Intervenor Exhibit I-ROREM-261,consisting of 840508 Memo Discussing Insp of Outstanding QC-US Rept Items for safety- Related Items,Per Author Procedures.Areas Deficient for QC Dept Listed
ML20214E137
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/04/1986
From: Dewald I
COMSTOCK ENGINEERING, INC.
To: Klachko M, Saklak R, Seese L
COMSTOCK ENGINEERING, INC.
References
84-05-09-01, 84-5-9-1, OL-I-ROREM-261, NUDOCS 8705210677
Download: ML20214E137 (1)


Text

3 "r%/t'57 - oc- /y9% Z- &m -Z & / 1 Ah W

W 2b h h ,s. ,

y*jV 1 Comstock Engineering'd7Inti..

( ,

13 AS :46 Memorandum Cfr To: L. Seese/R. Sakla M. Klachko/ J. Hii D" .i ~0fficie:

Braidwood From: I. DeWald

Subject:

BRD #10,806 Unit Concept Trend Analysis Date:

$~0~0' control No. 84-05-09-01 The subject letter indicates a total of 19,933 items were inspected; 1,713 items were deficient, which is an 8.59% percentage.

With the above mentioned trend completed by CECO QA through the QC-US Reports, it is essential that any item on outstanding QC-US reports be inspected for' safety related items per our procedures.

The inspection should be completed af ter LKC Construction has notified the QC Department that the deficient item has been corrected.

The QC-US Reports are to be trended to ensure they are closed out in a timely manner.

t Also, the areas deficient for the QC Department were: .,

A. Cable Pan Hanger Welding - Not Inspected.

. B. Conduit Hanger Welding - Not Inspected.

C. Eleci.tical IImuget 3.== Timi.e. - I minatiuno, plai.e= wer e i.u *u e inspected, but program was not' completed. This has to be done.

There were three (3) NCR's written (No.s 920, 921 and 1,085) .

Comstock QC was requested by CECO to inspect 1 of the electrical hangers with base plates 4" x 6" x Is" in siz , or hangers installed in the Unit I Containment. The results were not sent or formulated for CECO as yet.

With the above areas of concern, it is imperative that the welding ares inspect to the details, stamp the welds and that the base piste lamination be ,

cleared up and a reply sent to CECO QA. This is to be accomplished by 5-18-84 l and replied to my office.

J. Hii is knowledgeable of the base plate information. )

M/7?WiwsMNt' w Fa e 4 . 5 4 v'r t:- I. F. DeWald j Quality Control Manager HR006855 /

IFD/jf d

. cc: QC Tile f ."' du, WJLC d'=~ .+C.w.N.;' /,44k..=7.</.: .

l QC Manager Tile & yisi 7.yj4 g,', glg , 4 g) m, ,,

l 8705210677 861204 / /-- 4'4 A'7 7'N40% C4',_ 3A s 7, ATc .," ' '

j PDR ADOCK 05000456 .O F O PDR U ZdOA)D.:../. !O~* 7Ns*,W.,r ; q~,g. ,

. - - . - - ,.