ML20214E108

From kanterella
Jump to navigation Jump to search
Intervenor Exhibit I-ROREM-258,consisting of 840502 Memo Requesting Assurance in Writing That All Necessary Insps Complete Re Closed safety-related Reworks 014,015 & 018,per Plant Procedure 4.3.24
ML20214E108
Person / Time
Site: Braidwood  
Issue date: 12/04/1986
From: Seese L
COMSTOCK ENGINEERING, INC.
To: Saklak R
COMSTOCK ENGINEERING, INC.
References
84-05-02-10, 84-5-2-10, OL-I-ROREM-258, NUDOCS 8705210655
Download: ML20214E108 (1)


Text

_._ _- - - - -

jy~ Q WW h.

WE

&v o'(

(v Comstock Engineering, Inc. \\

,o

(

Memorandum

~87 MA'/ 13 A E 46} e c

hi g;. Braidwood To.

R. Saklak From:

L. G. Seese 5-2-84

Subject:

Completed Re-Works Date:

control No.

84-05-02-10 Today we received the first three (3) closed safety related re-works.

You will have to assure that all necessary inspections are complete and then advise me in writing so that I can close the Re-Work. The original copies of Re-Works 014, 015 and 018 will be held in the Vault until your action is complete. This action is required to comply with Braidwood Procedure 4.3.24.

Sincerely, m

C_

C A

L. G. Seese Asst. Quality Control Manager LCS/jf Attachments Re-Work 14, 15 and 18 cc: QC File - No attachments QC Manager File E N Q'liff.9. '

  • C WO lFAQ,..I,,(

,2..,,, b,,, g; 7d u m Q p.q..'-.c m:a we.

& A' MM n.orgoa,

-)

I'I 'I J'7','/1,,,T/ g g.,

,)

f.

7

~N *. f,.5 g 87052106SS 861204

[d,6 '//y"",' ' *... -.....

  • * ' ~ '

PDR ADOCK 05000456 G

PDR

,,,,,(y,,- ]g MRGGCS50

();i r (,'f,,,L,f m%W

~.10 ! ? * *.'. o Or s

_