MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
gy
'yp Telephone (412) 393-8000
- t3 "."PA 15077-0004 Shippingport March 6,1997 Beaver Valley Power Station Unit 1 - Docket No 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit I and Unit 2 for the month ofFebruary,1997.
Respectfully, m h-R. L. LeGrand Division Vice President, Nuclear Operations /
Plant Manager DTJ/ sip Enclosures cc: NRC Regional Office I King of Prussia, PA 9703180048 970228 PDR ADOCK 05000334 R PDR The Nuclear Professionals 180014 lingpapppppgy
NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE i
UNIT 1 i
FEBRUARY 1997 i
i February 1 The Unit operated at a nominal value of 100% output for the entire report period.
! through However, at 2240 hours0.0259 days <br />0.622 hours <br />0.0037 weeks <br />8.5232e-4 months <br /> on 02/19/97, the Unit initiated a plant shutdown per
. February 28 Technical Specifications due to both Emergency Diesel Generators being considered 4 inoperable. At 2246 hours0.026 days <br />0.624 hours <br />0.00371 weeks <br />8.54603e-4 months <br /> with Turbine load reduced by approximately 10 MWe, i
one of two Emergency Diesel Generators was returned to service and the required Technical Specification shutdown was aborted. Turbine load was returned to full ' ,
output and the second Emergency Diesel Generator was subsequently returned to i service at 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on 02/20/97.
' 1 In addition to the above, the following events which also occurred during the report period are being reported as required by Technical Specifications.
- February 1 The Automatic Rod Position Deviation Monitor, although still functional, was not through considered openble per Technical Specifications. The limiting condition for February 28 operation as specified in the Technical Specifications was met because the deviations between the ind:cated rod positions were verified to be within their 12 step limits by obtaining analog / digital rod positions at least once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
I n
_. _. -. - - . _ . . - . . - . _ - . . - . - - _ - - . - ___ . - - = _ - . - . -
1 AVERAGE DAILY UNIT POWER LEVEL I
i DOCKET NO. 50-334 UNIT BVPS Unit 1 DATE March 3,1997 l COMPLETED BY David T. Jones 4
i TELEPHONE (412)393-4962 l 4
I MONTH February 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 828 17 828 2 828 18 821 3 827 19 822 4 828 20 822 5 829 21 811 6 829 22 823 l 7 829 23 828 8 831 24 828 l 9 831 25 828 10 830 26 827 11 829 27 818 12 830 28 829 13 828 29 ---
14 827 30 ---
15 830 31 ---
16 829 INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
. -. -. - . . . .. - . . . - _. - _ . . .. _._. . . . . ~ - .- - - _ . . . _ . _ . . . . . _..
l J
i i
1 OPERATING DATA REPORT DOCKET NO.* 50-334 REPORT DATE: 03/05/97 COMPLETED BY: DAVID T. JONES
, TELEPHONE: (412) 393 4962 1
l OPERATING STATUS
]. 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1
- 2. REPORTING PERIOD: FEBRUARY 1997 * *
- 3. LICENSED THERMAL POWER (MWt): 2652 *
- 1 f 4. NAMEPLATE RATING (Gross MWe) : 923 *
- 5. DESIGN ELECTRICAL RATING (Net MWe)- 835 * *
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe) : 860 * * !
7 MAX. DEPENDABLE CAPACITY (Net MWe): 810 * ** * * * * * ** ** * *
- 8. IF CRANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe). None i 10. REASONS FOR RESTRICTIONS, IF ANY: N/A 1
i 4
i THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 672.0 1416.0 182616.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 672.0 1416.0 122063.9
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOF.WAS ON LINE: 672.0 1416.0 119902.6
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH) : 1744174.0 3701812.0 290975554.5 1
- 17. GROSS ELECT. ENERGY GEN. (MWH)? 588070.0 1236490.0 94104082.0' I
- 18. NET ELECTRICAL ENERGY GEN. (MWH) : 555620.0 1169400.0 88030969.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 67.4
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 67.4
- 21. UNIT CAPACITY FACTOR (MDC): PCT 102.1 102.0 61.8
- 22. UNIT CAPACITY FACTOR (DER): PCT 99.0 98.9 60.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 14.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH) : ,
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS.IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
UNIT SHUTDOWNS AND POWER REDUCTIONS (220%) Docket No. 50-334 Unit Name BVPS Unit #1 -
Date March 3,1997 '
Completed By David T. Jones REPORT MONTH Febmary 1997 Telephone (412)393-4 % 2 ,
No. Date Typel Duration Reason 2 Method of Licensee System Component Cause & Correctist Action to Prevent (Hours) Shutting Event Report # Code 4 Code 5 Recurrence Down Reactor 3 None I 2 3 4 F-Forced Reason: Method Exhibit F-Inmuchoes for Preparahan of Data Entry S-Sdieduled A-Equipment Failure (Explain) I-Manual Sheets for Lacensee Event Report (IIR) File B-Mastenance or Test 2-Manual Scram (NUREG0161)
C-Refueling 3-Automahc Saam D-Regulatory Restrichon 4-Carfd from Previous Month E-Operator Training & Ijeense Exam 5-Reduction 5 F-Administrative 9-Other Exhitst II-Same Sourse G4hu: rational Error (Explain) 1I4hher(Explain)
_ _ 7_ _
.t
. NARRATIVE
SUMMARY
OF l 4
MONTHLY OPERATING EXPERIENCE UNIT 2 FEBRUARY 1997 i
- February 1 The Unit operated at a nominal value of 100% output.
through February 17 February 18 At 2032 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.73176e-4 months <br />, approximately 10 MWe of output was lost due to a loss of efficiency when the IIigh Level Dump Valve for the "B" Reheater Drain Receiver Tank failed
, open due to failure ofit's air supply line. As a result, a slight power reduction was made at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br /> to match Tavg with Tref.
February 19 The valve was isolated for repairs and the Unit was subsequently returned to full
- power at 0535 hours0.00619 days <br />0.149 hours <br />8.845899e-4 weeks <br />2.035675e-4 months <br />.
- February 20 The Unit operated at a nominal value of 100% output for the remainder of the report through period.
February 28 i
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-412
- UNIT BVPS Unit 2 DATE March 3,1997 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 MONTH Februaiv 1997 I
i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 841 17 844 2 842 18 838 3 841 19 836 4 839 20 837 5 840 21 829 l
6 845 22 841 7 845 23 843
. 8 844 24 843 j 9 845 25 842 10 842 26 841 11 844 27 836 12 845 28 843 13 845 29 ---
14 842 30 ---
15 845 31 ---
16 844 INSTRUCTIONS On this form, list the average daily unit power level MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
e OPERATING DATA REPORT DOCKET NO : 50-412 REPORT DATE: 03/05/97 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 OPERATING STATUS
'1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2
- 2. REPORTING PERIOD: FEBRUARY 1997 * *
- 3. LICENSED THERMAL POWER (MWt) : 2652 * *
- 4. NAMEPLATE RATING (Gross MWe) : 923 * *
- 5. DESIGN' ELECTRICAL RATING (Net MWe): 836- * *
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe) - 870 *
- 7, MAX. DEPENDABLE CAPACITY (Net MWe): 820 **************
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe) : None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 672.0 1416.0 81399.0 !
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 672.0 1210.7 68931.7 !
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE: 672.0 1192.8 68457.5
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1773166.0 3005961.0 170217804.0
- 17. GROSS ELECT.-ENERGY GEN. (MWH): 594765.0 1000126.0 55496549.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 565474.0 942767.0 52431363.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 84.2 84,1
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 84.2 84.1
- 21. UNIT CAPACITY FACTOR (MDC) : PCT 102.6 81.2 78.2
- 22. UNIT CAPACITY FACTOR (DER) : PCT 100.7 79.6 77.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 15.8 4.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) :
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A j I
l
)
UNIT SHUTDOWNS AND POWER REDUCTIONS (220%) Docket No. 50-412 Unit Name BVPS Unit #2 Date March 3, IP7 ,
Completed By David T. Jones ,_
REPORT MONTil February 1997 Telephone (412)393-4 % 2 ,
No. Date Typel Duration Reason 2 Method of Licensee System Component Cause & Corrective Action to Prevent (flours) Shutting Event Report # Code 4 Codes Recurrence Down Reactor 3 None I 2 3 4 F-Fonxd Reason: Method: Exinbit F-Instructions for P garshon of Data Entry S-Scheduled A-Equipment Failure (Explain) 1-Manual Sheets for Ixensee Evers Report (LER) File B-Maintenance er Test 2-Manual Scram (NUREGGI61).
C-Refuehng 3-Automatic Scrarn D-Regulatory Restriction 4-Corm'd frorn Prevunas Month E@ator Traming & License Exam 5-Rethetson 5 F-Achnenistrative 9-Other Eximbit H-Same Source G@ational Error (Explain)
Il4)ihar(Eglain)
- --_- ._ - - _ . _ - _ _ _ _ _ - _ . _ _ _ _ _ - _ - _ _ _ - _ - _ _ _ - _ _ _ _ - _ - _ - _ - _ _ - - _ - - _ _ _ - - - _ _ _ _ - _ - - - _ _ _ _ _ _ _ - _ - - _ _ _ _ -