ML20214F892
| ML20214F892 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/04/1986 |
| From: | Worthington K COMSTOCK ENGINEERING, INC. |
| To: | Dewald I COMSTOCK ENGINEERING, INC. |
| References | |
| 84-08-01-05, 84-8-1-5, OL-I-ROREM-280, NUDOCS 8705260332 | |
| Download: ML20214F892 (1) | |
Text
-
~
~
~ L -jf,2,,,,
g gg pa4~/ c-g
' lor 230 wunTab
"'~
Comstock Engineering, Inc.
f Memorandum
~87 MY 13 A8 :51 ogg;,,9h CEI QC T. F. DeWald
,7
- v. n K. Worthinston m:
ject:
Backlos Counts Date: 08/01/84 l
ntrol No.: 84-08-01-05 i
The revised counts for backlog inspection are listed below. These counts reflect all inspections to be performed that are known at present by myself and my leads. Any addi-tional inspections that may or any not be discovered are indeterminate.
n Welding and Configuration...........
1488 Walding-376 all in house (does not include risers) i configuration-1112 all in house (does not include risers)
Junction Bos and Egeipment.
346 (92 in house)
Junction Box-32 in house Equipment-60 in house 254 Junction Boz and Equipsest returned to construction awaiting disposition by others.
4 28 in house Eiser Project.
1 May be increased to 300 plus if 1001 reinspection required.
vm o aC- _
g/[sq 8705260332 861204 DOCK 05000456 l
E. t-hington 1
PDR PDR Wort G
Assistant Quality Control Manager EN/tdr cc:
T. Faserba L. Seese l
E. Saklak j
QC Vault File II I
)
M.W[-6b/-W7'.#LN MUCL[AR REGULATORY COMMIS$l27C W
A
)
Offkial Enh Ms.
(QQ st
- m t m 4
o
,,mmo uCuno u,.c a g 8 5 51<
y
_RUECTED 8
g p
_ f([
C88fE W' Mit i Contrator..
Yb$
Other _
l' p A;4m h9er'tr
_,.. _,. _ _