ML20214F892

From kanterella
Jump to navigation Jump to search
Intervenor Exhibit I-ROREM-280,consisting of 840801 Memo Listing Revised Counts for Backlog Insp for Welding & Configuration,Junction Box & Equipment & Riser Project
ML20214F892
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/04/1986
From: Worthington K
COMSTOCK ENGINEERING, INC.
To: Dewald I
COMSTOCK ENGINEERING, INC.
References
84-08-01-05, 84-8-1-5, OL-I-ROREM-280, NUDOCS 8705260332
Download: ML20214F892 (1)


Text

-

~

~

~ L -jf,2,,,,

g gg pa4~/ c-g

' lor 230 wunTab

"'~

Comstock Engineering, Inc.

f Memorandum

~87 MY 13 A8 :51 ogg;,,9h CEI QC T. F. DeWald

,7

v. n K. Worthinston m:

ject:

Backlos Counts Date: 08/01/84 l

ntrol No.: 84-08-01-05 i

The revised counts for backlog inspection are listed below. These counts reflect all inspections to be performed that are known at present by myself and my leads. Any addi-tional inspections that may or any not be discovered are indeterminate.

n Welding and Configuration...........

1488 Walding-376 all in house (does not include risers) i configuration-1112 all in house (does not include risers)

Junction Bos and Egeipment.

346 (92 in house)

Junction Box-32 in house Equipment-60 in house 254 Junction Boz and Equipsest returned to construction awaiting disposition by others.

4 28 in house Eiser Project.

1 May be increased to 300 plus if 1001 reinspection required.

vm o aC- _

g/[sq 8705260332 861204 DOCK 05000456 l

E. t-hington 1

PDR PDR Wort G

Assistant Quality Control Manager EN/tdr cc:

T. Faserba L. Seese l

E. Saklak j

QC Vault File II I

)

M.W[-6b/-W7'.#LN MUCL[AR REGULATORY COMMIS$l27C W

A

)

Offkial Enh Ms.

(QQ st

m t m 4

o

,,mmo uCuno u,.c a g 8 5 51<

y

_RUECTED 8

g p

_ f([

C88fE W' Mit i Contrator..

Yb$

Other _

l' p A;4m h9er'tr

_,.. _,. _ _