Intervenor Exhibit I-ROREM-272,consisting of Summary of 840627 Staff Meeting Re Insp of Conduit Straps,Raceway Status,Insp Quantity Vs Quality,Level III Welding Inspectors Assignments & Remodeling Plans
ML20214F586
Person / Time
Site: Braidwood  
Issue date: 12/04/1986
From:
AFFILIATION NOT ASSIGNED
To:
AFFILIATION NOT ASSIGNED
References
OL-I-ROREM-272, NUDOCS 8705260165
Download: ML20214F586 (1)


Text

6C-&5lclVS'~bb

'hnM -- M y

s 9.......

I 2'71 gnFF NEEIING 6/27/84.=J,;5,0_R.M,. [

t JeWald/Worthington/Saklak/Seese

' 1)"

Irv - When did configuration Inspectors start Inspecting conduit strap, IW 13 A8 :48 Saklak says this came from Don Kaffe. Irv feels the engagement should inspected by the. Conduit Inspector. Rick states that this is the way Bossong was trained to Inspect while he was a line walker.

Irv will Oh*

talk to LKC Engineering.

Rick feels that the detail J. has just beenUO;

, '

  • J fJ

^'

changed on the drawing.

2) Raceway Status-Saklak Previous Problem - with the pan node walk down.

Many items inspected by Steve Scott however, no form 19 issued.

Irv says in this case Re-inspect.

E.C. Ernst items will be addressed on an NCR. Ken says 100% of Ernst Weld Inspections were overviewed by p.T.L Rick will turn information needed from P.T.L. over to Ken and he will follow thru. Irv suggests that Soberski assign raceway inspections to the paper-work match-up.

3) Rick points out that in the Rush for the {}uantity of Inspections, the Quality of paperwork has slipped.

Rick also reviews the negative aspects 1

of the cross training.

t t

4)

Review the Level III Welding Inspectors assignments. Irv to talk to Puckett and confirm his assignments.

5) Ridt has current people on the 426 elevation.

'Ihe office space if for Rick and leads. Ken Questions remodeling plans.

Sak has insufficient space.

6) Rick complains about getting ec:::pleted reworks completed without Installation Reports.
7) Rage Porter will be in ' thursday and Friday to work with Rod Simms on training.
8) Kan talks about the need for getting seen space (stand up cabinet) to lock up the Inspectors Personnal Belongings plus tools.
9) Saklak says that Mike Iachner is being forced to do Pat Foss's job.

Needs another means of cross reference.

I

10) Ken and Rick an: to work up a report for Irv showing where the Inspectors are assigned.
11) Kan wants Sumrow to Revise 4.8.12 to eliminating the problem with welder stamp.

12)

Irv wants Rick to bring his file cabinet in to the trailer.

s

13) Rick needs certs. for Stavens, Walker and Frey.

8705260165 861204 -

gonomis i

PDR ADOCK 05000456

^