W Comstock Engineering, Inc.
87 ft?/ 13 A8 :51 Memorandum i
gF-To:
L. C. fasse Se Worthinnten Memo 84-c8-01-05
. Date: 08/01/84
)
Control No.: 84-08-01-11 Do you want the new welding and configuration count compiled by T.. Worthington incorporated into the Backlog i
Status Repos to be issued 08/03/847 Since the new count is considerably higher than what has been reported (1488 vs. 514), I recommend we include it.
The number of b.klos inspections completed in this area over the last 5 weeks is 1279 or an average of 255 per week. Based strickly on this average the additional inspections will not be complete until 09/05/84.
.,,,6,,
Sincerely, Q[ w }n }. -
c
. ~ - -
L. C. Seese Assistant Quality Control Manager ICS/tdr ces E. Worthington QC Vault File MUCLEAR REGut.ATORY COMMl3110N 0
Offc at Me Docket No.
bd60 la the matter of Staff IDENT;HED Asciicant RE*EIVED
{
REJECTED i
Intervenor I
Cont's Off7
-b Contractor DATE Other
/
Mness Reporter V
j EP.C00755 8705260297 861204 PDR ADOCK 05000456 G
PDR l
1
_ _ _. _ _. _ _. _ _ _,. _. _