Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
{{#Wiki_filter:$
3
+ , ,
[
~!
A f.
. Telephone (412) 3916000 Nuclest Group L-98-002 Shippmgport, PA 15077-0004 January 7,1998 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Goeratine Report '
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for the month ofDecember,1997.
Respectfully, 3 O>m N <
R. L. LeGrand Division Vice President, Nuclear Operations /
Plant Manager DTJ/ sip '
Enclosures-cc: ,NRC Regional Office King of Prussia, PA 9801160019 971231 i PDR ADOCK 05000334 R PDR The Nuclear Professionals t 2,;0 J 3 -
# 'l NARRATIVE
SUMMARY
OF -
MONTHLY OPERATING EXPERIENCE DECEMBER 1997 December 1 - The Unit remained shutdown in Mode 5 as an unplanned extension of the 12th
'through refueling outage continued. The unplanned extension was required for the following-December 20 reasons: (1) to evaluate and correct original design deficiencies with piping supports in small-bore pipes having a dianster of 2 inches or less in a variety of systems in the
" plant; (2) for weld repair and replacement of a thmnal relief valve in Contaimnent
-Penetration #20; and (3) to evaluste the effect on Unit 1 of the common Control.
Room Emergency Pressurization System due to modifications required at Unit 2.
December 20 Following resolution and completion of all unplanned refueling outage extension startup holds, the Unit entered Mode 4 at 2011 hours, and continued with planned refueling outage startup activities.
. December 21 The Unit continued to heatup in preparation for entering Mode 3.
through 1 December 22 .
December 23 The Unit entered Mode 3 at 0951 hours.
December 24 The Unit remained in Mode 3 for the remainder of the report period as the planned through 12th refueling outage startup activities continued.
December 31 i-l 1.,
i i
k:
i l
1-t l
,i= ,
l
_ . _ _ _ _ . _ _ __ _ .._[ .
I
,s, AVERAGE DAILY UNIT POWER LEVEL [
, ,, DOCKET NO. 50-334 :
UNIT BVPS Unit !
DATE January 2,1998 -;
COMPLETED BY David T. Jones TELEPHONE (412)393-4%2 -
. MONTH December 1997 ,
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Ne.)
1 0 17 0 2 0 13 0 3- 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 .
7 ,
0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 .
I1 0 27 0 12 0 28 0 13 0 29 0 _
14 ,
0 30 0 15 0 31 0 .
16 0 INSTRUCTIONS On this form, list the average dally unit power level MWe-Net for each day in the reporting month.
; Compute to the nearest whole megawatt. .
m w- ww- + * + r' q we w a-w> + ei Wmy ewy3--, v
. t
=
u OPERATING DATA REPORT '!
DOCKET NO.- 50-334- '
, REPORT DATE: ~01/05/98 COMPLETED BY: DAVI9 T. JONES TELEPHONE: (412) 393 4967 OPERATING STATUS i
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1
- 2. REPORTING PERIOD: DECEMBER 1997 * * ;
- 3. LICENSED THERMAL POWER (MWt): 2652 *
- 4.-NAMEPLATE RATING (Gross ~MWe): 923 * *
' 5. DESIGN ELECTRICAL RATING (Net MWe) : 835 * *
- 6. MAX. DEPENDABLE CAPACITY (Gross ifWe): 860 * *
- 7. MAX. DEPENDABLE CAPACITY (Wat MWe) : 810 **************
- 8. IF CHANGES OCCUR IN CAPACITY RAT!NGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE ,
- 11. HOURS IN REPORTING PERIOD: 744.0 8760.0 189960.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 5014.3 125662.2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 0.0 4986.9 123473.5
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 0.0 1299G062.0 300269804.5
- 17. GROSS ELECT. ENERGY GEN. (MWH): 0.0 4281604.0 97149196.0 +
- 18. NET ELECTRICAL ENERGY GEN. (i4WH) : -10370.0 3997014.0 90858583.0
- 19. UNIT SkRVICE FACTOR: (PP.RCENT) 0.0 56.9 6G.7 ,
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 56.9 66.7
- 21. UNIT CAPACITY FACTOR (MDC) : PCT 0.0 56.3 61.2
- 22. UNIT CAPACITY FACTOR (DER) : PCT 0.0 F4.6 59.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 100.0 32.7 15.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT IS CURRENTLY SHUTDOWN FOR AN UNPLANNED EXTENSION OF ITS 12TH REFUELING OtJTAGE WHICH BEGAN ON 9/28/97.
- 25. IF dHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: JAN. 191g_,
- 26. UNITS IN TEST STATUS (PRIOR TO COP 94ERCIAL OPERATION) :
. FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY ,,
N/A N/A COMMERCIAL OPERATION N/A N/A
)
+ w w
- i i- , i 1 UNIT SHUTDOWNS AM) POWER REDUCDONS 420%) Docket No. % 334 - l Unit Ne me BVPS Unit #1 ;
Dane January 5,1998 >
Casupleted By Deved T. James REPORTIWONTH D= - her1997 -
TW (412)393-4962
~
No. Deee Typel Durahos Reason 2 Method of I aremare Systems C- ,-
Cause& Corncarve Aasesto Psevent (Hours) Shutting Event Report # Code 4 Code 5 Recunence i Dours :
Reactor 3 t 19 - 971201 F 401.0 H 4 1 -035 ZZ 7 F172 The Unit's 12th aufnehag sustge was
==m==d'id to evalumee and conect engsmal r desaga h wish paying suppests in sanell-hose pipes having a h of i 2 inches or less in a vanety of syssesus in i the plant.
I 20 971217 F 40.0 A 9 N/A SD VALVEX The Unit's 12th refueleng euenge was :
e=eandad for weld repair and . ,"
^
' l of a thenmal relief vahe in Comeanument i Ptmetramon #20.
21 971219 F- 35.2 F 9 N/A AA ELOWER The Unit's 12th senselung euenge was
*=es= dad to evalunee the cNec en Unit 1 [
- ef the- Comesel Rossa En
- speacy '
3 Psussur==an== Systema due ::
i i h requesed at Uni- 2.
I 22 971220 S 267.8 C 4 N/A RC FUELXX The Unit scenanned skuedown to ==*=se
- with it's id==m= 12th 3,anshair euenge ;
r W activstges.
i 4 !
{ l 2 3 4 I
- F-Forced Ra===r W Enttit F-lukucanum Eur Pneyssamma ofDean Duty ,
, S. - A.r , ymi:,,,(F.ya ) 3.Manuel Ames Isr Uommmme Emma Itapest (12R) Fier P "- ---er Test 2-Masumet scramm (IsUREGel61) :
C-RmAssessa 3 h 5sume i Dampsimbury Romerussen 44 sat'd Summ Prevemma lemush 4
E4parmaer Training a I h Emmun 52 h 3 F.Aesammaarmerwe 94dser FM M.3meme gauge F. " Fmer(FW) a H40sr(FK) i I
i
... NARRATIVE
SUMMARY
OF :
o ;
MONTHLY OPERATING EXPERIENCE - I
'[
UNIT 2 - 7 DECEMBER 1997- ,
December 1 The Unit operated at a nominal value of 100% output. f through :
December 15 ;
i December 16 The Unit operated at a nominal value of 100% output until 1300 hours when an :
unplanned shutdown was begun to take the Unit omine to make moditications to the ,
Control Room Emergency Pressurization System. The Unit was taken omine at .;
1724 hours when the Main Unit Generator output breakers were opened. Mode 2 .
. was entered at 1746 hours, and Mode 3 was entered at 1821 hours. [
a
. December 17- The Unit began to cooldown and entered Mode 4 at 0043 hourt. Cold shutdown (Mode 5) was entered at 1437 hours.
December 18 The Unit remained in Mode 5 for the remainder of the report period to continue with :
through modifications to the Control Room Emerger.cy Pressurization Systcm. Additional December 31 work completed within this report period included replacement of the seals on the "B" Reactor Coolant Pump and replacement of the mini-recirculation flow orifices ,
for the "A" and "C" Charging /High Head Safety Injection Pumps. j 9
)
w f
.- , ,. _ , . . . , , _ . - . - - . . . . . , ~ . _ , . . . . . . _ _ - _..-.., ___.... - _ _ _ . . _
3 3
, ... AVERAGE DAILY UNIT POWER LEVP.
DOCKET NO. 50-412 UNIT BVPS Unit 2 DATE Januaw2,1998 COMPLETED BY David T. Jones ,
TELEPHONE (412)393-4%2 l
- MONTH December 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 841 17 0 2 842 18 0 ,
3 839 19 0 4 838 20 0 3 842 21 0 6 842 22 0 .
7 844 23 0 8 844 24 0 9 843 25 0 10 ' 839 26 _ ,, _
0 11 841 27 0 l'2 842 28 0 13 843 29 0 14 843 30 0 f
15 842 31 0 16 514
- INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month. ,
Compute to the nearest whole megawatt.
i
.* e e 90 OPERATING DATA REPORT DOCKET NO.: 50-412 REPORT DATE: 01/05/98 COMPLETED BY: DAVID T. JONES TELEPHONE: (e.2) 393-4962 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2
- 2. REPORTING PERIOD: DECEMBER 1997 * *
- 3. LICENSED THERMAL POWER-(MWt): 2652 * *
- 4. NAMEPLATE RATING (Gross MWe): 923 * *
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836 * *
- 6. M'X. DEPENDABLE CAPACITY (Groes MWe) : 870 * *
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820 ** ************
- 8. IF , ANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe) : None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 8760.0 88743.0
- 12. NO. OF HRS. RFACTOR WAS CRITICAL: 378.4 7623.5 75344.5
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE: 377.4 7584.7 74849.4
- 11. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 990010.0 19674630.0 186886473.0 17 GROSS ELECT. ENERGY GEN. (MWH): 331716.0 6505249.0 610'11672.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH) : 310828.0 6158702.0 57647298.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 50.7 86.6 84.3
- 20. UNIT AVAILABILITY FACTOR: (PERCENT) 50.7 86.6 84.3
- 21. UNIT CAPACITY FACTOR (MDC): PCT 50.9 85.7 78.9
- 22. UNIT CAPACITY FAC1DR (DER): PCT $0.0 84.1 77.7 '
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 49.3 13.4 5.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
CURRENTLY SHUTDOWN IN AN UNPLANNED OUTAGE TO MAKE MODIFICATIONS TO THE CONTROL ROOM EMERGENCY PRESSURIZATION SYSTEM. 7TH REFUELING OUTAGE TO BEGIN 4/17/98.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: JAN. 1998
- 26. UNITS IN TEST. STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION ,
N/A N/A
s.
l :r
~
UNIT SHLTIDOWNS AND POWER REDUCTK!NS (220%) Dechet No. 30-412 .' ,
Unit Nesme BVPS Unit 82 Dane Jemmary 5,19'"5 Complened By Dewed T. Jones REPORTMONTH December 1997 - Tchphone (412) 3934 962 ;
E i' -
- No. Date Typel Derasson Reason 2 Method cf Iw System e ,_
^
Cause & Conecane Asensa ao Prevent (Hours) Shutting Event Report # Code 4 Cade5 Roomrnace Down l~_ Reactor 3 . - .
I 15 971216 F- 366.6 H I N/A AA BIDWER The Usit ines shmedsen se ammhe ;
-masceaman go h Cong[ 3seg, si i Emergency Poemannemassa Sysema l hecesse er e in mesens -
somme siasie assne immhue dessa casena.
i
?
i i
I 2 3 4 F-Forced h had=e l Eadunit F-Immsusassam for Ptuyersissa e(Duan Insry i- *- A*.. Feihme(Fp) 3.gggumal gegen gag 7 - Eeuse Reyest(12R)Rie
! IMemansmesse erTest 24emmmmmisesamm (NURBOSl61) i 4 -
c.m % t.h same Basymbnesy Remarusses -
44eart Sumn Pwiemum nimmt.
E4pammerTeminha&Imamme Emma S-Reemmens S -{'
F Aemummerusive 9 4 tur Eshth M4mmse sessus
, W Esser (Esyimin) h(Eiyamin) g m.,.p. .<+w-, ..w, .a - e = w- * -w-.-.er-w. m==-'-wwe',' e*eee'+**-w'-* * ' ~ - - - - ' ' * -' - ' }}