e i- ,

.Ab7T Telephone (412) 393 6000 N k 0;wp L-97-072 SNppmgport. PA 15077-0004 December 5,1997 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of November,1997.

Respectfully,

,,a/ "

R. L. LeGrand Division Vice President, Nuclear Operations /

Plant Manager DTJ/slp Enclosures cc: NRC Regional Oflice King of Prussia, PA

[O

!,b ,f l l,!

w The Nuclear Professionals 9712150120 971130 4 -

DR ADOCK 0500

n NARRATIVE

SUMMARY

OF -

. MONTHLY OPERATING EXPERIENCE' UNIT 1 NOVEhBER 1997 -

-November i The Unit remained shutdown in Mode 5 as its 12th refueling outage continued. On through _ November 12,1997, at 0359 hours0.00416 days <br />0.0997 hours <br />5.935847e-4 weeks <br />1.365995e-4 months <br />, an unplanned outage extension of the planned November 30 45 day refueling outage was begun _ to evaluate and correct original _ design

- deficiencies with piping supports in small bore pipes having a diameter of 2 inches or

-less in a variety of systems in the plant. The Unit remained shutdown in Mode 5 for the remainder of the month.

i

AVERAGE DAILY UNIT POWER LEVEL

, DOCKET NO. 50-334 UNIT BVPS Unit 1 DATE December 1.- 1997  ;

COMPLETED BY David T. Jones J TELEPHONE (412)393-4962 i MONTli - November 1997 DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net)

-1 0 17 0

-- 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0

-12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 ---

16 0 _

INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OPERATING DATA REPORT DOCKET NO. 50-334 REPORT DATE: 12/02/97 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 OPEPATING STATyr

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1
  • Notes *
2. REPORTING PERIOD: NOVEMBER 1997 *
  • 3.~ LICENSED THERMAL POWER (MWt) : 2652 * *
4. NAMEPLATE RATING (Gross MWe) : 923 * *
5. DESIGN ELECTRICAL RATING (Net MWe): 835 * *
6. MAX DEPENDABLE CAPACITY (Gross MWe): W60 *
  • 7 MAX. DEPENDABLE CAPACITY (Net MWe): 810 * * * * * * * * * *** * *
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 720.0 8016.0 189216.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 5014.3 125662.2
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 0.0 4986.9 123473.5
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH); 0.0 12996062.0 300269804.5
17. GkvSS ELECT, ENERGY GEN. (MWH) : 0.0 4281604.0 97149196.0
18. NET FLECTRICAL ENERGY GEN. (MWH) : -3290.0 4007384.0 90868953.0
19. UNIT SERVICE FACTOR: (PERCENT) 0.0 62.2 66.9
20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 62.2 66.9
21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 61.7 61.5
22. UNIT CAPACITY FACTOR (DER) : PCT 0.0 59.9 59.7
23. UNIT FORCED OUTAGE RATE: (PERCENT) 100.0 28.1 15.6
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH)-

THE UNIT IS CURRENTLY SHUTDOWN FOR AN UNPLANNED EXTENSION OF ITS 12TH REFUELING OUTAGE.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/17/97
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

F

' UNIT SHUTDOWNS AND POWER REDUCTIONS (220%) Docket No.. 50-334

  • Unit Namie BVPS Unit 81'  ;

Date Decensber 2,1997 --

Completed By Devut T. Jones ,

REPORTMONTI{ Nir. W 1997- Telephone (412)393-4 % 2 No. Date ' Typel Duration Reason 2 Method of - I =v==ce Sysacni C-- ,.

e==e & Conective Action to Prevent (Hours) - - Shutting Event Report # Code 4 radei Recunence Down -

Reactor 3

.17 971101 S 268.0 C 4 N/A RC FUELXX The Unit re===d shutdown as it's pI==, e 12th refuehag outage emanumand I8 97Ii12 'F 452.0 H 9 l-97-035 ZZ 777777 The refueling outage was eveendad to evahamie and conect ensinal design deficiencies with piping sig, orts in ssuall-bore pipes' havsng a diasmeser of 2 inches or less in a'vnnety of sysse=== in the plant _

.7 i

1 2 3 4 F-Forad '

Reason: W Th F-Immaractiema for Preparassen of Data Emery S-SJoeduled -A-F, -Fashsre(Emplam) 1-Mansal Slusses for i m- Event Report (LER) File '

B-Maiseenance er Test 2-Manual Scram

~

pt.!RE00161). .

C-Refuelmg 3-Anmeenstic Saans D-Regelseory Reseriction 4 Casa *d fresa Previous Masah 'i E4)peraser Traming A 1.k:anse Exam 5-R h - 5 F-Aesunmarative 94)iher Esimht H-Samme sensee G4- ' Error (Emplain)

H-Other(E#)

y - - . . - -

~ ~~ ~

e. e;

'i .1 NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE --

l

~,

UNIT 2 - ,

'l NOVEMBER 1997 j l

November 1 The Unit operated at a nominal value of 100% output for the entire report period.

through November 30

+

5 , w a

4

AVERAGE DAILY UNIT POWER LEVEL

.- DOCKET NO, 50-412 UNIT BVPS Unit 2 DATE December 1,1997 COMPLETED BY David T. Jones _

TELEPHONE - (412) 393-4962 MONTH November 1997 DAY AVERAGS DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 833 17 842 2 ,

836 .I t 842 3 838 19 _

838 4 840 20 837 5 840 9.1 836 6 838 22 838 7 838 23 841 8 839 24 843 9 838 25 841 Id 839 26 838 11 841 27 841 12 842 28 837 13 842 29 837 14 839 30 836 15 841 31 ---

16 840 INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

4 OPERATING DATA REPORT DOCKET NO.: 50-412 REPORT DATE: 12/02/97 COMPLETED TsY: DAVID T. JONES TELEPHONE: (412) 393-4962 OPEPATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2
  • Notes *
2. REPORTING PERIOD: NOVEMBER 1997 * *
3. LICENSED THERMAL POWER (MWt): 2652 * *
4. NAMEPLATE RATING (Gross MWe) : 923 * *
5. DESIGN ELECTRICAL RATING (Net MWo): 836 * *
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870 * *

'. MAX. DEPENDABLE CAPACITY (Net MWe):

i 820 * * * * * ** * * * ** **

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASON 3:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH (F%R TO DATE CUM"LATIVE
11. HOURS IN REPORTING PERIOD: 720.0 8016.0 07999.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 7245.1 74966.1
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 720.0 7207.3 74472.0
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 .0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1902744.0 18684620.0 185896463.0
17. GROSS ELECT. ENERGY GEN. (MWH): 634688.0 6173533.0 60669956.0
18. NdT ELECTRICAL ENERGY GEN. (MWH): 604056.0 5847874.0 57336470.0 IS. UNIT SERVICE FACTOR: (PERCENT) 100.0 89.9 84.6
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 89.9 84.6
21. UNIT CAPACITY FACTOR (MDC): PCT 102.3 89.0 79.1
22. UNIT CAPACITY FACTOR (DER): PCT 100.4 87.3 77.9
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 10.1 5.0
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE DATE,AND DURATION OF EACH):

THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS SEVENTH REFUELING OUTAGE ON APRIL 17 1998. THE OUTAGE IS SCHEDULED TO LAST FOR 40 DAYS. _

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

1 , . _ . . . _ . .

1.

,aq Dociet No, "50-412'

, UNIT SIIUTDOWNS AND POWER REDUCTIONS (220%)

Unit Name BVPS Unit #2 Date - Dcoesuber 2,1997 Completed By ' Deved T. Jones ' .

REPORT MONTH t h M 1997 Telephone - (412) 393-4%I -

No. Date -~ Typel Duration Reason 2 Method of Im System - Component Cause & Conectrve Action to Prennt .

(Hours) .. Shutting Event Report # Code 4 , Code 5 Recuncace Down .

Reactor 3 NONE' o

1 2 3 4 F-Farwd Reammi. Method. Esimha F-Ineucskwis for 7., arDusa F.emy S-Sdaduled AF, , - Fasture(Expla'a) 1-Manual Sheses for bcensee Evan Repwt(LER) File B-Mah or Test 2-Manua! Saam (NUREG0161)

C-Refueling 3-Ausamstac Scrans D-Reguiseary P.esencesan 4Can'd fruss Previous Maneh

- E4)per. ear Training A Uanse Exam 5-P h= 5 i

- F-Adhnirmsarative 94)ther Exluime ll.Sarne Source 04)perational Enw (Explain) '

II4)tha (Explain)

~- -

_ < - _ _