Intervenor Exhibit I-ROREM-243,consisting of 831019 Memo Discussing Vendor Welded Hangers Not Conforming to Present Welding Procedures.Concurrence Re Whether or Not Hangers Need Repairing or Acceptable Requested
ML20214D656
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/04/1986
From: Baranowski B, Saklak R
COMSTOCK ENGINEERING, INC.
To: Mennecke C
COMSTOCK ENGINEERING, INC.
References
83-10-19-04, 83-10-19-4, OL-I-ROREM-243, NUDOCS 8705210418
Download: ML20214D656 (1)


Text

. . - _ _ _ __________ _ __

[-forLm - 10

.,,.$,.../

, '. NMh \

f.

' M ...~~

Comstock Engineering, Inc. a7 m a A8:42 C u mor neum .

v.:l. es Wt i. Braidwood To. Carl Mannecke Office:

From: R. M. Saklak/B. Baranowski .

Subject:

Vendor Welded Hangers Date: October 19. 1!

CONTROL NO: 83-10-19,04 The following Hangers H014, H019, H020, H021, on Drawing 20E-2-3053H and Hanger H029 on Drawing 20E-2-3052H were inspected before erection of hanger for possible defective welds. These hangers are believed to be vendor manufactured welds and are nonconforming to present welding procedures. ,

O If the given hangers are installed without Q.C. inspection they will be inaccessable to do later. The welds are heavily painted, have no vendor /

welder I.D. stamps, insufficient fusion spatter, undercut.

Please concur if hangers need repairing or are acceptable.

NUCLIAR REGutaTORY COMMiss10N Docket No. b 0 0 gial h No.

  • la the matter of O7 '

Staff IDENTIFIED

[f/

Anticant RECEIVED

'[ R.M. Saklak inervenor V REJECTED Q.C. Supervisor Cont'g Offr Contractor DATE

'M Other

  • Witness o B. Baranowski Resortar ej g/ / / ,

Level II Inspector RMS/BB/dar NUCLEAR REGULATORY COMMIS$10N 8705210418 861204 Dechet No. Official hh. No. - PDR ADOCK 05000456 la the matter of G PDR staff IDENTIFIED Aplicant RECEIVED _

I?P.L30155 latervenor REJECTED Cart'g Wr