. _ - .

t glVA

~

'A@

Telephone (412) 393-6000 f

?"E* ??","

Shippingport PA 15077-0004 October 7,1996 l

l Beaver Valley Power Station

! Unit 1 - Docket No. 50-334, License No. DPR-66 l Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report i

i U. S. Nuclear Regulatory Commission l Document Control Desk Washington, D.C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for the month of September,1996.

1 Respectfully, T. P. Noonan Division Vice President, Nuclear Operations / l Plant Manager

\ \

, DTJA:p i

Enclosures ,

g cc: NRC Regional Office #

l King of Prussia, PA 9610160320 960930 PDR ADOCK 05000334 R PDR Nw The Nuclear Professionals 160073

- -- -- _ - - x-u-- - a w-- A- --> B _ -,-1-2

~

. NARRATIVE

SUMMARY

OF I

MONTHLY OPERATING EXPERIENCE l UNIT 1 l

SEPTEMBER 1996  !

I l

September 1 The Unit operated at a nominal value of 100% output during the entire report period. I through September 30 l

l In addition to the above, the following Analog Rod Position Indication (ARPI) problems were encountered i during the report period and are being reported as required by Technical Specifications.

September 21 The analog rod position indication (ARPI) for control rod H-2 was declared through inoperable at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> due to reading greater than the technical specification limit September 30 of 12 steps. Actual rod position was verified to be within the 12 step limit by obtaining primary detector voltage readings. Troubleshooting activities c~ontinued throughout the remainder of the report period, however, a repair of the ARPI problem for control rod H 2 had not yet been completed by the end of the report period.

September 24 The analog rod position indication (ARPI) for control rod H-10 was declared inoperable at 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br /> due to reading greater than the technical specification limit

)

of 12 steps. Actual rod position was verified to be within the 12 step limit by obtaining primary detector voltage readings. The limiting condition for operation as specified in the technical specifications was met (a maximum of one ARPI per bank  ;

can be inoperable at any one time) because control rod H-2 is located in control bank l

D and control rod H-10 is located in control bank C.

September 25 After returning to within 12 steps following a recalibration ofits ARPI, control rod H-10 was returned to service at 0925 hours0.0107 days <br />0.257 hours <br />0.00153 weeks <br />3.519625e-4 months <br />.

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-334 UNIT BVPS Unit 1 DATE October 1,1996 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 MONTH September 1996 DAY AVERAGE DAILY POWER ;EL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 816 17 825 2 818 18 823 3 816 19 824 4 816 20 824 5 815 21 824 6 815 22 825 7 815 23 825 ,

8 811 24 826 j i

9 812 25 828 10 813 26 825 11 817 27 818 12 817 28 823 13 823 29 827 14 826 30 827 15 824 31 ---

16 823 I

INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

i I . *.

s #

OPERATING DATA REPORT l

DOCVIT NO. 50-334 REPORT DATE: 10/01/96 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 i

l OPERATING STATUS l

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1
  • Notes
  • j
2. REPORTING PERIOD: SEPTEMBER 1996 * *
3. LICENSED THERMAL POWER (MWt). 2652 * *
4. NAMEPLATE RATING (Gross MWe): 923 * *
5. DESIGN ELECTRICAL RATING (Net MWe) 835 * *
6. MAX. DEPENDABLE CAPACITY (Gross MWe) : 860 *
  • I 7. MAX. DEPENDABLE CAPACITY (Net MWe) : 810 ****** * * * * ****
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A i THIS MONTH YEAR TO DATE CUMULATIVE l
11. HOURS IN REPORTING PERIOD: 720.0 6575.0 178991.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 4987.1 118438.9 13 REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 720.0 4925.5 116277.6
15. UNIT RESFRVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1901486.0 12527344.0 281449406.5
17. GROSS ELECT. ENERGY GEN. (MWH): 624790.0 4124225.0 90938242.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 589980.0 3870115.0 85036939.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 74.9 66.7
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 74.9 66.7
21. UNIT CAPACITY FACTOR (MDC) : PCT 101.2 72.7 61.0
22. UNIT CAPACITY FACTOR (DER) : PCT 98.1 70.5 59.1
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 8.4 15.2 l
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

1 j

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: )

l 1

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : l l FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A )

INITIAL ELECTRICITY N/A N/A l COMMERCIAL OPERATION N/A N/A

UNIT SHUTDOWNS AND POWER REDUCTIONS (220%) Docket No. 5(b334 Unit Name BVPS Unit #1 Date October 1,1996 ,

Completed By David T. Jones REPORT MONTH September 19% Telephone (412)393-4 % 2 No. Date Typel Duration Reason 2 Method of Licensee System Component Cause & Corrective Action to Prevent Shutting Event Report # Code 4 Code 5 Recurrence (Hours)

Down Reactor 3 Nonc I 2 3 4 Reason. Method. Exhibit F-Instructions for Preparation of F-Forced S-Schcluled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREGO161).

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont'd. from Previous Month E Ope:ator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit H-Same Source G-Operational Error (Explain)

Il-Other (Explain)

. I L , NARRATIVE

SUMMARY

OF j MONTHLY OPERATING EXPERIENCE i I

l UNIT 2 SEPTEMBER 1996 September 1 The Unit began the report period in Mode 4 as cooldown for the sixth refueling  :

outage continued. Mode 5 was entered at 0305 hours0.00353 days <br />0.0847 hours <br />5.042989e-4 weeks <br />1.160525e-4 months <br />. j 1

September 2 The Unit remained in Mode 5 :s the sixth refueling outage continued.. l through 1 September 4 i

I September 5 The Unit entered Mode 6 at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />. l l

I 1

September 6 The Unit remained in Mode 6 as the sixth refueling outage continued.

through September 27 1

September 28 The Unit entered Mode 5 at 2125 hours0.0246 days <br />0.59 hours <br />0.00351 weeks <br />8.085625e-4 months <br />. I l

September 29 The Unit remained in Mode 5 for the remainder of the report period.

through  !

September 30 4

i 1

l

. AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO. 50-412 UNIT BVPS Unit 2 DATE October 1,1996

COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 MONTH September 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 )

8 0 24 0 9 0 25 0 10 0 26 0_ l 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 ---

16 0 l

INSTRUCTIONS l

On this form, list the average daily unit power level MWe-Net for each day in the reporting month.

l Compute to the nearest whole megawatt.

OPERATING DATA REPORT DOCKET NO : 50-412 REPORT DATE: 10/02/96 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 *Netes *
2. REPORTING PERIOD: SEPTEMBER 1996 * *
3. LICENSED THERMAL POWER (MWt)t 2652 *
4. NAMEPLATE RATING (Gross MWe) : 923 *

)

5. DESIGN ELECTRICAL RATING (Net MWe). 836 * *
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870 * *
7. MAX. DEPENDABLE CAPACITY (Net MWe) : 820 *** * * * * * * * * * * *
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: j l
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A I

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD: 720.0 6575.0 77774.0 I
12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 5827.8 67309.6
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 0.0 5804.9 66899.E
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH) : 0.0 14669113.0 166493119.0
17. GROSS ELECT. ENERGY GEN. (MWH): 0.0 4830599.0 5426392'*.0
18. NET ELECTRICAL ENERGY GEN. (MWH): -3100.0 4576531.0 512960'o4.0
19. UNIT SERVICE FACTOR: (PERCENT) 0.0 88.3 86.0
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 88.3 86.0
21. UNIT CAPACITY FACTOR (MDC) : PCT 0.0 84.9 80.1
22. UNIT CAPACITY FACTOR (DER) : PCT 0.0 83.3 78.9
23. UNIT FORCED OUTAGE RATE 4 (PERCENT) 0.0 0.4 2.5
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH) :

THE UNIT WAS SHUTDOWN FOR ITS SIXTH REFUELING OUTAGE ON 08/30/96. THE l REFUELING OUTAGE IS SCHEDULED TO LAST FOR 45 DAYS.  !

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/14/96
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)r FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

l

e Docket No. 50-412 *-

UNIT SHUTDOWNS AND POWER REDUCFIONS (220%) .

Unit Name BVPS Unit #2 Date October 1,19% ,

Completed By _L'wid T. Jones REPORT MONTH Scotember 19% Telephone (412)393-4 % 2 No. Date Typel Duration Reason 2 Method of Licensee System Component Cause & Corrective Action to Prevent (Hours) Shutting Event Report # Code 4 Code 5 Recm m e Down Reactor 3 8 960901 S 720.0 C 4 N/A RC FUELXX The Unit remained s5tdown for its sixth refueling outage.

I 2 3 4 F-Forced Reason: Method- Exhibit F-Instructions for IYeparation of S-Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREGO16I).

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit II-Same Soune G-Operational Error (Explain)

Ii-Other (Explain)