Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2
ML20132B100
Person / Time
Site: Beaver Valley
Issue date: 11/30/1996
From: David Jones, Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9612170054
Download: ML20132B100 (9)


Text

_ _ _ _ .- . , _ _ . - . _ - . . . - . - . . . . . . . .. .. . . . . . . . .- . - - . . . - . .

. l

}Vs'- hav VaNey Power Station 4 5' Shippingport, PA 15077-00C4 THOMAS P. NOONAN (412) 393 7622 DMalon Vice President Fax (412) 393-4905 Nuclear Operations December 6,1996 4

Beaver Valley Power Station 4

Unit 1 - Docket No. 50-334, License No. DPR-66

Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatine Report i

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for the month of November,1996.

Respectfully, hY &

T. P. Noonan Division Vice President, Nuclear Operations /

Plant Manager DTJ/ksr d' l

Enclosures

' b, Y cc: NRC Regional OfTice s King of Prussia, PA \

9612170054 961130 DEllVERING PDR ADOCK 05000334 R PDR 0UALITY 160033 4NERGV

- NARRATIVE

SUMMARY

OF i

MONTHLY OPERATING EXPERIENCE I

UNIT 1 NOVEMBER 1996 l

November 1 The Unit operated at a nominal value of 100% output during the entire report period. 1 through November 30 l

l i

j 4

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-334 UNIT BVPS Unit 1 DATE December 3,1996 COMPLETED BY David T. Jones TELEPHONE (412)393-4962 MONTH November 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 827 17 826 2 828 18 827 3 828 19 827 4 827 20 830 5 826 21 831 6 _

820 22 829 7 815 23 828 8 826 _

24 827 9 827 25 827 10 829 26 827 ._

11 826 27 828 12 829 28 828 13 827 29 827 14 830 30 825 15 __,

829 31 ---

~

16 829 .

INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.

Compute to the neares: whole megawatt.

OPERATING DATA REPORT DOCKET NO.: 50-334 REPORT DATE: 12/04/96 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 OPERATING STATUS UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1

  • Notes
  • 1.
2. REPORTING PERIOD: NOVEMBER 1996 2652 * *
3. LICENSED THERMAL POWER (MWt) :
4. NAMEPLATE RATING (Gross MWe,. 923 * *
5. DESIGN ELECTRICAL RATING (Net MWe)- 835 *
6. MAX. DEPENDABLE CAPACITY (Gross MWe) : 860 *
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810 **************
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe) : None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DAT7 CUMULATIVE
11. HOURS 3 42 PORTING PERIOD: 720.0 8040.0 180456.0
12. NO. OP L . REACTOR WAS CRITICAL: 720.0 6452.1 119903.9
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 720.0 6390.5 117742.6
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1898890.0 16392199.0 285314261.5
17. GROSS ELECT. ENERGY GEN. (MWH) : 629620.0 5404685.0 92218702.0
18. NET ELECTRICAL ENERGY GEN. (MNH): 595260.0 5080375,0 86247199.0 19.* UNIT SERVICE FACTOR: (PERCENT) 100.0 79.5 67.0
20. UNIT AVAILABI'.ITY FACTOR:(PERCENT) 100.0 79.5 67.0
21. UNIT CAPACITY FACTOR (MDC) : PCT 102.1 78.0 61.3
22. UNIT CAPACITY FACTOR (DER) : PCT 99.0 75.7 59.5
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 6.6 15.1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH) :
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED N/A INITIAL CRITICALITY N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNIT SHUTDOWNS AND POWER REDUCTIONS (220%) 'ocket No. 50-334 ,

Jnit Name BVPS Unit #1 Date December 3,1996 Completed By David T. Jones .

REPORT MONTH Novenser 1996 Telephone (412)393-4 % 2 Date Typel Duration Reason 2 Method of Licensee System Component Cause & Corrective Action to Prevent No.

Shutting Event Report # Codc4 Code 5 Recurrence (Hours)

Down Reactor 3 i

Nonc I 2 3 4 F-Formi Reasom Method. Exhibit F-Instructions for Preparation of S-Scheduled A-Equipment Failure (Explain) 1-Maned Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG0161).

C-Refueling 3-Autornatic Scram D-Regulatory Restriction 4-Cont'd. frun Previous Month E-Operator Trauung & License Exam 5-Reduction 5 F-Adramistrative 9-Other Exhibit II-Same Source G-Operational Error (Explain)

IIOher(Explain)

NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE UNIT 2 NOVEMBER 1996 November 1 The Unit began the report period in Mode 6 with the reactor vessel defueled while through repair of the seals on the "A" and "B" Residual Heat Removal Pumps continued.

November 15 November 16 Following repair, testing, and return of the "A" and "B" Residual Heat Removal Pumps to seMee, core reload was begun at 0109 hours0.00126 days <br />0.0303 hours <br />1.802249e-4 weeks <br />4.14745e-5 months <br />.

November 17 Core reload was completed at 2005 hours0.0232 days <br />0.557 hours <br />0.00332 weeks <br />7.629025e-4 months <br />.

November 18 The Unit remained in Mode 6 while preparations for entering Mode 5 continued.

through November 19 November 20 Mode 5 was entered a 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />.

November 21 The Unit remaine.d in Mode 5 while preparations for entering Mode 4 continued.

through November 26 November 27 Mode 4 was entered at 0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br />. Mode 3 was entered at 2247 hours0.026 days <br />0.624 hours <br />0.00372 weeks <br />8.549835e-4 months <br />.

November 28 The Unit remained in Mode 3 for the remainder of the report period while through preparations for entering Mode 2 continued.

November 30

AVERAGE DAILY UNIT POWER LEVEL i 1

DOCKET NO. 50-412 UNIT BVPS Unit 2 DATE December 3,1996  ;

COMPLETED BY David T. Jones I TELEPHONE (412)393-4962 i

MONTH November 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY P.OWER LEVEL 4 (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 --

16 0 INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

s OPERATING DATA REPORT DOCKET NO.: 50-412 REPORT DATE: 12/04/96 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2
  • Notes *
2. REPORTING PERIOD: NOVEMBER 1996 * *
3. LICENSED THERMAL POWER (MWt ) ': 2652 * *
4. NAMEPLATE RATING (Gross MWe) : 923 * *
5. DESIGN ELECTRICAL RATING (Net MWe): 836 * *
6. MAX. DEPENDABLE CAPACITY (Gross MWe) : 870 * *
7. MAX. DEPENDABLE CAPACITY (Net MWe): 820 **************
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

i

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 720.0 8040.0 79239.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 5827.8 67309.6
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 0.0 5804.9 66899.5
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 0.0 14669115.0 166493118.0
17. GROSS ELECT. ENERGY GEN. (MWH) : 0.0 4830599.0 54263928.0
18. NET ELECTRICAL ENERGY GEN. (MWH): -8958.0 4560114.0 51279637.0
19. UNIT SERVICE FACTOR: (PERCENT) 0.0 72.2 84.4
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 72.2 84.4
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 69.2 72.6
22. UNIT CAPACITY FACTOR (DER): PCT 0.0 67.8 77.4
23. UNIT FORCED OUTAGE RATE: (PERCENT) 100.0 15.5 4.0
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

THE UNIT WAS SHUTDOWN FOR ITS SIXTH REFUELING OUTAGE ON 8/30/96. THE PLANNED 45 DAY OUTAGE WAS EXTENDED TO REPAIR THE A & B RESIDUAL HEAT REMOVAL PUMPS.

25. IF SHUT DOWN AT ELO OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/11/96
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

- _. - -. _ .~. _ ..- ~....._ _.---. _ . ---- - ..- --.- - . -..

. 'i UNIT SHUIDOWNS AND POWER REDUCllONS (220%) Docket No. 50-412 ,- i Unit Name BVPS Unit #2 Date Deannher 1,1996  :

. C P By Davut T. Jones - i REPORT MONTH November 1996 Tc'-y=-: (412)393-4 % 2 i

No. Date Typel Duration Reason 2 Method of Licensee System Component Cause & Corrective Action to Prevent  !

(Hours) Shutting Even' Report # Code 4 Code 5 Recurrence Down Reactor 3 12  % I101 F 630.4 A/C 4 N/A CF PUMPXX Continued with the forced extension of the Sixth Refueling Outage to repair leaking seals on both the "A" and "B" Residual Heat Removal (RHR) Pumps.

13 %I127 S 89.6 C 9 N/A RC FUELXX Continued with previously planned startup activities related to the Unit's Sixth Refueling Outage.

I 2 3 4 F-Forced Reason- Method. Exhibit F-Instructions for Preparation of S-Scheduled A-Equipment Failure (Explam) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREGO161).

C-Refueling 3-Automatic Scram D-Regulatory Restnction 4-Cont'd. from Previous Month E4hierator Trauung & License Exam 5-Reductaan 5 F-Adnunistrative 9-Other Exhibit H-Same Source G-Operational Erm (Explam)

II4)ther (Explam)