Intervenor Exhibit I-ROREM-273,consisting of 840630 Memo Re QC Inspectors Directing Craft Personnel During in-processing Type Insps.Inspectors Should Not Direct Craft at Any Time
ML20214F600
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/04/1986
From: Dewald I
COMSTOCK ENGINEERING, INC.
To: Saklak R, Worthington K
COMSTOCK ENGINEERING, INC.
References
84-06-30-12, 84-6-30-12, OL-I-ROREM-273, NUDOCS 8705260174
Download: ML20214F600 (1)


Text

.

IIQT~ 2% T k'b<a m - z. 73 Y

~~

Comstock Engineering, Inc.

( Memorandum '87 lit' 13 AE :48

/ -

To: r_ turnethinatnn / R. Saklak -

g Office
Braidwood From: T_ naumi d

Subject:

Tnanar +nen Directorina craft Date: June 30, 1984 Control No:

84-06-30-12 .

D It has been brought to my attention on various occassions that in some instances the QC Inspectors were directing craft personnel during in-process type inspections.

Instruct your Inspectors that the Inspectors are not, repeat - not i

to direct the craft at anytime during any function that their re-sponsibility is verification that the job is performed per approved procedures, if during the inspection, the craft are violating the procedure at the time of the inspection the foreman should be notified of the situation so corrective action can be taken.

'1his does not eleviate the Inspectors responsibility to stop work I if the situation is detrimental to the equipment / unit that would cause a non-conforming condition per 10 CFR Part 21.

I. F. DeWald QC Manager IFD/pb cc QC File QC Mgr. File umEAR REGUtMORT COMMiss108 4 p/73

,uSaSc6 o' I o'*5 ' c*7",-O'

^

in ttie matter of -

b*

--lDENTIFIED _

~RECElVED __

N9 cant _

1i y latervener _

Cont's Off'r _ - - - - y , K % __

contractor _

Witness _

s n.wer

/} } ;7,fk's , /.

p 8705260174 861204 }?y,f',00721 PDR ADOCK 05000456 g PDR