W-Same Source.

G-Operational Error (Explain)

H-Other (Emptain)

i NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE i UNIT 2 l

OCTOBER 1995 l

I l October 1 The Unit operated at a nominal value of 100% output during the through entire report period.

October 31 l

)

l l

l l

l l l l l  !

l I

i l

l l

l i

l l

AVERAGE MILY LNIT POWER LEVEL j DO3ET NO. 50-412 LNIT BVPS Unit 2 MTE Nov. 2. 1995 CIMPLETED BY David T. Jones TELEPH NE (412) 393-7551_

20tGE Octr**r 1995 DAY AVERAGE IRILY POWER LEVEL MY AVERAGE MILY POWER LEVEL (Ne-Net) (We-Net) 1 830 17 841 2 829 18 836 3 829 19 835 4 831 20 835 5 827 21 842 6 827 22 840 7 836 23 837 8 839 24 837 i

9 __. 837 25 842 l

10 835 26 840 11 _ 836 27 836 12 834 28 839 13 834 29 840  !

14 832 30 838 15 843 31 839 16 843 INSIRUCTIONS ,

on this fann, list the average daily unit power level Me-Net for each day in the reporting month. Ctmpute to the nearest Wole megawatt.

~

r OPERATING DATA REPORT DOCKET No.: 50-412 REPORT DATE: 11/02/95 COMPLETED BY: DAVID T. JONES i TELEPHONE: (412) 393-7553 OPERATING STATUS 1

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: OCTOBER 1995
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Cross MWe): 923
5. DESIGN ELECTRICAL RATING -(Net. MWe): 836
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
11. HOURS IN REPORTING PERIOD: 745.0 7296.0 69735.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 745.0 6193.3 60017.8
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS CENERATOR WAS ON LINE: 745.0 6153.0 59630.6
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. CROSS THERMAL ENERGY GEN. (MWH): 1967617.0 15649594.0 148170916.0
17. GROSS ELECT. ENERGY GEN. (MWH): 655431.0 5160783,0 48212576.0
18. NET ELECTRICAL ENERGY CEN. (MWH): 622939.0 4886167.0 45561181.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 f4.3 85.5
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 f4.3 85.5
21. UNIT CAPACITY FACTOR (MDC): PCT 102.0 31.7 79.3
22. UNIT CAPACITY FACTOR (DER): PCT 100.0 110.1 78.2
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 9.6 2.8
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DUFATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL. ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNIT SHUTDOWNS AND POWER REDUCTIONS (220%) Docket No. 50-412 Unit Name BVPS Unit 82 s Date November 2. 199'/

Completed By. David T. Jones REPORT MONTH October 1995 ' Telephone (412) 393-7553 f Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typet (Hours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence NONE 1

4 P

1 2 3 '4 F-Forced Reason: Method: Exhibit F-Instructions for S-Scheduled A-Equipment Falture (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit R-Same Source.

G-Operational Error (Explain)

H-Other (Explain)

- -- -. . --. . - -