or G e

'Ai5 Telephone (412) 393-6000

.O x4 Shippmgport. PA 15077-0004 February 6,1996 Beaver Valley Power Station Unit 1 - Docket No. 50-3H License No. DPR-66 Unit 2 - Docket No. 50-c , Jcense No. NPF-73 Monthly Ooe. , a; Reoort U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gent'emen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of January,1996.

Respectfully, T. P. nan Division Vice President, Nuclear Operations /

Plant Manager DTJ/slp Enclosures cc: NRC Regional Office King of Prussia, PA ee The Nuclear Professionals 0?"Oh

,W ,

9602120395 960131 -

PDR ADOCK 05000334  :

R PDR j

- . - . . . . . . . . . _ - - = . - . - - . . . . - - - - . - . . - - . . . . . . . - . - .

NARRATIVE

SUMMARY

OF -

MONTHLY OPERATING EXPERIENCE l UNIT 1 JANUARY 1996 January 1 The Unit operated at a nominal value of 100% output during the  ;

through entire report period.

January 31 l

l l

AVERAGE DMLY IMIT POWER LEVEL l 4

DOGEP NO. 50-334 l LNIT BVPS Unit 1 I

DATE Feb. 1, 1996 l CIEPLETED BY David T. Jones )

TELEPHCNE (4 12) 393-7553 i M2FIH Jar-v 1996 DAY AVERAGE DMLY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL G; tot) G % 10t) 1 834 17 828 1

2 834 18 823 3 832 19 826 4 832 20 831 5 833 21 824 6 826 22 836 7 827 23 835 8 824 24 828 9 826 25 830 10 834 26 826 11 836 27 815 i 12 844 28 819 13 834 29 826 14 826 30 828 15 829 31 831 16 828 INSIRUCTICNS on this fann, list the average daily unit power level M4e-Net for each day in the reporting month. Ocmpute to the nearest Mole megawatt.

OPERATING DATA REPORT DOCKET No.: 50-334 REPORT DATE: 02/02/96 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: JANUARY 1996
3. LICENSED THERMAL POWER (MUt): 2652
4. NAMEPIATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Not MWe): 835
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABI2 CAPACITY (Not MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER 12 VEL TO WHICH RESTRICTED, IF ANY (Not NUe): Nona
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YE4R TO DATE CUMUIATIVE
11. HOURS IN REPORTING PERIOD: 744.0 744.0 173160.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 744.0 114195.8
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 744.0 744.0 112096.1
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1965199.0 1965199.0 270887261.5
17. GROSS ELECT. ENERGY GEN. (MWH): 652390.0 652390.0 87466407.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 616180.0 616180.0 81783004.0 I?. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 66.'5
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 66.5
21. UNIT CAPACITY FACTOR (MDC): PCT 102.2 102.2 60.7
22. UNIT CAPACITY FACTOR (DER): PCT 99.2 99.2 58.9
23. UNIT PORCED OUTAGE RATE: (PERCENT) 0.0 0.0 15.4
24. SHUTDOWNS SCHEDULED OVER NEKT SIX MONTHS (TYPE.DATE AND DURATION OF EACH):

THE UNIT IS Sf*HRBUTJn TO RHtfTDOWN FOR ITS 11TH naruRT TNC OUTACE ON MARCH 22. 1996. THE DRFURT.TNG OUTAct IS SCHRDUtzn TO T ART FOR 55 DAYS .

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COPMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A

' COMMERCIAL OPERATION N/A N/A

UNIT SMUTDOWNS AND POWER RED.lCTIONS (220%) Docket No. 50-334 '

Unit Name RVPS Unit #1 Date February 2. 1996 "

Completed By David T. Jones REPORT MONTH January 1996 Telephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component No. Date Typel (Nours) Reason 2 Doun Reactor 3 Report 8 Action to Code 4 Code 5 Prevent Recurrence NONE 1 2 3 t

4 F-Forced Reason: Method:

S-Scheduled A-Equipment Failure (Emplain) Exhibit F-Instructions for 1-Manual Preparation of Data Entry Sheets e-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram 0-Regulatory Restriction (NUREG0161).

4-Cont'd. from *revious Month E-Operator Training & License Exam 5-Reduction 5 F-Administrative 9-Ot her Exhibit N-Same Source.

G-Operational Error (Emplain)

N-Other (Emplain)

NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE UNIT 2 JANUARY 1996 January 1 The Unit began the report miod operating at approximately 46%

output for planned enc -of-cycle fue . conservation (cycle stretch).

January 2 A return to full power was commenced at 0007 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. A nominal value of 100% output was achieved at 0608 hours0.00704 days <br />0.169 hours <br />0.00101 weeks <br />2.31344e-4 months <br />.

January 3 The Unit operated at a nominal value of 100% output.

through January 10 January 11 The Unit operated at a nominal value of 100% output until 2206 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.39383e-4 months <br /> when a scheduled load reduction was commenced for planned end-of-cycle fuel conservation.

January 12 An output of approximately 46% was achieved at 0418 hours0.00484 days <br />0.116 hours <br />6.911376e-4 weeks <br />1.59049e-4 months <br />.

January 13 The Unit remained at approximately 46% output for planned through end-of-cycle fuel conservation.

January 14 January 15 A return to full power was commenced at 0016 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />. A nominal value of 100% output was achieved at 0714 hours0.00826 days <br />0.198 hours <br />0.00118 weeks <br />2.71677e-4 months <br />.

January 16 The Unit operated at a nominal value of 100% output for the through remainder of the report period.

January 31

1

~

I l 1 .

AvecE taux wrr P0wm ravel  !

i l

DOGET No. 50-412 I INIT BVPS thit 2 l DATE Feb. 1, 1996 1 OCMPLETED BY David T. Jonas I TELEPf M E (412) 393-7553 l PDFIH Jar-v 1996 i

DAY AVERAGE DAILY POWER LEVEL DhY AVERAGE DPILY POWER LEVEL i GL 12t) (Mie-Net) i 1 366 17 835

'2 781 18 836  !

3 839 19 841 4 840 20 841 5 842 21 837 6 841 22 834 7 841 23 830 1

)

8 841 24 831 9 839 25 841 10 842 26 838 1 1

1 11 837 27 835 j 12 375 28 840 13 343 29 835 I

14 341 30 839 ,

15 771 31 841 16 ' 836 1

INSTRUCTIONS

'On this form, list the average daily unit power level Nie-Net for each day in the reporting month. Ctmpute to the nearest idiole megawatt.

- . . - - - . ._ - -. ~ _ - . - . - . .

1 1

l OPERATING DATA REPORT DOCKET No.: 50-412 REPORT DATE: 02/02/96 COMPLETED BY: DAVID T. JONES TRT2 PHONE: (412) 393-7553 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: JANUARY 1996
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
7. MAX. DEPENDABLE CAPACITY (Not MWe): 820
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe): Nona
10. REASONS FOR RESTRICTIONS, IF ANY: N/A l

THIS MONTH YEAR TO DATE -

CUMUIATIVE

11. HOURS IN REPORTING PERIOD: 744.0 744.0 71943.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 744.0 744.0 62225.8 I
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 744.0 744.0 61838.6
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1818553.0 1818553.0 153642556.0
17. GROSS ELECT. ENERGY GEN. (MWH): 606068.0 606068.0 50039397.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 574233.0 574233.0 47293756.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 86.0
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 86.0
21. UNIT CAPACITY FACTOR (MDC): PCT 94.1 94.1 79,8
22. UNIT CAPACITY FACTOR (DER): PCT 92.3 92.3 78.6
23. UNIT FORCED DUTAGE RATE: (PERCENT) 0.0 0.0 2.7
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DL1tATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARIUP: I
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A j INITIe.L ELECTRICITY N/A N/A l COMMEWIAL OPERATION N/A N/A '

e UNIT SHUTDOWNS AND POWER REDUCTIONS (120%) Docket No. 50-412 Unit Name 8VPS Unit #2 Date February 2. 1996 Completed By David T. Jones REPORT M0WTH Januarv 1996 Yeiephone t4121 393 7553 Method of Licensee cause & Corrective Duration Shutting Event System Component Action to No. Date Typel (Nours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence 1 960101 S O N 4 N/A ZZ 222222 The Unit continued to operate at approx 46X output for planned end-of-cycle fuel conservation (cycle stretch).

2 960111 S 0 M 5 N/A 2Z ZZZZZZ The Unit reduced output from approm 1001 to approx 461 for planned end-of-cycle fuel conservation (cycle stretch). l I

1 2 3 4 '

F-Forced Reason: Method: Exhibit F-Instructions for ,

S-Scheduled A-E % Ipment Falture (Explain) 1-Manuel Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File '

C-Refueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5 F Administrative 9-Other Exhibit N-Same Source.

G-Operational Error (Explain)  ;

H-Other (Explain) f

?

, _ _ . .