Provides Clarifications Re Regulatory Basis for Requested Alternative Re Circumferential Shell Welds,Submitted to NRC,
ML20211F158
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/22/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9709300359
Download: ML20211F158 (2)


Text

- - - _ - _ _ _ - _ _ - _ - _ _ _ - _ _ - _ _ _ _ _ - - - _ - - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

Station Support Department

. - b,

' W 10 CFR 50.5Sa PECO NUCLEAR nmemc-,

A Unit of PECO Energ- II LI9 September 22,1997 Docket No. 50-278 License No. DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Center Washington, DC 20555

Subject:

Peach Bottom Atomic Pvwer Station, Unit 3 Proposed Alternative in Accordance with 10CFR50.55a(a)(3)(i)

References:

1. Letter from G. A Hunger, Jr. (PECO Energy Company) to U. S.

~

Nuclear Regulatory Commission (USNRC), dated January 30, 1997

2. Letter from J. W. Shea (USNRC) to G. A Hunger, Jr. (PECO Energy Company), dated March 26,1997
3. Letter from G. A Hunger, Jr. (PECO Energy Company) to USNRC, dated April 29,1997
4. Letter from J. F. Stolz (USNRC) to G. A Hunger, Jr. (PECO Energy Company), dated July 2,1997
5. Letter from G. A Hunger, Jr. (PECO Energy Company) to USNRC, dated September 4,1997

Dear Sir:

The purpose of this letter is to provide clarifications regarding the regulatory basis /j/

for the requested alternative coriceming circumferential shell welds which was r submitted to the U. S. Nuclesr Regulatory Commission (USNRC) in the Reference 5 ,O letter. As discussed in the Reference 4 letter, PECO Energy Company (PECO Energy) received approval for an alternative plan for the examination of the Peach Bottom Atomic Power Station (PBAPS), Unit 3 Reactor Pressure Vessel (RPV) shell welds. In the Referenca 5 letter, PECO Energy requested approval /fpd/

t of an additional Reactor Pressure Vessel (RPV) alternative weld examination plan for PBAPS, Unit 3 in accordance with 10CFR50.55a(a)(3)(i), pursuant to the provisions of 10 CFR 50.55a(g)(6)(ii)(A)(5), for the next two operating cycles.

5 C 0.105 9709300359 DR 970922 ADOCK 0500 8 gg ,

, ll

September 22,1997 Page 2 This request was consistent with the information contained in Information Notice (IN) G7-63, " Status of NRC Staff's Review of BWRVIP-05."

PECO Energy will be performing an examination of the reactor vessel longitudinal shell welds to the maximum extent practical from the inner diameter, within the constraints of vessel internal restrictions. The extent of weld examination coverage anticipated for the longitudinal shell welds is identified on Table 1 of Reference 3, as approved in the Reference 4 letter. It should be noted that our current examination plan is designed to provide longitudinal weld coverage, however, incidental coverage will result in an estimated portion of 2-3 percent of the intersecting horizontal weli These proposed examinations are an alteniative to the augmented examinations specified in 10 CFR 50.55a(g)(6)(ii)(A)(2) for circumferential welds, and an alternative to the inservice inspection requirements for circumferential welds in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI,1980 tidition through Winter 1981 Addenda (Table IWB-2500-1, Exa,nination Category B-A, item No. B1.11).

If you have any questions, please contact us.

Very truly yours,

.d. M A.

G. A. Hunger, .,

b Director-Licensing Attachment cc: H. J. Miller, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident inspector, PBAPS